ML15196A522: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 July 22, 2015 | ||
& Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 July 22, 2015 | |||
==SUBJECT:== | ==SUBJECT:== | ||
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -REVIEW OF THE SPRING 2014 STEAM GENERA TOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164) | VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -REVIEW OF THE SPRING 2014 STEAM GENERA TOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164) | ||
==Dear Mr. Gatlin:== | ==Dear Mr. Gatlin:== | ||
By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14314A033), | By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14314A033), and May 21, 2015 (ADAMS Accession No. ML 15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21. The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed. | ||
and May 21, 2015 (ADAMS Accession No. ML 15147A017), | |||
South Carolina Electric | |||
& Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), | |||
Unit 1. These inspections were performed during refueling outage 21. The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed. | |||
If you have any questions, please contact the Project Manager, Shawn Williams, at 301A15-1009 or via e-mail at Shawn.Williams@nrc.gov. | If you have any questions, please contact the Project Manager, Shawn Williams, at 301A15-1009 or via e-mail at Shawn.Williams@nrc.gov. | ||
Docket No. 50-395 | Docket No. 50-395 | ||
Line 36: | Line 30: | ||
==Enclosure:== | ==Enclosure:== | ||
As Stated cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395 TAC NO. MF5164 By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14314A033), | As Stated cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395 TAC NO. MF5164 By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14314A033), and May 21, 2015 (ADAMS Accession No. ML 15147 A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator (SG) tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21. VCSNS, Unit 1, has three Westinghouse Delta-75 SGs that were installed in 1994. Each SG has 6,307 thermally treated alloy 690 tubes with an outside diameter of 0.6875 inches and a nominal wall thickness of 0.040 inches. The tubes are supported by nine Type 405 stainless steel tube support plates and the U-bend sections are supported by four Type 405 stainless steel anti-vibration bars. The first 17 rows of tubing were stress relieved during fabrication. | ||
and May 21, 2015 (ADAMS Accession No. ML 15147 A017), South Carolina Electric | |||
& Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator (SG) tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), | |||
Unit 1. These inspections were performed during refueling outage 21. VCSNS, Unit 1, has three Westinghouse Delta-75 SGs that were installed in 1994. Each SG has 6,307 thermally treated alloy 690 tubes with an outside diameter of 0.6875 inches and a nominal wall thickness of 0.040 inches. The tubes are supported by nine Type 405 stainless steel tube support plates and the U-bend sections are supported by four Type 405 stainless steel anti-vibration bars. The first 17 rows of tubing were stress relieved during fabrication. | |||
On June 29, 2015, the licensee provided clarification regarding their May 21, 2015 letter. The clarification is provided below: | On June 29, 2015, the licensee provided clarification regarding their May 21, 2015 letter. The clarification is provided below: | ||
* Eight tubes are plugged. | * Eight tubes are plugged. | ||
Line 46: | Line 37: | ||
* No degraded or dripping plugs were identified. | * No degraded or dripping plugs were identified. | ||
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings. | The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings. | ||
Based on a review of the information | Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by the Technical Specifications. | ||
In addition, the NRC staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Enclosure Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 July 22, 2015 | |||
In addition, the NRC staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Enclosure Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric | |||
& Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 July 22, 2015 | |||
==SUBJECT:== | ==SUBJECT:== | ||
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164) | VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164) | ||
==Dear Mr. Gatlin:== | ==Dear Mr. Gatlin:== | ||
By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14314A033}, | By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14314A033}, and May 21, 2015 (ADAMS Accession No. ML 15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21. The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed. | ||
and May 21, 2015 (ADAMS Accession No. ML 15147A017), | |||
South Carolina Electric | |||
& Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), | |||
Unit 1. These inspections were performed during refueling outage 21. The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed. | |||
If you have any questions, please contact the Project Manager, Shawn Williams, at 301-415-1009 or via e-mail at Shawn.Williams@nrc.gov. | If you have any questions, please contact the Project Manager, Shawn Williams, at 301-415-1009 or via e-mail at Shawn.Williams@nrc.gov. | ||
Docket No. 50-395 | Docket No. 50-395 |
Revision as of 00:38, 9 July 2018
ML15196A522 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 07/22/2015 |
From: | Shawn Williams Plant Licensing Branch II |
To: | Gatlin T D South Carolina Electric & Gas Co |
Williams S | |
References | |
TAC MF5164 | |
Download: ML15196A522 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 July 22, 2015
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -REVIEW OF THE SPRING 2014 STEAM GENERA TOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164)
Dear Mr. Gatlin:
By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14314A033), and May 21, 2015 (ADAMS Accession No. ML 15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21. The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed.
If you have any questions, please contact the Project Manager, Shawn Williams, at 301A15-1009 or via e-mail at Shawn.Williams@nrc.gov.
Docket No. 50-395
Enclosure:
As Stated cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395 TAC NO. MF5164 By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14314A033), and May 21, 2015 (ADAMS Accession No. ML 15147 A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator (SG) tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21. VCSNS, Unit 1, has three Westinghouse Delta-75 SGs that were installed in 1994. Each SG has 6,307 thermally treated alloy 690 tubes with an outside diameter of 0.6875 inches and a nominal wall thickness of 0.040 inches. The tubes are supported by nine Type 405 stainless steel tube support plates and the U-bend sections are supported by four Type 405 stainless steel anti-vibration bars. The first 17 rows of tubing were stress relieved during fabrication.
On June 29, 2015, the licensee provided clarification regarding their May 21, 2015 letter. The clarification is provided below:
- Eight tubes are plugged.
- The cumulative number of plugs is 16 (8 on the hot leg and 8 on the cold leg).
- All 16 plugs were in their proper locations.
- No degraded or dripping plugs were identified.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings.
Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by the Technical Specifications.
In addition, the NRC staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Enclosure Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 July 22, 2015
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 -REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164)
Dear Mr. Gatlin:
By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14314A033}, and May 21, 2015 (ADAMS Accession No. ML 15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21. The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed.
If you have any questions, please contact the Project Manager, Shawn Williams, at 301-415-1009 or via e-mail at Shawn.Williams@nrc.gov.
Docket No. 50-395
Enclosure:
As Stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 R/F Sincerely, IRA/ Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsAcrs_AcnwMailCTR Resource RidsNrrDorlDpr Resource RidsNrrPMSummer Resource RidsNrrLASFigueroa Resource RidsRgn2MailCenter Resource RidsNrrDeEpnb Resource KKarwoski, NRR GKulesa, NRR AJohnson, NRR AHuynh,NRR ADAMS Accession No.: ML 15196A522
- By Memo dated 07/10/15 OFFICE LPLll-1/PM LPLll-1/LA DE/ESGB/BC LPLll-1/BC LPLll-1/PM NAME SWilliams SFigueroa GKulesa RPascarelli SWilliams DATE 07/21/15 07/20/15 07/10/15 07/21/15 07/22/15 OFFICIAL RECORD COPY