MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2015 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 21 (TAC NO. MF5164)
Dear Mr. Gatlin:
By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14314A033), and May 21, 2015 (ADAMS Accession No. ML15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21.
The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed.
If you have any questions, please contact the Project Manager, Shawn Williams, at 301A15-1009 or via e-mail at Shawn.Williams@nrc.gov.
Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
As Stated cc w/encl: Distribution via Listserv
REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395 TAC NO. MF5164 By letter dated November 5, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14314A033), and May 21, 2015 (ADAMS Accession No. ML15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator (SG) tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21.
VCSNS, Unit 1, has three Westinghouse Delta-75 SGs that were installed in 1994. Each SG has 6,307 thermally treated alloy 690 tubes with an outside diameter of 0.6875 inches and a nominal wall thickness of 0.040 inches. The tubes are supported by nine Type 405 stainless steel tube support plates and the U-bend sections are supported by four Type 405 stainless steel anti-vibration bars. The first 17 rows of tubing were stress relieved during fabrication.
On June 29, 2015, the licensee provided clarification regarding their May 21, 2015 letter. The clarification is provided below:
- The cumulative number of plugs is 16 (8 on the hot leg and 8 on the cold leg).
- All 16 plugs were in their proper locations.
- No degraded or dripping plugs were identified.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings.
Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by the Technical Specifications. In addition, the NRC staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
Enclosure
ML15147A017), South Carolina Electric & Gas Co. (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at Virgil C. Summer Nuclear Station (VCSNS), Unit 1. These inspections were performed during refueling outage 21.
The NRC staff has completed its review of these reports and concludes that the licensee provided the information required by the VCSNS, Unit 1, Technical Specifications and that no additional follow-up is required at this time. The staff's review is enclosed.
If you have any questions, please contact the Project Manager, Shawn Williams, at 301-415-1009 or via e-mail at Shawn.Williams@nrc.gov.
Sincerely, IRA/
Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
As Stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 R/F KKarwoski, NRR RidsAcrs_AcnwMailCTR Resource RidsNrrLASFigueroa Resource GKulesa, NRR RidsNrrDorlDpr Resource RidsRgn2MailCenter Resource AJohnson, NRR RidsNrrPMSummer Resource RidsNrrDeEpnb Resource AHuynh,NRR ADAMS Accession No.: ML15196A522 *By Memo dated 07/10/15 OFFICE LPLll-1/PM LPLll-1/LA DE/ESGB/BC LPLll-1/BC LPLll-1/PM NAME SWilliams SFigueroa GKulesa RPascarelli SWilliams DATE 07/21/15 07/20/15 07/10/15 07/21/15 07/22/15