| title = LER 1976-028-00 for St. Lucie Unit 1, Review of the Testing Proposed for Unit 2 Hydrogen Sampling System Isolation Valves Led to Examination of Purchase Order for the Identical Unit 1 Valves
| title = LER 1976-028-00 for St. Lucie Unit 1, Review of the Testing Proposed for Unit 2 Hydrogen Sampling System Isolation Valves Led to Examination of Purchase Order for the Identical Unit 1 Valves
| author name = Schmidt A D
| author name = Schmidt A
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
| addressee name = Moseley N C
| addressee name = Moseley N
| addressee affiliation = NRC/IE, NRC/RGN-II
| addressee affiliation = NRC/IE, NRC/RGN-II
| docket = 05000335, 05000389
| docket = 05000335, 05000389

Revision as of 10:40, 17 June 2019

LER 1976-028-00 for St. Lucie Unit 1, Review of the Testing Proposed for Unit 2 Hydrogen Sampling System Isolation Valves Led to Examination of Purchase Order for the Identical Unit 1 Valves
ML18113A434
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/18/1976
From: Schmidt A
Florida Power & Light Co
To: Moseley N
NRC/IE, NRC/RGN-II
References
PRN-LI-76-150 LER 1976-028-00
Download: ML18113A434 (12)


Text

r NRC FORM 195 U.S.NUCLEAR REGULATORV COMMISSION I2.1E)NRC DISTRIBUTION FoR PART 50 DOCKET'MATERIAL DOCKET NUMBER S-3 FILE NUMBER INCIDENT REPORT Mr Moseley@LETTER 0 ORIGINAL ,@COPV QNOTOR IZED II UN C LASS I F I E D~p PROP Florida~Pwr 6 Light Co giami, Fla A D Scfimidt.INPUT FORM DATE OF DOCUMENT 6-18-76 DATE RECEIVED 7 6 76 NUMSER OF COPIES RECEIVED no originals rec'd NA/8QN8/DESCRIPTION Ltr trans the, following:

ENCLOSURE S.i J I 1 Licensee Event Report (R08'76-28) on 6-4-76 concerning failure of hydrogen sampling sampling system isolat on valves.........

),~I Kt Lucie 81 1It~'~II i NOTE: IF PERSONNEL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J, COLLINS NCH CH EF'CYS FOR AC ON I LIC~ASST~'.H/CYS ACRS I CYS HQbBKR&fSE T TO LA FOR ACTION/INFORMATION 7 INTERNAL D IST RI BUTION NRC PDR IGE 2 SCHROEDER/IPPOLITO HOUSTON NOVAK CHECK GRIhIES CASE LE HANAUER TEDESCO hIACCARY EISENHUT BAER'HA'0 VOLLhIER/HUNCH EGER J COLLINS PDR~IC: S~EXTEIINAL DISTRIBUTION CONTROL NUMBER NIIC FOIIM IQS f2 161 r)h---c>.".ii (8S-i)Vi;05<)

aXOqO>.SII.~VS 99afIOOiZ gfl~lqfidl8 fI9'iqOl4gff

>0 9 XIII';61 QIIlfl I93IIOO~~~~.~~.~BOV I I'V LIOS:f GEO'.5 M33 elec.'fI~S QUG<.'

r E~.~P.O, IIOX 013100, NIIAMI, Ft.ORIDA 33101 FLORIOA FOVJFR&LIGHT COMPANY June 18, 1976 PRN-LI-7 6-15 0 Mr.Norman C.Moseley, Director, Region II Office of Inspection and, Enforcement U.S.Nuclear Regulatory Commission 230 Peachtree Street, N.N., Suite 818 Atlanta, Georgia 30303

Dear Mr.Moseley:

REPORTABLE OCCURRENCE 335-76-28 ST.LUCIE UNIT 1 DATE OP OCCURRENCE:

JUNE 4, 1976 C'YDROGEN SAMPLING SYSTEM ISOLATION VALVES The attached Licensee Event Report is being submitted in accordance with Technical Specificaiton 6.9 to provide prompt notification of the subject occurrence.

Very truly yours,>sr.D.Schmidt Vice President Power Resources.MAS/ao Attachment cc: Jack R.Newman, Esquire Director, Office of Inspection and Enforcement (40)'irector, Of f ice of Management Inf ormation and Program Control (3)iQg/~(~HELPING BUILD FLORIDA 0~~t

[oa~]89 r CONTROL SLOCK:~1 UCENSEE NAME, S L S 1 0 14 15 LICENSEE EVENT REPORT EVENT TYPE UCENSE TYPE UCENSE NUMBER 0 0 0 0 0-0 0 4 l.'1 1 1~01 25 26 30 31 32 (~BE PRINT ALL REQUIRED INFORMATION)

REPORT.REPORT CATEGORY TYPE SOURCE"rQO71 CON'T~T L.0 7 8'57.58.59 60 61 EVENT OESCRIPTION'g R'f the tes'tin'OCKET NUMBER EVENT GATE REPORT OATE 5 0-0 3 3 5 0 6 0 4 7 6 G 6 1 8 7 6 68 69 74 75.80 ro osed for Unit 2 h drogen sampling system*isola-7 8'9 80 t00$~tion valVOs led to an examination of the, purchase.order for the identical 7 8 9~04 1 valves Unit 1 FSAR Section 3.11 classifies these valves as 80 7 8 9 80 Qg'ronmental'ate or lA.'owever, it has been determined that the 7 8.9 80 Q~g Unit 1 valves have not been t*e tested for the proposed environment in 7 8 9 SYSTEM CAUSE COBE COOE COMPONENT COOE[OOTI~BE~A'A L V E 7 8 910 11 12 CAUSE OESCRIPTION Qg Unit 1 h dio en sam lin X A 17 43 COMPONENT MANUFACIU PER X 9 9 9 47 VQULTQN N s stem isolation valves were not tested-for 80 7 8 9 80 (oa>]ate or 1A environmental conditions in accordance with IEEE-323{1971)7 8 9 80'Qg because the re uirement to do so was not specified in the purchase order.OTHER STATUS N/A 7 8 9 LOSS OR OAMAGE TO FACILITY TYPE OESCR{PTION uz.7>>8 9~10 PUBLICITY 7 89 7 89 FACIUTY STATUS%POWER[111'B~05 0 7 8 9.10 12 13 FORM OF ACTIVITY C0ATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY[rig~z~z N/A 7'S.S 10 11 PERSONNEL EXPOSURES NUMBER TYPE OESCR{PTION

~s~oo o~z 7 8 9, 11 12 13 PERSONNEL INJURIES OESCR{PTION 7 8 9 11 12 PROBABLE CONSEQUENCES

  • t11g METHOO OF OISCOVERY~d 44-45 46 44 45 N/A N/A N/A N/A N/A OISCOVERY OESCRIPTION Purchase order review LOCATION OF RELEASE N/A 80 80 80.80 80 80 80'0 AOOITIONAL FACTORS~18 See page two (2)for continuation of Event Description., 7 8 9 Component Manufacturer

-Circle Seal Corporation 7 89 80 80 NAME'AN'HONE.

305/552-3779 CPO ddI r dd7 REPORTABLE OCCURANCE 335-76-28 LICENSEE EVENT REPORT PAGE'TWO Event Descri tion (Continued) accordance with'IEEE-323(1971) because the requirement to do so was not specified in the purchase order.As an interim corrective action, administrative guidelines have been written to inform appropriate personnel of the action to be taken if the valves wild not operate under post-accident conditions.

Operations personnel have been informed that they'hould actuate the hydrogen recombiners if a containment hydrogen sample cannot be taken.Based on FSAR hydrogen generation analysis for the existing pl'ant design, the operator has 45 days to actuate either hydrogen recombiner before the hydrogen concentration reaches 4%.An investigation of possible long-term corrective action is being conducted and a follow-up report will be submitted upon completion of the investigation.

This was the first occurrence of this type (335-76-28)-

P.O.BOX 013100, MIAMI, FLORIDA 33101 FLORIDA POWER&LIGHT COMPANY June 18, 1976 PRN-LI-76-150 Mr.Norman C.Moseley,,Director, Region II Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission 230 Peachtree Street, N.W., Suite 818 Atlanta, Georgia 30303

Dear Mr.Moseley:

REPORTABLE OCCURRENCE 335-76-28 ST.LUCIE UNIT 1 DATE OF OCCURRENCE:

JUNE 4, 1976 HYDROGEN SAMPLING SYSTEM ISOLATION VALVES The attached Licensee Event Report is being submitted in accordance with Technical Specificaiton 6.9 to provide prompt notification of the subject occurrence.

Very truly yours, D.Schmidt Vice President Power Resources ,MAS/ao Attachment CC Jack R.Newman, Esquire Director, Office of Inspection and Enforcement (40)Director, Office of Management Information and Program Control (3)HELPING BUILD FLORIDA

~~

4~'I[oaf 7 89 CONTROL BLOCK: UCENSEE NAMES L S 1 0 14 15 UCENSE NUMBER-O OOO O-0 LICENSEE EVENT REPORT RASE PRINT ALL REQUIRED INFDRMATIDN) 6 UCENSE EVENT TYPE TYPE 0 4 111 1~01 25 26 30 31 32 REPORT.AEPOAT CATEGORY TYPE SOURCE[001IcoN T~E L 0 7 8'57.58.59 60 61 OOCKET NUMBEA 5 0-0 3 3 5~EVENT OATE REPORT OATE 060476061876 69 74 75 80 EVENT OESCRIPTION QOg.R.w of the testin ro osed for.Unit 2 h drogen sampling system isola-7 8 9 80 I.tion valVhs led to an examination of the purchase:order for the identical 7 89 1 valves Unit 1 FSAR Section 3.11 classifies these'alves as 80 7 8 9 60 Qg'ronmental'ate or lA.'owever, it has been determined that the 7 8.9 80 IH'h 7 89 SYSTEM CAUSE COOE COO E COMPONENT COOE~SE~A V A L V E 7 8 9 10 11 12 CAUSE OESCRIPTION gg Unit 1 h dro en sam lin FAME COMPONENT SUPPLER X A 17'3 COMPONENT MANUFACTURER X 999 44 47 VQEATCIN N s stem isolation valves were not tested for 80 7 8 9 Qg ate or 1A environmental conditions in accordance with IEEE-323(1971) 80 7 8 9~80 ,Q~O because the re uirement to do so was not specified in the purchase order.OTHER STATUS N/A 7 89 LOSS OR OAMAGE TO FACILITY TYPE OESCAIPTION

~Z-7 89-10 PU8UCITY[iirJ 7 8 9 7 89 FACILIIY STATUS'%OWER~E~OZ O 7 8 9 10 12 13 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTNITY Q1g~Z.Z*N/A 7 8 9 10 11 PERSONNEL EXPOSURES NUMBER TYPE OESCRIPTION Qg~oo 0~z 7 89 11 12 13 PERSONNEL INJURIES OESCRIPTION

~4 0 0 7 8 9 11 12 PROBABLE CONSEQUENCES Qg METHOO OF OISCOVEAY DISCOVERY OESCAIPTION

~d Purchase order review 44 45 46 LOCATION OF RELEASE N/A 44 45 N/A N/A N/A N/A N/A 80 80 80 80 80 80 80~80 AOOITIONAL FACTORS~18 See page two (2)for continuation of Event Description.

7 89 Component Manufacturer

-Circle Seal Corporation 7 89 80'0 NAME'MAN PHONE.305/552-3779 dFO ddt 4 ddT

~~s e-

'I REPORTABLE OCCURANCE 335-76-28 LXCENSEE EVENT REPORT PAGE TWO Event Descri tion (Continued) accordance with'XEEE-323(1971) because.the requirement to do so was not'pecified in the purchase order.=As an interim corrective action, administrative guidelines have been written to inform appropriate personnel of the action to be taken if the valves will not operate under post-accident conditions.

Operations personnel have been informed that they'hould actuate the hydrogen recombiners if a containment hydrogen sample cannot be taken.Based on PSAR hydrogen generation analysis for the existing plant design, the operator has 45 days to actuate either hydiogen recombiner before the hydrogen concentration reaches 4%.An investigation of possible long-term corrective action is being conducted and a follow-up report will be submitted upon completion of the investigation.

~This was the first occurrence of this type (335-76-28)-