| ==References:== | | ==References:== |
|
| |
|
| (1) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2012-130), "Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications," Accession No. ML 12262A290, September 14, 2012.(2) L. Raghavan (NRC) to J. H. Goldberg (FPL), "Issuance of Amendment No. 154 to Facility Operating License DPR-31 Turkey Point Unit 3 for Remainder of Cycle 13 (TAC No.M86203)," June 15, 1993.(3) L. Raghavan (NRC) to J. H. Goldberg (FPL), "Administrative Correction to Amendment No.154 to Facility Operating License DPR-31 Turkey Point Unit 3 (TAC No. M86203), June 23, 1993.On September 14, 2012, in accordance with the provisions of 10 CFR 50.90, Florida Power &Light Company (FPL) requested to amend Renewed Facility Operating Licenses (OL)DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specification (TS)(Reference 1). Administrative License Amendment Request (LAR) No. 217 will (1) close and remove license conditions that have been fully satisfied, (2) revise TS 5.5.1 to remove related license conditions, (3) correct several inadvertent errors identified in the TS, and (4) update the reference to the Physical Security Plan (PSP) to the latest approved revision in the related license conditions. | | (1) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2012-130), "Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications," Accession No. ML12262A290, September 14, 2012.(2) L. Raghavan (NRC) to J. H. Goldberg (FPL), "Issuance of Amendment No. 154 to Facility Operating License DPR-31 Turkey Point Unit 3 for Remainder of Cycle 13 (TAC No.M86203)," June 15, 1993.(3) L. Raghavan (NRC) to J. H. Goldberg (FPL), "Administrative Correction to Amendment No.154 to Facility Operating License DPR-31 Turkey Point Unit 3 (TAC No. M86203), June 23, 1993.On September 14, 2012, in accordance with the provisions of 10 CFR 50.90, Florida Power &Light Company (FPL) requested to amend Renewed Facility Operating Licenses (OL)DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specification (TS)(Reference 1). Administrative License Amendment Request (LAR) No. 217 will (1) close and remove license conditions that have been fully satisfied, (2) revise TS 5.5.1 to remove related license conditions, (3) correct several inadvertent errors identified in the TS, and (4) update the reference to the Physical Security Plan (PSP) to the latest approved revision in the related license conditions. |
| During the review of Administrative LAR No. 217, NRC identified several discrepancies between the Turkey Point Units 3 and 4 TS pages and the NRC Turkey Point Unit 3 Current Facility Operating License DRP-31 Tech Specs (ML 052790649). | | During the review of Administrative LAR No. 217, NRC identified several discrepancies between the Turkey Point Units 3 and 4 TS pages and the NRC Turkey Point Unit 3 Current Facility Operating License DRP-31 Tech Specs (ML052790649). |
| On June 15, 1993, NRC issued Amendment No. 154 for Turkey Point Unit 3 to change the TS relating to the Movable In-core Detector System (Reference 2). Amendment No. 154 permitted continued power operation with the minimum number of movable in-core detector thimbles reduced from 38 to 25 thimbles and was applicable only for the remainder of Unit 3, Cycle 13 operation. | | On June 15, 1993, NRC issued Amendment No. 154 for Turkey Point Unit 3 to change the TS relating to the Movable In-core Detector System (Reference 2). Amendment No. 154 permitted continued power operation with the minimum number of movable in-core detector thimbles reduced from 38 to 25 thimbles and was applicable only for the remainder of Unit 3, Cycle 13 operation. |
| , On June 23, 1993, NRC issued an administrative correction to Amendment No. 154 (Reference 3). Since Turkey Point Units 3 and 4 have common TS and Amendment No. 154 was applicable to Unit 3 only, the TS pages approved by Amendment No. 154 were assigned new page numbers and the existing TS pages at that time were left in place since they were applicable to Unit 4 and to Unit, 3 after Cycle 13. Reference 2 stated that the Amendment No. 154 TS pages would Florida Power & Light Company 9760 SW 344 St., Florida City, FL 33035 Turkey Point Units 3 and 4 L-2013-294 Docket Nos. 50-250 and 50-251 Page 2 of 2 become void after Unit 3 Cycle 13 and should be removed from the TS at that time. FPL removed the Amendment No. 154 TS pages on April 26, 1994 after completion of Unit 3 Cycle 13.This supplement to Administrative LAR No. 217 requests deletion of the following Amendment No.154 obsolete pages from the Turkey Point Unit 3 TS (ML 052790649): | | , On June 23, 1993, NRC issued an administrative correction to Amendment No. 154 (Reference 3). Since Turkey Point Units 3 and 4 have common TS and Amendment No. 154 was applicable to Unit 3 only, the TS pages approved by Amendment No. 154 were assigned new page numbers and the existing TS pages at that time were left in place since they were applicable to Unit 4 and to Unit, 3 after Cycle 13. Reference 2 stated that the Amendment No. 154 TS pages would Florida Power & Light Company 9760 SW 344 St., Florida City, FL 33035 Turkey Point Units 3 and 4 L-2013-294 Docket Nos. 50-250 and 50-251 Page 2 of 2 become void after Unit 3 Cycle 13 and should be removed from the TS at that time. FPL removed the Amendment No. 154 TS pages on April 26, 1994 after completion of Unit 3 Cycle 13.This supplement to Administrative LAR No. 217 requests deletion of the following Amendment No.154 obsolete pages from the Turkey Point Unit 3 TS (ML052790649): |
| 3/4 2-6a 3/4 2-9a 3/4 2-1Oa 3/4 2-12a 3/4 3-40a Deletion of the obsolete pages is an administrative request since the referenced pages were only applicable to Unit 3 during Cycle 13. The proposed change does not impact the no significant hazards determination and environmental consideration provided in L-2012-130, Administrative LAR No. 217 (Reference 1).This letter contains no new commitments and no revisions to existing commitments. | | 3/4 2-6a 3/4 2-9a 3/4 2-1Oa 3/4 2-12a 3/4 3-40a Deletion of the obsolete pages is an administrative request since the referenced pages were only applicable to Unit 3 during Cycle 13. The proposed change does not impact the no significant hazards determination and environmental consideration provided in L-2012-130, Administrative LAR No. 217 (Reference 1).This letter contains no new commitments and no revisions to existing commitments. |
| In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.I declare under penalty of perjury that the foregoing is true and correct.Executed on October 23, 2013.Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health}} | | In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.I declare under penalty of perjury that the foregoing is true and correct.Executed on October 23, 2013.Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health}} |
Letter Sequence Supplement |
---|
TAC:MF0602, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML1022200222010-08-0505 August 2010 Fuel Storage Criticality Analysis Project stage: Request ML1105603352011-02-22022 February 2011 Supplement 1 to Fuel Storage Criticality Analysis Project stage: Request L-2011-401, License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 32011-09-22022 September 2011 License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 3 Project stage: Supplement L-2011-390, Supplement 2 to the Extended Power Uprate License Amendment Request No. 205 Regarding New and Spent Fuel Storage Requirements2011-11-0909 November 2011 Supplement 2 to the Extended Power Uprate License Amendment Request No. 205 Regarding New and Spent Fuel Storage Requirements Project stage: Supplement L-2011-541, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 2052011-12-22022 December 2011 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 Project stage: Request L-2012-050, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and New Fuel Storage Requirements2012-02-15015 February 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and New Fuel Storage Requirements Project stage: Request L-2012-081, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Spent Fuel Pool Storage Requirements2012-02-23023 February 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Spent Fuel Pool Storage Requirements Project stage: Request L-2012-130, Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2012-09-14014 September 2012 Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Request ML13077A0052013-03-15015 March 2013 NRR E-mail Capture - Turkey Point, Units 3 and 4-Acceptance Review Regarding License Amendment Request 217 Regarding Administrative Changes to the Technical Specifications Project stage: Acceptance Review ML13137A4602013-05-23023 May 2013 Request for Additional Information Regarding License Request No. 217 and Changes to Operating License Conditions and Technical Specifications Project stage: RAI L-2013-294, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2013-10-23023 October 2013 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Supplement L-2014-070, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2014-03-11011 March 2014 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Supplement ML13329A0922014-06-13013 June 2014 Issuance of Amendments Regarding Operating License Conditions and Technical Specifications Project stage: Approval L-2015-045, License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2015-02-18018 February 2015 License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request 2012-02-23
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] |
Text
October 23, 2013 L-2013-294 10 CFR 50.90 FPL.U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications
References:
(1) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2012-130), "Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications," Accession No. ML12262A290, September 14, 2012.(2) L. Raghavan (NRC) to J. H. Goldberg (FPL), "Issuance of Amendment No. 154 to Facility Operating License DPR-31 Turkey Point Unit 3 for Remainder of Cycle 13 (TAC No.M86203)," June 15, 1993.(3) L. Raghavan (NRC) to J. H. Goldberg (FPL), "Administrative Correction to Amendment No.154 to Facility Operating License DPR-31 Turkey Point Unit 3 (TAC No. M86203), June 23, 1993.On September 14, 2012, in accordance with the provisions of 10 CFR 50.90, Florida Power &Light Company (FPL) requested to amend Renewed Facility Operating Licenses (OL)DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specification (TS)(Reference 1). Administrative License Amendment Request (LAR) No. 217 will (1) close and remove license conditions that have been fully satisfied, (2) revise TS 5.5.1 to remove related license conditions, (3) correct several inadvertent errors identified in the TS, and (4) update the reference to the Physical Security Plan (PSP) to the latest approved revision in the related license conditions.
During the review of Administrative LAR No. 217, NRC identified several discrepancies between the Turkey Point Units 3 and 4 TS pages and the NRC Turkey Point Unit 3 Current Facility Operating License DRP-31 Tech Specs (ML052790649).
On June 15, 1993, NRC issued Amendment No. 154 for Turkey Point Unit 3 to change the TS relating to the Movable In-core Detector System (Reference 2). Amendment No. 154 permitted continued power operation with the minimum number of movable in-core detector thimbles reduced from 38 to 25 thimbles and was applicable only for the remainder of Unit 3, Cycle 13 operation.
, On June 23, 1993, NRC issued an administrative correction to Amendment No. 154 (Reference 3). Since Turkey Point Units 3 and 4 have common TS and Amendment No. 154 was applicable to Unit 3 only, the TS pages approved by Amendment No. 154 were assigned new page numbers and the existing TS pages at that time were left in place since they were applicable to Unit 4 and to Unit, 3 after Cycle 13. Reference 2 stated that the Amendment No. 154 TS pages would Florida Power & Light Company 9760 SW 344 St., Florida City, FL 33035 Turkey Point Units 3 and 4 L-2013-294 Docket Nos. 50-250 and 50-251 Page 2 of 2 become void after Unit 3 Cycle 13 and should be removed from the TS at that time. FPL removed the Amendment No. 154 TS pages on April 26, 1994 after completion of Unit 3 Cycle 13.This supplement to Administrative LAR No. 217 requests deletion of the following Amendment No.154 obsolete pages from the Turkey Point Unit 3 TS (ML052790649):
3/4 2-6a 3/4 2-9a 3/4 2-1Oa 3/4 2-12a 3/4 3-40a Deletion of the obsolete pages is an administrative request since the referenced pages were only applicable to Unit 3 during Cycle 13. The proposed change does not impact the no significant hazards determination and environmental consideration provided in L-2012-130, Administrative LAR No. 217 (Reference 1).This letter contains no new commitments and no revisions to existing commitments.
In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.I declare under penalty of perjury that the foregoing is true and correct.Executed on October 23, 2013.Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health