ML17309A614: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1-MEGULAT(O INFORMATION DISTRIBUTION STEM(RIDE)tACCESSION NBR:9704070035 DOC.DATE:
{{#Wiki_filter:CATEGORY 1-MEGULAT(O INFORMATION DISTRIBUTION STEM (RIDE)t ACCESSION NBR:9704070035 DOC.DATE: 97/03/31 NOTARIZED:
97/03/31NOTARIZED:
NO FACIL:50'-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester'AUTH;NAME AUTHOR AFFILIATION MECREDY,R.C.
NOFACIL:50'-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
'AUTH;NAME AUTHORAFFILIATION MECREDY,R.C.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.


==SUBJECT:==
==SUBJECT:==
Forwardsapplication foramendtoDPR-18,revising spentpoolstoragerequirements.
Forwards application for amend to DPR-18,revising spent pool storage requirements."Spent Fuel Pool Re-racking Licensing Rept," also encl.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
"SpentFuelPoolRe-racking Licensing Rept,"alsoencl.DISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
GeneralDistribution NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
DOCKET G 05000244 fuel T 05000244 RECIPIENT ID CODE/NAME PD1-1 LA VISSINGFG.
DOCKETG05000244fuelT05000244RECIPIENT IDCODE/NAME PD1-1LAVISSINGFG.
INTERNA.CENTER 0~M NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 0 D E NOTE TO ALL"RIDS" RECIPIENTS:
INTERNA.CENTER0~MNRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTIONLISTS OR REDUCE THE NUMBER OF COPIES.RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 ANn ROCHESTER GAS AND ELECTRIC CORPORATION
NOACCOPIESLTTRENCL11111111111111RECIPIENT IDCODE/NAME PD1-1PDNRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3NRCPDRCOPIESLTTRENCL1111111110110DENOTETOALL"RIDS"RECIPIENTS:
~89 EASTAVENUE, ROCHESTER, N.Y Id649-0001 AREA CODE716 5'-2700 ROBERT C.MECREDY Vice President Nvcieor operations March 31, 1997 V.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555  
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTIONLISTS ORREDUCETHENUMBEROFCOPIES.RECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR13ENCL12 ANnROCHESTER GASANDELECTRICCORPORATION
~89EASTAVENUE, ROCHESTER, N.YId649-0001 AREACODE7165'-2700ROBERTC.MECREDYVicePresident Nvcieoroperations March31,1997V.S.NuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
Application forAmendment toFacilityOperating License,RevisedSpentFuelPoolStorageRequirements Rochester Gas&ElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244
Application for Amendment to Facility Operating License, Revised Spent Fuel Pool Storage Requirements Rochester Gas&Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Vissing:==
==Dear Mr.Vissing:==
TheenclosedLicenseAmendment Request(LAR)proposestorevisetheGinnaStationImprovedTechnical Specifications (ITS)toreflectaplannedmodification tothespentfuelpool(SFP)storageracks.Specifications associated withSFPboronconcentration, fuelassemblystorage,andthemaximumlimitonthenumberoffuelassemblies whichcanbestoredintheSFPwillberevised.AlsoincludedwithintheLARisaLicensing ReportfortheproposedSFPmodification.
The enclosed License Amendment Request (LAR)proposes to revise the Ginna Station Improved Technical Specifications (ITS)to reflect a planned modification to the spent fuel pool (SFP)storage racks.Specifications associated with SFP boron concentration, fuel assembly storage, and the maximum limit on the number of fuel assemblies which can be stored in the SFP will be revised.Also included within the LAR is a Licensing Report for the proposed SFP modification.
Themodification totheSFPisnecessary toaccommodate storageofspentfueluntiltheexpiration oftheGinnaStationlicensein2009.WerequestthatthisLARbeapprovedbyJanuary1998inordertosupportplannedinstallation oftheracksduringpoweroperation beginning inAugust1998.Thiswillallowimplementation ofthismodification fortheMarch1999Refueling Outage.WefurtherrequestthatuponNRCapproval, theapplication shouldbeconsidered effective immediately uponcompletion oftheSFPmodifications andimplemented within30daysthereafter.
The modification to the SFP is necessary to accommodate storage of spent fuel until the expiration of the Ginna Station license in 2009.We request that this LAR be approved by January 1998 in order to support planned installation of the racks during power operation beginning in August 1998.This will allow implementation of this modification for the March 1999 Refueling Outage.We further request that upon NRC approval, the application should be considered effective immediately upon completion of the SFP modifications and implemented within 30 days thereafter.
Verytrulyyours,RobertC.MecredyAttachments 9704070035 970331,PDRADOCK05000244CPDRII!III/III!Illlilll!IIIIIIIIIIIII!
Very truly yours, Robert C.Mecredy Attachments 9704070035 970331, PDR ADOCK 05000244 C PDR II!III/III!Illlilll!IIIIIIIIIIIII!
IIIIIIIIIII 4
IIIIIIIIIII 4
U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14B2)PWRProjectDirectorate I-1Washington, DC20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector Mr.F.WilliamValentine, President NewYorkStateEnergy,Research, andDevelopment Authority 2Rockefeller PlazaAlbany,NY12223-1253 p+gQQt)e++Q"j~OGILtl',,l~cg'~)ls~>l>>'<~LRochester GasKElectricK.K.GienaMm,learI'owerI'lant~,~>>1II+'1s4i%ISpentFuelPeelRe-racking UcensingRepertFebruaryl997 l~)}}
U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)PWR Project Directorate I-1 Washington, DC 20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr.F.William Valentine, President New York State Energy, Research, and Development Authority 2 Rockefeller Plaza Albany, NY 12223-1253 p+gQQt)e++Q"j~O GI Ltl',,l~c g'~)ls~>l>>'<~L Rochester Gas K Electric K.K.Giena Mm,lear I'ower I'lant~,~>>1 II+'1s 4 i%I Spent Fuel Peel Re-racking Ucensing Repert February l997 l~)}}

Revision as of 10:05, 6 July 2018

Forwards Application for Amend to License DPR-18 Re SFP Storage Requirements. Spent Fuel Pool Re-Racking Licensing Rept, Also Encl
ML17309A614
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1997
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A848 List:
References
NUDOCS 9704070035
Download: ML17309A614 (6)


Text

CATEGORY 1-MEGULAT(O INFORMATION DISTRIBUTION STEM (RIDE)t ACCESSION NBR:9704070035 DOC.DATE: 97/03/31 NOTARIZED:

NO FACIL:50'-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester'AUTH;NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Forwards application for amend to DPR-18,revising spent pool storage requirements."Spent Fuel Pool Re-racking Licensing Rept," also encl.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET G 05000244 fuel T 05000244 RECIPIENT ID CODE/NAME PD1-1 LA VISSINGFG.

INTERNA.CENTER 0~M NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 0 D E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTIONLISTS OR REDUCE THE NUMBER OF COPIES.RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 ANn ROCHESTER GAS AND ELECTRIC CORPORATION

~89 EASTAVENUE, ROCHESTER, N.Y Id649-0001 AREA CODE716 5'-2700 ROBERT C.MECREDY Vice President Nvcieor operations March 31, 1997 V.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

Application for Amendment to Facility Operating License, Revised Spent Fuel Pool Storage Requirements Rochester Gas&Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

The enclosed License Amendment Request (LAR)proposes to revise the Ginna Station Improved Technical Specifications (ITS)to reflect a planned modification to the spent fuel pool (SFP)storage racks.Specifications associated with SFP boron concentration, fuel assembly storage, and the maximum limit on the number of fuel assemblies which can be stored in the SFP will be revised.Also included within the LAR is a Licensing Report for the proposed SFP modification.

The modification to the SFP is necessary to accommodate storage of spent fuel until the expiration of the Ginna Station license in 2009.We request that this LAR be approved by January 1998 in order to support planned installation of the racks during power operation beginning in August 1998.This will allow implementation of this modification for the March 1999 Refueling Outage.We further request that upon NRC approval, the application should be considered effective immediately upon completion of the SFP modifications and implemented within 30 days thereafter.

Very truly yours, Robert C.Mecredy Attachments 9704070035 970331, PDR ADOCK 05000244 C PDR II!III/III!Illlilll!IIIIIIIIIIIII!

IIIIIIIIIII 4

U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)PWR Project Directorate I-1 Washington, DC 20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr.F.William Valentine, President New York State Energy, Research, and Development Authority 2 Rockefeller Plaza Albany, NY 12223-1253 p+gQQt)e++Q"j~O GI Ltl',,l~c g'~)ls~>l>>'<~L Rochester Gas K Electric K.K.Giena Mm,lear I'ower I'lant~,~>>1 II+'1s 4 i%I Spent Fuel Peel Re-racking Ucensing Repert February l997 l~)