Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


SUBJECT:
SUBJECT: BYRON STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000454/201340 5; 05000455/201340 5
BYRON STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000454/2013405; 05000455/2013405


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On October 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Byron Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.
On October 31, 2013 , the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Byron Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.


The enclosed inspection report documents the inspection results, which were discussed on October 31, 2013, with Mr. Kearney and other members of your staff.
The enclose d inspection report documents the inspection results, which were discussed on October 31, 2013 , with Mr. Kearney and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector s reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector s reviewed selected procedures and records, observed activities, and interviewed personnel.
Line 43: Line 42:
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
-Related Information
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos.
Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos.
Line 52: Line 49:


===Enclosure:===
===Enclosure:===
Inspection Report 05000454/2013405;05000455/2013405
Inspection Report 05000454/2013405;05000455/201340 5


===w/Attachment:===
===w/Attachment:===
Line 60: Line 57:
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR


T. Dimitriadis, RI B. Desai, RII M. Haire, RIV G. Armstrong
T. Dimitriadis, RI B. Desai, RII M. Haire, RIV G. Armstrong , Byron Station Security Manager J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl:
, Byron Station Security Manager J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl:
Distribution via ListServŽ
Distribution via ListServŽ
}}
}}

Revision as of 18:38, 13 July 2018

IR 05000454-13-405; 05000455-13-405: 10/28/2013 - 10/31/2013, Byron Station; Units 1 and 2; Routine Security Baseline Inspection. (Cover Letter Only)
ML13347B068
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/12/2013
From: Skokowski R A
Plant Support Branch II
To: Pacilio M J
Exelon Generation Co, Exelon Nuclear
Alan Anderson
References
IR-13-405
Download: ML13347B068 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 December 12, 2013

Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: BYRON STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000454/201340 5; 05000455/201340 5

Dear Mr. Pacilio:

On October 31, 2013 , the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Byron Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.

The enclose d inspection report documents the inspection results, which were discussed on October 31, 2013 , with Mr. Kearney and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector s reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection

. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Enclosure contains Sensitive Unclassified Non

-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos.

50-454; 50-455 License Nos. NPF-37; NPF-66 Nonpublic

Enclosure:

Inspection Report 05000454/2013405;05000455/201340 5

w/Attachment:

Supplemental Information

cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR

T. Dimitriadis, RI B. Desai, RII M. Haire, RIV G. Armstrong , Byron Station Security Manager J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl:

Distribution via ListServŽ