ML19045A491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000321, 05000366
| docket = 05000321, 05000366
| license number =  
| license number =  
| contact person = Lee B E, 301-415-2916, NRR/DLP
| contact person = Lee B, 301-415-2916, NRR/DLP
| case reference number = EA-13-109
| case reference number = EA-13-109
| document type = E-Mail
| document type = E-Mail

Revision as of 15:08, 14 June 2019

(EA-13-109) HCVS FIP Follow-Up
ML19045A491
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/28/2019
From: Enfinger T
Southern Nuclear Operating Co
To: Rajender Auluck
Division of Licensing Projects
Lee B, 301-415-2916, NRR/DLP
References
EA-13-109
Download: ML19045A491 (2)


Text

Component NameEquipment IDRangeLocation Local Event Temp Local Event Humidity Local Radiation Level Qualification Qualification Temp Qualification Humidity Qualification Radiation Power Supply Wetwell Vent Instruments and Components HCVS effluent strap-

on thermocouple1T48-N1500-400°FTorus Bay218°F50-100%1.39+E7 RADIEEE 344-19750-500°FNo electronics, not susceptible3.00E+08 RADNone required HCVS effluent

radiation monitor1T48-N1521E-1 to 1E+5 RAD/HR Torus Bay218°F50-100%1.39+E7 RADIEEE 344-1975 0-350°F 0-95%2.00E+08 RAD1R25

-S067 From: Auluck, Rajender To: Lee, Brian

Heida, Bruce
Wyman, Stephen
Armstrong, Garry
Roche, Kevin
Scales, Kerby
Parillo, John

Subject:

FW: Hatch HCVS FIP Follow-Up Date: Monday, January 28, 2019 3:49:18 PM From: Enfinger, Timothy Lee [1]

Sent: Monday, January 28, 2019 2:21 PM To: Auluck, Rajender <Rajender.Auluck@nrc.gov>

Subject:

[External_Sender] Hatch HCVS FIP Follow-Up Hello Raj, We have some supplemental information related to the Plant Hatch HCVS FIP for the staff's consideration.

Can you provide us a ballpark timeframe for when review may be complete?

Here is the supplemental information:

Action 1: Clarification on Manual Actions No follow-up after discussions regarding remote manual, with battery back-up, operation.

Action 2: Additional Information for Table 1 In regard to FIP Table 1, "List of HCVS Component, Control and Instrument Qualifications" additional information (in red text) for the HCVS effluent radiation monitor is

provided here.

Note that the local event temperature, local event humidity, and local radiation level are identical to those for the HCVS effluent strap-on thermocouple (applicable information repeated in table excerpt for convenience).

The qualification temperature, humidity, and radiation are from SNC Document S-77683 (now loaded in the ePortal).

The power supply is shown in the FIP, Attachment 3.

Action 3: Location of HCVS Batteries and Chargers This diagram indicates the location of the HCVS batteries and chargers.

Action 4: Confirmation Latest Revision of Specific Calculations/Evaluations are Provided on ePortal SMNH-13-013, Sizing of Accumulator Tanks for Reliable Hardened Containment Vent System for Unit 2, is Version 1.0. Confirmed Version 1.0 is on ePortal.SMNH-13-019, Sizing of Nitrogen Bottles for Reliable Hardened Containment Vent System, is Version 1.0. Confirmed Version 1.0 is on ePortal.

A-47400, FLEX Portable System Pump Sizing Evaluations for Hatch Units 1 and 2 Core Cooling Phase 2, is Version 2.0. Confirmed Version 2.0 is on

ePortal.

Respectfully, Tim Enfinger Senior Licensing Engineer Southern Nuclear 3535 Colonnade Parkway Bin N-274-EC Birmingham, AL 35243 Tel 205.992.7924 Email tlenfing@southernco.com southernnuclear.com