ML15148A469: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Singal, BalwantSent:Thursday, May 28, 2015 12:51 PMTo:'Hope, Timothy' (Timothy.Hope@luminant.com)Cc:'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Singal, Balwant Sent:Thursday, May 28, 2015 12:51 PM To:'Hope, Timothy' (Timothy.Hope@luminant.com)
Cc:'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)


==Subject:==
==Subject:==
Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)Tim,  By letter dated April 20, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15119A216), Luminant Generation Company LLC, requested approval for application of an alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI examination requirements for reactor pressure vessel cold leg weld inspection frequency for Comanche Peak Nuclear Power Plant, Unit 1.
Acceptance Review - Relief Request 1B3-3, Co manche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Tim,  By letter dated April 20, 2015 (Agencywide Document s Access and Management System (ADAMS) Accession No. ML15119A216), Luminant Generation Company LLC, requested approval for application of an alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI examination requirements for reactor pressure vessel cold leg weld inspection frequency for Comanche Peak Nuclear  
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
 
If you have any questions, please contact me.
Power Plant, Unit 1.  
Balwant K. Singal Senior Project Manager (Comanche Peak and Columbia) Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 Hearing Identifier:  NRR_PMDA Email Number:  2114  Mail Envelope Properties  (Balwant.Singal@nrc.gov20150528125100)  
 
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in  
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
 
If you have any questions, please contact me.  
 
Balwant K. Singal Senior Project Manager (Comanche Peak and Columbia) Nuclear Regulatory Commission Division of Operating Reactor Licensing  
 
Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222  
 
Hearing Identifier:  NRR_PMDA Email Number:  2114  Mail Envelope Properties  (Balwant.Singal@nrc.gov20150528125100)


==Subject:==
==Subject:==
Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)  Sent Date:  5/28/2015 12:51:02 PM  Received Date:  5/28/2015 12:51:00 PM From:    Singal, Balwant Created By:  Balwant.Singal@nrc.gov Recipients:    "'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)" <Jack.Hicks@luminant.com>  Tracking Status: None   
Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)  Sent Date:  5/28/2015 12:51:02 PM  Received Date:  5/28/2015 12:51:00 PM From:    Singal, Balwant Created By:  Balwant.Singal@nrc.gov Recipients:    "'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)" <Jack.Hicks@luminant.com>  Tracking Status: None   
"'Hope, Timothy' (Timothy.Hope@luminant.com)" <Timothy.Hope@luminant.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2064      5/28/2015 12:51:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
"'Hope, Timothy' (Timothy.Hope@luminant.com)" <Timothy.Hope@luminant.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2064      5/28/2015 12:51:00 PM
 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 00:38, 1 July 2018

2015/05/28 NRR E-mail Capture - Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)
ML15148A469
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 05/28/2015
From: Singal B K
Plant Licensing Branch IV
To: Hope T R
Luminant Generation Co
References
TAC MF6125
Download: ML15148A469 (2)


Text

1NRR-PMDAPEm Resource From:Singal, Balwant Sent:Thursday, May 28, 2015 12:51 PM To:'Hope, Timothy' (Timothy.Hope@luminant.com)

Cc:'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)

Subject:

Acceptance Review - Relief Request 1B3-3, Co manche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)

Tim, By letter dated April 20, 2015 (Agencywide Document s Access and Management System (ADAMS) Accession No. ML15119A216), Luminant Generation Company LLC, requested approval for application of an alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI examination requirements for reactor pressure vessel cold leg weld inspection frequency for Comanche Peak Nuclear

Power Plant, Unit 1.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in

sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Comanche Peak and Columbia) Nuclear Regulatory Commission Division of Operating Reactor Licensing

Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222

Hearing Identifier: NRR_PMDA Email Number: 2114 Mail Envelope Properties (Balwant.Singal@nrc.gov20150528125100)

Subject:

Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125) Sent Date: 5/28/2015 12:51:02 PM Received Date: 5/28/2015 12:51:00 PM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients: "'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)" <Jack.Hicks@luminant.com> Tracking Status: None

"'Hope, Timothy' (Timothy.Hope@luminant.com)" <Timothy.Hope@luminant.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2064 5/28/2015 12:51:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: