Line 3: |
Line 3: |
| | issue date = 07/26/2017 | | | issue date = 07/26/2017 |
| | title = Acceptance Review and Resource Estimate for Braidwood, Units 1 and 2, and Byron, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specifications | | | title = Acceptance Review and Resource Estimate for Braidwood, Units 1 and 2, and Byron, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specifications |
| | author name = Wiebe J S | | | author name = Wiebe J |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Sprengel R | | | addressee name = Sprengel R |
Revision as of 10:00, 19 June 2019
|
---|
Category:E-Mail
MONTHYEARML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML24030A0022024-01-30030 January 2024 NRR E-mail Capture - NRC Acceptance Review for Braidwood Station, Units 1 and 2, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML24039A0412024-01-30030 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Braidwood Request for Alternative (I4R-18) ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 2024-09-06
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Wednesday, July 26, 2017 3:31 PM To: Ryan Sprengel
Subject:
Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, Licens e Amendment Request to Revise Control Room Ventilation Temperature Control System Technical SpecificationRyan, By letter dated June 30, 2017 (Agencywide Document s Access and Management System (ADAMS) Accession No. ML17181A276), Exelon Generation Company, LLC (Exelon), submitted a license amendment request revise Technical Specification (TS) 3.7.11, "Control Room Ventilation (VC) Temperature Control System," to modify the TS Actions for two inoperable VC Temperature Control System trains. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is June, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me at (301) 415-6606.
Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier: NRR_PMDA Email Number: 3625 Mail Envelope Properties (Joel.Wiebe@nrc.gov20170726153100)
Subject:
Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification Sent Date: 7/26/2017 3:31:22 PM Received Date: 7/26/2017 3:31:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov
Recipients: "Ryan Sprengel" <ryan.sprengel@exeloncorp.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2771 7/26/2017 3:31:00 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: