Line 9: |
Line 9: |
| | docket = 05000321, 05000366 | | | docket = 05000321, 05000366 |
| | license number = | | | license number = |
| | contact person = Lee B E, 301-415-2916, NRR/DLP | | | contact person = Lee B, 301-415-2916, NRR/DLP |
| | case reference number = EA-13-109 | | | case reference number = EA-13-109 |
| | document type = E-Mail | | | document type = E-Mail |
Revision as of 15:08, 14 June 2019
Letter Sequence Other |
---|
|
Results
Other: ML16099A260, ML17254A042, ML19045A491, NL-15-2121, Third Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109), NL-17-0778, Sixth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109), NL-18-0200, Unit 1, Completion of Required Action for NRC Order EA-13-109 Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, NL-18-1333, Completion of Required Action for NRC Order EA-13-109 Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
|
|
Similar Documents at Hatch |
---|
Category:E-Mail
MONTHYEARML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatchs RPV Head Studs LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) 2024-09-04
[Table view] |
Text
Component NameEquipment IDRangeLocation Local Event Temp Local Event Humidity Local Radiation Level Qualification Qualification Temp Qualification Humidity Qualification Radiation Power Supply Wetwell Vent Instruments and Components HCVS effluent strap-
on thermocouple1T48-N1500-400°FTorus Bay218°F50-100%1.39+E7 RADIEEE 344-19750-500°FNo electronics, not susceptible3.00E+08 RADNone required HCVS effluent
radiation monitor1T48-N1521E-1 to 1E+5 RAD/HR Torus Bay218°F50-100%1.39+E7 RADIEEE 344-1975 0-350°F 0-95%2.00E+08 RAD1R25
-S067 From: Auluck, Rajender To: Lee, Brian
- Heida, Bruce
- Wyman, Stephen
- Armstrong, Garry
- Roche, Kevin
- Scales, Kerby
- Parillo, John
Subject:
FW: Hatch HCVS FIP Follow-Up Date: Monday, January 28, 2019 3:49:18 PM From: Enfinger, Timothy Lee [1]
Sent: Monday, January 28, 2019 2:21 PM To: Auluck, Rajender <Rajender.Auluck@nrc.gov>
Subject:
[External_Sender] Hatch HCVS FIP Follow-Up Hello Raj, We have some supplemental information related to the Plant Hatch HCVS FIP for the staff's consideration.
Can you provide us a ballpark timeframe for when review may be complete?
Here is the supplemental information:
Action 1: Clarification on Manual Actions No follow-up after discussions regarding remote manual, with battery back-up, operation.
Action 2: Additional Information for Table 1 In regard to FIP Table 1, "List of HCVS Component, Control and Instrument Qualifications" additional information (in red text) for the HCVS effluent radiation monitor is
provided here.
Note that the local event temperature, local event humidity, and local radiation level are identical to those for the HCVS effluent strap-on thermocouple (applicable information repeated in table excerpt for convenience).
The qualification temperature, humidity, and radiation are from SNC Document S-77683 (now loaded in the ePortal).
The power supply is shown in the FIP, Attachment 3.
Action 3: Location of HCVS Batteries and Chargers This diagram indicates the location of the HCVS batteries and chargers.
Action 4: Confirmation Latest Revision of Specific Calculations/Evaluations are Provided on ePortal SMNH-13-013, Sizing of Accumulator Tanks for Reliable Hardened Containment Vent System for Unit 2, is Version 1.0. Confirmed Version 1.0 is on ePortal.SMNH-13-019, Sizing of Nitrogen Bottles for Reliable Hardened Containment Vent System, is Version 1.0. Confirmed Version 1.0 is on ePortal.
A-47400, FLEX Portable System Pump Sizing Evaluations for Hatch Units 1 and 2 Core Cooling Phase 2, is Version 2.0. Confirmed Version 2.0 is on
ePortal.
Respectfully, Tim Enfinger Senior Licensing Engineer Southern Nuclear 3535 Colonnade Parkway Bin N-274-EC Birmingham, AL 35243 Tel 205.992.7924 Email tlenfing@southernco.com southernnuclear.com