{{#Wiki_filter:Three Mile Island -2 Post Shut Down Activities Report  Public Meeting Bruce Watson, CHPChief, Reactor Decommissioning BranchU.S. Nuclear Regulatory Commission, Washington, D.C. 20555 1
{{#Wiki_filter:Three Mile Island -2 Post Shut Down Activities Report  Public Meeting Bruce Watson, CHPChief, Reactor Decommissioning BranchU.S. Nuclear Regulatory Commission, Washington, D.C. 20555 1
US NRC Decommissioned Facilities 10126802401998199920002001200220032004200520062007200820092010201120122013Power Reactors 2Research ReactorsMaterials Sites Agenda*Discuss the NRC Decommissioning ProcessProcess*Discuss the TMI-2 Post Shutdown Decommissioning Activities Report (PSDAR)*Discuss the NRC Inspection Process*Hear public comments on PSDAR p3 Three Mile Island, Unit 2 PtShtdPost-Shutdown Decommissioning Activities Report John Buckley ReactorDecommissioningBranch Reactor Decommissioning BranchU.S. Nuclear Regulatory Commission, WashingtonDC20555 4Washington
US NRC Decommissioned Facilities 10 12 6 8 0 2 4 01998199920002001200220032004200520062007200820092010201120122013Power Reactors 2Research ReactorsMaterials Sites Agenda*Discuss the NRC Decommissioning Process Process*Discuss the TMI-2 Post Shutdown Decommissioning Activities Report (PSDAR)*Discuss the NRC Inspection Process*Hear public comments on PSDAR p 3 Three Mile Island, Unit 2 PtShtd P os t-Sh u td own Decommissioning Activities Report John Buckley ReactorDecommissioningBranch Reactor Decommissioning BranchU.S. Nuclear Regulatory Commission, WashingtonDC20555 4 Washington , D.C. 20555 NRC Decommissioning Process*Permanently cease operations*Certify permanent cessation of operations*Certify fuel removed from reactor*Submit PSDAR (within 2 years)
, D.C. 20555 NRC Decommissioning Process*Permanently cease operations*Certify permanent cessation of operations*Certify fuel removed from reactor*Submit PSDAR (within 2 years)
*SAFSTORand/orplantdecommissioning
*SAFSTORand/orplantdecommissioning
*SAFSTOR and/or plant decommissioning*Application for license termination (LTP)Liii5*License term ination TMI-2 Decommissioning Process*The March 28, 1979, accident made the shutdownofTMI2differentfromallother shutdown of TMI-2 different from all other reactors.CSS*NRC approved PDM S SAR on September 14, 1993, with License Amendment 45.*GPU submits PSDAR on June 28, 2013, to establish compliance with 50.82.
*SAFSTOR and/or plant decommissioning*Application for license termination (LTP)Liii 5*Li cense term i nat i on TMI-2 Decommissioning Process*The March 28, 1979, accident made the shutdownofTMI2differentfromallother shutdown of TMI-2 different from all other reactors.CSS*NR C approved PDM S S AR on September 14, 1993, with License A mendment 45.*GPU submits PSDAR on June 28, 2013, to establish compliance with 50.82.
6 PSDARRequirements PSDAR Requirements
6 PSDARRequirements PSDAR Requirements
*10 CFR 50.82(a)(4)
*10 CFR 50.82(a)(4)
*PSDAR describes:
*PSDAR describes:
-planned decommissionin g activities pg-decommissioning schedule
-p lanned decommissionin g activities pg-decommissioning schedule
-costestimateforthedecommissioning cost estimate for the decommissioning
-costestimateforthedecommissioning cost estimate for the decommissioning
-environmental impacts of decommissioning7decossog PSDAR Review Process*NRC notices receipt of PSDAR & requestspubliccomments requests public comments*NRC schedules PSDAR public meeting*NRC considers public comments
-environmental impacts of deco mmi ss i o nin g 7decossog PSDAR Review Process*NRC notices receipt of PSDAR & requestspubliccomments requests public comments*NRC schedules PSDAR public meeting*NRC considers public comments
*Review PSDAR in accordance with eeSaccodacet Regulatory Guide 1.185
*R e vi e w P S DAR in acco r da n ce wi t h eeSaccodacet Regulatory Guide 1.185
*PSDARdoesnotrequireNRCapproval 8*PSDAR does not require NRC approval PSDAR Review Criteria*Decom can be completed as described*Decom can be completed within 60 years*Decom can be completed for the estimated cost
*PSDARdoesnotrequireNRCapproval 8*PSDAR does not require NRC approval PSDAR Review Criteria*Decom can be completed as described*Decom can be completed within 60 years*Decom can be completed for the estimated cost
*Decom activities do not endanger public ecoacttesdootedagepubc health and safety or the environment 9
*D eco m act ivi t i es do n ot e n da n ge r pub li c ecoacttesdootedagepubc health and safety or the environment 9
PSDAR Highlights*Decommissioning of TMI-2 will start after TMI-1 operating license expires in April 2034 TMI2illbitiditPDMSdtil
PSDAR Highlights*Decommissioning of TMI-2 will start after TMI-1 operating license expires in April 2034 TMI2illbitiditPDMSdtil
*TMI-2 will be maintained in current PDMS mode until decommissioning begins
*TMI-2 w ill b e ma i n t a i ne d i n curren t PDMS mo d e un til decommissioning begins
*TMI-2licenseterminationwilloccurbeforeSeptember TMI2 license termination will occur before September 2053 (60 years after cessation of operations)*Decommissioning costs are estimated to be $844885000(bd2008dll)
*TMI-2licenseterminationwilloccurbeforeSeptember TMI 2 license termination will occur before September 2053 (60 years after cessation of operations)*Decommissioning costs are estimated to be $844885000(bd2008dll)
$844,885,000 (based on 2008 dollars)*Environmental impacts of planned decommissioning activitiesareboundedbyimpactsassociatedwithpost
$844 , 885 , 000 (b ase d on 2008 d o ll ars)*Environmental impacts of planned decommissioning activitiesareboundedbyimpactsassociatedwithpost
-10activities are bounded by impacts associated with postaccident cleanup activities and GEIS Conclusion*NRC received a PSDAR for TMI-2 on June282013 June 28, 2013*Although NRC is not required to approve SCthe PSDAR by regulation, NR C will review the PSDAR*NRC will consider the public comments in its review of the TMI-2 PSDAR 11 ThreeMileIsland
-10 activities are bounded by impacts associated with postaccident cleanup activities and GEIS Conclusion*NRC received a PSDAR for TMI-2 on June282013 June 28 , 2013*Although NRC is not required to approve SC the P S DAR by regulation, NR C will review the PSDAR*NRC will consider the public comments in its review of the TMI-2 PSDAR 11 ThreeMileIsland
-Unit2Three Mile Island -Unit 2Decommissioning Power Reactor OversightProgram Oversight ProgramPSDAR Public Meeting August 28, 2013Laurie A. Kauffman Health PhysicistDivision of Nuclear Materials Safety Region I Decommissioning Power Reactor OversightProgram Oversight Program*Decommissioning power reactor inspection program is described in Inspection Manual Chapter 2561AlItifdbRiItff
-Unit2 Three Mile Island -Unit 2Decommissioning Power Reactor OversightProgram Oversight ProgramPSDAR Public Meeting August 28, 2013Laurie A. Kauffman Health PhysicistDivision of Nuclear Materials Safety Region I Decommissioning Power Reactor OversightProgram Oversight Program*Decommissioning power reactor inspection program is described in Inspection Manual Chapter 2561AlItifdbRiItff
*Annual Inspection performed by Region I staff-Verify controls and methods for safe storage of radioactive material and structures at permanently shutdown reactors 13 TMI-2 SAFSTOR PROGRAM*No ongoing decommissioning activities  *Material condition of components remain unchanged*Safe storage programs being conducted according to Technical Specifications and site procedures*NRC Inspection Reports are located in ADAMS http://wwwnrcgov/reading
*A nnua l I nspec ti on per f orme d b y R eg i on I s t a ff-Verify controls and methods for safe storage of radioactive material and structures at permanently shutdown reactors 13 TMI-2 SAFSTOR PROGRAM*No ongoing decommissioning activities  *Material condition of components remain unchanged*Safe storage programs being conducted according to Technical Specifications and site procedures*NRC Inspection Reports are located in ADAMS http://wwwnrcgov/reading
-rm/adamshtml http://www
-rm/adamshtml http://www
.nrc.gov/reading rm/adams.html14 NRC Contacts*John Buckley, Project Manager-John.Buckley@nrc.gov-301-415-6607
.nrc.gov/reading rm/adams.html 14 NRC Contacts*John Buckley, Project Manager-John.Buckley@nrc.gov-301-415-6607
*BruceWatson,BranchChief Bruce Watson, Branch Chief-Bruce.Watson@nrc.gov-301-415-6221*Laurie Kauffman, Inspector
*BruceWatson,BranchChief Bruce Watson, Branch Chief-Bruce.Watson@nrc.gov-301-415-6221*Laurie Kauffman, Inspector
-Laurie.Kauffman@nrc.gov 610337532315-610-337-5323}}
-Laurie.Kauffman@nrc.gov 610 337 5323 15-610-337-5323}}

Revision as of 00:17, 14 July 2018

Enclosure 3- NRC Presentation Handout
ML13262A149
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/19/2013
From: Watson B A
NRC/FSME/DWMEP/DURLD/RDB
To:
Shared Package
ML13262A166 List:
References
Download: ML13262A149 (15)


Text

Three Mile Island -2 Post Shut Down Activities Report Public Meeting Bruce Watson, CHPChief, Reactor Decommissioning BranchU.S. Nuclear Regulatory Commission, Washington, D.C. 20555 1

US NRC Decommissioned Facilities 10 12 6 8 0 2 4 01998199920002001200220032004200520062007200820092010201120122013Power Reactors 2Research ReactorsMaterials Sites Agenda*Discuss the NRC Decommissioning Process Process*Discuss the TMI-2 Post Shutdown Decommissioning Activities Report (PSDAR)*Discuss the NRC Inspection Process*Hear public comments on PSDAR p 3 Three Mile Island, Unit 2 PtShtd P os t-Sh u td own Decommissioning Activities Report John Buckley ReactorDecommissioningBranch Reactor Decommissioning BranchU.S. Nuclear Regulatory Commission, WashingtonDC20555 4 Washington , D.C. 20555 NRC Decommissioning Process*Permanently cease operations*Certify permanent cessation of operations*Certify fuel removed from reactor*Submit PSDAR (within 2 years)

  • SAFSTORand/orplantdecommissioning
  • SAFSTOR and/or plant decommissioning*Application for license termination (LTP)Liii 5*Li cense term i nat i on TMI-2 Decommissioning Process*The March 28, 1979, accident made the shutdownofTMI2differentfromallother shutdown of TMI-2 different from all other reactors.CSS*NR C approved PDM S S AR on September 14, 1993, with License A mendment 45.*GPU submits PSDAR on June 28, 2013, to establish compliance with 50.82.

6 PSDARRequirements PSDAR Requirements

  • 10 CFR 50.82(a)(4)
  • PSDAR describes:

-p lanned decommissionin g activities pg-decommissioning schedule

-costestimateforthedecommissioning cost estimate for the decommissioning

-environmental impacts of deco mmi ss i o nin g 7decossog PSDAR Review Process*NRC notices receipt of PSDAR & requestspubliccomments requests public comments*NRC schedules PSDAR public meeting*NRC considers public comments

  • PSDARdoesnotrequireNRCapproval 8*PSDAR does not require NRC approval PSDAR Review Criteria*Decom can be completed as described*Decom can be completed within 60 years*Decom can be completed for the estimated cost
  • D eco m act ivi t i es do n ot e n da n ge r pub li c ecoacttesdootedagepubc health and safety or the environment 9

PSDAR Highlights*Decommissioning of TMI-2 will start after TMI-1 operating license expires in April 2034 TMI2illbitiditPDMSdtil

  • TMI-2 w ill b e ma i n t a i ne d i n curren t PDMS mo d e un til decommissioning begins
  • TMI-2licenseterminationwilloccurbeforeSeptember TMI 2 license termination will occur before September 2053 (60 years after cessation of operations)*Decommissioning costs are estimated to be $844885000(bd2008dll)

$844 , 885 , 000 (b ase d on 2008 d o ll ars)*Environmental impacts of planned decommissioning activitiesareboundedbyimpactsassociatedwithpost

-10 activities are bounded by impacts associated with postaccident cleanup activities and GEIS Conclusion*NRC received a PSDAR for TMI-2 on June282013 June 28 , 2013*Although NRC is not required to approve SC the P S DAR by regulation, NR C will review the PSDAR*NRC will consider the public comments in its review of the TMI-2 PSDAR 11 ThreeMileIsland

-Unit2 Three Mile Island -Unit 2Decommissioning Power Reactor OversightProgram Oversight ProgramPSDAR Public Meeting August 28, 2013Laurie A. Kauffman Health PhysicistDivision of Nuclear Materials Safety Region I Decommissioning Power Reactor OversightProgram Oversight Program*Decommissioning power reactor inspection program is described in Inspection Manual Chapter 2561AlItifdbRiItff

  • A nnua l I nspec ti on per f orme d b y R eg i on I s t a ff-Verify controls and methods for safe storage of radioactive material and structures at permanently shutdown reactors 13 TMI-2 SAFSTOR PROGRAM*No ongoing decommissioning activities *Material condition of components remain unchanged*Safe storage programs being conducted according to Technical Specifications and site procedures*NRC Inspection Reports are located in ADAMS http://wwwnrcgov/reading

-rm/adamshtml http://www

.nrc.gov/reading rm/adams.html 14 NRC Contacts*John Buckley, Project Manager-John.Buckley@nrc.gov-301-415-6607

  • BruceWatson,BranchChief Bruce Watson, Branch Chief-Bruce.Watson@nrc.gov-301-415-6221*Laurie Kauffman, Inspector

-Laurie.Kauffman@nrc.gov 610 337 5323 15-610-337-5323