|
|
Line 19: |
Line 19: |
| {{#Wiki_filter:* * | | {{#Wiki_filter:* * |
| * ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: | | * ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: |
| Byron Date of Exam: 04/29/2013 Exam Level: RO [8:1 SRO [8:1 Item Description | | Byron Date of Exam: 04/29/2013 Exam Level: RO [8:1 SRO [8:1 Item Description |
| : 1. Questions and answers are technically accurate and applicable to the facility. | | : 1. Questions and answers are technically accurate and applicable to the facility. |
| : 2. a. NRC KJAs are referenced for all questions. | | : 2. a. NRC KJAs are referenced for all questions. |
| : b. Facility learning objectives are referenced as available. | | : b. Facility learning objectives are referenced as available. |
| : 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exam, consult the NRR OL program office). 5. 6. 7. 8. 9. 10. 11. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate: | | : 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exam, consult the NRR OL program office). 5. 6. 7. 8. 9. 10. 11. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate: |
| _ the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started; or _ the examinations were developed independently; or _ the licensee certifies that there is no duplication; or _ other (explain) | | _ the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started; or _ the examinations were developed independently; or _ the licensee certifies that there is no duplication; or _ other (explain) |
Line 28: |
Line 28: |
| enter the actual RO I SRO-only question distribution(s) at right. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension | | enter the actual RO I SRO-only question distribution(s) at right. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension |
| /analysis level; the SRO exam may exceed 60 percent if the randomly selected KAs support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right. References/handouts provided do not give away answers or aid in the elimination of distractors. | | /analysis level; the SRO exam may exceed 60 percent if the randomly selected KAs support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right. References/handouts provided do not give away answers or aid in the elimination of distractors. |
| Question content conforms with specific KJA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are justified Question psychometric quality and format meet the guidelines in ES Appendix B. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with value on cover sheet a. Author b. Facility Reviewer(*) | | Question content conforms with specific KJA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are justified Question psychometric quality and format meet the guidelines in ES Appendix B. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with value on cover sheet a. Author b. Facility Reviewer(*) |
| : c. NRC Chief Examiner (#) d. NRC Regional Supervisor Note: | | : c. NRC Chief Examiner (#) d. NRC Regional Supervisor Note: |
| * The facility reviewer's are not apiJiicable f<lr | | * The facility reviewer's are not apiJiicable f<lr |
| # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required . ES-401, Page 29 of 33 Initial a b*}} | | # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required . ES-401, Page 29 of 33 Initial a b*}} |
Similar Documents at Byron |
---|
Category:License-Operator
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1732021-10-28028 October 2021 Proposed Sim JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1162021-10-28028 October 2021 ES-301-3 ML21361A2552021-10-28028 October 2021 ES-301-2 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3252021-10-28028 October 2021 Scenarios ML21361A3322021-10-28028 October 2021 Written Exam ML21361A2752021-10-28028 October 2021 ES-301-5 2024-06-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A2452021-10-28028 October 2021 ES-301-1 ML21356B7332021-10-28028 October 2021 ES-403-1 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3322021-10-28028 October 2021 Written Exam ML21361A1162021-10-28028 October 2021 ES-301-3 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A2552021-10-28028 October 2021 ES-301-2 ML21361A1352021-10-28028 October 2021 ES-401-6 ML21361A2562021-10-28028 October 2021 ES-401-2 2024-06-19
[Table view] |
Text
Byron Date of Exam: 04/29/2013 Exam Level: RO [8:1 SRO [8:1 Item Description
- 1. Questions and answers are technically accurate and applicable to the facility.
- 2. a. NRC KJAs are referenced for all questions.
- b. Facility learning objectives are referenced as available.
- 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exam, consult the NRR OL program office). 5. 6. 7. 8. 9. 10. 11. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
_ the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started; or _ the examinations were developed independently; or _ the licensee certifies that there is no duplication; or _ other (explain)
Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified};
enter the actual RO I SRO-only question distribution(s) at right. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension
/analysis level; the SRO exam may exceed 60 percent if the randomly selected KAs support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right. References/handouts provided do not give away answers or aid in the elimination of distractors.
Question content conforms with specific KJA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are justified Question psychometric quality and format meet the guidelines in ES Appendix B. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with value on cover sheet a. Author b. Facility Reviewer(*)
- c. NRC Chief Examiner (#) d. NRC Regional Supervisor Note:
- The facility reviewer's are not apiJiicable f<lr
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required . ES-401, Page 29 of 33 Initial a b*