ML17107A318: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this transmittal document is decontrolled  LIMITED INTERNAL DISTRIBUTION PERMITTED  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION April 13, 2017  Mr. George A. Lippard III  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
  UNITED STATES NUCLEAR REGULATORY COMMISSION  
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
  Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this  
transmittal document is decontrolled  
  LIMITED INTERNAL DISTRIBUTION PERMITTED  
  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
April 13, 2017  
   Mr. George A. Lippard III  
Vice President Nuclear Operations  
Vice President Nuclear Operations  
South Carolina Electric & Gas Company  
South Carolina Electric & Gas Company  
Virgil C. Summer Nuclear Station P.O. Box 88 (Mail Code 800) Jenkinsville, SC 29065  
Virgil C. Summer Nuclear Station P.O. Box 88 (Mail Code 800) Jenkinsville, SC 29065  
   
   
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000395/2017405   Dear Mr. Lippard:  
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000395/2017405
Dear Mr. Lippard:  
 
   
   
On March 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security  
On March 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security  
inspection at your Virgil C. Summer, Unit 1 and discussed the results of this inspection with you  
inspection at your Virgil C. Summer, Unit 1 and discussed the results of this inspection with you  
and other members of your staff.  The results of this inspection are documented in the enclosed report.   
and other members of your staff.  The results of this inspection are documented in the enclosed  
The NRC inspectors did not identify any finding or violation of more than minor significance.   
report.   
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."   
The NRC inspectors did not identify any finding or violation of more than minor significance.  
   
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."  
   
However, the enclosed report contains Security-Related Information, so the enclosed report will  
However, the enclosed report contains Security-Related Information, so the enclosed report will  
not be made publically available in accordance with 10 CFR 2.390(d)(1).  If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390"   
not be made publically available in accordance  
with 10 CFR 2.390(d)(1).  If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390"   
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Lippard 2 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  The NRC is waiving the affidavit requirements for your response in  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Lippard 2 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  The NRC is waiving the affidavit requirements for your response in  
accordance with 10 CFR 2.390(b)(1)(ii)  Sincerely,  
accordance with 10 CFR 2.390(b)(1)(ii)  
  Sincerely,  
 
  /RA/   
  /RA/   
Scott M. Shaeffer, Chief  Engineering Branch 2  
Scott M. Shaeffer, Chief  Engineering Branch 2  
Division of Reactor Safety   
 
Docket Nos.: 50-395 License Nos.: NPF-12  
Division of Reactor Safety  
   
Docket Nos.: 50-395 License Nos.: NPF-12
Enclosure:  
Enclosure:  
Inspection Report 05000395/2017405  
Inspection Report 05000395/2017405  
   w/Attachment:  Supplemental Information (OUO)   
 
   w/Attachment:  
   Supplemental Information (OUO)  
   
cc:  See page 3  
cc:  See page 3  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Lippard 3 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION cc: Mr. Gregg Douglass, Manager  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Lippard 3 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
cc: Mr. Gregg Douglass, Manager  
 
Nuclear Protection Services SCE&G, Virgil C. Summer Nuclear Station  Hwy 215 N at Bradham Blvd.  
Nuclear Protection Services SCE&G, Virgil C. Summer Nuclear Station  Hwy 215 N at Bradham Blvd.  
Jenkinsville, South Carolina 29065.   
Jenkinsville, South Carolina 29065.  
   
   
   
    
    


__ ____  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP RII:DRS    SIGNATURE PJB4 ETC1 VIA EMAIL ADM2 SMS    NAME P. Braaten E. Coffman A. Masters S. Shaeffer    DATE 4/15/2017 4/13/2017 4/13/2017 4/13/2017    E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO
__ ____  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP RII:DRS    SIGNATURE PJB4 ETC1 VIA EMAIL ADM2 SMS  
   NAME P. Braaten E. Coffman A. Masters S. Shaeffer    DATE 4/15/2017 4/13/2017 4/13/2017 4/13/2017    E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO
}}
}}

Revision as of 21:31, 29 June 2018

Virgil C. Summer - Cyber Security Implementation Inspection Report 05000395/2017405 - Cover Letter Only
ML17107A318
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/13/2017
From: Shaeffer S M
NRC/RGN-II/DRS/EB2
To: Lippard G A
South Carolina Electric & Gas Co
References
IR 2017405
Download: ML17107A318 (4)


See also: IR 05000395/2017406

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

April 13, 2017

Mr. George A. Lippard III

Vice President Nuclear Operations

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station P.O. Box 88 (Mail Code 800) Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000395/2017405

Dear Mr. Lippard:

On March 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your Virgil C. Summer, Unit 1 and discussed the results of this inspection with you

and other members of your staff. The results of this inspection are documented in the enclosed

report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html

and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will

not be made publically available in accordance

with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390"

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Lippard 2 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in

accordance with 10 CFR 2.390(b)(1)(ii)

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-395 License Nos.: NPF-12

Enclosure:

Inspection Report 05000395/2017405

w/Attachment:

Supplemental Information (OUO)

cc: See page 3

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Lippard 3 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

cc: Mr. Gregg Douglass, Manager

Nuclear Protection Services SCE&G, Virgil C. Summer Nuclear Station Hwy 215 N at Bradham Blvd.

Jenkinsville, South Carolina 29065.

__ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP RII:DRS SIGNATURE PJB4 ETC1 VIA EMAIL ADM2 SMS

NAME P. Braaten E. Coffman A. Masters S. Shaeffer DATE 4/15/2017 4/13/2017 4/13/2017 4/13/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO