Peach Bottom Annual Assessment M
ti 1
Meeting Reactor Oversight Process - 2011 Nuclear Regulatory Commission - Region I Delta, PA April 25, 2012
Agenda
- Introduction
- Review of Reactor Oversight Process
- National Summary of Plant Performance Di i
f Pl P
f R
l 2
- Discussion of Plant Performance Results
- NRC Closing Remarks
- Break
- NRC available to address public questions
Region I Organization William M. Dean Regional Administrator David C. Lew Deputy Regional Administrator Darrell Roberts Director Division of Reactor Projects Chris Miller Director Division of Reactor Safety 3
James W. Clifford Deputy Director Peter R. Wilson Deputy Director Paul G. Krohn Branch Chief Regional Specialists Peach Bottom Resident Inspectors Sam Hansell Adam Ziedonis Ami Rao (acting)
Project Engineers Andrew Rosebrook Sherlyn Ibarrola Eric Miller
NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment 4
- Security: Ensure adequate protection in the secure use and management of radioactive materials
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Performance Indicator Results Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Performance Indicator Results Strategic Performance Areas 5
Significance Threshold Action Matrix Significance Threshold Regulatory Response Significance Threshold Action Matrix Significance Threshold Regulatory Response
Action Matrix Concept Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple Repetitive Degraded Cornerstone Unacceptable Performance All Inputs are Green; Cornerstone Objectives Fully Met 1 or 2 White Inputs (in different cornerstones);
Cornerstone 2 White or 1 Yellow Input; Cornerstone Objectives Met w/
Moderate Degradation in Multiple Yellow Inputs or 1 Red Input; Cornerstone Objectives Met w/
Significant Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; 6
Fully Met Cornerstone Objectives Fully Met Degradation in Safety Performance Significant Degradation in Safety Performance Column; Unacceptable Margin to Safety Increasing safety significance Increasing NRC inspection efforts Increasing NRC/Licensee management involvement Increasing regulatory actions Peach Bottom Units 2 & 3
11 3
1 1 As of 12/31/2011 Licensee Response Regulatory Response Industry-Wide Performance 88 g
y p
Degraded Cornerstone Multiple/Repetitive Degraded IMC 0350 Process
Industry-Wide Inspection Findings &
Performance Indicators (PIs)
Data current as of 2/24/2012 and does not include security findings Findings Green 846 White 13 PIs Green 6585 White 9
White 13 Yellow 2 Red 0
White 9
Yellow 0 Red 0
Peach Bottom Inspection Activities January 1 - December 31, 2011
- A total of 6500 hours0.0752 days <br />1.806 hours <br />0.0107 weeks <br />0.00247 months <br /> of inspection and related activities
- 2 resident inspectors on site 9
- 16 regional inspections
- 3 major team inspections:
- Component Design Basis Inspection
- Initial Operator Licensing Examination
- Problem Identification and Resolution
Peach Bottom Assessment Results and Summary January 1 - December 31, 2011
- Peach Bottom Unit 2 and 3
- Licensee Response Column
- All Green Findings and Performance 10 g
Indicators
- Peach Bottom Units 2 and 3
- NRC plans to conduct baseline inspections
Contacting the NRC
- Report an emergency
- (301) 816-5100 (call collect)
- Report a safety concern 11
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html 12 Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html Public Document Room 800-397-4209 (Toll Free)