ML18155A431: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


==Reference:==
==Reference:==
: 1) NSPM letter, S. Northard to NRC Document Control Desk, "Changes to Technical Specification Bases," L-Pl-16-045, dated May 20, 2016 (ADAMS Accession No. ML 16161A372)
: 1) NSPM letter, S. Northard to NRC Document Control Desk, "Changes to Technical Specification Bases," L-Pl-16-045, dated May 20, 2016 (ADAMS Accession No. ML16161A372)
In accordance with TS 5.5.12, "Technical Specifications (TS) Bases Control Program", the Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, submits a compact disc (Enclosure
In accordance with TS 5.5.12, "Technical Specifications (TS) Bases Control Program", the Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, submits a compact disc (Enclosure
: 1) containing the TS Bases for the Prairie Island Nuclear Generating Plant, Units 1 and 2, that includes the changes to the bases from* Revisions 230 through 241 that have been implemented since the previous submittal (Reference 1 ).
: 1) containing the TS Bases for the Prairie Island Nuclear Generating Plant, Units 1 and 2, that includes the changes to the bases from* Revisions 230 through 241 that have been implemented since the previous submittal (Reference 1 ).

Revision as of 02:27, 17 June 2019

Changes to Technical Specification Bases
ML18155A431
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/18/2018
From: Sharp S
Northern States Power Company, Minnesota
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-Pl-18-030
Download: ML18155A431 (2)


Text

1717 Wakonade Drive Welch, MN 55089 (l Xcel Energy RESPONSIBLE BY NATURE 800.895.4999 xcelenergy.com May 18, 2018 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Changes to Technical Specification Bases L-Pl-18-030 TS 5.5.12.d

Reference:

1) NSPM letter, S. Northard to NRC Document Control Desk, "Changes to Technical Specification Bases," L-Pl-16-045, dated May 20, 2016 (ADAMS Accession No. ML16161A372)

In accordance with TS 5.5.12, "Technical Specifications (TS) Bases Control Program", the Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, submits a compact disc (Enclosure

1) containing the TS Bases for the Prairie Island Nuclear Generating Plant, Units 1 and 2, that includes the changes to the bases from* Revisions 230 through 241 that have been implemented since the previous submittal (Reference 1 ).
  • Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Please contact Mr. Richard. Loeffler, at 612-342-8981.

fo Scott Sharp Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Document Control Desk Page2 Enclosure (1) -Compact Disc cc: Administrator, Region Ill, USNRC Project Manager, Prairie lsiand, USNRC Resident Inspector, Prairie Island, USNRC