ML15148A469

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1
ML15148A469
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 05/28/2015
From: Balwant Singal
Plant Licensing Branch IV
To: Hope T
Luminant Generation Co
References
TAC MF6125
Download: ML15148A469 (2)


Text

NRR-PMDAPEm Resource From: Singal, Balwant Sent: Thursday, May 28, 2015 12:51 PM To: 'Hope, Timothy' (Timothy.Hope@luminant.com)

Cc: 'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)

Subject:

Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)

Tim, By letter dated April 20, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15119A216), Luminant Generation Company LLC, requested approval for application of an alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI examination requirements for reactor pressure vessel cold leg weld inspection frequency for Comanche Peak Nuclear Power Plant, Unit 1.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Comanche Peak and Columbia)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1

Hearing Identifier: NRR_PMDA Email Number: 2114 Mail Envelope Properties (Balwant.Singal@nrc.gov20150528125100)

Subject:

Acceptance Review - Relief Request 1B3-3, Comanche Peak Nuclear Power Plant, Unit 1 (TAC No. MF6125)

Sent Date: 5/28/2015 12:51:02 PM Received Date: 5/28/2015 12:51:00 PM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"'Jack.Hicks@luminant.com' (Jack.Hicks@luminant.com)" <Jack.Hicks@luminant.com>

Tracking Status: None

"'Hope, Timothy' (Timothy.Hope@luminant.com)" <Timothy.Hope@luminant.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2064 5/28/2015 12:51:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: