{{Adams
{{Adams
| number = ML17284A126
| number = ML17244A109
| issue date = 09/06/2017
| issue date = 09/05/2017
| title = FOIA/PA-2017-0675, Request for Pilgrim Nuclear Power Station, the Problem Identification and Resolution Sample Inspection Report 05000293/2017405.
| title = Pilgrim Nuclear Power Station - Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only)
| author name = Legere C
| author name = Dentel G T
| author affiliation = Cape Cod Times
| author affiliation = NRC/RGN-I/DRS/EB2
| addressee name =  
| addressee name = Sullivan B
| addressee affiliation = NRC/OCIO
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| docket = 05000293
| license number =  
| license number = DPR-035
| contact person =  
| contact person = Dentel G T
| case reference number = FOIA/PA-2017-0675, IR 2017405
| document report number = IR 2017405
| document type = FOIA/Privacy Act Request
| document type = Letter
| page count = 1
| page count = 3
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: To: Legere. Christine FOIA Resource CASE NO: 2017-0675 DATE REC'D: 09/06/2017 Subject: [External_Sender]
{{#Wiki_filter:Sullivan September 5, 2017 Mr. Brian Sullivan Site Vice President Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station -Problem Identification and resolution sample inspection report: 05000293/2017405 Date: Wednesday, September 06, 2017 9:35:36 AM Letter to Brian Sullivan, Pilgrim VP dated Sept. 5, 2017 I request under the Freedom oflnformation Act documents related to the above-listed report, dealing with security-related problem identification and resolution inspection on Aug. 23, 2017 Christine Legere Cape Cod Times 508-916-0422 This message may contain confidential and/or privileged informatio If you are not the intended recipient or authorized to receive this for the intended recipient, you must not use, copy, disclose or take any action based on this message or any information herein. If you have received this message in error, please advise the sender immediately by sending a reply e-mail and delete this message. Thank you for your cooperatio *
 
600 Rocky Hill Plymouth, MA 02360-5508
 
SUBJECT: PILGRIM NUCLEAR POWER STATION - PROBLEM IDENTIFICATION AND RESOLUTION SAMPLE INSPECTION REPORT 05000293/2017405
 
==Dear Mr. Sullivan:==
On August 11, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security-
related Problem Identification and Resolution inspection at your Pilgrim Nuclear Power Station. On August 23, 2017, the NRC inspector discussed the results of this inspection with Mr. Franco Pasquale, Information Technology Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
The inspector documented two findings of very low security significance (Green) in this report. These findings involved violations of NRC requirem ents. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
 
Each finding had a distinct cross-cutting aspect. The first cross-cutting aspect was in the area of Problem Identification and Resolution, Resolution, because Entergy did not take effective
 
corrective actions to resolve and correct a previous NRC-identified violation [P.3]. The second cross-cutting aspect was in the area of Problem Identification and Resolution, Evaluation, because Entergy did not conduct an adequate evaluation of a security issue [P.2].
 
If you contest the violation or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. In addition, if you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC Resident Inspector at the Pilgrim Nuclear Power Station.
 
.
Enclosure contains Sensitiv e Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal docu m e n t i s deco n t r o ll ed. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely,/RA/ Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety
 
Docket No. 50-293 License No. DPR-35
 
Nonpublic
 
===Enclosure:===
Inspection Report 05000293/2017405
 
===w/Attachment:===
Supplementary Information
 
cc w/o encl; w/o OUO-SRI: Distribution via ListServ
 
cc w/encl; w/OUO-SRI:
P. Beabout, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA
 
ML17244A109 (Cover letter) ADAMS ACCESSION NUMBER: ML17244A104 (Cover letter w/enclosure) Non-Public Designation Category: MD 3.4 Non-Public A.3 Cover Letter SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME LDumont ABurrit GDentel DATE 8/24/17 8/30/17 8/25/17
}}
}}

Revision as of 22:35, 8 October 2018

Pilgrim Nuclear Power Station - Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only)
ML17244A109
Person / Time
Site: Pilgrim
Issue date: 09/05/2017
From: Dentel G T
Engineering Region 1 Branch 2
To: Brian Sullivan
Entergy Nuclear Operations
Dentel G T
References
IR 2017405
Download: ML17244A109 (3)


Text

Sullivan September 5, 2017 Mr. Brian Sullivan Site Vice President Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.

600 Rocky Hill Plymouth, MA 02360-5508

SUBJECT: PILGRIM NUCLEAR POWER STATION - PROBLEM IDENTIFICATION AND RESOLUTION SAMPLE INSPECTION REPORT 05000293/2017405

Dear Mr. Sullivan:

On August 11, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security-

related Problem Identification and Resolution inspection at your Pilgrim Nuclear Power Station. On August 23, 2017, the NRC inspector discussed the results of this inspection with Mr. Franco Pasquale, Information Technology Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspector documented two findings of very low security significance (Green) in this report. These findings involved violations of NRC requirem ents. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

Each finding had a distinct cross-cutting aspect. The first cross-cutting aspect was in the area of Problem Identification and Resolution, Resolution, because Entergy did not take effective

corrective actions to resolve and correct a previous NRC-identified violation [P.3]. The second cross-cutting aspect was in the area of Problem Identification and Resolution, Evaluation, because Entergy did not conduct an adequate evaluation of a security issue [P.2].

If you contest the violation or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. In addition, if you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC Resident Inspector at the Pilgrim Nuclear Power Station.

.

Enclosure contains Sensitiv e Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal docu m e n t i s deco n t r o ll ed. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/ Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 50-293 License No. DPR-35

Nonpublic

Enclosure:

Inspection Report 05000293/2017405

w/Attachment:

Supplementary Information

cc w/o encl; w/o OUO-SRI: Distribution via ListServ

cc w/encl; w/OUO-SRI:

P. Beabout, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA

ML17244A109 (Cover letter) ADAMS ACCESSION NUMBER: ML17244A104 (Cover letter w/enclosure) Non-Public Designation Category: MD 3.4 Non-Public A.3 Cover Letter SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME LDumont ABurrit GDentel DATE 8/24/17 8/30/17 8/25/17