ML120100562: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 87: | Line 87: | ||
" trip.If a LOOP is in progress, the operators would transition from EOP-1.0 to EOP-8.0 LOSS OF OFFSITE POWER/NATURAL CIRCULATION RECOVERY.EOP-8.0 safety function status checks require 3 of 4 preferred AC busses to be energized.So if only one is not energized , the function is met and NO corrective action is directed.If the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0, Functional Recovery Procedure, and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized. | " trip.If a LOOP is in progress, the operators would transition from EOP-1.0 to EOP-8.0 LOSS OF OFFSITE POWER/NATURAL CIRCULATION RECOVERY.EOP-8.0 safety function status checks require 3 of 4 preferred AC busses to be energized.So if only one is not energized , the function is met and NO corrective action is directed.If the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0, Functional Recovery Procedure, and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized. | ||
If less than 3 are available, step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, or 4 as applicable. | If less than 3 are available, step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, or 4 as applicable. | ||
In summary, for loss of 1 preferred bus with any other single event in progress procedures do not direct any action being taken with exception of annunciator response procedure ARP-3.16 I EPRI HRA Calculator 4.0 Manpower Requirements: | In summary, for loss of 1 preferred bus with any other single event in progress procedures do not direct any action being taken with exception of annunciator response procedure ARP-3.16 I EPRI HRA Calculator | ||
===4.0 Manpower=== | |||
Requirements: | |||
1/5/20121/5/2012 O p erations: Shift Mana g er 1 0 Shift Su p ervisor: 1 1 STA: 1 1 Reactor o p erators: 2 1 Plant o p erators: 4 2 Maintenance | 1/5/20121/5/2012 O p erations: Shift Mana g er 1 0 Shift Su p ervisor: 1 1 STA: 1 1 Reactor o p erators: 2 1 Plant o p erators: 4 2 Maintenance | ||
: Mechanics: | : Mechanics: | ||
Line 98: | Line 101: | ||
Com p lexi ty of Res p onse: Co g nitive Sim le Execution Com p lex E q ui p ment Accessibilit | Com p lexi ty of Res p onse: Co g nitive Sim le Execution Com p lex E q ui p ment Accessibilit | ||
: Control Room Accessible Cable Spreading Room (AB 607'Accessible Stress: Moderate Plant Res p onse As Ex p ected: Yes Workload: Low Performance Sha p in g Factors: Ne g ative Performance Shaping Factor Notes: Because of the relatively long system window, the workload is not high.While the PSFs could be assigned as"negative" due to the emergency lighting in service for a LOOP case, operator interviews conducted in August 2009 confirmed that there is sufficient emergency lighting available for both access and execution. | : Control Room Accessible Cable Spreading Room (AB 607'Accessible Stress: Moderate Plant Res p onse As Ex p ected: Yes Workload: Low Performance Sha p in g Factors: Ne g ative Performance Shaping Factor Notes: Because of the relatively long system window, the workload is not high.While the PSFs could be assigned as"negative" due to the emergency lighting in service for a LOOP case, operator interviews conducted in August 2009 confirmed that there is sufficient emergency lighting available for both access and execution. | ||
The PSFs are therefore not assessed as negative.Additionally, a second AO would do peer checking on a"not to delay basis." However, there is more than sufficient time to complete this action as the SPAR execution ratio is 6.17 EPRI HRA Calculator 4.0 Timing | The PSFs are therefore not assessed as negative.Additionally, a second AO would do peer checking on a"not to delay basis." However, there is more than sufficient time to complete this action as the SPAR execution ratio is 6.17 EPRI HRA Calculator | ||
===4.0 Timing=== | |||
T S W 4.00 Hours T delay 60.00 Minutes I T11 0.00 Minutes Cue t=0 T H 30.00 Minutes 1/5/20121/5/2012 Irreversible DamageState Timing Analysis: The system window is based on battery depletion time.As given in the EOP-3.0 basis document (rev 11)[47], the battery depletion time is 4 hours per DBD Chapter 4.01, Section 3.2.2, and FSAR Chapter 8.According to an OPS estimate, it will take the operators 20 minutes to complete EOP-1.0.For a LOOP event, the crew will then transition to EOP-8.0 LOSS OF OFFSITE POWER/NATURAL CIRCULATION RECOVERY.EOP-8.0 safety function status checks require 3 of 4 preferred AC busses to be energized. | |||
If the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0 Functional Recovery Procedure and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized. | If the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0 Functional Recovery Procedure and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized. | ||
If less than 3 are available, contingency action step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, 4 as applicable. | If less than 3 are available, contingency action step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, 4 as applicable. | ||
Reaching this step is expected to take another 40 minutes per OPS estimates (08/26/09). | Reaching this step is expected to take another 40 minutes per OPS estimates (08/26/09). | ||
Therefore, the time to reach the direction for this action is expected to take a total of 60 minutes.(Tdelay)The manipulation time estimate for this action is 30 minutes.(OPS estimate 08/26/09)Time available for recovery: 150.00 Minutes SPAR-H Available time (cognitive): 150.00 Minutes SPAR-H Available time (execution)ratio: 6.00 Minimum level of dependence for recovery: ZD 18 I EPRI HRA Calculator 4.0 Cognitive Unrecovered ACP-CBOB-BYREG-2 Table 3: ACP-CBOB-BYREG-2 COGNITIVE UNRECOVERED Pc Failure Mechanism Branch HEP Pca: Availabilit y of Information a ne g.Pcb: Failure of Attention a ne g.Pc,,: Misread/miscommunicate data a ne g.Pcd: Information misleadin g a ne g.Pce: Ski p a ste p in p rocedure 6.0e-03 Pcf: Misinter p ret instruction a ne g.Pc: Misinter p ret decision lo g ic c 6.0e-03 Pch: Deliberate violation a ne g.Sum of PCa throu g h PCh=Initial Pc=1.2e-02 1/5/20121/5/2012 19 EPRI HRA Calculator 4.0 pca: Availability of information Indication Avail in CR Indication Warning/Aitemate Training on CR Accurate in Procedure Indicators | Therefore, the time to reach the direction for this action is expected to take a total of 60 minutes.(Tdelay)The manipulation time estimate for this action is 30 minutes.(OPS estimate 08/26/09)Time available for recovery: 150.00 Minutes SPAR-H Available time (cognitive): 150.00 Minutes SPAR-H Available time (execution)ratio: 6.00 Minimum level of dependence for recovery: ZD 18 I EPRI HRA Calculator | ||
===4.0 Cognitive=== | |||
Unrecovered ACP-CBOB-BYREG-2 Table 3: ACP-CBOB-BYREG-2 COGNITIVE UNRECOVERED Pc Failure Mechanism Branch HEP Pca: Availabilit y of Information a ne g.Pcb: Failure of Attention a ne g.Pc,,: Misread/miscommunicate data a ne g.Pcd: Information misleadin g a ne g.Pce: Ski p a ste p in p rocedure 6.0e-03 Pcf: Misinter p ret instruction a ne g.Pc: Misinter p ret decision lo g ic c 6.0e-03 Pch: Deliberate violation a ne g.Sum of PCa throu g h PCh=Initial Pc=1.2e-02 1/5/20121/5/2012 19 EPRI HRA Calculator 4.0 pca: Availability of information Indication Avail in CR Indication Warning/Aitemate Training on CR Accurate in Procedure Indicators | |||
------------- | ------------- | ||
1.Oe-01 (a)neg.--O.Oe+00 (b)neg.1.0e+00 6.Oe+00 Me-01 (c)neg.3.0e-03 (d)1.5e-03 Yes 5.0e-01 1.Oe+No 1.Oe-0 1 (e)5.0e-02 1.0e+00 (f)5.0e-01 1.Oe+00 1.0e+00 (g)O.Oe+00 1/5/20121/5/2012 Preferred AC bus indications are available in the CR and they are accurate.The operators have been trained on all CR indications. | 1.Oe-01 (a)neg.--O.Oe+00 (b)neg.1.0e+00 6.Oe+00 Me-01 (c)neg.3.0e-03 (d)1.5e-03 Yes 5.0e-01 1.Oe+No 1.Oe-0 1 (e)5.0e-02 1.0e+00 (f)5.0e-01 1.Oe+00 1.0e+00 (g)O.Oe+00 1/5/20121/5/2012 Preferred AC bus indications are available in the CR and they are accurate.The operators have been trained on all CR indications. | ||
Line 112: | Line 121: | ||
The operators have practiced loss of preferred AC bus restoration actions in the simulator. | The operators have practiced loss of preferred AC bus restoration actions in the simulator. | ||
pch: Deliberate violation Belief in Adequacy Adverse Reasonable Policy of of Instruction Consequence if Alternatives"Verbatim" O.Oe+00-----------(a)neg.Yes O.Oe+00 (b)5.0e-01 No O.Oe+00 (c)1.0e+00 O.Oe+00 O.Oe+00 O.Oe+00 O.Oe+00 (d)neg.0.0e+00 (e)neg.The Palisades operators believe in the adequacy of their instruction. | pch: Deliberate violation Belief in Adequacy Adverse Reasonable Policy of of Instruction Consequence if Alternatives"Verbatim" O.Oe+00-----------(a)neg.Yes O.Oe+00 (b)5.0e-01 No O.Oe+00 (c)1.0e+00 O.Oe+00 O.Oe+00 O.Oe+00 O.Oe+00 (d)neg.0.0e+00 (e)neg.The Palisades operators believe in the adequacy of their instruction. | ||
22 EPRI HRA Calculator 4.0 Cognitive Recovery ACP-CBOB-BYREG-2 Table 4: ACP-CBOB-BYREG-2 COGNITIVE RECOVERY 1/5/20121/5/2012 Initial HEP a>Wa)3: Luc)<U)a)>!E CU o LL 0^>wa)"-0 co=?of Final Value Pca: ne g.----1.0e+00 Pcb: ne g.------1.0e+00 Pcc: ne g.------1.0e+00 Pcd: ne g.------1.0e+00 Pce: 6.0e-03 X X---5.0e-02 3.0e-04 Pcf: ne g.------1.0e+00 Pc: 6.0e-03-X X--5.0e-02 3.0e-04 Pch: ne g.------1.0e+00 Sum of Pca throu g h Pch=Initial Pc=6.0e-04 Notes: "Extra crew" is used as a surrogate for"Shift Supervisor" (Control Room Supervisor) credit.23 I EPRI HRA Calculator 4.0 Execution Unrecovered ACP-CBOB-BYREG-2 Table 5: ACP-CBOB-BYREG-2 EXECUTION UNRECOVERED 1/5/20121/5/2012 Procedure: SOP-30 , STATION POWER Comment Stress Over Ride Step No.Instruction | 22 EPRI HRA Calculator | ||
===4.0 Cognitive=== | |||
Recovery ACP-CBOB-BYREG-2 Table 4: ACP-CBOB-BYREG-2 COGNITIVE RECOVERY 1/5/20121/5/2012 Initial HEP a>Wa)3: Luc)<U)a)>!E CU o LL 0^>wa)"-0 co=?of Final Value Pca: ne g.----1.0e+00 Pcb: ne g.------1.0e+00 Pcc: ne g.------1.0e+00 Pcd: ne g.------1.0e+00 Pce: 6.0e-03 X X---5.0e-02 3.0e-04 Pcf: ne g.------1.0e+00 Pc: 6.0e-03-X X--5.0e-02 3.0e-04 Pch: ne g.------1.0e+00 Sum of Pca throu g h Pch=Initial Pc=6.0e-04 Notes: "Extra crew" is used as a surrogate for"Shift Supervisor" (Control Room Supervisor) credit.23 I EPRI HRA Calculator | |||
===4.0 Execution=== | |||
Unrecovered ACP-CBOB-BYREG-2 Table 5: ACP-CBOB-BYREG-2 EXECUTION UNRECOVERED 1/5/20121/5/2012 Procedure: SOP-30 , STATION POWER Comment Stress Over Ride Step No.Instruction | |||
/Comment Error THERP HEP Factor Type Table Item NP-24.2 NOTE CHECK for fault per Note located prior to step 4.17 in ONP-24.2 NOTE located prior to step 4.17 in ONP-24.2: NOTE: If the loss of the preferred AC bus is due to the Inverter DC input breaker opening and the Inverter AC output breaker did NOT trip, it is unlikely that there is a fault on the referred AC bus itself.2 EOM 20-7b 2 1.3E-3 EOC 20-9 2 1.3E-3 EOC 20 11 7 ne g.Total Ste p HEP 5.2e-03 IF the Preferred AC Bus is to be restored on the Bypass Regulator following an Inverter failure , THEN PLACE the Manual Bypass Switch in the BYPASS SOURCE p osition.SOP-30-7.6.2.c--EOM 20-7b 2 1.3E-3 2 EOC 20-12 4 1.3E-3 EOC 20-12 8a 2.7E-4 Total Ste p HEP 5.8e-03 CLOSE (ON)Breaker 41 on Instrument AC Bus Y01 EOM 20-7b 2 1.3E-3 SOP-30-7.6.2.d EOC 20-12 12 3.8E-3 2 EOC 20-12 8a 2.7E-4 Total Ste p HEP 1.1e-02 PLACE the Kirk interlock key (SS key#234)into the breaker lock for Preferred AC Bus to be transferred | /Comment Error THERP HEP Factor Type Table Item NP-24.2 NOTE CHECK for fault per Note located prior to step 4.17 in ONP-24.2 NOTE located prior to step 4.17 in ONP-24.2: NOTE: If the loss of the preferred AC bus is due to the Inverter DC input breaker opening and the Inverter AC output breaker did NOT trip, it is unlikely that there is a fault on the referred AC bus itself.2 EOM 20-7b 2 1.3E-3 EOC 20-9 2 1.3E-3 EOC 20 11 7 ne g.Total Ste p HEP 5.2e-03 IF the Preferred AC Bus is to be restored on the Bypass Regulator following an Inverter failure , THEN PLACE the Manual Bypass Switch in the BYPASS SOURCE p osition.SOP-30-7.6.2.c--EOM 20-7b 2 1.3E-3 2 EOC 20-12 4 1.3E-3 EOC 20-12 8a 2.7E-4 Total Ste p HEP 5.8e-03 CLOSE (ON)Breaker 41 on Instrument AC Bus Y01 EOM 20-7b 2 1.3E-3 SOP-30-7.6.2.d EOC 20-12 12 3.8E-3 2 EOC 20-12 8a 2.7E-4 Total Ste p HEP 1.1e-02 PLACE the Kirk interlock key (SS key#234)into the breaker lock for Preferred AC Bus to be transferred | ||
.(Located in B yp ass Re g ulator)selection error is negligible SOP-30-7.6.2.e--EOM 20-7b 2 1.3E-3 2 used as a surro g ate EOC 20-12 8a 2.7E-4 Total Ste p HEP 3.1e-03 PLACE the breaker lock to OPEN position (this allows permissive closing of associated breaker).SOP 30-7 6 2 f EOM 20-7b 2 1.3E-3 2...EOC 20-12 3 1.3E-3 EOC 20-12 8a 2.7E-4 Total Ste HEP 5.8e-03 24 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 CLOSE (ON)the B yp ass Re g ulator Breaker to the Inverter to be s p ared.EOM 20-7b 2 1.3E-3 SOP 30-7.6.2.g EOC 20-12 4 1.3E-3 2 EOC 20-12 8a 2.7E-4 Total Ste p HEP PERFORM the following to transfer loads from the Inverter to the Bypass 5.8e-03 Re g ulator EOM 20-7b 2 1.3E-3 selection error-CLOSE B yp ass Source AC In ut Breaker.EOC 20-12 4 1.3E-3 mani p ulation error-CLOSE B yp ass Source AC In p ut Breaker.EOC 20-12 8a 2.7E-4 VERIFY In S y nc li g ht is ON.EOC 20-9 1 VERIFY In S y nc li g ht is ON.EOC 20-11 7 ne.ne PUSH"B yp ass Source To Load" ushbutton. | .(Located in B yp ass Re g ulator)selection error is negligible SOP-30-7.6.2.e--EOM 20-7b 2 1.3E-3 2 used as a surro g ate EOC 20-12 8a 2.7E-4 Total Ste p HEP 3.1e-03 PLACE the breaker lock to OPEN position (this allows permissive closing of associated breaker).SOP 30-7 6 2 f EOM 20-7b 2 1.3E-3 2...EOC 20-12 3 1.3E-3 EOC 20-12 8a 2.7E-4 Total Ste HEP 5.8e-03 24 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 CLOSE (ON)the B yp ass Re g ulator Breaker to the Inverter to be s p ared.EOM 20-7b 2 1.3E-3 SOP 30-7.6.2.g EOC 20-12 4 1.3E-3 2 EOC 20-12 8a 2.7E-4 Total Ste p HEP PERFORM the following to transfer loads from the Inverter to the Bypass 5.8e-03 Re g ulator EOM 20-7b 2 1.3E-3 selection error-CLOSE B yp ass Source AC In ut Breaker.EOC 20-12 4 1.3E-3 mani p ulation error-CLOSE B yp ass Source AC In p ut Breaker.EOC 20-12 8a 2.7E-4 VERIFY In S y nc li g ht is ON.EOC 20-9 1 VERIFY In S y nc li g ht is ON.EOC 20-11 7 ne.ne PUSH"B yp ass Source To Load" ushbutton. | ||
EOC 20-12 4.1.3E-3 PUSH"B yp ass Source To Load" p ushbutton.EOC 20-12 8a 2.7E-4 VERIFY"B yp ass Source Su pp l y in g Load" li g ht is ON.EOC 20-9 2 1.3E-3 SOP 30-7.6.2.h.VERIFY"B yp ass Source Su pp l y in g Load" li g ht is ON.EOC 20-11 7 ne g 2 ENSURE Manual B yp ass Switch in BYPASS SOURCE p osition.EOC 20-9 2.1.3E-3 ENSURE Manual Bypass Switch in BYPASS SOURCE position.Used as EOC 20-11 7 a surro g ate.neg.OPEN Inverter Out p ut breaker.EOC 20-12 4 1.3E-3 OPEN Inverter Out p ut breaker.EOC 20-12 8a 2.7E-4 OPEN B yp ass Source AC In p ut breaker.EOC 20-12 4 1.3E-3 OPEN B yp ass Source AC In p ut breaker.EOC 20-12 8a 2.7E-4 DEPRESS ALARM RESET to clear Inverter alarms.EOC 20-12 3 1.3E-3 DEPRESS ALARM RESET to clear Inverter alarms.EOC 20-12 8a 2.7E-4 OPEN Inverter Output breaker.Tot SHOULD I ADD THE STEPS OMITTED?If not-al Ste p HEP 2.3e-02 chan a to short list SOP 30-7.6.2.6 EOM 20-7b 2 1.3E-3 2 EOC 20-12 4 1.3E-3 EOC 20-12 8a 2.7E-4 Execution recovery provided by independent personnel Tot See Section 4 3 of the HRA Notebook for further al Ste p HEP 2 5.8e-03.information | EOC 20-12 4.1.3E-3 PUSH"B yp ass Source To Load" p ushbutton.EOC 20-12 8a 2.7E-4 VERIFY"B yp ass Source Su pp l y in g Load" li g ht is ON.EOC 20-9 2 1.3E-3 SOP 30-7.6.2.h.VERIFY"B yp ass Source Su pp l y in g Load" li g ht is ON.EOC 20-11 7 ne g 2 ENSURE Manual B yp ass Switch in BYPASS SOURCE p osition.EOC 20-9 2.1.3E-3 ENSURE Manual Bypass Switch in BYPASS SOURCE position.Used as EOC 20-11 7 a surro g ate.neg.OPEN Inverter Out p ut breaker.EOC 20-12 4 1.3E-3 OPEN Inverter Out p ut breaker.EOC 20-12 8a 2.7E-4 OPEN B yp ass Source AC In p ut breaker.EOC 20-12 4 1.3E-3 OPEN B yp ass Source AC In p ut breaker.EOC 20-12 8a 2.7E-4 DEPRESS ALARM RESET to clear Inverter alarms.EOC 20-12 3 1.3E-3 DEPRESS ALARM RESET to clear Inverter alarms.EOC 20-12 8a 2.7E-4 OPEN Inverter Output breaker.Tot SHOULD I ADD THE STEPS OMITTED?If not-al Ste p HEP 2.3e-02 chan a to short list SOP 30-7.6.2.6 EOM 20-7b 2 1.3E-3 2 EOC 20-12 4 1.3E-3 EOC 20-12 8a 2.7E-4 Execution recovery provided by independent personnel Tot See Section 4 3 of the HRA Notebook for further al Ste p HEP 2 5.8e-03.information | ||
.This execution recovery factor is applied 0.5 to the individual execution steps with a dependence factor based on the time available for recovery.Note EXEC RECOV-that the execution stress factors applied to the OCR execution subtasks are not applied to the execution recovery factor.The EOM does not apply.Although the execution occurs in both the control room and in the cable spreading room, the"outside control room" execution recove ry factor is a pp lied.Total Ste p HEP 5.0e-01 25 EPRI HRA Calculator 4.0 Execution Recovery 1/5/20121/5/2012 ACP-CBOB-BYREG-2 Critical Step No.Recovery Step No.Table 6: ACP-CBOB-BYREG-2 EXECUTION RECOVERY Action HEP (Crit)HEP (Rec)Dep Cond.HEP Total for ONP-24.2 NOTE CHECK for fault er Note located p rior to ste p 4.17 in ONP-24.2 5.2e-03 ecec step 2 6e-03 EXEC RECOV-Execution recovery provided by independent personnel.OCR 5.0e-01 ZD 5.0e-01 SOP-30-7.6.2.c IF the Preferred AC Bus is to be restored on the bypass Regulator following an Inverter failure , THEN PLACE the 5.8e-03 2 9e-03 Manual B yp ass Switch in the BYPASS SOURCE p osition..EXEC RECOV-Execution recovery provided by independent personnel OCR 5.0e-01 ZD 5.0e-01 SOP-30-7.6.2.d CLOSE (ON)Breaker 41 on Instrument AC Bus Y01 1 1e-02 EXEC RECOV-Execution recovery provided by independent personnel.5.5e-03 OCR 5.Oe-01 ZD 5.Oe-01 SOP-30-7.6.2.e PLACE the Kirk interlock key (SS key#234)into the breaker lock for Preferred AC Bus to be transferred.(Located in 3.1a-03 1.6e-03 B yp ass Re g ulator)EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.Oe-01 SOP 30-7.6.2.f PLACE the breaker lock to OPEN position (this allows p ermissive closin g of associated breaker).5.8e-03 2.9e-03 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.0e-01 SOP 30-7.6.2.g CLOSE (ON)the Bypass Regulator Breaker to the Inverter to be s p ared.5.8e-03 2.9e-03 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.0e-01 ZD 5.0e-01 SOP 30-7.6.2.h.PERFORM the following to transfer loads from the Inverter to the B yp ass Re g ulator 2.3e-02 1.2e-02 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.Oe-01 SOP 30-7.6.2.6 OPEN Inverter Out p ut breaker.5.8e-03 2 9e-03 EXEC RECOV-Execution recovery provided by independent personnel.OCR 5,1:-01 ZD 5.Oe-01 Total Unrecovered: | .This execution recovery factor is applied 0.5 to the individual execution steps with a dependence factor based on the time available for recovery.Note EXEC RECOV-that the execution stress factors applied to the OCR execution subtasks are not applied to the execution recovery factor.The EOM does not apply.Although the execution occurs in both the control room and in the cable spreading room, the"outside control room" execution recove ry factor is a pp lied.Total Ste p HEP 5.0e-01 25 EPRI HRA Calculator | ||
===4.0 Execution=== | |||
Recovery 1/5/20121/5/2012 ACP-CBOB-BYREG-2 Critical Step No.Recovery Step No.Table 6: ACP-CBOB-BYREG-2 EXECUTION RECOVERY Action HEP (Crit)HEP (Rec)Dep Cond.HEP Total for ONP-24.2 NOTE CHECK for fault er Note located p rior to ste p 4.17 in ONP-24.2 5.2e-03 ecec step 2 6e-03 EXEC RECOV-Execution recovery provided by independent personnel.OCR 5.0e-01 ZD 5.0e-01 SOP-30-7.6.2.c IF the Preferred AC Bus is to be restored on the bypass Regulator following an Inverter failure , THEN PLACE the 5.8e-03 2 9e-03 Manual B yp ass Switch in the BYPASS SOURCE p osition..EXEC RECOV-Execution recovery provided by independent personnel OCR 5.0e-01 ZD 5.0e-01 SOP-30-7.6.2.d CLOSE (ON)Breaker 41 on Instrument AC Bus Y01 1 1e-02 EXEC RECOV-Execution recovery provided by independent personnel.5.5e-03 OCR 5.Oe-01 ZD 5.Oe-01 SOP-30-7.6.2.e PLACE the Kirk interlock key (SS key#234)into the breaker lock for Preferred AC Bus to be transferred.(Located in 3.1a-03 1.6e-03 B yp ass Re g ulator)EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.Oe-01 SOP 30-7.6.2.f PLACE the breaker lock to OPEN position (this allows p ermissive closin g of associated breaker).5.8e-03 2.9e-03 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.0e-01 SOP 30-7.6.2.g CLOSE (ON)the Bypass Regulator Breaker to the Inverter to be s p ared.5.8e-03 2.9e-03 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.0e-01 ZD 5.0e-01 SOP 30-7.6.2.h.PERFORM the following to transfer loads from the Inverter to the B yp ass Re g ulator 2.3e-02 1.2e-02 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.Oe-01 SOP 30-7.6.2.6 OPEN Inverter Out p ut breaker.5.8e-03 2 9e-03 EXEC RECOV-Execution recovery provided by independent personnel.OCR 5,1:-01 ZD 5.Oe-01 Total Unrecovered: | |||
6.5e-02 Total Recovered: 3.3e-02 26 O Entergy PSA En ineerin EA-PSA-SDP-D11-2 07 Rev.1 EnteiXy g g Analysis Attachment 13-Page 1 of 4 Attachment 13 Procedure Use Evaluation for DC Panel ED-11-2 Fault Event This attachment contains the following:Event procedure use in narrative formatEvent procedure use in flow chart format (Figure Al 3-1)Note: the narrative and flow chart provide an overview of procedure usage during the ED-11-2 event.They are not all inclusive, i.e.they do not include all procedures referenced | 6.5e-02 Total Recovered: 3.3e-02 26 O Entergy PSA En ineerin EA-PSA-SDP-D11-2 07 Rev.1 EnteiXy g g Analysis Attachment 13-Page 1 of 4 Attachment 13 Procedure Use Evaluation for DC Panel ED-11-2 Fault Event This attachment contains the following:Event procedure use in narrative formatEvent procedure use in flow chart format (Figure Al 3-1)Note: the narrative and flow chart provide an overview of procedure usage during the ED-11-2 event.They are not all inclusive, i.e.they do not include all procedures referenced | ||
/used during the event.Procedure Use Narrative 1.Procedure Use Expectations During the ED-11-2 event multiple procedures were concurrently in use, including Emergency Operating Procedures (EOPs), Off Normal Procedures (ONPs), Annunciator Response Procedures (ARPs), General Operating Procedures (GOPs)and System Operating Procedures (SOPs).EOP and ONP procedure steps are written in the order the writer expects the plant to respond.Since the plant may not respond exactly as predicted, performance of steps out of sequence may be necessary. | /used during the event.Procedure Use Narrative 1.Procedure Use Expectations During the ED-11-2 event multiple procedures were concurrently in use, including Emergency Operating Procedures (EOPs), Off Normal Procedures (ONPs), Annunciator Response Procedures (ARPs), General Operating Procedures (GOPs)and System Operating Procedures (SOPs).EOP and ONP procedure steps are written in the order the writer expects the plant to respond.Since the plant may not respond exactly as predicted, performance of steps out of sequence may be necessary. |
Revision as of 14:58, 13 October 2018
ML120100562 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 01/05/2012 |
From: | Entergy Nuclear Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML1200100495 | List: |
References | |
EA-11-241, EA-11-243, PNP 2012-06 CR-PLP-2011-4822 | |
Download: ML120100562 (31) | |
Text
A Entergy PSA En ineerin EA-PSA-SDP-D11-2-11-07 Rev.1 g g Analysis Attachment 12-Page 1 of 26 Attachment 12 HRA Calculator Output for Developed HEPs This attachment contains the EPRI HRA Calculator output for the failure to trip charging pump HEP, and failure to align EY-10 to the bypass regulator, and failure to align an alternate charger, as discussed in Section 6.3.References
[1]EPRI HRA Calculator TM, Version 4.0, Electric Power Software Center, 9625 Research Drive, Charlotte, NC 28262.
I EPRI HRA Calculator 4.0 1/5/20121/5/2012 CVC-PMOA-P55-TRIP-S, OP FAILS TO STOP CHARGING PUMP OPERATION (HEP)Co g nitive Method Date Anal y st-Reviewer CBDTM/ASEP/THERP 12/07/11 FJY-BAB Anal y sis File File Date File Size (B yt es)Pal Post HEPs r31-5-11.HRA 12/07/11 5935104 Table 1: CVC-PMOA-P55-TRIP-S
SUMMARY
Anal y sis Method: CBDTM/ASEP Combination (Sum)Anal y sis Database: Pal Post HEPs r3 1-5-11.HRA 12/07/11, 5935104 B y tes)Anal y sis Results: without Recove ry with Recove ry PCO-CBDTM 6.8e-03 3.1 e-04 PC0-ASEP 1.9e-03 1.9e-03 Pexe 2.0e-02 4.6e-03 Total HEP 6.8e-03 Error Factor 5 This HEP is modified from the base case to replicate the conditions of the 9/25/2011 loss of dc event.As a result of the loss of dc and preferred ac power in this event an additional charging pump started on a right channel safety injection signal.Letdown was isolated when CV-2009 closed due a right channel containment high radiation signal.Consequently the event results in a charging letdown flow mismatch which results in a continuous rise in pressurizer level.This condition requires the operator action to control charging to regain control of pressurizer level prior to challenging a pressurizer safety.The timing regarding this action is provided under the time window description.
This action is the same as the base case action under different conditions with the same indications and alternate timing as described in the'Time Window'discussion.
In response to annunciator LETDOWN HT EX TUBE INLET HI-LO PRESS, EK-0704 operators would observe charging and letdown flow and place all 3 orifice valve control switches to CLOSE per ARP-4.The ARP then directs restoring charging and letdown when desired per SOP-2A.If P-55A is not stopped , PZR level will continue rising.a.SOP-2A Section 7.3.9 TO RESTORE LETDOWN provides direction for restoring letdown flow.There is no stated procedural link between the ARPs and SOP-2A Section 7.3.8 ISOLATE LETDOWN AT RATED CONDITIONS
.However, this section does provide direction to successfully mitigate this condition and may be referred to as the title describes the existing condition.
b.In the event action is not taken to manually control charging flow, PZR level will continue rising and the PRESSURIZER LEVEL HI-LO, EK-0761 annunciator will alarm at 62.75%level, and then annunciator PRESSURIZER HIGH LEVEL, EK-0769 will alarm at 75%level.ARP response for these annunciators directs the operator to SHIFT level level control to the channel not in service.Additionally direction is provided that manual control may be necessary.
On reactor trip the operators enter EOP-1.0 STANDARD POST-TRIP ACTIONS.Immediate Actions Step 5 directs the operator to manually control charging and letdown to maintain PZR level between 42%and 57%, at which time they take manual control of the charging pumps.1.Initial Conditions:
Steady state, full power operations Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)2 EPRI HRA Calculator 4.0 1/5/20121/5/2012 2.Initiating Event: Malfunction occurs spuriously isolating letdown.3.Accident Sequence (preceding functional failures and successes):
LETDOWN HT EX TUBE OUTLET HI-LO PRESS EK-0704 annunciators alarms.ARP-4 provides guidance that the operator may have to to manually control pressure and RESTORE Charging and Letdown in a controlled manner per SOP-2A.In this scenario, failure to trip charging pump(s)would challenge pressurizer safeties.4.Preceding operator errors or successes in sequence: No operator errors or additional successes noted.5.Operator action success criterion:
Success is tripping charging pumps P-55B, C and/or A as necessary to restore level to the normal operating band.6.Consequences of failure: SORV, LOCA, and potential for core damage.Cues and Indications Initial Cue EK-0704, LETDOWN HT EX TUBE OUTLET HI-LO PRESS Recovery Cue Pump breaker status indicating lights on panel EC-02.Charging flow indication FIC-0202 on panel EC-02.Pressurizer level indication LIC-0101A/B (narrow range on EC-02), LI-0103A (wide range, on EC-02)and LIA-0102A (wide ran g e on p anel EC-12).Cue/s In response to annunciator LETDOWN HT EX TUBE INLET HI-LO PRESS, EK-0704 operators would observe charging and letdown flow and place all 3 orifice valve control switches to CLOSE per ARP-4.The ARP then directs restoring charging and letdown when desired per SOP-2A.If P-55A is not stopped, PZR level will continue rising.In the event action is not taken to manually control charging flow, PZR level will continue rising and the PRESSURIZER LEVEL HI-LO, EK-0761 annunciator will alarm at 62.75%level, and then annunciator PRESSURIZER HIGH LEVEL, EK-0769 will alarm at 75%level.Additional indication available:
LI-0103B on panel EC-33 in the Auxiliary Building 590 elevation LI-0102B on panel EC-150 in the Turbine Building 607 elevation De g ree of Clarit y Ve Good Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)
I EPRI HRA Calculator 4.0 1/5/20121/5/2012 Procedures and Trainin g Co g nitive Procedure ARP-4 TILE 4 (Revision: 58)Co g nitive Ste p Number OPERATOR ACTION Co g nitive Instruction CHECK Char g in g flow and Letdown flow matched.Execution Procedure ARP-4 TILE 4 (Revision: 58)Other Procedure SOP-2A (Revision: 69)Job Performance Measure PL-OPS-CVC-005J Classroom Trainin g Fre q uenc y 0.5 p er y ear Simulator Trainin g Fre q uenc y: 0.5 p er y ear Notes Procedures applicable to this action EOP-1.0 STANDARD POST-TRIP ACTIONS REV 12 ARP-4 PRIMARY COOLANT PUMP STEAM GENERATOR AND ROD DRIVES SCHEME EK-07 (EC-12)REV 58 SOP-2A CHEMICAL AND VOLUME CONTROL SYSTEM REV 70 In response to annunciator LETDOWN HT EX TUBE INLET HI-LO PRESS, EK-0704 operators would observe charging and letdown flow and place all 3 orifice valve control switches to CLOSE per ARP-4.The ARP then directs restoring charging and letdown when desired per SOP-2A.If P-55A is not stopped , PZR level will continue rising.TRAINING: Initial training and is included in 2 year training plan.JPM PL-OPS-CVC-005J, MANUALLY LOWER CHARGING AND LETDOWN FLOW includes an action to manually stop P-55B or P-55C when desired to reduce letdown flow.Stopping P-55A would be a similar action.Man p ower Re q uirements Default Actual O p erations: Shift Mana g er 1 0 Shift Su p ervisor 1 1 STA 1 0 Reactor O p erators 2 1 Plant O p erators 4 0 Maintenance Mechanics 0 0 Electricians 0 0&C Technicians 0 0 Health Ph y sics Technicians 1 0 Chemist: Technicians 1 0 Analysis File: Pal_Post HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)
I EPRI HRA Calculator 4.0 1/5/20121/5/2012 CVC-AVOB-CV-2001 OP FAILS TO CLOSE CV-2001 ON HIGH TEMP AT LETDOWN HX E-58 (HEP)CVC-AVOA-CV-2003 OPERATOR FAILS TO CLOSE LETDOWN ORIFICE STOP VALVE CV-2003 (HEP)CVC-AVOA-CV-2122.
OP FAILS TO OPEN LETDOWN INTERMEDIATE PRESSURE CONTROL (HEP)CVC-PMOA-P55-TRIP OP FAILS TO STOP CHARGING PUMP OPERATION (HEP)CVC-PMOE-P-55-2 OP FAILS TO START ADDITIONAL CHARGING PUMPS FOR 2 IN SERVICE CVC-MVOA-SUCT-SRCE OP FAILS TO TRANSITION SUCTION SOURCE TO SIRWT (HEP)Timing Analysis TS T delay 22.00 Minutes I T1/2 Cue t=0 62.00 Minutes 29.00 Minutes, Irreversible DamageState Timin g Anal y sis Tsw 62.00 Minutes Tdela y 22.00 Minutes T112 29.00 Minutes TM 2.00 Minutes Time available for recove ry 9.00 Minutes SPAR-H Available time (co g nitive)38.00 Minutes SPAR-H Available time (execution)ratio 5.50 Minimum level of dependence for recove T 2.00 Minutes HD Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)5 EPRI HRA Calculator 4.0 1/5/20121/5/2012 Regarding Tsw: The time for Tsw is based on the 9/25/2011 loss of dc event that led to increasing pressurizer level.The rising pressurizer level was consequence the loss dc power that caused isolation of letdown flow and a right channel safety injection signal.The right channel safety injection signal resulted in the start of an additional charging pump.The excess charging flow with no letdown flow caused the rise in pressurizer level and pressure.Based on the event timeline and additional information provided in the EA-PSA-SDP-D11-2-11-07, the time to the consequential condition that pressurizer safety would be challenged without operator intervention was determined to be 62 minutes.Additional details regarding the event response are discussed in the EA.The time to the indication of high pressurizer pressure and increasing level was 22 minutes.The median (actual)response time was 29 minutes.The response time was a result of operator action to verify boration requirements were met prior throttling injection flow.The base version of the HEP assumed a bounding condition and was based on three charging pumps operating with nominal letdown and assumed the consequential failure occurs when 100%level is reached and ignored the volume above 100%.The base version with three charging pumps operating predicted the time to consequential failure to be 30 minutes.The base version with only two charging pumps operating operating predicts consequential failure at 64 minutes similar to the Tsw for 9/25/2011 event.The execution time is unchanged as the actions in this version are the same actions used in the base case.Per P-IOAQ (RMassa, 12/21/2010):
Tm: It would take-2 minutes to complete the action once the need is identified.
NOTE: Currently, actions to open the additional letdown valves are not credited as part of this action.Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)
EPRI HRA Calculator 4.0 1/5/20121/5/2012 Cognitive Anal y sis Pc Failure Mechanism Branch HEP Pca: Availabilit y of Information a ne.Notes: Indicators available, accurate.Crew trained.PCb: Failure of Attention I 7.5e-04 Notes: Workload expected to be high (multiple alarms).Operators monitor pressurizer conditions, usin g instruments located on a front p anel.Indicators are alarmed.P,,: Misread/miscommunicate data a ne g.Notes: The applicable indications are easy to locate and they do not have human en g ineerin g deficiencies.
The Palisades o p erators use formal communications.
Pcd: Information misleadin g a ne g.Notes: Cues as stated.Pce: Ski p a ste p in p rocedure 6.Oe-03 Notes: The steps concerning pressurizer control and leak isolation are not hidden in any way although they are not graphically distinct.The operators are in multiple procedures.
The ONPs and the ARPs are Continuous Use procedures and the operators are required to mark off ste p s as the y are com p leted via the circle/slash method of lacekee in g.PCf: Misinter p ret Instructions a ne g.Notes: The procedure steps involving pressurizer control use standard wording and the o p erators have all the information the need to com p lete this action.P, ,: Misinter p ret decision lo g ic I ne g.Notes: There are no NOT, AND or OR statements in the decision logic for pressurizer control.The operators have practiced pressurizer control, however, the scenarios postulated for this action are do not clearly link the symptoms to the action of controlling the charging p um p s.Pch: Deliberate violation a ne g.Notes: The operators believe that the instructions contained in their procedures are accurate and ade q uate.Initial P, without recove ry credited)6.8e-03 Notes Co g nitive Com p lexit y:::=Com p lex E q ui p ment Accessibilit y Control Room (Panel C-12): Accessible pca: Availability of information Indication Avail in CR Indication Warning/Altemate Training on CR Accurate in Procedure Indicators
-1.Oe-01---
---(a)neg.--O.Oe+00 (b)neg.1.0e+00 de-w00 1.0e-01 (c)neg.3.0e-03 (d)1.5e-03 Yes 1.Oe+00 5.Oe-01 (e)5.0e-02 No 1.Oe-01 1.0e+00 (f)3.0e-01 1.Oe+00 Indicators available, accurate.Crew trained.(g)0.0e+00 Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)
EPRI HRA Calculator 4.0-Monitor 0.Oe+00 (m)1.5e-02 pcb: Failure of attention Low vs.Hi Check vs.Monitor Front vs.Back Alarmed vs.Not Workload Panel Alarmed 1/5/20121/5/2012 Check 0.0e+00 (a)neg.O.Oe+00 Back (b)1.5e-04 S.Oe-02 Low 3.0e-03 (c)3.0e-03 1.0e+00 1.Oe+Op Front (d)1.5e-04 5.0e-02 Monitor O.Oe+00 (e)3.0e-03 1.Oe+00 3.0e-03 Back (f)3.0e-04 5.Oe-02 1.Ch-ice 3.0e-03 1.Oe+00 (g)6.0e-03 2.Ch ice Front (h)neg.5.0e-02 Check O.Oe+00 (i)neg.1.Oe+00 O.Oe+00 Back (j)7.5e-04 5.Oe-02 Hi 3.0e-03 (k)1.5e-02----1.0e+00 16e+00 Front (1)7.5e-04-------5.De 42 1.0e+00 3.Oe-03 Back (n)1.5e-03 S.Oe-02 3.0e-03 (o)3.0e-02 1.0e+00 Workload expected to be high (multiple alarms).Operators monitor pressurizer conditions, using instruments located on a front panel.Indicators are alarmed.pcc: Misread/miscommunicate data Indicators Easy to Good/Bad Indicator Formal Locate Communications r O.Oe+00 (a)neg.O.Oe+00 I (b)3.Oe-03 T---------3.0e-03 O.Oe+00 (c)1.0e-03 Yes 1.0e-03 (d)4.0e-03 3.0e-03 No 3 0 03 O.Oe+00.(e)e-O.Oe+00 (f)6.0e-03 3.0e-03 3.Oe-03 (g)4.0e-03 O.Oe+00 1.Oe-03 (h)7.0e-03 The applicable indications are easy to locate and they do not have human engineering deficiencies.
The Palisades operators use formal communications.
Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)8 I EPRI HRA Calculator 4.0 No pcd: Information misleading All Cues as Stated Warning of Specific Training General Training Differences
(a)neg.1.Cues as stated.pce: Skip a step in procedure Obvious vs.Single vs.Multiple Graphically Placekeeping Aids Hidden Distinct (b)3.0e-03 (c)1.0e-02 (d)1.0e-01 (e)1.0e+00 3.0e-03 (a)1.0e-03 3.3e-01 (b)3.0e-03 1.Oe-02 O.Oe+00 (c)3.0e-03 3.0e-03 1.0e+00 (d)1.0e-02 1.Oe-02 O.Oe+00 3.Oe-03 (e)2.Oe-03 3.3e-01 Yes 1.Oe-02 (f)4.0e-03 3.Oe-03 No-(g)6.Oe-03 3.Oe 03 1.Oe+00 (h)1.3e-02 1.0e-02 1.0e-01 (i)1.0e-01 1/5/20121/5/2012 The steps concerning pressurizer control and leak isolation are not hidden in any way although they are not graphically distinct.The operators are in multiple procedures.
The ONPs and the ARPs are Continuous Use procedures and the operators are required to mark off steps as they are completed via the circle/slash method of placekeeping.
pcf: Misinterpret instruction Standard or All Required Training on Step Ambiguous wording Information Yes No O.Oe+00-------------(a)neg.1.0e-01 (b)3.Oe-03 3.0e-02 1.0e+00 (c)3.0e-02 (d)3.0e-03 (e)3.0e-02 (f)6.0e-03 (g)6.0e-02 The procedure steps involving pressurizer control use standard wording and the operators have all the information they need to complete this action.Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)
I EPRI HRA Calculator 4.0 pcg: Misinterpret decision logic"NOT" tatement°AND" or"OR" Both"AND" 3 Practiced Scenario Statement"OR" 3.3e-01 (a)1.6e-02 3.0e-02 (b)4.9e-02 1.0e+00 1.2e-02 (c)6.Oe-03 3.3e-01 0.0e+00 (d)1.9e-02 1.Oe+00 3.3e-01 (e)2.0e-03 O.Oe+00 1/5/20121/5/2012 No 3.3e-0 1 (g)1.0e-02 3.0e-02 1.Oe+00 (h)3.1e-02 1.Oe-03 3.3e-01 (i)3.0e-04 O.Oe+00 O.Oe+00 1.Oe+00 0)1.0e-03 (k)neg.-----_---3.3e-01 O.Oe+00---(I)neg.1.0e+00 There are no NOT, AND or OR statements in the decision logic for pressurizer control.The operators have practiced pressurizer control, however, the scenarios postulated for this action are do not clearly link the symptoms to the action of controlling the charging pumps.pch: Deliberate violation Belief in Adequacy Adverse Reasonable Policy of of Instruction Consequence if Alternatives"Verbatim"----------------a neg.No (b)5.0e-01 (c)1.0e+00 (d)neg.(e)neg.The operators believe that the instructions contained in their procedures are accurate and adequate.Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)10 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 Co g nitive Rec ve ry ova w C2 14i>0)3: x w V 4>Uw: LL W W.5 w^L (V cY d^c>, d dv>aai^Q-j>,>, a m w X^^>>d Ii>PCa ne g.-----N/A-1.0e+00 Pcb 7.5e-04 X-X--N/A-1.0e-02 7.5e-06 Pc,, ne g.-----N/A-1.0e+00 Pcd ne g.-----N/A-1.0e+00 Pce 6.0e-03 X X---N/A-5.0e-02 3.0e-04 Pcf ne g.-----N/A-1.0e+00 Pc ne g.-----N/A-1.0e+00 Pch ne g.-----N/A-1.0e+00 Final Pc (with recove credited)3.1e-04 Notes Pc uses"extra crew" as a surrogate for shift supervisor credit (Control Room Supervisor).
Control room actions would be peer checked as they are performed by the other Reactor O p erator, Shift En g ineer or Control Room Su p ervisor.Pc ASEP Nominal Diagnosis Model In order to compensate for possible non-conservative estimates produced by the cause-based method for short term actions (Time available for recovery<1 hour), the cognitive failure probability for short term actions is taken to be the sum of the cause-based and ASEP results;longer term actions do not include the ASEP component.
Use Nominal HEP because the event is not a"well-recognized classic", but it is trained on.Actual Time Error Factor Median HEP Mean Upper Bound Lower Bound 29.0 minutes 10 4.6e-04 1.9e-03 6.7e-03 3.1e-05 Execution Performance Sha p in g Factors Environment Li g htin g Normal Heat Normal Radiation Back g round Atmos p here Normal Equipment Accessibility Control Room (Panel EC-02)Accessible Stress Moderate Plant Response As Ex p ected: Yes Workload: Hi g h Performance Shaping Factors: Optimal Notes Following recognition of the need for the action (Pcognitive), the operator workload is assessed as high due to the number actions required as a consequence of the event.The PSFs are not ne g ative for this action which is executed in the control room.Execution Com p lexit y Sim p le Analysis File: Pal_Post_HEPs_r3 1-5-11.HRA (12/07/11, 5935104 Bytes)11 EPRI HRA Calculator 4.0 1/5/20121/5/2012 Execution Unrecovered Procedure: ARP-4 TILE 4 , PRIMARY SYSTEM VOLUME LEVEL PRESSURE SCHEME EK-07 (C-12)Comment Stress Over Step No.Instruction
/Comment Error THERP HEP Factor Ride Type Table Item IF PLCS does NOT respond, THEN RESTORE AND MAINTAIN PZR level between 42%and 57%: a.OPERATE PZR Level Control S y stem (PLCS).EOP-1 Step--EOM 20-7b 2 1.3E-3 2 5.1 a EOC 20-12 2 3.8E-3 Total Step HEP 1.0e-02 IF PLCS does NOT respond, THEN RESTORE AND MAINTAIN PZR level between 42%and 57%:b.MANUALLY OPERATE Char g in g and Letdown EOP-1 Step--EOM 20-7b 2 1.3E-3 2 5.1 b EOC 20-12 2 3.8E-3 Total Step HEP 1.Oe-02 Execution recovery provided by independent personnel See Section 4.3 of the HRA Notebook for further information
.This execution recovery factor is applied to the individual execution steps with a EXEC RECOV time-ICR CR available y.for reco v e ry.Note that the 2 0.1 execution stress factors applied to the execution subtasks are not applied to the execution recovery factor.The EOM does not a pp l y.Total Ste p HEP 1.0e-01 12 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 Execution Recovered Critical Recovery Ste No.Ste No.Action HEP (Crit)HEP (Rec)Dep.Cond.HEP Rec ()p Total for Ste EOP-1 IF PLCS does NOT respond, THEN RESTORE 1.0e-02 2 3e-03 Step 5.1 AND MAINTAIN PZR level between 42%and 57%:.a a.OPERATE PZR Level Control S y stem (PLCS).EXEC Execution recovery provided by independent 1.0e-01 MD 2.3e-01 RECOV-ICR p ersonnel EOP-1 IF PLCS does NOT respond, THEN RESTORE 1.0e-02 2 3e-03 Step 5.1 AND MAINTAIN PZR level between 42%and.b 57%:b.MANUALLY OPERATE Charging and Letdown EXEC Execution recovery provided by independent 1.0e-01 MD 2.3e-01 RECOV-ICR p ersonnel Total Unrecovered
- 2.0e-02 Total Recovered: 4.6e-03 13 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 ACP-CBOB-BYREG-2, OPERATOR FAILS TO ALIGN BUS Y-01 THROUGH BYPASS REGULATOR TO SUPPLY A DE-ENERGIZED PFAC BUS (HEP)Anal y st: FJY Rev.Date: 12/08/11 Reviewer: BAB Co g nitive Method: CBDTM/THERP Anal y sis Database: Pal Post HEPs r3 1-5-11.HRA 12/08/11, 5967872 B y tes)Table 2: ACP-CBOB-BYREG-2
SUMMARY
Anal y sis Results: without Recove ry with Recove ry Pco 1.2e-02 6.0e-04 Pere 6.5e-02 3.3e-02 Total HEP 3.3e-02 Error Factor 5 Assigned Basic Events: Related Human Interactions:
Although Y20 is modeled in this calculation, the analysis applies equally to the alignment of any of the remaining preferred AC busses.Initial Cue: Loss of Preferred AC Bus Y10, Y20, Y30, or Y40 Recovery Cue: Cue: Multiple procedures (as listed in the"Procedures" section)direct the operators to verify that AC busses are energized.
For the preferred AC busses, the contingency action directs OPS to: ONP-24.1, LOSS OF PREFERRED AC BUS Y10 ONP-24.2, LOSS OF PREFERRED AC BUS Y20 ONP-24.3, LOSS OF PREFERRED AC BUS Y30 ONP-24.4, LOSS OF PREFERRED AC BUS Y40 Degree of Clarity of Cues&Indications:
Very Good Procedures:
Cognitive: ONP-24.2 (LOSS OF PREFERRED BUS Y20)Revision: 23 Execution: SOP-30 (STATION POWER)Revision: 53 Other: EOP-9.0 (FUNCTIONAL RECOVERY PROCEDURE)Revision: 19 14 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 Cognitive Procedure:
Step: 4.17 Instruction:
IF a fault does NOT exist on Y20, THEN REFER TO SOP-30 AND PLACE Y20 on the Bypass Regulator.
Procedure Notes: EOP-1.0, STANDARD POST-TRIP ACTIONS step 4.4.6)states: VERIFY 3 of 4 Preferred AC buses are energized.
EOP-2.0, REACTOR TRIP RECOVERY, step 4.9 directs the operators to verify that the given AC buses are energized.
The contingency action for the preferred AC busses directs the operators to ONP-24.1 through ONP-24.4, LOSS OF PREFERRED AC BUS Y10/Y20/Y30/Y40.The following procedures contain this action: EOP-2.0 REACTOR TRIP RECOVERY EOP-9.0 FUNCTIONAL RECOVERY PROCEDURE MV-AE-DC-1 ONP-2.3 LOSS OF DC POWER ONP-24.1, 24.2, 24.3, 24.4 LOSS OF PREFERRED BUS Y-10, Y-20, Y-30, Y-40 ARP-3 WINDOWS 34, 44, 45, 46 PREFERRED AC BUS NO.1, 2, 3, 4 TROUBLE ARP-3 WINDOW 48 125V DC BUS UNDERVOLTAGE/TROUBLE SOP-30, STATION POWER, Section 7.6.2, To Supply a Preferred AC Bus With the Bypass Regulator This is an Auxiliary Operator action, and the following JPMs are available: (Licensed Operators)JPMPL-OPS-EPS-001 (PLACE PREFERRED AC BUS, Y-20 ON BYPASS REGULATOR)
Training: Simulator, Frequency:
0.5 per year JPM Procedure:
JPM ISBA-JPM-04 (PLACE PREFERRED AC BUS, Y-20 ON BYPASS REGULATOR)
Revision: 6 Identification and Definition:
This action aligns power from bus Y-01 via the bypass regulator to a preferred AC power bus (Y-10, Y-20, Y-30 or Y-40)which has failed due to a failure of its power source , i.e.MCC-1 or MCC-2.As stated earlier, although Y20 is modeled here, the analysis applies to the alignment of any of the remaining preferred AC busses.1.Initial Conditions:
Steady state, full power operations 2.Initiating Event: LODC (bus ED-10)3.Accident Sequence (preceding functional failures and successes):
Loss of DC power to DC bus ED10-R and ED10-L.Reactor Trip 15 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 Turbine Trip OPS enters EOP-1.0 and performs the standard post-trip actions.The operators would continue in EOP-1.0 and enter ONP-24.1 and ONP-24.3 For post trip actions and indications of loss of preferred ac panels EY-10 and EY-30.ARP-3, alarm response refers the operators to ONP-24.1 and ONP-24.3 for alternatives to power the preferred AC panel loads.EOP-1.0 event diagnostic directs the operator to EOP 9.0 if 3 of 4 preferred AC busses are not energized.
Given the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0 Functional Recovery Procedure and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized.
If less than 3 are available, step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, 4 as applicable.
ONP-24.2 step 4.17 directs: IF a fault does NOT exist on Y20, THEN REFER TO SOP-30 AND PLACE Y20 on the Bypass Regulator.
SOP-30, STATION POWER, Section 7.6.2, To Supply a Preferred AC Bus With the Bypass Regulator.
4.Preceding operator errors or successes in sequence: No operator errors or additional successes noted.5.Operator action success criterion: Success is restoring Y20 prior to battery depletion.
6.Consequences of failure: Loss of TD AF pump and AF valve control Key Assumptions:
Current modeling assumes only Y-20 can be backed up by the bypass regulator.
Any single preferred AC bus can be backed up.Operator Interview Insights: EOP-2.0, REACTOR TRIP RECOVERY, would only be entered if the scenario was an"uncomplicated
" trip.If a LOOP is in progress, the operators would transition from EOP-1.0 to EOP-8.0 LOSS OF OFFSITE POWER/NATURAL CIRCULATION RECOVERY.EOP-8.0 safety function status checks require 3 of 4 preferred AC busses to be energized.So if only one is not energized , the function is met and NO corrective action is directed.If the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0, Functional Recovery Procedure, and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized.
If less than 3 are available, step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, or 4 as applicable.
In summary, for loss of 1 preferred bus with any other single event in progress procedures do not direct any action being taken with exception of annunciator response procedure ARP-3.16 I EPRI HRA Calculator
4.0 Manpower
Requirements:
1/5/20121/5/2012 O p erations: Shift Mana g er 1 0 Shift Su p ervisor: 1 1 STA: 1 1 Reactor o p erators: 2 1 Plant o p erators: 4 2 Maintenance
- Mechanics:
0 0 Electricians:
0 0&C Technicians:
0 0 Health Ph y sics: Technicians:
1 0 Chemist: Technicians:
1 0 Execution Performance Shaping Factors: Environment
- Li g htin g Normal Heat/Humidit y Normal Radiation Back g round Atmos p here Normal S p ecial Re q uirements:
Com p lexi ty of Res p onse: Co g nitive Sim le Execution Com p lex E q ui p ment Accessibilit
- Control Room Accessible Cable Spreading Room (AB 607'Accessible Stress: Moderate Plant Res p onse As Ex p ected: Yes Workload: Low Performance Sha p in g Factors: Ne g ative Performance Shaping Factor Notes: Because of the relatively long system window, the workload is not high.While the PSFs could be assigned as"negative" due to the emergency lighting in service for a LOOP case, operator interviews conducted in August 2009 confirmed that there is sufficient emergency lighting available for both access and execution.
The PSFs are therefore not assessed as negative.Additionally, a second AO would do peer checking on a"not to delay basis." However, there is more than sufficient time to complete this action as the SPAR execution ratio is 6.17 EPRI HRA Calculator
4.0 Timing
T S W 4.00 Hours T delay 60.00 Minutes I T11 0.00 Minutes Cue t=0 T H 30.00 Minutes 1/5/20121/5/2012 Irreversible DamageState Timing Analysis: The system window is based on battery depletion time.As given in the EOP-3.0 basis document (rev 11)[47], the battery depletion time is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per DBD Chapter 4.01, Section 3.2.2, and FSAR Chapter 8.According to an OPS estimate, it will take the operators 20 minutes to complete EOP-1.0.For a LOOP event, the crew will then transition to EOP-8.0 LOSS OF OFFSITE POWER/NATURAL CIRCULATION RECOVERY.EOP-8.0 safety function status checks require 3 of 4 preferred AC busses to be energized.
If the safety function criteria (SF)are not met (2 or more preferred AC busses NOT energized), then the operators would transition to EOP-9.0 Functional Recovery Procedure and start working through success path MV-AE-DC-1 since it is the only"jeopardized" SF.MV-AE-DC-1 step 6 directs operators to verify at least 3 preferred AC busses are energized.
If less than 3 are available, contingency action step 6.1 directs operators to ENERGIZE ALL available preferred AC Buses per ONP-24.1, 2, 3, 4 as applicable.
Reaching this step is expected to take another 40 minutes per OPS estimates (08/26/09).
Therefore, the time to reach the direction for this action is expected to take a total of 60 minutes.(Tdelay)The manipulation time estimate for this action is 30 minutes.(OPS estimate 08/26/09)Time available for recovery: 150.00 Minutes SPAR-H Available time (cognitive): 150.00 Minutes SPAR-H Available time (execution)ratio: 6.00 Minimum level of dependence for recovery: ZD 18 I EPRI HRA Calculator
4.0 Cognitive
Unrecovered ACP-CBOB-BYREG-2 Table 3: ACP-CBOB-BYREG-2 COGNITIVE UNRECOVERED Pc Failure Mechanism Branch HEP Pca: Availabilit y of Information a ne g.Pcb: Failure of Attention a ne g.Pc,,: Misread/miscommunicate data a ne g.Pcd: Information misleadin g a ne g.Pce: Ski p a ste p in p rocedure 6.0e-03 Pcf: Misinter p ret instruction a ne g.Pc: Misinter p ret decision lo g ic c 6.0e-03 Pch: Deliberate violation a ne g.Sum of PCa throu g h PCh=Initial Pc=1.2e-02 1/5/20121/5/2012 19 EPRI HRA Calculator 4.0 pca: Availability of information Indication Avail in CR Indication Warning/Aitemate Training on CR Accurate in Procedure Indicators
1.Oe-01 (a)neg.--O.Oe+00 (b)neg.1.0e+00 6.Oe+00 Me-01 (c)neg.3.0e-03 (d)1.5e-03 Yes 5.0e-01 1.Oe+No 1.Oe-0 1 (e)5.0e-02 1.0e+00 (f)5.0e-01 1.Oe+00 1.0e+00 (g)O.Oe+00 1/5/20121/5/2012 Preferred AC bus indications are available in the CR and they are accurate.The operators have been trained on all CR indications.
pcb: Failure of attention Low vs.Hi[:J Workload ck vs.Monitor Front vs.Back Panel Alarmed vs.Not Alarmed Check Er+00-------(a)neg.O.Oe+00 Back (b)1.5e-04 S.Oe-02 Low 3.0e-03 (c)3.0e-03 1.0e+Dn 1.2.(d)1.5e-04 (e)3.0e-03 (f)3.0e-04 (g)6.0e-03 (h)neg.(i)neg.(j)7.5e-04 (k)1.5e-02 (I)7.5e-04 (m)1.5e-02 (n)1.5e-03 (o)3.0e-02 The operator workload would not be high in view of the long system window.The operator would only need to check preferred AC bus status, located on a front panel, to recognize the need for this action.20 I EPRI HRA Calculator 4.0 No pcc: Misread/miscommunicate data Indicators Easy to Good/Bad Indicator Formal Locate Communications
r O.Oe+00-(a)neg.oe-woo (b)3.0e-03--r 3.0e-03+00 (c)1.0e-03 1.0e-03 (d)4.0e-03 3.0e-03 (e)3.0e-03 (f)6.0e-03 (g)4.0e-03 (h)7.Oe-03 1/5/20121/5/2012 The AC bus indications are easy to locate and they do not have human engineering deficiencies.
The Palisades operators use formal communications.
pcd: Information misleading All Cues as Stated Warning of Specific Training General Training Differences No------------------------------(a)neg.All cues are as stated.pce: Skip a step in procedure Obvious vs.Single vs.Multiple Graphically Placekeeping Aids Hidden Distinct (b)3.Oe-03 (c)1.0e-02 (d)1.0e-01 (e)1.0e+00 3.0e-03 (a)1.Oe-03 3.3e-01 (b)3.0e-03 1.Oe-02 O.Oe+00 (c)3.0e-03 3.Oe-03 1.0e+00 (d)1.0e-02 1.0e-02 O.Oe+00 (e)2.Oe-03 3.0e-03 Yes 3.3e-01 1.Oe-02 (f)4.0e-03 No 3.Oe-03--------(g)6.0e-03 3.Oe-0 3 1.Oe+00 (h)1.3e-02 1.0e-02 (i)1.0e-01 The applicable procedure steps are not hidden in any way although they are not graphically distinct.The operators are potentially in multiple procedures.
The EOPs have placekeeping aids and the Palisades operators use the circle/slash method of placekeeping for the SOPs.21 I EPRI HRA Calculator 4.0 pcf: Misinterpret instruction Standard or All Required Training on Step Ambiguous wording Information rde-ROO-------(a)neg.Oe+00 (b)3.0e-03 1 Oe-01 3.0e-02 (c)3.0e-02 1.0e+00 No 1.0e-01 (d)3.0e-03 1.0e+00 (e)3.0e-02 1.0e-01 (f)6.Oe-03 4 n"-nn (g)6.0e-02 1/5/20121/5/2012 The applicable procedure steps use standard wording and the operators have all the information they need to complete this action.pcg: Misinterpret decision logic"NOT" Statement"AND" or"OR" Both"AND"&Practiced Scenario Statement"OR" 3.3e-01 (a)1.Be-02 3.Oe-02 (b)4.9e-02 1.Oe+00 2e-02 (c)8.Oe-03_------3.3e-01 6Ae-03 L O.Oe+00 1.0e+00 (d)1.9e-02 3.3e-01 (e)2.0e-03 oe+oo (f)6.Oe-03 Yes 1.Oe+00 No 3.3e-0 1 (g)1.0e-02 3.0e-02 (h)3.1e-02 1.Oe+00 1.0e-03 (i)3.0e-04 3.3e-01 O.Oe+00 O.Oe+00 1.Oe+00 (j)1.Oe-03 3.3e-01 (k)neg.O.Oe+00 n^^n (I)neg.There are implied NOT and AND statements in the decision logic for this action.There are no OR statements.
The operators have practiced loss of preferred AC bus restoration actions in the simulator.
pch: Deliberate violation Belief in Adequacy Adverse Reasonable Policy of of Instruction Consequence if Alternatives"Verbatim" O.Oe+00-----------(a)neg.Yes O.Oe+00 (b)5.0e-01 No O.Oe+00 (c)1.0e+00 O.Oe+00 O.Oe+00 O.Oe+00 O.Oe+00 (d)neg.0.0e+00 (e)neg.The Palisades operators believe in the adequacy of their instruction.
4.0 Cognitive
Recovery ACP-CBOB-BYREG-2 Table 4: ACP-CBOB-BYREG-2 COGNITIVE RECOVERY 1/5/20121/5/2012 Initial HEP a>Wa)3: Luc)<U)a)>!E CU o LL 0^>wa)"-0 co=?of Final Value Pca: ne g.----1.0e+00 Pcb: ne g.------1.0e+00 Pcc: ne g.------1.0e+00 Pcd: ne g.------1.0e+00 Pce: 6.0e-03 X X---5.0e-02 3.0e-04 Pcf: ne g.------1.0e+00 Pc: 6.0e-03-X X--5.0e-02 3.0e-04 Pch: ne g.------1.0e+00 Sum of Pca throu g h Pch=Initial Pc=6.0e-04 Notes: "Extra crew" is used as a surrogate for"Shift Supervisor" (Control Room Supervisor) credit.23 I EPRI HRA Calculator
4.0 Execution
Unrecovered ACP-CBOB-BYREG-2 Table 5: ACP-CBOB-BYREG-2 EXECUTION UNRECOVERED 1/5/20121/5/2012 Procedure: SOP-30 , STATION POWER Comment Stress Over Ride Step No.Instruction
/Comment Error THERP HEP Factor Type Table Item NP-24.2 NOTE CHECK for fault per Note located prior to step 4.17 in ONP-24.2 NOTE located prior to step 4.17 in ONP-24.2: NOTE: If the loss of the preferred AC bus is due to the Inverter DC input breaker opening and the Inverter AC output breaker did NOT trip, it is unlikely that there is a fault on the referred AC bus itself.2 EOM 20-7b 2 1.3E-3 EOC 20-9 2 1.3E-3 EOC 20 11 7 ne g.Total Ste p HEP 5.2e-03 IF the Preferred AC Bus is to be restored on the Bypass Regulator following an Inverter failure , THEN PLACE the Manual Bypass Switch in the BYPASS SOURCE p osition.SOP-30-7.6.2.c--EOM 20-7b 2 1.3E-3 2 EOC 20-12 4 1.3E-3 EOC 20-12 8a 2.7E-4 Total Ste p HEP 5.8e-03 CLOSE (ON)Breaker 41 on Instrument AC Bus Y01 EOM 20-7b 2 1.3E-3 SOP-30-7.6.2.d EOC 20-12 12 3.8E-3 2 EOC 20-12 8a 2.7E-4 Total Ste p HEP 1.1e-02 PLACE the Kirk interlock key (SS key#234)into the breaker lock for Preferred AC Bus to be transferred
.(Located in B yp ass Re g ulator)selection error is negligible SOP-30-7.6.2.e--EOM 20-7b 2 1.3E-3 2 used as a surro g ate EOC 20-12 8a 2.7E-4 Total Ste p HEP 3.1e-03 PLACE the breaker lock to OPEN position (this allows permissive closing of associated breaker).SOP 30-7 6 2 f EOM 20-7b 2 1.3E-3 2...EOC 20-12 3 1.3E-3 EOC 20-12 8a 2.7E-4 Total Ste HEP 5.8e-03 24 I EPRI HRA Calculator 4.0 1/5/20121/5/2012 CLOSE (ON)the B yp ass Re g ulator Breaker to the Inverter to be s p ared.EOM 20-7b 2 1.3E-3 SOP 30-7.6.2.g EOC 20-12 4 1.3E-3 2 EOC 20-12 8a 2.7E-4 Total Ste p HEP PERFORM the following to transfer loads from the Inverter to the Bypass 5.8e-03 Re g ulator EOM 20-7b 2 1.3E-3 selection error-CLOSE B yp ass Source AC In ut Breaker.EOC 20-12 4 1.3E-3 mani p ulation error-CLOSE B yp ass Source AC In p ut Breaker.EOC 20-12 8a 2.7E-4 VERIFY In S y nc li g ht is ON.EOC 20-9 1 VERIFY In S y nc li g ht is ON.EOC 20-11 7 ne.ne PUSH"B yp ass Source To Load" ushbutton.
EOC 20-12 4.1.3E-3 PUSH"B yp ass Source To Load" p ushbutton.EOC 20-12 8a 2.7E-4 VERIFY"B yp ass Source Su pp l y in g Load" li g ht is ON.EOC 20-9 2 1.3E-3 SOP 30-7.6.2.h.VERIFY"B yp ass Source Su pp l y in g Load" li g ht is ON.EOC 20-11 7 ne g 2 ENSURE Manual B yp ass Switch in BYPASS SOURCE p osition.EOC 20-9 2.1.3E-3 ENSURE Manual Bypass Switch in BYPASS SOURCE position.Used as EOC 20-11 7 a surro g ate.neg.OPEN Inverter Out p ut breaker.EOC 20-12 4 1.3E-3 OPEN Inverter Out p ut breaker.EOC 20-12 8a 2.7E-4 OPEN B yp ass Source AC In p ut breaker.EOC 20-12 4 1.3E-3 OPEN B yp ass Source AC In p ut breaker.EOC 20-12 8a 2.7E-4 DEPRESS ALARM RESET to clear Inverter alarms.EOC 20-12 3 1.3E-3 DEPRESS ALARM RESET to clear Inverter alarms.EOC 20-12 8a 2.7E-4 OPEN Inverter Output breaker.Tot SHOULD I ADD THE STEPS OMITTED?If not-al Ste p HEP 2.3e-02 chan a to short list SOP 30-7.6.2.6 EOM 20-7b 2 1.3E-3 2 EOC 20-12 4 1.3E-3 EOC 20-12 8a 2.7E-4 Execution recovery provided by independent personnel Tot See Section 4 3 of the HRA Notebook for further al Ste p HEP 2 5.8e-03.information
.This execution recovery factor is applied 0.5 to the individual execution steps with a dependence factor based on the time available for recovery.Note EXEC RECOV-that the execution stress factors applied to the OCR execution subtasks are not applied to the execution recovery factor.The EOM does not apply.Although the execution occurs in both the control room and in the cable spreading room, the"outside control room" execution recove ry factor is a pp lied.Total Ste p HEP 5.0e-01 25 EPRI HRA Calculator
4.0 Execution
Recovery 1/5/20121/5/2012 ACP-CBOB-BYREG-2 Critical Step No.Recovery Step No.Table 6: ACP-CBOB-BYREG-2 EXECUTION RECOVERY Action HEP (Crit)HEP (Rec)Dep Cond.HEP Total for ONP-24.2 NOTE CHECK for fault er Note located p rior to ste p 4.17 in ONP-24.2 5.2e-03 ecec step 2 6e-03 EXEC RECOV-Execution recovery provided by independent personnel.OCR 5.0e-01 ZD 5.0e-01 SOP-30-7.6.2.c IF the Preferred AC Bus is to be restored on the bypass Regulator following an Inverter failure , THEN PLACE the 5.8e-03 2 9e-03 Manual B yp ass Switch in the BYPASS SOURCE p osition..EXEC RECOV-Execution recovery provided by independent personnel OCR 5.0e-01 ZD 5.0e-01 SOP-30-7.6.2.d CLOSE (ON)Breaker 41 on Instrument AC Bus Y01 1 1e-02 EXEC RECOV-Execution recovery provided by independent personnel.5.5e-03 OCR 5.Oe-01 ZD 5.Oe-01 SOP-30-7.6.2.e PLACE the Kirk interlock key (SS key#234)into the breaker lock for Preferred AC Bus to be transferred.(Located in 3.1a-03 1.6e-03 B yp ass Re g ulator)EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.Oe-01 SOP 30-7.6.2.f PLACE the breaker lock to OPEN position (this allows p ermissive closin g of associated breaker).5.8e-03 2.9e-03 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.0e-01 SOP 30-7.6.2.g CLOSE (ON)the Bypass Regulator Breaker to the Inverter to be s p ared.5.8e-03 2.9e-03 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.0e-01 ZD 5.0e-01 SOP 30-7.6.2.h.PERFORM the following to transfer loads from the Inverter to the B yp ass Re g ulator 2.3e-02 1.2e-02 EXEC RECOV-Execution recovery provided by independent personnel OCR 5.Oe-01 ZD 5.Oe-01 SOP 30-7.6.2.6 OPEN Inverter Out p ut breaker.5.8e-03 2 9e-03 EXEC RECOV-Execution recovery provided by independent personnel.OCR 5,1:-01 ZD 5.Oe-01 Total Unrecovered:
6.5e-02 Total Recovered: 3.3e-02 26 O Entergy PSA En ineerin EA-PSA-SDP-D11-2 07 Rev.1 EnteiXy g g Analysis Attachment 13-Page 1 of 4 Attachment 13 Procedure Use Evaluation for DC Panel ED-11-2 Fault Event This attachment contains the following:Event procedure use in narrative formatEvent procedure use in flow chart format (Figure Al 3-1)Note: the narrative and flow chart provide an overview of procedure usage during the ED-11-2 event.They are not all inclusive, i.e.they do not include all procedures referenced
/used during the event.Procedure Use Narrative 1.Procedure Use Expectations During the ED-11-2 event multiple procedures were concurrently in use, including Emergency Operating Procedures (EOPs), Off Normal Procedures (ONPs), Annunciator Response Procedures (ARPs), General Operating Procedures (GOPs)and System Operating Procedures (SOPs).EOP and ONP procedure steps are written in the order the writer expects the plant to respond.Since the plant may not respond exactly as predicted, performance of steps out of sequence may be necessary.
To avoid masking event symptoms and complicating diagnosis, additional actions to those stated in the EOP-1.0 Immediate Actions are not permitted until EOP-1.0 event diagnosis completion, except as directed as an immediate action of an applicable ONP, or are otherwise immediately essential for personnel safety, plant safety, equipment protection or safety of the public.II.EOP-1.0 Standard Post-Trip Actions Operators enter EOP-1.0 Standard Post-Trip Actions and perform Immediate and Operator Actions.The loss of dc and preferred ac buses precluded verification of some required conditions.
For example, main generator breaker, atmospheric steam dump valve, and auxiliary feedwater pump P-8B and associated flow control valve indications were not available.Operators performed contingency action 2.b.1 to open the main generator breakers after verifying their status with International Transmission Control (ITC).The loss of dc panels ED-11-1 and ED-11-2 and preferred ac buses EY-10 and EY-30 were identified.
EOP-1.0 Operator Actions include performing GOP-10 Balance of Plant Actions Following A Reactor Trip and event diagnosis using the diagnostic flow chart.Due to not having at least 3 preferred ac buses energized , the operators were directed to EOP-9.0 Functional Recovery Procedure.GOP-10 checklist GCL-10.1 Post Trip Checklist Inside Control Room directs review of control panel annunciators and referencing associated ARPs.The unavailability of ED-11-1 and ED-11-2 noted previously and annunciator EK-0548 125V DC UNDERVOLTAGE ARP-3 Electrical Auxiliaries and Diesel Generator Scheme EK-05 (EC-11)direction provided cues for ONP-2.3 Loss of DC Power entry.Operators entered both EOP-9.0 and ONP-2.3.
Entergy PSA En ineerin EA-PSA-SDP-D11-2 07 Rev.I Entero b-y g g Analysis Attachment 13-Page 2 of 4 III.EOP-9.0 Functional Recovery Procedure Operators enter EOP-9.0 and perform Operator Actions including referring to Site Emergency Plan (SEP)EI-1, verifying emergency boration in progress and identifying in use safety function success paths.It was determined that SEP implementation was not required.The following safety function success paths were selected based on EOP-9.0 Resource Assessment Tree'conditions' criteria: 1.Reactivity Control: RC-3 Boration Using SIS (due to SIAS activated) 2.Maintenance of Vital Auxiliaries Electric DC: MVAE-DC-1 Battery Chargers/Station Batteries 3.Maintenance of Vital Auxiliaries Electric AC: MVAE-AC-1 Offsite Power 4.Inventory Control: IC-2 Safety Injection (due to SIAS activated) 5.Pressure Control: PC-3 Saturated Pressure Control (due to SIAS activated) 6.Heat Removal: HR-2 S/G with SI Operating (due to SIAS activated) 7.Containment Integrity:
CI-1 Automatic/Manual Isolation 8.Containment Atmosphere Control: CA-1 Containment Air coolers (Normal Mode*)9.Maintenance of Vital Auxiliaries Water: MVAW-1 Service Water and CCW 10.Maintenance of Vital Auxiliaries Air: MVAA-1 Instrument Air Compressors
- Note: Although containment air coolers were operating in the Emergency Mode, CA-1 was selected based on meeting plant conditions criteria, i.e.containment temperature
<125oF and containment pressure<0.85 psig.Operators identified MVAE-DC-1 as the only jeopardized safety function and proceeded completing appropriate actions while monitoring other safety functions by performing periodic safety function status checks (SFSCs).The MVAE-DC-1 instruction column Step 6 condition requiring at least 3 preferred ac buses energized was not met.This required operators to perform the contingency action ('ENERGIZE ALL available Preferred AC Buses'), referring to applicable ONPs (ONP-24.1 Loss of Preferred AC Bus Y-10 and ONP-24.3 Loss of Preferred AC Bus Y-30).After verification of bus EY-30 being fault-free, operators energized EY-30 from the bypass regulator per ONP-24.3 and SOP-30 Station Power Section 7.6.2.Pressurizer (PZR)pressure and level controllers and the heater select switch were placed in channel B during performance of ONP-24.3.This action enabled the PZR spray valves (lowered PCS pressure), reduced P-55A charging pump speed from 53 gpm to 33 gpm and opened the letdown orifice isolation valves.Opening the orifice valves resulted in RV-2006 lifting and annunciator EK-0702 RELIEF VALVE 2006 RELIEF VALVE DISCH HI TEMP alarming.Operators isolated flow to RV-2006 by placing the orifice valve handswitches to close per ARP-4 Primary System Volume Level Pressure Scheme EK-07 (C-12).Due to observed high PZR level, in use success paths Inventory Control IC-2 and Heat Removal HR-2 were referenced for direction to stop PCS inventory addition.Emergency boration requirements were verified per HR-2 Step 6 and safety injection throttling criteria verified per IC-2 Step 10.Operators then throttled safety injection, including stopping both operating charging pumps.
Entergy PSA En ineerin EA-PSA-SDP
-D11-2-11-07 Rev.1 nteW g g Analysis Attachment 13-Page 3 of 4 IV.ONP-2.3 Loss of DC Power Due to observed steam generator E-50A high level, operators identified the need to stop AFW pump P-8B.ONP-2.3 Step 2.b directs stopping P-8B by closing steam supply valve CV-0522B per SOP-12 Feedwater System Section 7.2.3 and Attachment 9.Operators dispatched a plant operator to close CV-0522B using EOP Supplement 19 Alternate Auxiliary Feedwater Methods Section 4 Steps 2.a and 2.b, which is equivalent to SOP-12 for the necessary actions.After verifying dc buses ED-1 OL and ED-10R fault free, operators energized them from station battery ED-01 per ONP-2.3 Step 11 and placed#3 battery charger ED-17 in service per SOP-30 Step 7.8.2.After verifying bus EY-10 fault-free, and due to its normal power supply (inverter ED-06)not being available (dc input breaker tripped open), operators energized EY-30 from its normal power supply (inverter ED-08)per SOP-30 Step 7.6.3 and energized EY-10 from the bypass regulator per SOP-30 Step 7.6.2.Reenergizing panel ED-11-1 resulted in instrument air compressor C-2A tripping and annunciator EK-1104 AIR COMPRESSORS C2A, C2B, C2C TRIP alarming.Per ARP-7 Auxiliary Systems Scheme EK-11 (C-13)operators manually started C-2B and C-2C and referred to ONP-7.1 Loss of Instrument Air.(Compressors C-2B and C-2C did not automatically start due to breaker 72-119 not being available.)
Procedure Use Flow Chart Procedure Use Flow Chart Figure A13-1: Procedure Use Flow Chart Ift Entergy PSA EA-PSA-SDP
-D11-2-11-07 Rev.1 En ineerin Entero g g Analysis Attachment 13-Page 4 of 4 References
[1]Admin 4.06, Revision 20, Emergency Operating Procedure Development and Implementation
[2]Admin 4.16, Revision 3, Off Normal Procedure Development and Implementation
[3]ARP-3, Revision 70, Electrical Auxiliaries and Diesel Generator Scheme EK-05 (EC-1 1)[4]ARP-4, Revision 58, Primary System Volume Level Pressure Scheme EK-07 (C-12)[5]ARP-7, Revision 79, Auxiliary Systems Scheme EK-1 1 (C-13)[6]EI-1, Revision 54, Emergency Classification and Actions[7]EOP Supplement 19, Revision 10, Alternate Auxiliary Feedwater Methods[8]EOP-1.0, Revision 13, Standard Post-Trip Actions[9]EOP-9.0, Revision 21, Functional Recovery Procedure[10]EOP-9.0 HR-2, Revision 22, Heat Removal-2[11]EOP-9.0 IC-2, Revision 22, Inventory Control-2[12]EOP-9.0 MVAE-DC-1, Revision 20, Maintenance of Vital Auxiliaries Electric-DC-1
[13]GOP-10, Revision 21, Balance of Plant Actions Following A Reactor Trip[14]ONP-2.3, Revision 16, Loss of DC Power[15]ONP-7.1, Revision 13, Loss of Instrument Air[16]ONP-24.1, Revision 24, Loss of Preferred AC Bus Y10[17]ONP-24.3, Revision 24, Loss of Preferred AC Bus Y30[18]SOP-12, Revision 60, Feedwater System[19]SOP-30, Revision 63, Station Power Figure A13-1: Procedure Use Flow Chart EOP-1.0 Standard Post-Trip Actions EOP-1.0 Immediate Actions EOP-1.0 Operator Actions Perform diagnostic flow chart EOP-9.0 Functional Recovery Procedure EOP-9.0 Operator Actions Step 11 directs identifying safety function success paths (MVAE-DC-1 is"jeopardized", i.e.acceptance criteria not met)Step 1 directs referring to Site Emergency Plan El-1 (determined implementation not reauired)Contingency actions are required, e.g.jumper to open main generator breakers Operators note ED-11-1 and ED-11-2 not energized Step 4.6 acceptance criteria not met, i.e.<3 preferred ac buses energized Step 6 directs performing GOP-10 Balance of Plant Actions Following A Reactor Trip (includes GCL-10.1, GCL-10.2)GCL-10.1 Step 11 directs review all alarms, report unexpected alarms to the CRS and refer to ARPs as necessary ARP-3 for annunciator EK-0548 125V DC UNDERVOLTAGE directs referring to ONP-2.3 Loss of DC Power ONP-2.3 symptoms observed, entry conditions met Perform Operator Actions for MVAE-DC-1 Step 6 Contingency Action directs energizing ALL available preferred ac buses per applicable ONPs, i.e.ONP-24.1 and ONP-24.3 ON P-24.3 Loss of Preferred AC Bus Y-30 Step 4.5 directs placing EY-30 on the bypass regulator per SOP-30 Step 7.6.2 Placed EY-30 on#3 inverter ED-08 per SOP-30 Step 7.6.3 Perform Safety Perform Operator Perform Operator Function Status Checks Actions for IC-2 Actions for HR-2 (SFSCs)on remaining safety functions O N P-24.1 Loss of Preferred AC Bus Y-10 Step 4.4 directs selection PZR level control channel B Step 4.5 directs selection PZR heater control channel B Step 4.6 directs selecting PZR pressure control channel B Step 4.15 directs placing EY-10 on the bypass regulator per SOP-30 Step 7.6.2 Step 10 Verifies Step 6 Verifies PCS 51 throttling boron concentration criteria met met for securing I emergency boration Stopped charging pumps Step 2.b directs stopping auxiliary feedwater (AFW)pump P-8B per SOP-12 Section 7.2.3, Attachment 9*Operators performed this action per EOP Supplement 19 Section 4 Steps 2a and 2b which direct equivalent actions Step 11 directs restoring station battery ED-01 dc bus sections, and verifying preferred ac inverters restored (ED-06 not available) and 1 battery charger in service Placed#3 battery charger ED-17 in service per SOP-30 Step 7.8.2