| issue date = 03/31/1997
| issue date = 03/31/1997
| title = Forwards Application for Amend to License DPR-18 Re SFP Storage Requirements. Spent Fuel Pool Re-Racking Licensing Rept, Also Encl
| title = Forwards Application for Amend to License DPR-18 Re SFP Storage Requirements. Spent Fuel Pool Re-Racking Licensing Rept, Also Encl
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244

Revision as of 18:35, 18 June 2019

Forwards Application for Amend to License DPR-18 Re SFP Storage Requirements. Spent Fuel Pool Re-Racking Licensing Rept, Also Encl
ML17309A614
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1997
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A848 List:
References
NUDOCS 9704070035
Download: ML17309A614 (6)


Text

CATEGORY 1-MEGULAT(O INFORMATION DISTRIBUTION STEM (RIDE)t ACCESSION NBR:9704070035 DOC.DATE: 97/03/31 NOTARIZED:

NO FACIL:50'-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester'AUTH;NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Forwards application for amend to DPR-18,revising spent pool storage requirements."Spent Fuel Pool Re-racking Licensing Rept," also encl.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET G 05000244 fuel T 05000244 RECIPIENT ID CODE/NAME PD1-1 LA VISSINGFG.

INTERNA.CENTER 0~M NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 0 D E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTIONLISTS OR REDUCE THE NUMBER OF COPIES.RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 ANn ROCHESTER GAS AND ELECTRIC CORPORATION

~89 EASTAVENUE, ROCHESTER, N.Y Id649-0001 AREA CODE716 5'-2700 ROBERT C.MECREDY Vice President Nvcieor operations March 31, 1997 V.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

Application for Amendment to Facility Operating License, Revised Spent Fuel Pool Storage Requirements Rochester Gas&Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

The enclosed License Amendment Request (LAR)proposes to revise the Ginna Station Improved Technical Specifications (ITS)to reflect a planned modification to the spent fuel pool (SFP)storage racks.Specifications associated with SFP boron concentration, fuel assembly storage, and the maximum limit on the number of fuel assemblies which can be stored in the SFP will be revised.Also included within the LAR is a Licensing Report for the proposed SFP modification.

The modification to the SFP is necessary to accommodate storage of spent fuel until the expiration of the Ginna Station license in 2009.We request that this LAR be approved by January 1998 in order to support planned installation of the racks during power operation beginning in August 1998.This will allow implementation of this modification for the March 1999 Refueling Outage.We further request that upon NRC approval, the application should be considered effective immediately upon completion of the SFP modifications and implemented within 30 days thereafter.

Very truly yours, Robert C.Mecredy Attachments 9704070035 970331, PDR ADOCK 05000244 C PDR II!III/III!Illlilll!IIIIIIIIIIIII!

IIIIIIIIIII 4

U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)PWR Project Directorate I-1 Washington, DC 20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr.F.William Valentine, President New York State Energy, Research, and Development Authority 2 Rockefeller Plaza Albany, NY 12223-1253 p+gQQt)e++Q"j~O GI Ltl',,l~c g'~)ls~>l>>'<~L Rochester Gas K Electric K.K.Giena Mm,lear I'ower I'lant~,~>>1 II+'1s 4 i%I Spent Fuel Peel Re-racking Ucensing Repert February l997 l~)