| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 31, 2013 | | {{#Wiki_filter:May 31, 2013 |
|
| |
|
| Mr. Richard Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
| | ==SUBJECT:== |
| | | DUANE ARNOLD ENERGY CENTER NRC INITIAL LICENSE EXAMINATION REPORT 05000331/2013301 |
| SUBJECT: DUANE ARNOLD ENERGY CENTER NRC INITIAL LICENSE EXAMINATION REPORT 05000331/2013301 | |
|
| |
|
| ==Dear Mr. Anderson:== | | ==Dear Mr. Anderson:== |
Line 37: |
Line 36: |
| Operations Branch | | Operations Branch |
|
| |
|
| Division of Reactor Safety Docket No. 50 | | Division of Reactor Safety Docket No. 50-331 License No. DPR-49 |
| -331 License No. DPR-49 | |
|
| |
|
| Enclosures: 1. Operator Licensing Examination Report 05000331/2013301 w/Attachment: Supplemental Information 2. Simulation Facility Report cc w/encls: Distribution via ListServŽ Mr. William Simmons, Training Manager | | ===Enclosures:=== |
| | 1. Operator Licensing Examination Report 05000331/2013301 w/Attachment: Supplemental Information 2. Simulation Facility Report |
|
| |
|
| Enclosure 1 U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-331 License No: DPR-49 Report No: 05000331/2013301 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, IA Dates: April 8 - 25, 2013 Inspectors: B. Palagi, Senior Operations Engineer - Chief Examiner N. Valos, Senior Reactor Analyst - Examiner R. Baker, Operations Engineer - Examiner
| | REGION III Docket No: 50-331 License No: DPR-49 Report No: 05000331/2013301 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, IA Dates: April 8 - 25, 2013 Inspectors: B. Palagi, Senior Operations Engineer - Chief Examiner N. Valos, Senior Reactor Analyst - Examiner R. Baker, Operations Engineer - Examiner |
|
| |
|
| Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety | | Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety |
Line 126: |
Line 125: |
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| The following is a partial list of documents reviewed during the inspection. | | The following is a partial list of documents reviewed during the inspection. |
| : Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort. | | : Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that |
| : Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
| |
| : AR 01811771; Violation of TDAP 1836 NRC Exam Security Requirements;
| |
| : October 10, 2012
| |
| : Attachment
| |
| ==LIST OF ACRONYMS==
| |
| : [[USED]] [[]]
| |
| : [[ADAMS]] [[Agencywide Document Access and Management System]]
| |
| : [[AR]] [[Action Request]]
| |
| : [[DRS]] [[Division of Reactor Safety]]
| |
| : [[JPM]] [[Job Performance Measure]]
| |
| : [[NRC]] [[]]
| |
| : [[U.S.]] [[Nuclear Regulatory Commission]]
| |
| : [[PARS]] [[Publicly Available Records System]]
| |
| : [[RO]] [[Reactor Operator]]
| |
| SRO Senior Reactor Operator
| |
| SIMULATION FACILITY REPORT Facility Licensee: Duane Arnold Energy Center Facility Docket No: 50
| |
| -331 Operating Tests Administered: April 8 - 12, 2013 The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection
| |
| findings and are not, without further verification and review, indicative of non-compliance with
| |
| : [[10 CFR]] [[55.45(b). These observations do not affect]]
| |
| NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations. No licensee action is required in response to these observations. During the conduct of the simulator portion of the operating tests, the following items were
| |
| observed:
| |
| : [[ITEM]] [[]]
| |
| DESCRIPTION
| |
| None None
| |
| R. Anderson -2-
| |
| | |
| System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at
| |
| http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
| Sincerely, /RA/ By R. K. Walton Acting For/ Hironori Peterson, Chief
| |
| | |
| Operations Branch
| |
| Division of Reactor Safety
| |
| Docket No. 50
| |
| -331 License No. DPR-49
| |
| Enclosures:
| |
| 1. Operator Licensing Examination Report 05000331/2013301 w/Attachment: Supplemental Information 2. Simulation Facility Report cc w/encls: Distribution via ListServŽ Mr. William Simmons, Training Manager
| |
| | |
| DISTRIBUTION w/encls: Doug Huyck
| |
| | |
| RidsNrrDorlLpl3-1 Resource
| |
| RidsNrrPMDuaneArnold Resource
| |
| RidsNrrDirsIrib Resource
| |
| Chuck Casto
| |
| Cynthia Pederson
| |
| Steven Orth
| |
| | |
| Allan Barker
| |
| Carole Ariano
| |
| Linda Linn
| |
| : [[DRPIII]] [[]]
| |
| DRSIII Patricia Buckley Tammy Tomczak
| |
| | |
| John McHale,
| |
| : [[NRR]] [[Janet Kweiser,]]
| |
| : [[DRS]] [[DOCUMENT NAME:]]
| |
| : [[DUA]] [[2013 301]]
| |
| : [[RDB.]] [[docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy]]
| |
| : [[OFFICE]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[NAME]] [[RBaker:cs RKWalton for HPeterson]]
| |
| : [[DATE]] [[05/31/13 05/31/13]]
| |
| : [[OFFICI]] [[AL]]
| |
| : [[RECORD]] [[]]
| |
| : [[COPY]] [[]]
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) 2024-09-04
[Table view] Category:License-Operator
MONTHYEARIR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 ML22143A9352019-05-16016 May 2019 2019 DAEC Ile ES-201-1 ML22143A9382019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-201-3 ML22143A9392019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-301-7 ML22143A9412019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-4 ML22143A9422019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-9 ML22143A9432019-05-16016 May 2019 DAEC 2019 Outline Comments NG-19-0058, 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification2019-04-26026 April 2019 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification NG-19-0057, 2019 DAEC Initial License Examination Post Exam Submittal Letter2019-04-19019 April 2019 2019 DAEC Initial License Examination Post Exam Submittal Letter ML22143A9992019-04-0808 April 2019 2019 DAEC Ile Administered Admin JPMs ML22143B0002019-04-0808 April 2019 2019 DAEC Ile Administered Sim and Inplant JPMs ML22143B0012019-04-0808 April 2019 2019 DAEC Ile Scenarios ML22143B0022019-04-0808 April 2019 2019 Deac Ile Administered Written Exam ML22143B0032019-04-0808 April 2019 RO and SRO Exam Reference Handouts ML19087A3022019-03-28028 March 2019 Operator Licensing Examination Approval (Cdz) ML22144A0672019-02-22022 February 2019 2019 DAEC Ile Proposed RO and SRO Admin JPMs ML22144A0692019-02-22022 February 2019 2019 DAEC Ile Proposed Sim and Inplant JPMs ML22144A0712019-02-22022 February 2019 2019 DAEC Ile Proposed Scenarios ML22144A0732019-02-22022 February 2019 2019 DAEC Ile Proposed Written Exam ML22144A0742019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-3 ML22144A0752019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-4 ML22144A0762019-02-22022 February 2019 2019 Duane Arnold Initial License Exam Form ES-301-6 ML22144A0792019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-401-6 ML22145A4392019-01-23023 January 2019 2019 DAEC Initial License Examination Submittal Letter ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML22143B0042018-12-21021 December 2018 2019 DAEC Ile ES-201-2 ML22143B0052018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-1 ML22143B0062018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-2 ML22143B0072018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-5 ML22143B0082018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-401-1 and 401-3 ML22143B0092018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-D1 ML22143B0102018-11-12012 November 2018 2019 DAEC Ile Outline Submittal Letter NG-18-0089, Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)2018-07-25025 July 2018 Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02) ML18099A2622018-04-0909 April 2018 Gfes Results-March 2018, Duane Arnold Energy Center (Cover Letter Only) ML18086B0662018-03-27027 March 2018 Facility Cover Letter - Riii - March 2018 - GFE ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III IR 05000331/20173012017-07-14014 July 2017 NRC Initial License Examination Report 05000331/2017301 (Meb) ML17214A0272017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam ES-401-6 ML17214A0282017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Admin RO-SRO JPMs ML17214A0342017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Operating JPMs ML17214A0362017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Scenarios 1-2-3-Alt ML17214A0382017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam RO Written Examination ML17214A0502017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam SRO Written Examination ML17214A2142017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Scenarios ML17214A2322017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Operating Sim and IP JPMs ML17214A2592017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO-SRO Admin JPMs ML17214A2952017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO Written Examination ML17214A3072017-06-14014 June 2017 Dua 2017 Ile - Administered Exam SRO Written Examination ML17214A3502017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Written Examination Handouts ML17214A4012017-06-14014 June 2017 Dua 2017 Ile Administrative Files ES-401-4 2019-06-18
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
May 31, 2013
SUBJECT:
DUANE ARNOLD ENERGY CENTER NRC INITIAL LICENSE EXAMINATION REPORT 05000331/2013301
Dear Mr. Anderson:
On April 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Duane Arnold Energy Center (DAEC). The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on April 12, 2013, with Mr. G. Pry, Plant General Manager, and other members of your staff. An exit meeting was conducted by telephone on April 25, 2013, between you and Mr. B. Palagi, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicants.
The NRC confirmed the station submitted documentation noting that there were no post-examination comments for consideration during NRC grading of the examination. The NRC examiners administered an initial license examination operating test during the week of April 8, 2013. The written examination was administered by DAEC training department personnel on April 16, 2013. Six Senior Reactor Operator (SRO) and three Reactor Operator (RO) applicants were administered license examinations. The results of the examinations were finalized on May 16, 2013. All nine applicants passed all sections of their respective examinations. Six applicants were issued Senior Operator licenses and three were issued Operator Licenses. The written examination will be withheld from public disclosure for 24 months per your request. In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be ava ilable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ By R. K. Walton Acting For/
Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety Docket No. 50-331 License No. DPR-49
Enclosures:
1. Operator Licensing Examination Report 05000331/2013301 w/Attachment: Supplemental Information 2. Simulation Facility Report
REGION III Docket No: 50-331 License No: DPR-49 Report No: 05000331/2013301 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, IA Dates: April 8 - 25, 2013 Inspectors: B. Palagi, Senior Operations Engineer - Chief Examiner N. Valos, Senior Reactor Analyst - Examiner R. Baker, Operations Engineer - Examiner
Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety
1 Enclosure 1
SUMMARY OF FINDINGS
ER 05000331/2013301; 04/08/2013 - 04/25/2013; NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Initial License Examination Report. The announced initial operator licensing examination was conducted by regional U.S. Nuclear
Regulatory Commission examiners in accordance with the guidance of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9-Supplement 1. Examination Summary Nine of nine applicants passed all sections of their respective examinations. Six applicants were issued Senior Operator licenses and three applicants were issued Operator licenses. (Section 4OA5.1)
1
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The NRC examiners and members of the facility licensee's staff used the guidance prescribed in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9-Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensee's staff prepared
the outline and developed the written ex amination and operating test. The NRC examiners validated the proposed examination during the week of March 18, 2013, with the assistance of members of the facility licensee's staff. During the on-site validation week, the examiners audited two license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job per formance measures (JPMs) and dynamic simulator scenarios, during the period of April 8, 2013 through April 12, 2013. The facility licensee administered the written examination on April 16, 2013.
b. Findings
- (1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement. All changes made to the proposed examination, were made in a ccordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and documented on Form ES-401-9, "Written Examination Review Worksheet," which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). On April 24, 2013, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiners when grading the written examination.
The NRC examiners graded the written examination on April 24, 2013, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
- (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Changes made to the operating test, documented in a document titled, "Operating Test Comments," as well as the final as-administered dynamic simulator scenarios and JPMs, are available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS).
The NRC examiners completed operating test grading on May 11, 2013.
- (3) Examination Results Six applicants at the Senior Reactor Operator (SRO) level and three applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. Nine applicants passed all portions of their examinations and were issued their respective operating licenses.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, "Integrity of Examinations and Tests." The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," to determine acceptability of the licensee's examination security activities.
b. Findings
No significant findings were identified. However, one minor incident was identified by the licensee prior to exam validation and administration. The event involved one person who was signed on to the exam security agreement who had training contact with an initial license training student. This is contrary to the licensee's training department procedure, TDAP 1836, "NRC Exam Security Requirements," which prohibits providing instruction where examinees are in attendance. The training module presented was reviewed by the licensee, verified to not contain any objectives from the Licensed Operator training program, and the issue was discussed with the individuals involved and station management. No examination material compromise resulted. The event
was disclosed, discussed with the NRC Ch ief Examiner, and documented in Action Request (AR) 01811771.
The above event was entered into the facility licensee's Corrective Action Program and actions were initiated to prevent reoccurrence.
4OA6 Management Meetings
.1 Debrief The Chief Examiner presented the examination team's preliminary observations on April 12, 2013, to G. Pry, Plant General Manager, and other members of the Duane Arnold Energy Center Operations and Training Department staff.
.2 Exit Meeting The chief examiner conducted an exit meeting on April 25, 2013, with Mr. R. Anderson, Site Vice President, by telephone.
The NRC's final disposition of the station's post-examination comments were disclosed and discussed with Mr. Anderson during the telephone discussion. The examiners asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- R. Anderson, Site Vice President
- G. Rushworth, Operations Manager
- T. Byrne, Acting Licensing Manager
- G. Pry, Plant General Manager
- W. Simmons, Training Manager
- E. Murray, Exam Project Manager
- T. Erger, Assistant Operations Manager-Training
- J. Morris, Operations Instructor
- S. Vick, Operations Instructor
- M. Walter, Operations Instructor
NRC
- L. Haeg, Senior Resident Inspector
- B. Palagi, Senior Operations Engineer - Chief Examiner
- N. Valos, Senior Reactor Analyst - Examiner
- R. Baker, Operations Engineer - Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a partial list of documents reviewed during the inspection.
- Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that