ML17257A161: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 24: Line 24:
Six-mile RadiusPBAPS Second License Renewal Pre-Application Meeting -Environmental 2HoltwoodDamMuddy Run Pumped Storage Hydro FacilityConowingoDamPeach Bottom Atomic Power  
Six-mile RadiusPBAPS Second License Renewal Pre-Application Meeting -Environmental 2HoltwoodDamMuddy Run Pumped Storage Hydro FacilityConowingoDamPeach Bottom Atomic Power  


Station Background -Plant SettingPBAPS Second License Renewal Pre-Application Meeting -Environmental 3NS[COPYRIGHTED AERIAL IMAGE OF PBAPS SITE WILL APPEAR HERE]
Station Background -Plant SettingPBAPS Second License Renewal Pre-Application Meeting -Environmental 3 N S[COPYRIGHTED AERIAL IMAGE OF PBAPS SITE WILL APPEAR HERE]
Background -Site LayoutPBAPS Second License Renewal Pre-Application Meeting -Environmental 4NS Discussion Topics
Background -Site LayoutPBAPS Second License Renewal Pre-Application Meeting -Environmental 4 N S Discussion Topics
*Environmental Report Title
*Environmental Report Title
*No Refurbishment
*No Refurbishment

Revision as of 14:51, 7 July 2018

September 19, 2017 Pre-application Public Meeting Presentation on Peach Bottom Subsequent License Renewal Application
ML17257A161
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/19/2017
From: Ranek N
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Nancy Martinez
References
Download: ML17257A161 (7)


Text

Peach Bottom Atomic Power Station Second License Renewal Pre-Application Meeting -EnvironmentalSeptember 19, 2017 AGENDAOpening Remarks

  • Exelon Generation
  • NRC StaffBackground Discussion of Topics Wrap-up *Summary of Action Items
  • Closing Remarks-Exelon Generation-NRC StaffExelon Attendees:Michael P. Gallagher -Exelon -VP License Renewal & Decommissioning Nancy L. Ranek -Exelon -License Renewal Senior Environmental Lead John G. Hufnagel, Jr. -Exelon -License Renewal Senior Licensing LeadRoberta (Bobbie) Hurley -AECOM -PBAPS SLR ER Project Director David R. Lewis -Pillsbury Winthrop Shaw Pittman LLC -Legal CounselPBAPS Second License Renewal Pre-Application Meeting -Environmental 1

Background -

Six-mile RadiusPBAPS Second License Renewal Pre-Application Meeting -Environmental 2HoltwoodDamMuddy Run Pumped Storage Hydro FacilityConowingoDamPeach Bottom Atomic Power

Station Background -Plant SettingPBAPS Second License Renewal Pre-Application Meeting -Environmental 3 N S[COPYRIGHTED AERIAL IMAGE OF PBAPS SITE WILL APPEAR HERE]

Background -Site LayoutPBAPS Second License Renewal Pre-Application Meeting -Environmental 4 N S Discussion Topics

  • Environmental Report Title
  • No Refurbishment
  • No Incorporation by Reference
  • PBAPS Unit 1
  • Power Uprates
  • Groundwater Monitoring Program
  • Transmission Lines
  • Protected Species
  • Clean Water Act Section 401 Certification
  • Coastal Zone Management Act Consistency Determination Not Required
  • No Adverse Effect on Cultural Resources
  • Status of NPDES Permit Renewal (Clean Water Act Sections 316a & 316b)
  • SAMA Analysis Not Required

Wrap Up*Summary of Action Items

  • Closing Remarks
  • Exelon Generation