Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23170A008 | 29 June 2023 | Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 | |
ML23157A035 | 6 June 2023 | Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides | |
ML23094A149 | 11 April 2023 | Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 | Exemption Request COVID-19 |
ML23076A044 | 16 March 2023 | Pb U2 Scram Barrier Presentation KT Session | Internal Flooding |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML21165A194 | 16 June 2021 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation | Coronavirus |
ML21165A288 | 16 June 2021 | Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) | Coronavirus |
ML21095A016 | 5 April 2021 | 2021 RIC Session T12 - DOE-Sponsored Light Water Reactor Sustainability Program | Probabilistic Risk Assessment Aging Management |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20175A872 | 23 June 2020 | Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach | |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML20168A319 | 15 June 2020 | Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation | Coronavirus |
ML19318F951 | 20 November 2019 | Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency | Grace period |
ML19317C995 | 12 November 2019 | In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 | Anchor Darling |
ML19308B926 | 5 November 2019 | ACRS Plant License Renewal Subcommittee - Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Safety Evaluation Report (SER) with Confirmatory Item | Aging Management EVT-1 |
ML19256E385 | 12 September 2019 | SLR Dseis Public Meeting Sept 12 2019 - Scott Portzline - Former Three Mile Island Alert Presentation | |
ML19256E352 | 12 September 2019 | Slides - Peach Bottom SLRA Dseis Public Meeting - Sep 12 2019 | |
ML19157A054 | 6 June 2019 | Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides | |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19151A660 | 31 May 2019 | BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19084A098 | 22 March 2019 | Potential Topics for Pre-Application Meetings for Peach Bottom SLRA | Aging Management |
ML19022A200 | 23 January 2019 | Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants | Loop seal |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18144A693 | 31 May 2018 | License Amendment Request for Expanded Actions for LEFM Flow Meter Conditions - NRC Pre-Submittal Meeting May 31, 2018 | High Radiation Area |
ML18141A307 | 21 May 2018 | 18 - SLR Status | License Renewal Subsequent License Renewal |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML17320A200 | 15 November 2017 | Insights from Implementing FLEX in the Peach Bottom Seismic PRA Model | Safe Shutdown FLEX |
ML17257A161 | 19 September 2017 | September 19, 2017 Pre-application Public Meeting Presentation on Peach Bottom Subsequent License Renewal Application | |
ML17142A238 | 25 May 2017 | OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns | Probabilistic Risk Assessment Operator Manual Action FLEX Significance Determination Process |
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
ML12159A266 | 11 June 2012 | County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 | |
ML12130A099 | 9 May 2012 | Annual Assessment Meeting Slides Presentation Rev. 0, 2012 | |
ML12130A117 | 9 May 2012 | Pb 2012 Public Mtg Attendance Sheet April 2012 | |
ML120870140 | 27 March 2012 | Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR | |
ML12262A476 | 22 February 2012 | TMI Alert Portzline Presentation NUREG-0654 Public Mtg | Probabilistic Risk Assessment Chernobyl |
ML111080095 | 14 April 2011 | NRC Slides for Peach Bottom Public Meeting on April 13, 2011 | |
ML091980363 | 20 August 2009 | Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes | Cyber Security |
ML11228A231 | 13 August 2009 | State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas | |
ML091810934 | 16 June 2009 | Hand-outs for June 16, 2009 Public Meeting with Exelon | |
ML11228A230 | 14 April 2009 | State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants | B.5.b Mitigating Strategies |
ML090790850 | 16 March 2009 | Presentation: Introduction to Nuclear Graphite Workshop |