=Text=
=Text=
{{#Wiki_filter:..ACCELERATEDDISTRIBUTIONDEMONS+ATIONSYSTEMJIREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9405310164DOC.DATE:94/05/23NOTARIZED:YESDOCKETFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RochesterG05000244AUTH.*NAMEAUTHORAFFILIATIONMECREDY,R.C.RochesterGas6ElectricCorp.RECIP.NAMERECIPIENTAFFILIATIONJOHNSON,A.R.ProjectDirectorateI-3+5R
{{#Wiki_filter:..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEMJIREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9405310164 DOC.DATE:
94/05/23NOTARIZED:
YESDOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.*NAME AUTHORAFFILIATION MECREDY,R.C.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
ProjectDirectorate I-3+5R


==SUBJECT:==
==SUBJECT:==
ForwardsapplicationforamendtolicenseDPR-18,increasingallowableRCAtoimprovedTSvalues(NUREG-1431).IWestinghouseproprietaryreptWCAP-116686nonproprietaryreptWCAP-11678encl.ProprietaryreptWCAP-11668withheld.DDISTRIBUTIONCODE:AP01DCOPIESRECEIVED:LTRJENCLLSIZE:/STITLE:ProprietaryReviewDistribution-PreOperatingLicense6OperatingR/NOTES:LicenseExpdateinaccordancewith10CFR2,2.109(9/19/72).05000244ARECIPIENTIDCODE/NAMEPD1-3LAJOHNSON,ACOPIESLTTRENCL1133RECIPIENTIDCODE/NAMEPD1-3PDCOPIESLTTRENCL11DDINTERNAL:AEO~DOA~GFfQEEXTERNALNRCPDR01111110OGC/HDS110DSNOTETOALL"RIDS"RECIPIENTS:DDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:LTTR9ENCL7 Itg~0<~  
Forwardsapplication foramendtolicenseDPR-18,increasing allowable RCAtoimprovedTSvalues(NUREG-1431).
/////I///////'g//Z1//I///I/I///////////i////I//////SKfROCHESTERGASANDELECTRICCORPORATIONo89EASTAVENUE,ROCHESTERN.Y.14649-0001ROBERTC.MECREDYVicePresidentClnnaNuclearProductionMay23,1994TELEPHONEhREACODE7tB5462700U.S.NuclearRegulatoryCommissionDocumentControlDeskAttn:AllenR.JohnsonProjectDirectorateI-3Washington,D.C.20555
IWestinghouse proprietary reptWCAP-11668 6nonproprietary reptWCAP-11678 encl.Proprietary reptWCAP-11668 withheld.
DDISTRIBUTION CODE:AP01DCOPIESRECEIVED:LTR JENCLLSIZE:/STITLE:Proprietary ReviewDistribution
-PreOperating License6Operating R/NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244ARECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A COPIESLTTRENCL1133RECIPIENT IDCODE/NAME PD1-3PDCOPIESLTTRENCL11DDINTERNAL:
AEO~DOA~GFfQEEXTERNALNRCPDR01111110OGC/HDS110DSNOTETOALL"RIDS"RECIPIENTS:
DDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
LTTR9ENCL7 Itg~0<~  
/////I///////
'g//Z1//I///I/I///////////
i////I//////SKfROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER N.Y.14649-0001 ROBERTC.MECREDYVicePresident ClnnaNuclearProduction May23,1994TELEPHONE hREACODE7tB5462700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555


==Subject:==
==Subject:==
ApplicationforAmendmenttoOperatingLicenseReactorCoolantActivityTechnicalSpecificationsRochesterGasandElectricCorporationR.E.GinnaNuclearPowerPlantDocketNo.50-244Ref.(a):NRCLetter,C.RossitoA.Ladieu(WOG),"AcceptanceforReferencingofLicensingTopicalReportWCAP-10698...",March30,1987.(b):NUREG-0916,"SafetyEvaluationReportRelatedtotheRestartofR.E.GinnaNuclearPowerPlant",May1982.(c):RG&ELetter,R.MecredytoA.Johnson(NRC),"EmergencyResponseCapability...",October14,1992.(d):NRCLetter,A.JohnsontoR.Mecredy(RG&E),EmergencyResponseCapability-ConformancetoRegulatoryGuide1.97,revision3",February24,1993.(e):WOGLetter,L.WalshandA.EngeltoR.Jones(NRC),"WestinghouseOwnersGroupSteamGeneratorTubeUncoveryIssue",March31,1992.(f):NRCLetter,R.JonestoL.Walsh(WOG),"WestinghouseOwnersGroup,SteamGeneratorTubeUncoveryIssue",March10,1993.
Application forAmendment toOperating LicenseReactorCoolantActivityTechnical Specifications Rochester GasandElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244Ref.(a):NRCLetter,C.RossitoA.Ladieu(WOG),"Acceptance forReferencing ofLicensing TopicalReportWCAP-10698...",
March30,1987.(b):NUREG-0916, "SafetyEvaluation ReportRelatedtotheRestartofR.E.GinnaNuclearPowerPlant",May1982.(c):RG&ELetter,R.MecredytoA.Johnson(NRC),"Emergency ResponseCapability...",
October14,1992.(d):NRCLetter,A.JohnsontoR.Mecredy(RG&E),Emergency ResponseCapability
-Conformance toRegulatory Guide1.97,revision3",February24,1993.(e):WOGLetter,L.WalshandA.EngeltoR.Jones(NRC),"Westinghouse OwnersGroupSteamGenerator TubeUncoveryIssue",March31,1992.(f):NRCLetter,R.JonestoL.Walsh(WOG),"Westinghouse OwnersGroup,SteamGenerator TubeUncoveryIssue",March10,1993.


==DearMr.Johnson:==
==DearMr.Johnson:==
WCAP-11668(Proprietary)/WCAP-11678(Non-Proprietary)evaluatethepotentialradiologicalconsequencesduetoasteamgeneratortuberupture(SGTR)fortheR.E.GinnaNuclearPowerPlant.Thisg'Ti4053101b4'Tl40523PDR"ADOt"K'05000244ThepurposeofthisapplicationforAmendmenttoOperatingLicenseistoamendAppendixAofthatLicensetoincreasetheTechnicalSpecificationallowableprimarycoolantiodine(I-131)activitylimitfrom0.2pC+igmto1.0pCi/gm;andthetotalprimarycoolantactivityfrom84/EpCi/gmtotheStandardTechnicalSpecificationvalueof100/EpCi/gm,consistentwiththeImprovedTechnicalSpecifications(NUREG-1431).
WCAP-11668 (Proprietary)/WCAP-11678 (Non-Proprietary) evaluatethepotential radiological consequences duetoasteamgenerator tuberupture(SGTR)fortheR.E.GinnaNuclearPowerPlant.Thisg'Ti4053101b4'Tl40523 PDR"ADOt"K'05000244 Thepurposeofthisapplication forAmendment toOperating LicenseistoamendAppendixAofthatLicensetoincreasetheTechnical Specification allowable primarycoolantiodine(I-131)activitylimitfrom0.2pC+igmto1.0pCi/gm; andthetotalprimarycoolantactivityfrom84/EpCi/gmtotheStandardTechnical Specification valueof100/EpCi/gm,consistent withtheImprovedTechnical Specifications (NUREG-1431).
evaluationutilizestheanalysismethodologyofWCAP-10698-P-A"SGTRAnalysisMethodologytoDeterminetheMargintoSteamGeneratorOverfill."RG&EhasmettherequirementsforusageofWCAP-10698asoutlinedinNuclearRegulatoryCommissionletterfromC.E.Rossi(NRC)toA.E.Ladieu(WOG),(Referencea).Theletterrequiredeachutilitytoprovidefiveplantspecificinputs:1.Demonstrationthatcriticaloperatoractiontimesusedintheanalysisarerealisticandconsistentwiththoseobservedduringsimulatorexercises.2.AsitespecificSteamGeneratorTubeRuptureradiologicaloffsiteconsequenceanalysis.3.Astructural,analysisofthemainsteam'inesdemonstratingadequacyunderwater-filledconditions.4.Alistofsystems,components,andinstrumentationcreditedforaccidentmitigationandthespecifiedsafetygradeforeach.5.Acomparisonoftheplanttothe"boundingplant"usedinWCAP-10698.Items2and5areaddressedin.thesitespecificanalysisbeingsubmittedwiththisletter,WCAP-11668(Proprietary).Item3wasaddressedduringthereviewoftheSteamGeneratorTubeRuptureincidentatGinnaStation.ItsacceptabilityisdocumentedinNUREG-0916,(Referenceb).Item4iscontainedinourpost-accidentinstrumentationsubmittal(Referencec)(re.RegulatoryGuide1.97).NRCreviewandacceptanceofthisinformationisdocumentedinreferenced.Item1isdiscussedbelow.DuringtheweekofAugust19through23,1991simulatorrunsofthetwomostlimitingcasesidentifiedinWCAP-11668(Proprietary)/WCAP-11678(Non-Proprietary),weremadetovalidateassumedoperatorresponsetimes.ThesesimulatorrunsdemonstratedthatnotonlyweretheoperatorresponsetimesassumedintheWCAPsconservativewithadequatemargin,butalsothatrecentrefinementsintheemergencyoperatingprocedureshavefurtherreducedthelikelihoodofoverfillingtherupturedsteamgenerator.Forthetwolimitingcasesidentifiedoperatorresponsepreventedoverfillwithsignificantmargin,andterminatedbreakflowinunder45minutes.InbothcasesitwasnecessarytousetheWCAPassumedtimesforoperatoractionoutsidethecontrolroom.Thesetimeswerethelimitingfactorsinthescenarios,ascontrolroomoperatorshadtowaittoproceedwithfurthermitigatingactionsuntiltheseactionswereassumedtobecompleted.Operatorcritiquefollowingthesessionsindicatedthattheyfeltthesetimeswereunrealisticallyconservative.We,therefore,feelthatactualmitigationtimeswouldbeevenlessthanthosedemonstratedduringthesimulatorexercise.WCAP-11668/11678assumesthetuberuptureremainscoveredthrough-ItI outtheevent.Morerecentlyithasbeensuggestedthat,thisassumptionmaynotbeconservative.TheWestinghouseOwnersGroup(WOG)hasundertakenaprogramtoassesstheconsequencesoftuberuptureuncovery.Theresultsindicatethattheincreaseindosesisinsignificant.Theseresultsweretransmittedtothestaff(Referencee).Thestaffhasreviewedandapprovedthistransmittal(referencef).Therefore,wefeelthisissuehasbeenadequatelyaddressed.ItshouldbenotedthataproposaltomodifySection3.1.4.3.ahasalreadybeensubmittedtotheNRCvialetterMay13,1994.Page3.1-21ofAttachmentsBandCisbeingsubmittedinbothversions,sothatapprovalisnotdependentonthesequenceofproposedLicenseAmendmentRequestreviews.WerequestthatuponNRCapproval,thisamendmentshouldbeconsideredeffectiveimmediatelyandimplementedwithin60days.Veryrulyyours,oertc.ecryBJF/190Attachment
evaluation utilizestheanalysismethodology ofWCAP-10698-P-A "SGTRAnalysisMethodology toDetermine theMargintoSteamGenerator Overfill."
RG&Ehasmettherequirements forusageofWCAP-10698 asoutlinedinNuclearRegulatory Commission letterfromC.E.Rossi(NRC)toA.E.Ladieu(WOG),(Reference a).Theletterrequiredeachutilitytoprovidefiveplantspecificinputs:1.Demonstration thatcriticaloperatoractiontimesusedintheanalysisarerealistic andconsistent withthoseobservedduringsimulator exercises.
2.AsitespecificSteamGenerator TubeRuptureradiological offsiteconsequence analysis.
3.Astructural, analysisofthemainsteam'inesdemonstrating adequacyunderwater-filled conditions.
4.Alistofsystems,components, andinstrumentation creditedforaccidentmitigation andthespecified safetygradeforeach.5.Acomparison oftheplanttothe"bounding plant"usedinWCAP-10698.
Items2and5areaddressed in.thesitespecificanalysisbeingsubmitted withthisletter,WCAP-11668 (Proprietary).
Item3wasaddressed duringthereviewoftheSteamGenerator TubeRuptureincidentatGinnaStation.Itsacceptability isdocumented inNUREG-0916, (Reference b).Item4iscontained inourpost-accidentinstrumentation submittal (Reference c)(re.Regulatory Guide1.97).NRCreviewandacceptance ofthisinformation isdocumented inreference d.Item1isdiscussed below.DuringtheweekofAugust19through23,1991simulator runsofthetwomostlimitingcasesidentified inWCAP-11668 (Proprietary)/
WCAP-11678 (Non-Proprietary),
weremadetovalidateassumedoperatorresponsetimes.Thesesimulator runsdemonstrated thatnotonlyweretheoperatorresponsetimesassumedintheWCAPsconservative withadequatemargin,butalsothatrecentrefinements intheemergency operating procedures havefurtherreducedthelikelihood ofoverfilling therupturedsteamgenerator.
Forthetwolimitingcasesidentified operatorresponseprevented overfillwithsignificant margin,andterminated breakflowinunder45minutes.Inbothcasesitwasnecessary tousetheWCAPassumedtimesforoperatoractionoutsidethecontrolroom.Thesetimeswerethelimitingfactorsinthescenarios, ascontrolroomoperators hadtowaittoproceedwithfurthermitigating actionsuntiltheseactionswereassumedtobecompleted.
Operatorcritiquefollowing thesessionsindicated thattheyfeltthesetimeswereunrealistically conservative.
We,therefore, feelthatactualmitigation timeswouldbeevenlessthanthosedemonstrated duringthesimulator exercise.
WCAP-11668/11678 assumesthetuberuptureremainscoveredthrough-ItI outtheevent.Morerecentlyithasbeensuggested that,thisassumption maynotbeconservative.
TheWestinghouse OwnersGroup(WOG)hasundertaken aprogramtoassesstheconsequences oftuberuptureuncovery.
Theresultsindicatethattheincreaseindosesisinsignificant.
Theseresultsweretransmitted tothestaff(Reference e).Thestaffhasreviewedandapprovedthistransmittal (reference f).Therefore, wefeelthisissuehasbeenadequately addressed.
ItshouldbenotedthataproposaltomodifySection3.1.4.3.a hasalreadybeensubmitted totheNRCvialetterMay13,1994.Page3.1-21ofAttachments BandCisbeingsubmitted inbothversions, sothatapprovalisnotdependent onthesequenceofproposedLicenseAmendment Requestreviews.WerequestthatuponNRCapproval, thisamendment shouldbeconsidered effective immediately andimplemented within60days.Veryrulyyours,oertc.ecryBJF/190Attachment


==Enclosures:==
==Enclosures:==
1~One(1)submittalofanApplicationforAmendmenttoOperatingLicenseandassociatedsafetyevaluation.2~3~4~One(1)copyofanApplicationforWithholding,CAW-87-123,datedDecember3,1987,accompanyingAffidavit,andProprietaryInformationNoticeOne(1)copyofWCAP-11668,"LOFTTR2AnalysisofPotentialRadiologicalConsequencesFollowingaSteamGeneratorTubeRuptureattheR.E.GinnaNuclearPlant",November1987(Proprietary).One(1)copyofWCAP-11678,"LOFTTR2AnalysisofPotentialRadiologicalConsequencesFollowingaSteamGeneratorTubeRuptureat,theR.E.GinnaNuclearPlant",November1987(Non-Proprietary).xc>>Mr.AllenR.Johnson(MailStop14Dl)ProjectDirectorateI-3Washington,D.C.20555U.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA19406GinnaSeniorResidentInspector WESTINGHOUSEPROPRIETARYCLASS2WCAP"1166874>5'9QVLOFTTR2ANALYSISOFPOTENTIALRADIOLOGICALCONSEQUENCESFOLLOWINGASTEAMGENERATORTUBERUPTUREATTHER.E.GINNANUCLEARPOWERPLANT0.J.MendlerK.RubinNOVEMBER1987NuclearSafetyDepartmentThisdocumentcontainsinformationproprietarytoWestinghouseElectricCorporation;itissubmittedin.confidenceandistobeusedsolelyforthepurposeforwhichitisfurnishedandreturneduponrequest.Thisdocumentandsuchinformationisnottobereproduced,transmitted,disclosedorusedotherwiseinwholeorinpartwithoutauthorizationofWestinghouseElectricCorporation,NuclearEnergySystems.WestinghouseElectricCorporationNuclearEnergySystemsP.O.Box355Pittsburgh,Pennsylvania152301987byWestinghouseElectricCorporation1074v:1OP/120487 IP.'\10 WESTINGHOUSEPROPRIETARYCLASS2ThisdocumentcontainsmaterialthatisproprietarytotheWestinghouseElectricCorporation.Thispropr'ietaryinformationhasbeenmarkedbymeansofbrackets.ThebasisformarkingthematerialproprietaryisidentifiedbymarginalnotesreferringtothestandardsinSection8oftheaffidavitofR.A.Wiesemannofrecord"IntheHatterofAcceptanceCriteriaforEmergency.CoreCoolingSystemsforLightWaterCooledNuclearPowerReactors(DocketNo.RH-50-1)"atteanscriptpages3706through3710(February24,1972).'DuetotheproprietarynatureofthematerialcontainedinthisreportwhichwasobtainedatconsiderableWestinghouseexpenseandthereleaseofwhichwouldseriouslyaffectourcompetitiveposition,werequestthisinformationtobewithheldfrompublicdisclosureinaccordancewiththeRulesofPractice,10CFR2.790,andthattheinformationpresentedthereinbesafeguardedinaccordancewith10CFR2.903.Webelievethatwithholdingthisinformationwillnotadverselyaffectthepublicinterest.ThisinformationisforyourinternaluseonlyandshouldnotbereleasedtopersonsororganizationsoutsidethedirectorateofRegulationandtheACRSwithoutpriorapprovalofWestinghouseElectricCorporation.Shoulditbecome1necessarytoreleasethisinformationtosuchpersonsaspartofthereviewprocedure,pleasecontactWestinghouseElectricCorporationandtheywillmakethenecessaryarrangementsrequiredtoprotecttheirproprietary'nterests.1D74v:1D/7120B7 WESTINGHOUSEPROPRIETARYCLASS2TABLEOFCONTENTSPacaesI.INTRODUCTIONII.THERHALHYDRAULICANALYSISA.B.C.D.E.F.DesignBasisAccidentConservativeAssumptionsOperatorActionTimesTransientDescription-Case1TransientDescription-Case2HassReleases236132434III.RADIOLOGICALCONSEQUENCESANALYSISIV.CONCLUSION4358V.REFERENCES591074v:1D/112087 00-WESTINGHOUSEPROPRIETARYCLASS2I.INTRODUCTIONAnevaluationofthepotentialradiologicalconsequencesduetoasteamgeneratortuberupture(SGTR)eventhasbeenperformedfortheR.E.GinnanuclearpowerplanttodemonstratethattheoffsiteradiationdoseswillbelessthantheallowableguidelinesbasedontheStandardTechnicalSpecificationlimitonprimarycoolantactivity.Theevaluationdiscussedhereinassumesthat151.ofthesteamgeneratortubesareplugged.AdesignbasissteamgeneratortuberupturewasanalyzedforGinnausingthemethodologydevelopedinMCAP-10698(reference1)andthesupplementtoHCAP-10698(reference2).TwosinglefailurecaseswereconsideredtodeterminewhichisthemostlimitingsinglefailureforGinnawithrespecttoradiological.consequences.Thetwocasesexaminedwere:a,cCase1Intactsteamgeneratorpoweroperatedreliefvalve(PORV)failsclosedandmustbelocallyopened.Case2Rupturedsteamgeneratorpoweroperatedreliefvalvefailsopenandmustbelocallyisolated.PlantresponsetotheeventwasmodeledusingtheLOFTTR2computercodewithconservativeassumptionsofbreaksizeandlocation,condenseravailabilityandinitialsecondarywatermassinthefaultedsteamgenerator.Theanalysismethodologyincludesthesimulationoftheoperatoractionsforrecoveryfrom'steamgeneratortuberupturebasedontheWestinghouseOwnersGroupEmergencyResponseGuidelines,whicharethebasisfortheGinnaEmergencyOperatingProcedures.ThemassreleaseswerecalculatedwiththeLOFTTR2~programfromtheinitiationoftheeventuntilterminationofthebreakflow.Forthetimeperiodfollowingbreakflowtermination,steamreleasesandfeedwaterflowsfromtheintactandfaultedsteamgeneratorsweredeterminedfromamassandenergybalanceusingthecalculatedRCSandsteamgeneratorconditionsatthetimeofleakagetermination.Themassreleasesforbothcaseswereusedtodeterminetheradiationdosesattheexclusionareaboundaryandlowpopulationzoneassumingthattheprimarycoolantactivity'isattheStandardTechnicalSpecificationlimitpriortotheaccident.1074v:1D/112087 MESTINGHOUSEPROPRIETARYCLASS2II.THERMALHYDRAULICANALYSISIntegratedmassreleasestotheatmosphereandcondenserduringasteamgeneratortuberuptureeventwerecalculatedforvarioustimeperiodsduringtheaccident.ThissectionincludesthemethodsandassumptionsusedtomodeltheSGTReventandcalculatethemassreleases,aswellasthesequenceofeventsfortherecovery.A.DesinBasisAccidentTheaccidentmodeledisthecompleteseveranceofasteamgeneratortubelocatedatthetubesheetonthecoldlegside.Itwasalsoassumedthatlossofoffsitepoweroccurredatthetimeofreactortrip,andtheworstrodwasassumedtobestuckatreactortrip.a,cThemostlimitingsinglefailurewithrespecttosteamgeneratoroverfillwasdeterminedbyreference1tobeafailedclosedPORVontheintactsteamgenerator.SinceGinnaisatwoloopplant,theintactsteamgeneratorPORVmustbelocallyopenedbeforeRCScooldowncanbegin.ThisadditionaltimetolocallyopentheintactsteamgeneratorPORVwilldelayRCSdepressurization,causinganincreaseintotalprimarytosecondaryleakage.Consequently,morewaterwillaccumulateinthefaultedsteamgenerator.ThecasewheretheintactsteamgeneratorPORVfailstoopenondemandandmustbelocallyopenedwillbereferredtoasCase1.Themostlimitingsinglefailurewithrespecttooffsitedoseswasdeterminedbyreference2tobeafailedopenPORVonthefaulte'dsteamgenerator.FailureofthisPORVwillcauseanuncontrolleddepressurizationofthefaultedsteamgeneratorwhichwillincreaseprimarytosecondaryleakage.PressureintherupturedsteamgeneratorwillremainbelowthatintheprimarysystemuntilthefailedPORVcanbeisolated,andrecoveryactionscompleted.Thecasewherethefaulted'teamgeneratorPORVfailsopenandmustbelocallyisolatedwillbereferredtoasCase2.1074v:1D/112087 WESTINGHOUSEPROPRIETARYCLASS2B.ConservativeAssumtionsPlantresponsesandmassreleasesfromtheintactandfaultedsteamgeneratorpriortobreakflowterminationwerecalculatedusingLOFTTR2.WhilemodelingtheSGTReventthefollowingassumptionsweremade:1.ReactorTrionOvertemeratureDelta-Ta,cAturbinerunbackcanbeinitiatedautomaticallyortheoperatorcanmanuallyreducetheturbineloadtoattempttopreventareactortriponovertemperaturedelta-T.Althoughturbinerunbackissimulatedinthisanalysis,creditis.nottakenfordelayingreactortrip.Reactortripisassumedtooccuronovertemperaturedelta-T.Duetotheassumedlossofoffsitepowerthecondenserisnotavailableforsteamreleasesoncethereactoristripped.Consequently,afterreactortripthesteamgeneratorPORYsareusedforsteamreleases.Thusanearliertriptimeleadstomoresteamreleasedtotheatmospherefromthefaultedandintactsteamgenerators.2.PoweraTheinitialsteamgeneratorwatermassdecreaseswithincreasingpowerlevel.,Thus,alowerinitialpowerresultsinahigherinitialsteamgeneratorsecondarywatermasswhichisconservative.Onthisbasis,100%nominalpowerwasassumedfortheanalysisratherthanconsideringanoverpowerfactor.3.PressurizerWaterLevelTheRCSdepressurizationrateincreasesafterthepressurizerempties.Ahigherpressurizerwaterlevelwillincreasethetimerequiredforthepressurizertoempty.Thisresultsinmaintainingahigherprimarytosecondarypressuredifferentialandthusalargerbreakflowrateforalongertimeperiod.Therefore,itisconcludedthatmaximizingthepressurizerwaterlevelisconservative.a,c1074v:1D/112087 HESTINGHOUSEPROPRIETARYCLASS24.SteamGeneratorSeoond~arMassAhigherinitialsecondarywatermassintherupturedsteamgeneratorwasdeterminedbyReference1tobeconservativeforoverfill.FortheCase1analysisturbinerunbackwasassumedinitiatedandwassimulatedbyartificiallyincreasinginitialsteamgeneratorwatermass.TheinitialsteamgeneratortotalfluidmasswasassumedtobelOAabovenominalvalueplusthedifferentialmassbetween100%powerand70&#xc3;powertosimulateturbinerunback.However,ifsteamgeneratoroverfilldoesnotoccur,alowerinitialmassintheruptur'edsteamgeneratorresultsinaconservativepredictionofoffsitedoses..Thus,forCase2theinitialsecondarymasswasassumedtocorrespondtooperationat10Kbelownominalsteamgeneratorwatermass.a,c5.BreakLocationThetuberuptureanalyzedisadouble-endedbreakofonesteamgeneratortubelocatedatthetopofthetubesheetontheoutletsideofthesteamgenerator.Thelocationofthebreakonthecoldsideofthesteamgeneratorresultsinhigherprimarytosecondaryleakagethanabreakonthehotsideofthesteamgeneratorasdeterminedbyreference1.Therefore,itisconcludedthatthecoldlegsidebreaklocationisconservative.4i,C6.ReactorTriOelaAsnotedpreviously,theresultsforcaseswhichproduceanearlierreactortriparemoreconservativewithrespecttotheradiologicalconsequencesfromaSGTR.Thus,aminimumdelaytimefromthereactortripsignaltoreactortripisconservativefortheanalysis.Inaddition,asnotedabove,nocreditistakenforturbinerunbackdelayingreactortrip.a,c.1074v:10/112387 ttESTINGHOUSEPROPRIETARYCLASS27.T~tiTiD1Followingareactortrip,theturbinewillbeautomaticallytrippedafterasuitabledelaytime.Minimizingthedelaytimebetweenreactortripandturbinetripreducestheamountofsteamflowtotheturbineandincreasesthe.secondarywaterinventory.Thus,aminimumdelaytimebetweenreactortripandturbinetripisconservativefortheSGTRanalysis.a,c8.SteamGeneratorReliefValvePressureSetointHithalossofoffsitepower,thesecondarypressurewillincreasefollowingreactorandturbinetrip,andsteamwillberelievedthroughthesteamgeneratorPORVsandsafetyvalves.Alowersteamgeneratorreliefvalvepressuresetpointleadstoahigherprimarytosecondarypressuredifferentialandthushigherprimarytosecondaryleakage.Thus,theuseofthelowestsetpointforthesteamgenerator.reliefvalvesisconservativefortheanalysis.SincethePORVsetpointislowerthan.thesafetyvalvesetpoints,theuseofthePORVsetpointof1050psigforsteamreliefismoreconservative,9.PressurizerPressureforSIInitiationTheuseofthemaximumpressurizerpressuresetpointforSIinitiationresultsinearlieractuationoftheSIsystem.Thisleadstothemaintenanceofahigherprimarytosecondarypressuredifferentialandconsequentlyahigherbreakflowrateforalongertimeperiod.Thus,theuseofthemaximumpressurizerpressuresetpointforSIinitiation.intheanalysisisconservative.a,c10.LeakaeafterOverfilla,cOverfillisassumedtooccuriftherupturedsteamgeneratorbecomeswatersolid.Nocreditistakenforsteamlinevolume.1074v:10/112087 WESTINGHOUSEPROPRIETARYCLASS211.FlashinFractiona,cWhencalculatingtheamountofbreakflowthatflashestosteam,100percentofthebreakflowisassumedtocomefromthehotlegsideofthebreak.Sincethetuberuptureflowactuallyconsistsofflowfromthehotlegandcoldlegsidesofthesteamgenerator,thetemperatureofthecombinedflowwillbelessthanthehotlegtemperatureandtheflashingfractionwillbecorrespondinglylower.Thustheassumptionthat100percentofthebreakflowcomesfromthehotlegisconservativeforaSGTRanalysis.C.eratorActionTimesIntheeventofanSGTR,theoperatorisrequiredtotakeactionstostabilizetheplantandterminatetheprimarytosecondaryleakage.Anevaluationhasbeenperformed(reference1)toestablishtheoperatoractiontimesfor'useintheanalysisofadesignbasisSGTRevent.TheoperatoractionswhicharerequiredforrecoveryfromanSGTRandtheavailabledataonthetimestoperformtheseactionshaveb'eenreviewed.TheavailabledataonoperatoractiontimesforanSGTRincludesinformationwhichhasbeenobtainedfromreactorplantsimulatorstudiesaswellasplantdatafromfiveactualSGTRevents.Usingthisdata,operator-actiontimeshavebeenestablished.whichareconsideredtobeappropriateforadesignbasisSGTRevent.TheseoperatoractiontimeswerebeusedasinputfortheanalysisofthedesignbasisSGTRevent.ThemajoroperatoractionsforSGTRrecoverywhichareincludedintheE-3guidelineoftheWestinghouseOwnersGroupEmergencyResponseGuidelineswereexplicitlymodeledintheanalysis.Theoperatoractionsmodeledincludeidentificationandisolationoftherupturedsteamgenerator,cooldownanddepressurizationoftheRCStorestoreinventory,andterminationofSItostopprimarytosecondaryleakage.Theseoperatoractionsaredescribedbelow.1074v:1D/112087 MESTINGHOUSEPROPRIETARYCLASS21.I.dentifytherupturedsteamgenerator(step2).Highsecondarysideactivity,asindicatedbythesteamgeneratorblowdownlineradiationmonitororairejectorradiationmonitor,typicallywillprovidethefirstindicationofanSBTRevent.Therupturedsteamgeneratorcanbeidentifiedbyhighactivityinthecorrespondingsteamgeneratorblowdownline,mainsteamline,orwatersample.ForanSBTRthatresultsinahighpowerreactortrip,thesteamgeneratorwaterlevelwilldecreaseoff-scaleonthenarrowrangeforbothsteamgenerators.Theauxiliaryfeedwater(AFM)flowwillbegintorefillthesteamgenerators,typicallydistributingapproximatelyequalflowtobothsteamgenerators.Sinceprimarytosecondaryleakageaddsadditionalinventorywhichaccumulatesintherupturedsteamgenerator,levelwillreturntothenarrowrangeinthatsteamgeneratorsignificantlyearlierandwillcontinuetoincreasemorerapidly.Thisresponseprovidesconfirmationof.anSGTReventandalsoidentifiestherupturedsteamgenerator.2.Isolatetherupturedsteamgeneratorfromtheintactsteamgeneratorandisolatefeedwatertotherupturedsteamgenerator.(steps3and4).Onceatuberupturehasbeenidentified,recoveryactionsbeginbyisolatingsteamflowfromandstoppingfeedwaterflowtotherupturedsteamgenerator.Inadditiontominimizingradiologicalreleases,thisalsoreducesthepossibilityoffillingtherupturedsteamgeneratorwithwaterby1)minimizingtheaccumulationoffeedwaterflowand2)enablingtheoperatortoestablishapressuredifferentialbetweentherupturedandintactsteamgeneratorsasanecessarysteptowardterminatingprimarytosecondaryleakage.IntheguidelineforsteamgeneratortuberupturerecoveryintheERGs,theoperatorisdirectedtomaintainthelevelintherupturedsteamgeneratorbetweenjustonspanand50%onthenarrowrangeinstrument.Reference1assumedthattherupturedsteamgeneratorwouldbeisolatedwhenlevelinthesteamgeneratorreached[midwaybetweenthesepoints]'074v:1D/112487 WESTINGHOUSEPROPRIETARYCLASS2[(33%narrowrangelevel).]'orGinnaitwasalsoconservativetouse[33percent]'flevelforisolation.Therupturedsteamgeneratorwasassumedtobeisolatedat[33percentnarrowrangelevelorat10minutes,whicheverwaslonger.]'.CooldowntheReactorCoolantSystem(RCS)usingtheintactsteamgenerator(step14).Afterisolationoftherupturedsteamgenerator,theRCSiscooledasrapidlyaspossibletolessthansaturationtemperaturecorrespondingtotherupturedsteamgeneratorpressurebydumpingsteamfromonlytheintactsteamgenerator.Thisensuresadequatesubcoolinginthe.RCSafterdepressurizationtotherupturedsteamgeneratorpressureinsubsequentactions.,Withoffsitepoweravailable,thenormalsteamdumpsystemtothecondenserwillprovidesufficientcapacitytoperformthiscooldownrapidly'.Ifoffsitepowerislost,theRCSiscooledusingthepower-operatedreliefvalve(PORV)ontheintactsteamgeneratorsinceneitherthesteamdumpvalvesnorthecondenserwouldbeavailable.ItisnotedthatRCSpressurewilldecreaseduringthecooldownasshrinkageofthereactorcoolantexpandsthesteambubbleinthepressurizer.4.DepressurizetheRCStorestorereactorcoolantinventory(steps17or18).Whenthecooldowniscompleted,SIflowwillincreaseRCSpressureuntilbreakflowmatchesSIflow.Consequently,SI'flowmustbeterminatedtostopprimarytosecondaryleakage.However,adequatereactorcoolantinventorymustfirstbeassured.ThisincludesbothsufficientreactorcoolantsubcoolingandpressurizerinventorytomaintainareliablepressurizerlevelindicationafterSIflowisstopped.SinceleakagefromtheprimarysidewillcontinueafterSIflowisstoppeduntilRCSandrupturedsteamgeneratorpressuresequalize,an"excess"amountofinventoryisneededtoensure1074v:10/112487 WESTINGHOUSEPROPRIETARYCLASS2pressurizerlevelremainsonspan.The"excess"amountrequireddependsonRCSpressureandreducestozerowhenRCSpressureequalsthepressureintherupturedsteamgenerator.Toreducebreakflowandestablishsufficientpressurizerlevel,RCSpressureisdecreasedbyopeningthepressurizerPORV.5.TerminateSItostopprimarytosecondaryleakage(steps21-23).ThepreviousactionswillhaveestablishedadequateRCSsubcooling,secondarysideheatsink;andreactorcoolantinventoryfollowinganSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted,SIflowmustbestoppedtoprevent'epressurizationoftheRCSandtoterminateprimarytosecondaryleakage.PrimarytosecondaryleakagewillcontinueafterSIflowisstoppeduntilRCSpressureandrupturedsteamgeneratorpressuresequalize.Chargingflow,letdown,andpressurizerheaterswillthenbecontrolledtopreventrepressurizationoftheRCS'ndreinitiationofleakageintotherupturedsteam.generator.SincethesemajorrecoveryactionswillbemodelledintheSGTRanalysis,itisnecessarytoestablishthetimesrequiredtoperformtheseactions.Althoughtheintermediatestepsbetweenthemajoractionswillnotbeexplicitlymodelled,itisalsonecessarytoaccountforthetimerequiredtoperformthesteps,Itisnotedthatthetotaltimerequiredtocompletetherecovery-operationsconsistsofbothoperatoractiontimeandsystem,orplant,responsetime;Forinstance,thetimeforeachofthemajorrecoveryoperations(i.e.,RCScooldown,RCSdepressurization,'tc.)isprimarilyduetothetimerequiredforthesystemresponse,whereastheoperatoractiontimeisreflectedbythetimerequiredfortheoperatortoperformtheintermediateactionsteps.'TheoperatoractiontimestoinitiateRCScooldown,RCSdepressurizationandsafetyinjectionterminationweredevelopedinreference1andarelistedinTableII.1.Inadditiontotheoperatoractiontimesdevelopedinreference1,RochesterGasandElectricsuppliedtheoperatoraction1074v:1D/112087 MESTINGHOUSEPROPRIETARYCLASS2timesassociatedwithrecoveringfromthesinglefailures(Reference3).[Theseoperator'actions,whichwouldoccuroutsidethecontrolroom,includelocallyopeningtheintactsteamgeneratorPORV,locallyclosingtheintactsteamgeneratorPORVblockvalveandlocallyclosingthefaultedsteamgeneratorPORVblockvalve.]'hetimesassociatedwithperformingtheseoperatoractionsarelistedinTableII.2.[Itisnotedthatthe20minutestoopentheintactsteamgeneratorPORVconsistsof10minutestoidentifyandlocatethevalveand10minutestolinearlyopenthePORV.DuetolimitationsofLOFTTR2,theoperatoractiontoopentheintactsteamgeneratorPORVwassimulatedasastepopeningaftera15minutedelay,whichresultsinanequivalentintegratedsteamflowthroughthePORVattheendofthe20minuteperiod.]'074v:io/11208710 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.1OPERATORACTIONTIMESFORDESIGNBASISSGTRANALYSISActionTimeminIdentifyandisolaterupturedSGHaximumof10minorcalculatedtimetoreach334narrowrangelevelintherupturedSGOperatoractiontimetoinitiatecooldownCooldownCalculatedtimeforRCScooldownOperatoractiontimetoinitiatedepressurizationDepressurizationCalculatedtimeforRCSdepressurizationOperatoractiontimetoinitiateSIterminationSIterminationandpressureequalizationCalculatedtimeforSIterminationandequalizationofRCSandrupturedSGpressures1074v:1D/112087 WESTINGHOUSEPROPRIETARYCLASS2TABLEII.2ActionGINNASPECIFICOPERATORACTIONTIMESTimeminQ,CFaultedSteamGeneratorPORVBlockValveClosing-LocalAction15IntactSteamGeneratorPORVOpening-LocalAction20IntactSteamGeneratorPORVBlockValveClosing-LocalAction1074v:1D/11208712 II'ESTINGHOUSEPROPRIETARYCLASS2D.TransientDescrition-Case1[Case1addressesaSGTRinwhichthesinglefailureassumedisthattheintactsteamgeneratorPORVfailstoopenondemandandmustbelocallyopened.]'hesequence,ofeventsforCase1ispresentedinTableII.3.Followingthetuberupture,reactorcoolantflowsfromtheprimaryintothesecondarysideoftherupturedsteamgeneratorsincetheprimarypressureisgreaterthanthesteamgeneratorpressure.Inresponsetothislossofreactorcoolant,pressurizerleveldecreasesasshowninFigureII.1.TheRCSpressurealsodecreasesasshowninFigureII.2asthesteambubbleinthepressurizerexpands.AstheRCSpressuredecreasesduetothecontinuedprimarytosecondaryleakage,automaticreactortripoccursonanovertemperaturedelta-Ttripsignal.Afterreactortrip,corepowerrapidlydecreasestodecayheatlevels.Theturbinestopvalvescloseandsteamflowtotheturbineisterminated.Thesteamdumpsystemisdesignedtoactuatefollowingreactortriptolimittheincreaseinsecondarypressure,butthesteamdumpvalvesremainclosedduetothelossofcondenservacuumresultingfromtheassumedlossofoffsitepoweratthetimeofreactortrip.Thus,theenergytransferfromtheprimarysystemcausesthesecondarysidepressuretoincreaserapidlyafter'reactortripuntilthesteamgenerator.PORVslifttodissipatetheenergy,asshowninFigureII.3.TheRCSpressuredecreasesmorerapidlyafterreactortripasenergytransfertothesecondaryshrinksthereactorcoolantandtheleakflowcontinuestodepleteprimaryinventory.ThedecreaseinRCSinventoryresultsinalowpressurizerpressureSIsignal.PressurizerlevelalsodecreasesmorerapidlyfollowingreactortripandthepressurizereventuallyemptiesasshowninFigureII.1.Afterthepressurizerempties,theRCSpressurerapidlydecreasesasshowninFigureII.2.1074v:10/12048713 WESTINGHOUSEPROPRIETARYCLASS2Sinceoffsitepowerisassumedlostatreactor-trip,theRCPstripandagradualtransitiontonaturalcirculationflowoccurs.Immediatelyfollowingreactortripthetemperatureriseacrossthecoredecreasesascorepowerdecays(seeFigure11.4),however,thetemperaturerisesubsequentlyincreasesasnaturalcirculationflowdevelops.Thecoldlegtemperaturestrendtowardthesteamgeneratortemperatureasthefluidresidencetimeinthetuberegionincreases.TheRCStemperaturescontinuetoslowlydecreaseduetothecontinuedadditionoftheauxiliaryfeedwatertothesteamgeneratorsuntiloperatoractionsareinitiatedtocooldowntheRCS.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGeneratorOnceatuberupturehasbeenidentified,recoveryactionsbeginbyisolatingsteamflowfromtherupturedsteamgeneratorand.throttlingtheauxiliaryfeedwaterflowtotherupturedsteamgenerator.Asindicatedpreviously,therupturedsteamgeneratorisassumedtobeidentifiedandisolatedwhenthenarrowrangelevelreaches[33%]'ntherupturedsteamgeneratororat[10]'inutesafter.initiationoftheSGTR,whicheverislonger.ForGinna,thetimetoreach[33%]'slessthan[10]'inutes,thustherupturedsteamgeneratorisassumedtobeisolatedat[10]'inutes.2.CooldowntheRCStoEstablishSubcoolingMarginAfterisolationoftherupturedsteamgenerator,thereisa[5]'inuteoperator.actiontimeimposedpriortoinitiatingthecooldown.Theactualdelaytimeusedintheanalysisis4secondslongerbecauseofthecomputerprogramrequirementsforsimulatingtheoperatoractions.Afterthistime,actionsaretakentocooltheRCSasrapidlyaspossiblebydumpingsteamfromtheintactsteamgenerators.Sinceoffsitepowerislost,theRCSiscooledbydumpingsteamtotheatmosphereusingthePORVontheintactsteamgenerator.[ForCase1,aspreviouslynoted,theintactsteamgenerator]'074v:1D/11248714 MESTINGHOUSEPROPRIETARYCLASS2[PORVfailstoopen.Fortheanalysis,itwasassumedthatthevalvewasfullyopenedafteranadditionalperiodof15minutes(seepg.10).Thusat1804secondstheintactsteamgeneratorPORVisopenedforRCScooldown.]'hecooldowniscontinuedunti1RCSsubcoolingattherupturedsteamgeneratorpressureis20'Fplusanallowanceof17'Fforsubcoolinguncertainty.[WhentheseconditionsaresatisfieditisassumedthatittakestheoperatorfiveminutestoclosetheintactsteamgeneratorPORVblockvalve.]'tisnotedthatoverfilloftherupturedsteamgeneratoroccursduringthistimeperiodat'[2372]'econds,asshowninFigureII.6.ThiscooldownensuresthattherewillbeadequatesubcoolingintheRCSafterthesubsequentdepressurizationoftheRCStotherupturedsteamgeneratorpressure.ThereductionintheintactsteamgeneratorpressurerequiredtoaccomplishthecooldownisshowninFigureII.3,andtheeffectofthecooldownontheRCStemperatureisshowninFigureII.4.TheRCSpressurealsodecreasesduringthiscooldownprocessduetoshrinkageofthereactorcoolantasshowninFigureII.2.3,DepressurizeRCStoRestoreInventoryAftertheRCScooldown,a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.TheRCSisdepressurizedat2688secondstoassureadequatecoolantinventorypriortoterminatingSIflow.MiththeRCPsstopped,normalpressurizer'prayisnotavailableandthustheRCSisdepressurizedbyopeningapressurizerPORV.Thedepressurizationiscontinueduntilanyofthefollowingconditionsaresatisfied:RCSpressureislessthantherupturedsteamgeneratorpressureandpressurizerlevelisgreaterthan0%plusanallowanceof3%forpressurizerleveluncertainty,orpressurizer,levelisgreaterthan80%minusanallowanceof3%forpressurizerleveluncertainty,orRCSsubcoolingislessthanthe17'Fallowanceforsubcoolinguncertainty.TheRCSdepressurizationreducesthebreakflowasshowninFigureII.5andincreasesSIflowtorefillthepressurizer,asshowninFigureII.1.1074v:10/11248715 WESTINGHOUSEPROPRIETARYCLASS24.TerminateSItoStopPrimarytoSecondaryLeakageThepreviousactionsshouldhaveestablishedadequateRCSsubcooling,verifiedasecondarysideheatsink,andrestoredthereactorcoolantinventoryfollowingaSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted,theSIflowmustbestoppedtopreventrepressurizationoftheRCSandtoterminate"primarytosecondaryleakage.TheSIflowisterminatedwhentheRCSpressureincreases,,minimumAFWflowisavailableandatleastoneintactsteamgeneratorlevelisinthenarrowrange,RCSsubcoolingisgreaterthanthe17'Fallowanceforsubcoolinguncertainty,andthepressurizerlevelisgreaterthanthe3Xallowanceforpressurizerleveluncertainty.ToassurethattheRCSpressureisincreasing,SIwasnotterminatedintheanalysisuntiltheRCSpressureincreasedto50psiabovetherupturedsteamgeneratorpressure.Afterdepressurizationiscompleted,anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.TheprimarytosecondaryleakagecontinuesaftertheSIflowisterminateduntiltheRCSandrupturedsteamgeneratorsequalize.Thisoccurswhen'theintactsteamgeneratorPORVislocallyopenedtocooldowntheRCSsothatsubcoolingmaybemaintained.WhenthePORVisopenedtheincreasedenergytransferfromprimarytosecondarydepressurizestheRCStotheruptured.steamgeneratorpressure.1074v:10/11208716 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.3SEQUENCEOFEVENTSEVENTCASE1Timesecd.,CReactorTrip50Ruptured.SGIsolated600IntactSGPORVOpened1804OverfillRupturedSG2372IntactSGPORVIsolatedPRZRPORVOpenedPRZRPORVClosed256826882738SITerminated2798IntactPORVOpened3288BreakFlowTerminated34281074v:1D/11208717 WESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1188.88~78.68.4J68.t448.38.18~8.8..1Ei84.2E+84TINE(SEC).3Ei84.4E~84FigureII.1PressurizerLevel-Case11074v:1D/11208718 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASEI.25E+84.225Ei84.2E84.175E'84.15E+84Ld~,12SE~84LJOf~o.1E84Of758.588.258..IE~84.2E84.3E~84TIME(SEC).4E84FigureII.2RCSPressure-Case11074v:10/11208719 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALYSISISPERCENTTUBEPLUGGINGCASEI.I4E84.12Ei84RUPTUREDLOOP.1E~84888.INTACTLOOPOCC)ill688.488.288.8..IE~84.2E84.3E~84.4E~84TINE(SEC)FigureII.3SecondaryPressure-Case11074v:1D/11208l20 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAi1GENERATORTUBERUPTUREANALYSISPERCENTTUBEPLUGGINGCASE1658.688.~558.4JCD588.~458.IX488.C)358.CDCD~388.258~288'..1E~84..2E~84TI11E(SEC).3E~84~4E~84FigureII.4IntactLoopHotandColdLegRCSTemperatures-Case11074v:10/11208721 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAI1GENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1168.I48.128'SSUEUlKlD88.C)68~hCEZIIJm48.28.-28...IE~84.2E~84TIt1EISEC).3E84.4E+84FigureII.5PrimarytoSecondaryLeakage-Case11074v:1D/11208722 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAI1GENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1.6E84.SE84~.4E~84~.3'40.2Ei84.1E84.lE.84.2E~B4.3E~84.4E~84TlNEtSEC)FigureII.SRupturedSGRaterVolume-Case11074v:1D/11208123 WESTINGHOUSEPROPRIETARYCLASS2E.TransientDescrition-Case2[Case2addressesaSGTRinwhichthesinglefailureassumedisthatthefaultedsteamgeneratorPORVfailsopenatthetimethefaultedsteamgeneratorisisolated.]'hus,theCase2transientissimilartotheCase1transientuntilthattime..ThesequenceofeventsforCase2isIpresentedinTableII.4.FollowingthetuberupturetheRCSpressuredecreasesasshowninFigure11.7duetotheprimarytosecondaryleakage.Inresponsetothisdepressurization,thereactortripsonovertemperaturedelta-T.Afterreactortrip,corepowerrapidlydecreasestodecayheatlevelsandtheRCSdepressurizationbecomesmorerapid.Thesteamdumpsystemisinoperableduetotheassumedlossofoffsitepower,whichresultsinthesecondarypressurerisingtothesteamgeneratorPORVsetpointasshowninFigure11.8.ThedecreasingpressurizerpressureleadstoanautomaticSIsignalonlowpressurizerpressure.Pressurizerlevelalsodecreasesmorerapidlyfollowingreactortripuntiliteventuallyempties,asshowninFigure11.9.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGeneratorTherupturedsteamgeneratorisassumedtobeidentifiedandisolatedat[10minutesaftertheinitiationoftheSGTRorwhenthenarrowrangelevelreaches33%,whichevertimeisgreater.]'orthiscase,thetimetoreach[33/]'arrowrangelevelis[652]'econds,andthus,itwasassumedthattherupturedsteamgeneratorisisolatedatthattime.[TherupturedsteamgeneratorPORVisalsoassumedtofailopenatthistime.]'hefailurecausesthesteamgeneratortorapidlydepressurize,whichresultsinanincreaseinprimarytosecondaryleakage.Thedepressu'rizationoftherupturedsteamgeneratorincreases'hebreakflowandenergytransferfromprimarytosecondarywhichresultsinRCSpressureandtemperaturedecreasingmorerapidlythaninCase1.Therupturedsteamgenerator1074v:10/12048724 MESTINGHOUSEPROPRIETARYCLASS2depressurizationcausesacooldownintheintactsteamgeneratorloop.Asthe'ntactsteamgeneratorhotlegtemperaturedecreasesbelowthesteamgeneratorwatertemperaturereverseheattransfertakesplaceasshowninFigureII.10.[ItisassumedthatthetimerequiredfortheoperatortoidentifythattherupturedsteamgeneratorPORVisopenandtoclosetheassociatedblockvalveis15minutes.Thus,at1558secondsthedepressurizationofrupturedsteamgeneratoristerminated.]',c2.CoolDowntheRCStoestablishSubcoolingMargin[AftertherupturedsteamgeneratorPORVblockvalveisclosed,'hereisa5minuteoperatoractiontimeimposedpriortoinitiationofcooldown.]'hedepressurizationoftherupturedsteamgeneratoraffectstheRCScooldowntargettemperaturesincethetemperatureisdependentuponthepressureintherupturedsteamgenerator.Since'ffsitepowerislosttheRCSiscooledbydumpingsteamtotheatmosphereusingtheintactsteamgeneratorPORV.ThecooldowniscontinueduntilRCSsubcoolingattherupturedsteamgeneratorpressureis20'Fplusanallowanceof17'Fforinstrumentuncertainty.HecauseofthelowerpressureintherupturedsteamgeneratortheassociatedtemperaturetheRCSmustbecooledtoisalsolower,whichhastheneteffectofextendingthetimeforcooldown.ForCase2cooldownbeginsat[1858]'econds'andiscompletedat[2852]'econds.ThereductionintheintactsteamgeneratorpressurerequiredtoaccomplishthecooldownisshowninFigureII.8,andtheeffectofthecooldownontheRCStemperatureisshowninFigureII.10.TheRCSpressurealsodecreasesduringthiscooldownprocessduetoshrinkageofthereactorcoolantasshowninFigureII.7.3.DepressurizetoRestoreInventoryAftertheRCScooldown,a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.TheRCSisdepressurizedat[2974]'econdstoassureadequatecoolantinventorypriorto1074v:10/11248725 HESTINGHOUSEPROPRIETARYCLASS2terminatingSIflow,-HiththeRCPsstopped,normalpressurizersprayisnotavailableandthustheRCSisdepressurizedbyopeningapressurizerPORV.Thedepressurizationiscontinueduntilanyofthefollowingconditionsaresatisfied:RCSpressureislessthantherupturedsteamgeneratorpressureandpressurizerlevelisgreaterthan0%plusanallowanceof3%forpressurizerleveluncertainty,orpressurizerlevelisgreaterthan80%minusanallowanceof3%forpressurizerleveluncertainty,orRCSsubcoolingislessthanthe17'Fallowanceforsubcoolinguncertainty.TheRCSdepressurizationreducesthebreakflowasshowninFigureII.11andincreasesSIflowtorefillthepressurizer,asshowninFigure11.9.4.TerminateSItoStopPrimarytoSecondaryLeakage,ThepreviousactionsshouldhaveestablishedadequateRCSsubcooling,verifiedasecondarysideheatsink,andrestoredthereactorcoolantinventoryfollowinganSGTRtoensurethatSIflowisnolongerneeded.Nhentheseactionshavebeencompleted,theSIflowmustbestoppedtopreventrepressurizationoftheRCSandtoterminateprimarytosecondaryleakage.TheSIflowisterminatedwhentheRCSpressureincreases,'minimumAFHflowisavailableandatleastoneintactsteamgeneratorlevelisinthenarrowrange,RCSsubcoolingisgreaterthanthe17'Fallowanceforsubcoolinguncertainty,andthepressurizerlevelisgreaterthanthe3%allowanceforpressurizerleveluncertainty.ToassurethattheRCSpressureisincreasing,SIwasnotterminateduntiltheRCSpressureincreasedto50psiabovetherupturedsteamgeneratorpressure.Afterdepressurizationiscompleted,anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.FigureII.11showsthattheprimarytosecondaryleakagecontinuesaftertheSIflowisstoppeduntiltheRCSandrupturedsteamgeneratorpressureequalize.TherupturedsteamwatervolumeisshowninFigureII.12.ForCase2,therupturedsteamgeneratordoesnotoverfill.1074v:1D/112487 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.4SEQUENCEOFEVENTSCASE2EVENTTIMEsecReactorTrip49.4RupturedSGIsolatedRupturedSGPORVFailsOpena.cRupturedSGBlockValveClosed1558IntactSGPORVOpenedIntactSGPORVClosed18582852PRZRPORVOpenedPRZRPORVClosed29743006SITerminated3066BreakFlowTerminated34381D74v:1O/11208727 WESTINGHOUSEPROPRIETARYCLASS2GINNASTEAt1GENERATORTUBERUPTURE4NAL'/SIS15PERCENTTUBEPLUGGING2588.2258.CASE2-2888.CCl758.1588.~1258.cnI888.758.588.258.8.8.588.1888.l588.2888'588.5888.5588."4888.TIME(SEC)FigureII.7RCSPressure-Case21074v:10/11208728 HESTINGHOUSEPROPRIETARYCLASS21488.GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE21288.-l888.w888.688.w488,RUPTUREDLOOPINTACTLOOP288,8.588.1888.:l588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.8SecondaryPressure-Case21074v:10/11208729 WESTINGHOUSEPROPRIETARYCLASS2G1NNASTEANGENERATORTUBERUPTUREANALYS1515PERCENTTUBEPLUGGING188.CASE298.e8.78.LJw68.'58.48~38.028.18.8.8.588.1888.1588.2888'588.3888.3588.4888.TINE(SEC)FigureII.9PressurizerLevel-Case.21074v:10/11ZOST30 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALVSIS15PERCENTTUBEPLUGGING658.CASE2688.~558.O588.~z.458.o488.xIo358,388.TCOLDTHOTTHOT,TCOLDTHOTTCOLD258'88.8.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.10IntactLoopHotandColdLegRCSTemperatures-Case21074v:1D/11208731 MESTINGHOUSEPROPRIETARYCLASS2GINNASTEAMGENERATORTUBERUPTUREANALVSIS15PERCENTTUBEPLUGGINGCASE278.w68~58.o48.38.oc28.I8,-18.-288.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.11PrimarytoSecondaryLeakage-Case21074v:1D/11208732 MESTINGHOUSEPROPRIETARYCLASS26888.GINNASTEAMGENERATORTUBERUPTUREANALYSIS15PERCENTTUBEPLUGGING'ASE2H)I~5888.Ko4888.~5888.~g2888~I888.8.588.1888.1588.2888.2588.5888.5588.4888.,TIME(SEC)Figure11,12RupturedSGMaterVolume-Case21074v:1D/11208733 WESTINGHOUSEPROPRIETARYCLASS2F.MassReleasesThemassreleasesweredeterminedforeachofthesinglefailurecasesforuseinevaluatingtheexclusionareaboundaryandlowpopulationzoneradiationexposure.Thesteamreleasesfromtherupturedandintactsteamgenerators,thefeedwaterflowstotherupturedandintactsteamgenerators,andprimarytosecondarybreakflowintotherupturedsteamgeneratorweredeterminedfortheperiodfromaccidentinitiationuntil2hoursaftertheaccidentandfrom2to8hoursaftertheaccident.Thereleasesfor0-2.hoursareusedtocalculatetheradiationdosesattheexclusionareaboundaryfora2hourexposure,andthereleasesfor0-8hoursareusedtocalculatetheradiationdosesatthelowpopulationzoneforthedurationoftheaccident.IntheLOFTTR2analyses,theSGTRrecoveryactionsintheE-3guidelineweresimulateduntiltheterminationofprimarytosecondaryleakage.Aftertheprimarytosecondaryleakageisterminated,theoperatorswillcontinuetheSGTRrecoveryactionsintheE-3guidelinetopreparetheplantforcooldowntocoldshutdownconditions.TheseactionsincludeestablishingnormalChemicalandVolumeControlSystem(CVCS)operationtoprovidereactorcoolantinventorycontrolandaborationpath;restartingareac'torcoolantpump(RCP),ifnonearerunning,toensurehomogeneousRCSconditionsandtoprovidenormalpressurizerspray;orstoppingoneRCP,ifbotharerunning,tominimizetheheatinput'uringthesubsequentcooldown;andtheactionsnecessaryto'inimizethespreadofcontaminationonthesecondaryside.WhentheinstructionsprovidedinE-3arecompleted,theplantshouldbecooledanddepressurizedtocoldshutdownconditions.Therearethreealternatemeansofperformingthepost-SGTRcooldownprovidedintheWOGEmergencyResponseGuidelines.Theguidelinesare:ES-3.1,POST-SGTRCOOLDOWNUSINGBACKFILL;ES-3.2,POST-SGTRCOOLDOWNUSINGBLOWDOWN;andES-3.3,POST-SGTRCOOLDOWNUSINGSTEAMDUMP.Thepreferredmethodsareusingbackfillorblowdownsincethesemethodsminimizetheradioactivityreleasedtotheatmosphere.TheES-3.3guidelineusingsteamdumpprovidesthefastestmethodfor1074v:1D/11208734 WESTINGHOUSEPROPRIETARYCLASS2depressurizingtheRCSandrupturedsteamgenerator.Thismethodalsoresultsintheworstradiologicalreleases,especiallyifsteamdumptothecondenserisunavailable.Therefore,themethodusingsteamdumpwasselectedforevaluationofthelong-termmassreleasessincethisproducesconservativeresultsfortheoffsitedoseevaluation.Itisnotedthattheuseofthesteamdumpmethodwouldnotbepermittedifsteamgeneratoroverfilloccursandwaterentersthemainsteamlines.ThehighlevelactionsfortheES-3.3guidelinearediscussedbelow,1.PrepareforCooldowntoColdShutdownTheinitialstepstoprepareforcooldowntocoldshutdownareperformedintheE-3guidelinefollowingSItermination,andthesestepswillbecontinuedinES-3.3iftheyhavenotalreadybeencompleted.AfewadditionalstepsarealsoperformedinES-3.3prior.toinitiatingcooldown.Theseincludeisolatingthecoldleg.SIaccumulatorstopreventunnecessaryinjection,energizingpressurizerheatersasnecessarytosaturatethepressurizerwaterandtoprovideforbetterpressurecontrol,andassuringadequateshutdownmarginintheeventofpotentialborondilutionduetoin-leakagefromthe'rupturedsteamgenerator.2.CooldownRCStoResidualHeatRemoval(RHR)SystemTemperatureTheRCSiscooledbysteamingandfeedingtheintactsteamgeneratorsimilartoanormalcooldown.Sinceallimmediatesafetyconcernshavebeenresolved,thecooldownrateshouldbemaintainedlessthanthemaximumallowablerateof100'F/hr.ThepreferredmeansforcoolingtheRCSissteamdumptothecondensersincethisminimizestheradiologicalreleasesandconservesfeedwatersupply.ThePORVfortheintactsteamgeneratorcanalsobeusedifsteamdumptothecondenserisunavailable.WhentheRHRsystemoperatingtemperatureisreached,thecooldownisstoppeduntilRCSpressurecanalsobedecreased.Thisensuresthatpressure/temperaturelimitswillnotbeexceeded.1074v:1D/11208735 WESTINGHOUSEPROPRIETARYCLASS23.DepressurizeRCStoRHRSystemPressureWhenthecooldowntoRHRsystemtemperatureiscompleted,thepressureintherupturedsteamgeneratorisdecreasedbyreleasingsteamfromtherupturedsteamgenerator.Steamreleasetothecondenserispreferredsincethisminimizesradiologicalreleases.However,steamcanalsobereleasedtotheatmosphereusingthePORVontherupturedsteamgenerator.Anevaluationofthepotentialradiologicalconsequencesshouldbeperformedbeforereleasingsteamfromtherupturedsteamgeneratortotheatmosphere.Astherupturedsteamgeneratorpressureisreduced,theRCSpressureismaintainedequaltothepressureintherupturedsteamgeneratorinordertopreventin-leakageofsecondarysidewateroradditionalprimarytosecondaryleakage.NormalpressurizersprayisthepreferredmeansofRCSpressurecontrolsincethisconservescoolantinventory.Ifpressurizersprayisnotavailable,apressurizerPORVorauxiliaryspraycanbeusedtocontrolRCSpressure.Whenoverfilloftherupturedsteamgeneratoroccurs,aswithCase1,guidelineES-3.1POST-SGTRCOOLDOWNUSINGBACKFILLisassumedtobeused.ThehighlevelactionsforES-3.1aresimilartoES-3.3.However,themethodbywhichES-3.1instructstheoperatortodepressurizetherupturedsteamgeneratordiffersfromES-3.3.InGuidelineES-3.1theRCSisdepressurizedtopromotebackflowthroughthefailedtubewhichdepressurizestherupturedsteamgeneratorwithoutsteamreleasestotheatmosphere.4.CooldowntoColdShutdownWhenRCStemperatureandpressurehavebeenreducedtotheRHRsystemin-servicevalues,RHRsystemcoolingisinitiatedtocompletethecooldowntocoldshutdown.Whencoldshutdownconditionsareachieved,thepressurizercanbecooledtoterminatetheevent.1074v:1O/11208736 WESTINGHOUSEPROPRIETARYCLASS2F.1MethodologyforCalculationofMassReleasesTheoperatoractionsfortheSGTRrecoveryuptotheterminationofprimarytosecondaryleakagearesimulatedintheLOFTTR2analyses.Thus,thesteamreleasesfromtherupturedandintactsteamgenerators,thefeedwaterflowstotherupturedandintactsteamgenerators,andtheprimarytosecondaryleakageintotherupturedsteamgeneratorweredeterminedfromtheLOFTTR2resultsfortheperiodfromtheinitiationoftheaccidentuntiltheleakageisterminated.L2,CFollowingtheterminationofleakage,theoperatorsareassumedtocompletethestepsintheE-3andES-3.3orES-3.1guidelinestoprepareforcooldowntocoldshutdown.Thetimefromleakageterminationuntiltheinitiationofcooldownwasassumedtobe20minutes(seeReference2).Theassumedtimeof20minutestoinitiatethecooldownisconsideredtobeconservative,sincetheactualtimeisexpectedtobelongerforanactualeventbecauseanevaluationofthepotentialoffsiteradiationdoseswouldberequiredpriortousingthesteamdumpmethodforthepost-SGTRcooldown.ItwasassumedthattheRCSandintactsteamgeneratorconditionsaremaintainedstableduringthe20minuteperioduntilthecooldownisinitiated.ThePORVfortheintactsteamgeneratorwasthenassumedtobeusedtocooldowntheRCStotheRHRsystemoperatingtemperatureof332'F,atthemaximumallowablecooldownrateof100'F/hr..TheRCSandtheintactsteamgeneratortemperaturesat2hourswerethendeterminedusingtheRCSandintactsteamgeneratorparametersatthetimeofleakageterminationandtheRCScooldownrate.'hesteamreleasesandthefeedwaterflowsfortheintactsteamgeneratorfortheperiodfromleakageterminationuntil2hoursweredeterminedfromamassandenergybalanceusingthecalculatedRCSandintactsteamgeneratorconditionsatthetimeofleakageterminationandat2hours.ThecoredecayheatandtheheataddedfromtheoperationofoneRCPwereincludedintheenergybalanceforthistimeperiod.Sincetherupturedsteamgeneratorisisolated,nochangeintherupturedsteamgeneratorconditionsisassumedtooccuruntilsubsequentdepressurization.TheassumptionsofareasonablyshortpreparationtimeforcooldownandthemaximumcooldownrateresultinminimumRCSandsteamgeneratortemperaturesat2hours,andtherefore,aconservativeestimateofthesteamreleasedtotheatmosphereduringthefirst2hours.1074v:1D/11208737 HESTINGHOUSEPROPRIETARYCLASS2a,c'TheRCScooldownwasassumedtobecontinuedafter2hoursuntiltheRHRsystemin-servicetemperatureof332'Fisreached.DepressurizationoftherupturedsteamgeneratorwasthenassumedtobeperformedimmediatelyfollowingthecompletionoftheRCScooldown.TherupturedsteamgeneratorwasassumedtobedepressurizedtotheRHRin-servicepressureof343psiaviasteamreleasefromtherupturedsteamgeneratorPORV,sincethismaximizesthesteamreleasefromrupturedsteamgeneratortotheatmospherewhichisconservativefortheevaluationoftheoffsiteradiationdoses.TheRCSpressureisalsoassumedtobereducedconcurrentlyastherupturedsteamgeneratorisdepressurizedtominimizeflowbetweentheRCSandtherupturedsteamgenerator.ItisassumedthatthecontinuationoftheRCScooldownanddepressurizationtoRHRoperatingconditionsarecompletedwithin8hoursaftertheaccidentsincethereisampletimetocompletetheoperationsduringthistimeperiod.Thesteamreleasesandfeedwaterflowsfrom2to8hoursweredeterminedfortheintactsteamgeneratorfromamassandenergybalanceusingtheRCSandsteamgeneratorconditionsat2hoursandattheRHRsystemin-serviceconditions.ThecoredecayheatandtheheatadditionduetotheoperationofoneRCPwerealsoincludedintheenergybalanceforthistimeinterval.Thesteamreleasedfromtherupturedsteamgeneratorfrom2to8hourswasdetermined.based'namassandenergybalancefortherupturedsteamgeneratorusingtheconditionsatthetimeofleakageterminationandsaturatedconditionsattheRHRin-servicepressure.After8hours,itisassumedthatfurtherplantcooldowntocoldshutdownaswellaslong-termcoolingisprovidedbytheRHRsystem.Therefore,thesteam~releasestotheatmosphereareterminatedafterRHRin-serviceconditionsareassumedtobe.reachedat8hours.F.2HassReleaseResultsThemassreleasecalculationswereperformedforbothsinglefailurecasesusingthemethodologydiscussedabove.Forthetimeperiodfrominitiationoftheaccidentuntilleakagetermination,thereleasesweredeterminedfromtheLOFTTR2resultsfortwoseparateperiodsforuseinthedosecalculations.Thefirsttimeperiodconsideredisfromaccidentinitiationuntilreactortrip.Sincethecondenserisinserviceuntilreactortrip,anyradioactivity1074v:1D/11208738 WESTINGHOUSEPROPRIETARYCLASS2releasedtotheatmospherepriortoreactortripwillbethrough'hecondenserairejector.Afterreactortrip,'hereleasestotheatmosphereareassumedtobeviathesteamgeneratorPORVs.Themassreleasescalculatedfromthetimeofleakageterminationuntil2hoursandfrom2-8hoursarealsoassumedtobereleasedtotheatmosphereviathesteamgeneratorPORVs.ThemassreleasesfortheSGTRevent[assumingdelayeduseoftheintactsteamgeneratorPORV]'Case1)arepresentedinTableII.5.Theresultsindicatethatapproximately[21,990]'bmofsteamand[23,710]'bmofwaterisreleasedfromtherupturedsteamgeneratortotheatmosphereinthefirst2hours.Atotalof[129,300]'bmofprimarywateristransferredtothesecondarysideoftherupturedsteam.generatorbeforethebreakflowisterminated.ThemassreleasesfortheSGTReventassuming[failureandisolationoftherupturedsteamgeneratorPORV]'Case2)arepresentedinTableII.6.Theresultsindicatethatapproximately[62,480]'bmofsteamisreleasedtotheatmospherefromtherupturedsteamgeneratorwithinthefirst2hours.After2hours[33,300]'bmisreleasedtotheatmospherefromtherupturedsteamgenerator.Atotalof[172,800]'bmofprimarywateristransferredtothesecondarysideoftherupturedsteamgeneratorbeforebreakflowisterminated.1074v:1D/11208739 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.5CASE1MASSRELEASES0-TRIPTOTALMASSFLOW(POUNDS)TIMEPERIODTRIPTMSEP-OVFILL-TTBRK-T2HRSTMSEPOVFILLTTBRKT2HRS'RHRFaultedSGCondenserAtmosphereFeedwater47,80000015,450654043,60030,50000023,710*'00PICIntactSGCondenserAtmosphere47,150Feedwater47,1500000014,73032,95013,450151,870505,50046,04029,61017,900158,700513,500BreakFlow421647,57453,71023,800TRIPTMSEPOVFILLTTBRKT2HRSTRHR=Timeofreactortrip=[50]'ec.=Timewhenwaterreachesthemoistureseparators=[1086]'ec.=Timewhensteamgeneratoroverfills=[2372]'ec.=Timewhenbreakflowisterminated=[3428]'ec.=Timeat2hours=7200sec.=TimetoreachRHRin-serviceconditions,8hours=28,800sec.*Ha'ter1074v:1D/1120Sl40 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.6CASE2MASSRELEASES~TOTALMASSFLOM(POUNDS)TIMEPERIOD0-TRIPTRIPTMSEP"TTBRK-T2HRSTMSEPTTBRKT2HRSTRHRFaultedSGCondenserAtmosphereFeedwater46,8800062,09039042,74033,260033,300CL,CIntactSGCondenserAtmosphereFeedwater46,220000035,43018,450153,920457,00046,22097,78019,700160,300457,700BreakFlow4134132,66636,00000TRIP=TimeTMSEP=TimeTTBRK=TimeT2HRS=TimeTRHR=Timeofreactortrip=[49.4]'ec.whenwaterreachesthemoistureseparators=[2372]'ec.whenbreakflowisterminated=[3438]'ec.at2hours=7200sec.toreachRHRin-serviceconditions,8hours=28,800sec.1074v:1D/11208741 MESTINGHOUSEPROPRIETARYCLASS2TABLEII.7SUMMARIZEDMASSRELEASESTOTALMASSFLOM(POUNDS)CASE1CASE2FaultedSG0-TTBRKTTBRK-2HRS-2HRS8HRS0-TTBRK-2HRSTTBRK2HRS8HRSCondenser47,82046,880Atmosphere45,700*62,48033,300Feedwater74,10076,000IntactSGCondenser47,15046,2200Atmosphere61,130151,870505,500Feedwater122,800158,700513,50053,880153,920457,000163,700160,300.457,700BreakFlow129,3000172,800023,710ibmofthisiswater.1074v:10/1120S742 WESTINGHOUSEPROPRIETARYCLASS2III.RADIOLOGICALCONSEQUENCESANALYSISTheevaluationoftheradiologicalconsequencesofasteamgeneratortuberupture,assumesthatthereactorhasbeenoperatingattheproposedTechnicalSpecificationlimitforprimarycoolantactivityandattheexistingTechnicalSpecificationlimitforprimarytosecondaryleakageforsufficienttimetoestablishequilibriumconcentrationsofradionuclidesinthereactorcoolantandinthesecondarycoolant.Radionuclidesfromtheprimarycoolantenterthesteamgenerator,viatherupturedtube,andarereleasedtotheatmospherethroughthesteamgeneratorsafetyorpoweroperatedreliefvalvesandviathe4condenserairejector,exhaust.Thequantityofradioactivityreleasedtotheenvironment,duetoaSGTR,dependsuponprimaryandsecondarycoolantactivity,iodinespikingeffects,primarytosecondarybreakflow,breakflowflashingfractions,attenuationofiodinecarriedbytheflashedportionofthebreakflow,partitioningofiodinebetweentheliquidandsteamphases,themassoffluidreleasedfromthegeneratorandliquid-vaporpartitioningintheturbinecondenserhotwell.Alloftheseparameterswereconservativelyevaluatedforadesignbasisdoubleendedruptureofasingletube.A.'esinBasisAnalticalAssumtionsThemajor'assumptionsandparametersusedintheanalysisareitemizedinTable111.1.Thefollowingisadiscussionofthesourceterm.SourceTermCalculationsTheradionuclideconcentrationsintheprimaryandsecondarysystem,priortoandfollowingtheSGTRaredeterminedasfollows:a.Theiodineconcentrationsinthereactorcoolantwillbebaseduponpreaccidentandaccidentinitiatediodinespikes.1074v:1D/11208743 MESTINGHOUSEPROPRIETARYCLASS2AccidentInitiatedSpike-Theinitialprimarycoolantiodineconcentrationis1yCi/gmofDoseEquivalent(D.E.)I-131.FollowingtheprimarysystemdepressurizationassociatedwiththeSGTR,aniodinespikeisinitiatedintheprimarysystemwhichincreasestheiodinereleaseratefromthefueltothecoolanttoavalue500timesgreaterthanthereleaseratecorrespondingtotheinitialprimarysystemiodineconcentration.Thedurationofthespike,[3.31'ours,issufficienttoincreasetheinitialRCSI-131inventorybyafactorof[100]'ii.PreaccidentSpike-AreactortransienthasoccuredpriortotheSGTRandhasraisedtheprimarycoolantiodineconcentrationfrom1to60yCi/gramofD.E.I-131.b.Theinitialsecondarycoolantiodineconcentrationis0.1yCi/gramofD.E.I-131.c.Thechemicalformofiodineintheprimaryandsecondarycoolantisassumedtobeelemental.4DoseCalculationsThefollowingassumptionsandparameterswereusedtocalculatetheactivityreleasedtotheatmosphereandtheoffsitedosesfollowingaSGTR.1.ThemassofreactorcoolantdischargedintothesecondarysystemthroughtheruptureandthemassofsteamreleasedfromtheintactandrupturedsteamgeneratorstotheatmospherearepresentedinTableII.5andII.G.2.ThetimedependentfractionofruptureflowthatflashestosteamandisimmediatelyreleasedtotheenvironmentispresentedinFigureIII.1.3.Thetimedependentiodineremovalefficiencyforscrubbingofsteambubblesas'heyrisefromtheleaksite[(assumedtobeatthetopofthetubebundle)]'othewatersurfacewasalsodeterminedforeach,1074v:10/112087 MESTINGHOUSEPROPRIETARYCLASS2case.,Theiodineremovalefficiencyisdeterminedbythe.methodsuggestedbyPostmaandTam(Ref.6).TheiodineremovalefficienciesareshowninFigureIII.2.4.The0.2gpmprimarytosecondaryleakisassumedtobesplitevenlybetweenthesteamgenerators.5.Theiodinepartitionfactorbetweentheliquidandsteamoftherupturedandintactsteamgeneratorsisassumedtobe1DO.6.Nocredit'astakenforradioactivedecayduringreleaseandtransport,orforclouddepletionbygrounddepositionduringtransporttothesiteboundaryorouterboundaryofthelowpopulationzone.7.Short-termatmosphericdispersionfactors(x/gs)foraccidentanalysisandbreathingratesareprovidedinTableIII.4.ThebreathingrateswereobtainedfromNRCRegulatoryGuide1.4,(Ref.4).OffsiteThroidDoseCalculationModelOffsitethyroiddosesarecalculatedusingthe~uation:ThgtDCF,.g(IAR);.(BR).(x/()).]1Jwhere(IAR)..=integratedactivityofisotopeireleasedduring'the1Jtimeintervalj'nCi>>F*Nocreditistakenforclouddepletionbygrounddepositionorbyradioactivedecayduringtransporttotheexclusionareaboundaryortotheouterboundaryofthelow-populationzone.1074v:1D/11208745 WESTINGHOUSEPROPRIETARYCLASS2(BR)~breathingrateduringtimeinterval'inmeter/second(TableIII.4)(x/Q)=atmosphericdispersionfactorduringtimeintervaljJinsecond/meter(TableIII.4)(DCF).=thyroiddoseconversionfactorviainhalationfor1isotopeiinrem/Ci(TableIII.5)thyroiddoseviainhalationinremResultsThyroiddosesattheExclusionAreaBoundaryandLowPopulationZonearepresentedinTableIII.6.AlldosesarewellwithintheallowableguidelinesasspecifiedbyStandardReviewPlan15.6e3and10CFR100.1074v:1D/11248746 WESTINGHOUSEPROPRIETARYCLASS2TABLEIII.1PARAMETERSUSEDINEVALUATINGTHERADIOLOGICALCONSEQUENCESOFASTEAMGENERATORTUBERUPTUREI.SourceDataA.Corepowerlevel,MWt1520B.Totalsteamgeneratortubeleakage,priortoaccident,gpm0.2C.Reactorcoolantiodineactivity:1.AccidentInitiatedSpikeTheinitialRCiodineactivitiesbasedon1I>Ci/gramofD.E.I-131arepresentedinTableIII.3.TheiodineappearanceratesassumedfortheaccidentinitiatedspikearepresentedinTableIII.2.2,Pre-AccidentSpikePrimarycoolantiodineactivitiesbasedon60gCi/gramofD.E.I-131arepresentedinTableIII.3.,D.SecondarysysteminitialactivityDoseequivalentof0.1yCi/gmofI-131,presentedinTableIII.3.1074v:1D/11208747 HESTINGHOUSEPROPRIETARYCLASS2TABLEIII.l(Sheet2)E.Reactorcoolantmass,gramsF.Steamgeneratormass(each),grams1.27x103.39x10G.Offsitepow'erLostattimeofreactortripH.Primary-to-secondaryleakagedurationforintactSG,hrs.I.Speciesofiodine100percentelementalII.ActivityReleaseDataA.Faultedsteamgenerator1.Ruptureflow2.RuptureflowflashingfractionSeeTableII.5orII.GSeeFigureIII.13.IodinescrubbingplusmoistureseparatorremovalefficiencySeeFigureIII.24.Totalsteamrelease,lbsSeeTableII.5orII.G5.Iodinepartitionfactora.Priortooverfillb.Afteroverfill100-1.0-SeeFigureIII.36.Locationoftuberupture[TopofBundle]'074v:10/1120S748 MESTINGHOUSE.PROPRIETARYCLASS2TABLEIII.1(Sheet3)B.Intactsteamgenerator1.Primary-to-secondaryleakage,gpm0.12.Totalsteamrelease,lbsSeeTable11.5or11.63.Iodinepartitionfactor100C.Condenser1.Iodinepartitionfactor100D.AtmosphericOispersionFactorsSeeTableIII,41074v:lo/11208749 MESTINGHOUSEPROPRIETARYCLASS2TABLEIII.2IODINESPIKEAPPEARANCERATES(CURIES/SECOND)1-1323-133I"1340.942.221.743.071074v:1D/11208750 MESTINGHOUSEPROPRIETARYCLASS2TABLEIII.3IODINESPECIFICACTIVITIESIN(yCi/gm)THEPRIMARYANDSECONDARYCOOLANTBASEDON1,60AND0.1yCi/gramOFD.E.I-131Nuclide~Pit11~luCD/m60uCi/cDmSecondarCoolant0,1wCi/(1m0.7947.10.079I-1320.3520.70.0351.0160.70.1010.2012.20.020I-1350.7947.10.0791074v:1D/11208751 MESTINGHOUSEPROPRIETARYCLASS2TABLEIII.4ATMOSPHERICDISPERSIONFACTORSANDBREATHINGRATESTimeExclusionAreaBoundaryLowPopulation(hours)x/Q(Sec/m)3Zonex/Q(Sec/m)3BreathingRate(m/Sec)[4]0-22-84.8x103x103x103.47x103.47x101074v:1D/11208752 WESTINGHOUSEPROPRIETARYCLASS2TABLEIII.5THYROIDDOSECONVERSIONFACTORS(Rem/Curie)[51Nuclide~I-131I-1341.49x101.43x102.69x103.73x105.60x101074v:1D/11208753 NESTINGHOUSEPROPRIETARYCLASS2TABLEIII.6RESULTSOosesRemAllowableCase1Case2GuidelineValuel.AccidentInitiatedIodineSikeExclusionAreaBoundary(0-2hr.)Thyroid26.43.830LowPopulationZone(0-8hr.)Thyroid1.70.3302.Pre-AccidentIodineSikeExclusionAreaBoundary(0-2hr.)Thyroid102.122.1300,LowPopulationZone(0-8hr.)Thyroid6.41.4300~1074v:1D/11248754 WESTINGHOUSEPROPRIETARYCLASS2GINN4SGTRIS%TUBEPLUGGING-C4SER4OIOLOGIC4LCONSEOUENCESEV4LU4TIONBREAKFLOWFL4SNINGFR4CTION~ISCase1e.~It~Si,tt&~tt~S4,lt~SiTIICItttlGINN4SGTRISZTUBEPLUGGINGCASE2R4OIGLOOICALCONSEOUENCESEVALUATIONBREAKFLOWFLASHINGFR4CTION~ISCase2~ItH,tt14~StSI,ateiTletItttIFigureIII.1BreakFlowFlashingFraction1074v:1D/11208755 HESTINGHOUSEPROPRIETARYCLASS2GL,GCASE1o5~2081eeeTINE(SECONDS)1588288~5CASE24Z.(~2VM'I01088TINEISECONDSI1508288FigureIII.2SrubbingEfficiency1074v:1D/112087 WESTINGHOUSEPROPRIETARYCLASS2IE+2CASE11E+120~aC<LE+8ZIHE(HOURS)1.5JE+2CASE21E+120CC+IE+8TIHE(HOURS)FigureIII.3FaultedSGIodinePartitionFactors1074v:1D/11208757 WESTINGHOUSEPROPRIETARYCLASS2IV.CONCLUSIONThepotentialradiologicalconsequencesofasteamgeneratortubefailurewereevaluatedfortheR.E.GinnanuclearpowerplanttodemonstratethattheuseoftheStandardTechnicalSpecification(STS)primarycoolantactivitylimitof1yCi/gramofdoseequivalentI-131willresult.inoffsitedosesthatarewithintheappropriateguidelines,ThemassreleasesforadesignbasisdoubleendedruptureofasingletubewithalossofoffsitepowerwereconservativelycalculatedusingthecomputercodeLOFTTR2.Twocaseswereconsidered:[1)intactsteamgeneratorPORVfailsclosedandmustbelocally1opened,and2)rupturedsteamgeneratorPORVfailsopenandmustbelocallyisolated.]'heanalysisexplicitlymodeledthetimeneededforthe'peratorstoperformtherecoverystepsoutlinedinguidelineE-3ofRevision1oftheWestinghouseOwnersGroupEmergencyResponseGuidelines.TheresultingdosesattheexclusionareaboundaryandlowpopulationzonearewithintheallowableguidelinesasspecifiedbyStandardReviewPlan15.6.3andlOCFR100.Consequently,theSTSprimarycoolantactivitylimitissufficientlylowtoensurethattheradiologicalconsequencesofasteamgeneratortuberuptureattheR.E,Ginnaplantwillbewithintheguidelines.1074v:1D/11208758 HESTINGHOUSEPROPRIETARYCLASS2V.REFERENCES1.Lewis,Huang,Behnke,Fittante,Gelman,"SGTRAnalysisMethodologytoDeterminetheMargintoSteamGeneratorOverfill,"HCAP-10698-P-A,August1987.[PROPRIETARY'.Lewis,Huang,Rubin,"EvaluationofOffsiteRadiationDosesforaSteamGeneratorTubeRuptureAccident,"Supplement1toHCAP-10698-P-A,March1986.[PROPRIETARY]3.R.Elaisz,LetterfromRGEtoHestinghouseconcerningGinnaspecificoperatoractiontimesforSGTRanalysis,February7,1985.4.NRCRegulatoryGuide1.4,Rev.2,"AssumptionsUsedforEvaluatingthePotentialRadiologicalConsequencesofaLOCAforPressurizedHaterReactors",Jun'e1974.5.NRCRegulatoryGuide1.109,Rev.1,"CalculationofAnnualDosestoManFromRoutine,ReleasesofReactorEffluentsforthePurposeofEvaluatingCompliancewith10CFRPart50AppendixI",October1977.6.Postma,A.K.,Tam,P.S.,"IodineBehaviorinaPHRCoolingSystemFollowingaPostulatedSteamGeneratorTubeRupture",NUREG-0409.1074v:1D/12048759 IraV0;Jih}}
 
1~One(1)submittal ofanApplication forAmendment toOperating Licenseandassociated safetyevaluation.
2~3~4~One(1)copyofanApplication forWithholding, CAW-87-123, datedDecember3,1987,accompanying Affidavit, andProprietary Information NoticeOne(1)copyofWCAP-11668, "LOFTTR2AnalysisofPotential Radiological Consequences Following aSteamGenerator TubeRuptureattheR.E.GinnaNuclearPlant",November1987(Proprietary).
One(1)copyofWCAP-11678, "LOFTTR2AnalysisofPotential Radiological Consequences Following aSteamGenerator TubeRuptureat,theR.E.GinnaNuclearPlant",November1987(Non-Proprietary).
xc>>Mr.AllenR.Johnson(MailStop14Dl)ProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector WESTINGHOUSE PROPRIETARY CLASS2WCAP"1166874>5'9QVLOFTTR2ANALYSISOFPOTENTIAL RADIOLOGICAL CONSEQUENCES FOLLOWING ASTEAMGENERATOR TUBERUPTUREATTHER.E.GINNANUCLEARPOWERPLANT0.J.MendlerK.RubinNOVEMBER1987NuclearSafetyDepartment Thisdocumentcontainsinformation proprietary toWestinghouse ElectricCorporation; itissubmitted in.confidence andistobeusedsolelyforthepurposeforwhichitisfurnished andreturneduponrequest.Thisdocumentandsuchinformation isnottobereproduced, transmitted, disclosed orusedotherwise inwholeorinpartwithoutauthorization ofWestinghouse ElectricCorporation, NuclearEnergySystems.Westinghouse ElectricCorporation NuclearEnergySystemsP.O.Box355Pittsburgh, Pennsylvania 152301987byWestinghouse ElectricCorporation 1074v:1OP/120487 IP.'\10 WESTINGHOUSE PROPRIETARY CLASS2Thisdocumentcontainsmaterialthatisproprietary totheWestinghouse ElectricCorporation.
Thispropr'ietary information hasbeenmarkedbymeansofbrackets.
Thebasisformarkingthematerialproprietary isidentified bymarginalnotesreferring tothestandards inSection8oftheaffidavit ofR.A.Wiesemann ofrecord"IntheHatterofAcceptance CriteriaforEmergency
.CoreCoolingSystemsforLightWaterCooledNuclearPowerReactors(DocketNo.RH-50-1)"
atteanscript pages3706through3710(February 24,1972).'Duetotheproprietary natureofthematerialcontained inthisreportwhichwasobtainedatconsiderable Westinghouse expenseandthereleaseofwhichwouldseriously affectourcompetitive
: position, werequestthisinformation tobewithheldfrompublicdisclosure inaccordance withtheRulesofPractice, 10CFR2.790,andthattheinformation presented thereinbesafeguarded inaccordance with10CFR2.903.Webelievethatwithholding thisinformation willnotadversely affectthepublicinterest.
Thisinformation isforyourinternaluseonlyandshouldnotbereleasedtopersonsororganizations outsidethedirectorate ofRegulation andtheACRSwithoutpriorapprovalofWestinghouse ElectricCorporation.
Shoulditbecome1necessary toreleasethisinformation tosuchpersonsaspartofthereviewprocedure, pleasecontactWestinghouse ElectricCorporation andtheywillmakethenecessary arrangements requiredtoprotecttheirproprietary'nterests.
1D74v:1D/7120B7 WESTINGHOUSE PROPRIETARY CLASS2TABLEOFCONTENTSPacaesI.INTRODUCTION II.THERHALHYDRAULIC ANALYSISA.B.C.D.E.F.DesignBasisAccidentConservative Assumptions OperatorActionTimesTransient Description
-Case1Transient Description
-Case2HassReleases236132434III.RADIOLOGICAL CONSEQUENCES ANALYSISIV.CONCLUSION 4358V.REFERENCES 591074v:1D/112087 00-WESTINGHOUSE PROPRIETARY CLASS2I.INTRODUCTION Anevaluation ofthepotential radiological consequences duetoasteamgenerator tuberupture(SGTR)eventhasbeenperformed fortheR.E.Ginnanuclearpowerplanttodemonstrate thattheoffsiteradiation doseswillbelessthantheallowable guidelines basedontheStandardTechnical Specification limitonprimarycoolantactivity.
Theevaluation discussed hereinassumesthat151.ofthesteamgenerator tubesareplugged.Adesignbasissteamgenerator tuberupturewasanalyzedforGinnausingthemethodology developed inMCAP-10698 (reference 1)andthesupplement toHCAP-10698 (reference 2).Twosinglefailurecaseswereconsidered todetermine whichisthemostlimitingsinglefailureforGinnawithrespecttoradiological.
consequences.
Thetwocasesexaminedwere:a,cCase1Intactsteamgenerator poweroperatedreliefvalve(PORV)failsclosedandmustbelocallyopened.Case2Rupturedsteamgenerator poweroperatedreliefvalvefailsopenandmustbelocallyisolated.
PlantresponsetotheeventwasmodeledusingtheLOFTTR2computercodewithconservative assumptions ofbreaksizeandlocation, condenser availability andinitialsecondary watermassinthefaultedsteamgenerator.
Theanalysismethodology includesthesimulation oftheoperatoractionsforrecoveryfrom'steamgenerator tuberupturebasedontheWestinghouse OwnersGroupEmergency ResponseGuidelines, whicharethebasisfortheGinnaEmergency Operating Procedures.
Themassreleaseswerecalculated withtheLOFTTR2~programfromtheinitiation oftheeventuntiltermination ofthebreakflow.Forthetimeperiodfollowing breakflowtermination, steamreleasesandfeedwater flowsfromtheintactandfaultedsteamgenerators weredetermined fromamassandenergybalanceusingthecalculated RCSandsteamgenerator conditions atthetimeofleakagetermination.
Themassreleasesforbothcaseswereusedtodetermine theradiation dosesattheexclusion areaboundaryandlowpopulation zoneassumingthattheprimarycoolantactivity'isattheStandardTechnical Specification limitpriortotheaccident.
1074v:1D/112087 MESTINGHOUSE PROPRIETARY CLASS2II.THERMALHYDRAULIC ANALYSISIntegrated massreleasestotheatmosphere andcondenser duringasteamgenerator tuberuptureeventwerecalculated forvarioustimeperiodsduringtheaccident.
Thissectionincludesthemethodsandassumptions usedtomodeltheSGTReventandcalculate themassreleases, aswellasthesequenceofeventsfortherecovery.
A.DesinBasisAccidentTheaccidentmodeledisthecompleteseverance ofasteamgenerator tubelocatedatthetubesheetonthecoldlegside.Itwasalsoassumedthatlossofoffsitepoweroccurredatthetimeofreactortrip,andtheworstrodwasassumedtobestuckatreactortrip.a,cThemostlimitingsinglefailurewithrespecttosteamgenerator overfillwasdetermined byreference 1tobeafailedclosedPORVontheintactsteamgenerator.
SinceGinnaisatwoloopplant,theintactsteamgenerator PORVmustbelocallyopenedbeforeRCScooldowncanbegin.Thisadditional timetolocallyopentheintactsteamgenerator PORVwilldelayRCSdepressurization, causinganincreaseintotalprimarytosecondary leakage.Consequently, morewaterwillaccumulate inthefaultedsteamgenerator.
Thecasewheretheintactsteamgenerator PORVfailstoopenondemandandmustbelocallyopenedwillbereferredtoasCase1.Themostlimitingsinglefailurewithrespecttooffsitedoseswasdetermined byreference 2tobeafailedopenPORVonthefaulte'dsteamgenerator.
FailureofthisPORVwillcauseanuncontrolled depressurization ofthefaultedsteamgenerator whichwillincreaseprimarytosecondary leakage.Pressureintherupturedsteamgenerator willremainbelowthatintheprimarysystemuntilthefailedPORVcanbeisolated, andrecoveryactionscompleted.
Thecasewherethefaulted'team generator PORVfailsopenandmustbelocallyisolatedwillbereferredtoasCase2.1074v:1D/112087 WESTINGHOUSE PROPRIETARY CLASS2B.Conservative AssumtionsPlantresponses andmassreleasesfromtheintactandfaultedsteamgenerator priortobreakflowtermination werecalculated usingLOFTTR2.WhilemodelingtheSGTReventthefollowing assumptions weremade:1.ReactorTrionOvertemeratureDelta-Ta,cAturbinerunbackcanbeinitiated automatically ortheoperatorcanmanuallyreducetheturbineloadtoattempttopreventareactortriponovertemperature delta-T.Althoughturbinerunbackissimulated inthisanalysis, creditis.nottakenfordelayingreactortrip.Reactortripisassumedtooccuronovertemperature delta-T.Duetotheassumedlossofoffsitepowerthecondenser isnotavailable forsteamreleasesoncethereactoristripped.Consequently, afterreactortripthesteamgenerator PORYsareusedforsteamreleases.
Thusanearliertriptimeleadstomoresteamreleasedtotheatmosphere fromthefaultedandintactsteamgenerators.
2.PoweraTheinitialsteamgenerator watermassdecreases withincreasing powerlevel.,Thus,alowerinitialpowerresultsinahigherinitialsteamgenerator secondary watermasswhichisconservative.
Onthisbasis,100%nominalpowerwasassumedfortheanalysisratherthanconsidering anoverpower factor.3.Pressurizer WaterLevelTheRCSdepressurization rateincreases afterthepressurizer empties.Ahigherpressurizer waterlevelwillincreasethetimerequiredforthepressurizer toempty.Thisresultsinmaintaining ahigherprimarytosecondary pressuredifferential andthusalargerbreakflowrateforalongertimeperiod.Therefore, itisconcluded thatmaximizing thepressurizer waterlevelisconservative.
a,c1074v:1D/112087 HESTINGHOUSE PROPRIETARY CLASS24.SteamGenerator Seoond~ar MassAhigherinitialsecondary watermassintherupturedsteamgenerator wasdetermined byReference 1tobeconservative foroverfill.
FortheCase1analysisturbinerunbackwasassumedinitiated andwassimulated byartificially increasing initialsteamgenerator watermass.Theinitialsteamgenerator totalfluidmasswasassumedtobelOAabovenominalvalueplusthedifferential massbetween100%powerand70&#xc3;powertosimulateturbinerunback.However,ifsteamgenerator overfilldoesnotoccur,alowerinitialmassintheruptur'ed steamgenerator resultsinaconservative prediction ofoffsitedoses..Thus,forCase2theinitialsecondary masswasassumedtocorrespond tooperation at10Kbelownominalsteamgenerator watermass.a,c5.BreakLocationThetuberuptureanalyzedisadouble-ended breakofonesteamgenerator tubelocatedatthetopofthetubesheetontheoutletsideofthesteamgenerator.
Thelocationofthebreakonthecoldsideofthesteamgenerator resultsinhigherprimarytosecondary leakagethanabreakonthehotsideofthesteamgenerator asdetermined byreference 1.Therefore, itisconcluded thatthecoldlegsidebreaklocationisconservative.
4i,C6.ReactorTriOelaAsnotedpreviously, theresultsforcaseswhichproduceanearlierreactortriparemoreconservative withrespecttotheradiological consequences fromaSGTR.Thus,aminimumdelaytimefromthereactortripsignaltoreactortripisconservative fortheanalysis.
Inaddition, asnotedabove,nocreditistakenforturbinerunbackdelayingreactortrip.a,c.1074v:10/112387 ttESTINGHOUSE PROPRIETARY CLASS27.T~tiTiD1Following areactortrip,theturbinewillbeautomatically trippedafterasuitabledelaytime.Minimizing thedelaytimebetweenreactortripandturbinetripreducestheamountofsteamflowtotheturbineandincreases the.secondary waterinventory.
Thus,aminimumdelaytimebetweenreactortripandturbinetripisconservative fortheSGTRanalysis.
a,c8.SteamGenerator ReliefValvePressureSetointHithalossofoffsitepower,thesecondary pressurewillincreasefollowing reactorandturbinetrip,andsteamwillberelievedthroughthesteamgenerator PORVsandsafetyvalves.Alowersteamgenerator reliefvalvepressuresetpointleadstoahigherprimarytosecondary pressuredifferential andthushigherprimarytosecondary leakage.Thus,theuseofthelowestsetpointforthesteamgenerator.
reliefvalvesisconservative fortheanalysis.
SincethePORVsetpointislowerthan.thesafetyvalvesetpoints, theuseofthePORVsetpointof1050psigforsteamreliefismoreconservative, 9.Pressurizer PressureforSIInitiation Theuseofthemaximumpressurizer pressuresetpointforSIinitiation resultsinearlieractuation oftheSIsystem.Thisleadstothemaintenance ofahigherprimarytosecondary pressuredifferential andconsequently ahigherbreakflowrateforalongertimeperiod.Thus,theuseofthemaximumpressurizer pressuresetpointforSIinitiation
.intheanalysisisconservative.
a,c10.LeakaeafterOverfilla,cOverfillisassumedtooccuriftherupturedsteamgenerator becomeswatersolid.Nocreditistakenforsteamlinevolume.1074v:10/1 12087 WESTINGHOUSE PROPRIETARY CLASS211.FlashinFractiona,cWhencalculating theamountofbreakflowthatflashestosteam,100percentofthebreakflowisassumedtocomefromthehotlegsideofthebreak.Sincethetuberuptureflowactuallyconsistsofflowfromthehotlegandcoldlegsidesofthesteamgenerator, thetemperature ofthecombinedflowwillbelessthanthehotlegtemperature andtheflashingfractionwillbecorrespondingly lower.Thustheassumption that100percentofthebreakflowcomesfromthehotlegisconservative foraSGTRanalysis.
C.eratorActionTimesIntheeventofanSGTR,theoperatorisrequiredtotakeactionstostabilize theplantandterminate theprimarytosecondary leakage.Anevaluation hasbeenperformed (reference 1)toestablish theoperatoractiontimesfor'useintheanalysisofadesignbasisSGTRevent.TheoperatoractionswhicharerequiredforrecoveryfromanSGTRandtheavailable dataonthetimestoperformtheseactionshaveb'eenreviewed.
Theavailable dataonoperatoractiontimesforanSGTRincludesinformation whichhasbeenobtainedfromreactorplantsimulator studiesaswellasplantdatafromfiveactualSGTRevents.Usingthisdata,operator-actiontimeshavebeenestablished.
whichareconsidered tobeappropriate foradesignbasisSGTRevent.TheseoperatoractiontimeswerebeusedasinputfortheanalysisofthedesignbasisSGTRevent.ThemajoroperatoractionsforSGTRrecoverywhichareincludedintheE-3guideline oftheWestinghouse OwnersGroupEmergency ResponseGuidelines wereexplicitly modeledintheanalysis.
Theoperatoractionsmodeledincludeidentification andisolation oftherupturedsteamgenerator, cooldownanddepressurization oftheRCStorestoreinventory, andtermination ofSItostopprimarytosecondary leakage.Theseoperatoractionsaredescribed below.1074v:1D/112087 MESTINGHOUSE PROPRIETARY CLASS21.I.dentify therupturedsteamgenerator (step2).Highsecondary sideactivity, asindicated bythesteamgenerator blowdownlineradiation monitororairejectorradiation monitor,typically willprovidethefirstindication ofanSBTRevent.Therupturedsteamgenerator canbeidentified byhighactivityinthecorresponding steamgenerator blowdownline,mainsteamline, orwatersample.ForanSBTRthatresultsinahighpowerreactortrip,thesteamgenerator waterlevelwilldecreaseoff-scale onthenarrowrangeforbothsteamgenerators.
Theauxiliary feedwater (AFM)flowwillbegintorefillthesteamgenerators, typically distributing approximately equalflowtobothsteamgenerators.
Sinceprimarytosecondary leakageaddsadditional inventory whichaccumulates intherupturedsteamgenerator, levelwillreturntothenarrowrangeinthatsteamgenerator significantly earlierandwillcontinuetoincreasemorerapidly.Thisresponseprovidesconfirmation of.anSGTReventandalsoidentifies therupturedsteamgenerator.
2.Isolatetherupturedsteamgenerator fromtheintactsteamgenerator andisolatefeedwater totherupturedsteamgenerator.(steps 3and4).Onceatuberupturehasbeenidentified, recoveryactionsbeginbyisolating steamflowfromandstoppingfeedwater flowtotherupturedsteamgenerator.
Inadditiontominimizing radiological
: releases, thisalsoreducesthepossibility offillingtherupturedsteamgenerator withwaterby1)minimizing theaccumulation offeedwater flowand2)enablingtheoperatortoestablish apressuredifferential betweentherupturedandintactsteamgenerators asanecessary steptowardterminating primarytosecondary leakage.Intheguideline forsteamgenerator tuberupturerecoveryintheERGs,theoperatorisdirectedtomaintainthelevelintherupturedsteamgenerator betweenjustonspanand50%onthenarrowrangeinstrument.
Reference 1assumedthattherupturedsteamgenerator wouldbeisolatedwhenlevelinthesteamgenerator reached[midwaybetweenthesepoints]'074v:1D/112487 WESTINGHOUSE PROPRIETARY CLASS2[(33%narrowrangelevel).]'orGinnaitwasalsoconservative touse[33percent]'flevelforisolation.
Therupturedsteamgenerator wasassumedtobeisolatedat[33percentnarrowrangelevelorat10minutes,whichever waslonger.]'.CooldowntheReactorCoolantSystem(RCS)usingtheintactsteamgenerator (step14).Afterisolation oftherupturedsteamgenerator, theRCSiscooledasrapidlyaspossibletolessthansaturation temperature corresponding totherupturedsteamgenerator pressurebydumpingsteamfromonlytheintactsteamgenerator
.Thisensuresadequatesubcooling inthe.RCSafterdepressurization totherupturedsteamgenerator pressureinsubsequent actions.,
Withoffsitepoweravailable, thenormalsteamdumpsystemtothecondenser willprovidesufficient capacitytoperformthiscooldownrapidly'.
Ifoffsitepowerislost,theRCSiscooledusingthepower-operated reliefvalve(PORV)ontheintactsteamgenerator sinceneitherthesteamdumpvalvesnorthecondenser wouldbeavailable.
ItisnotedthatRCSpressurewilldecreaseduringthecooldownasshrinkage ofthereactorcoolantexpandsthesteambubbleinthepressurizer.
4.Depressurize theRCStorestorereactorcoolantinventory (steps17or18).Whenthecooldowniscompleted, SIflowwillincreaseRCSpressureuntilbreakflowmatchesSIflow.Consequently, SI'flowmustbeterminated tostopprimarytosecondary leakage.However,adequatereactorcoolantinventory mustfirstbeassured.Thisincludesbothsufficient reactorcoolantsubcooling andpressurizer inventory tomaintainareliablepressurizer levelindication afterSIflowisstopped.SinceleakagefromtheprimarysidewillcontinueafterSIflowisstoppeduntilRCSandrupturedsteamgenerator pressures
: equalize, an"excess"amountofinventory isneededtoensure1074v:10/112487 WESTINGHOUSE PROPRIETARY CLASS2pressurizer levelremainsonspan.The"excess"amountrequireddependsonRCSpressureandreducestozerowhenRCSpressureequalsthepressureintherupturedsteamgenerator.
Toreducebreakflowandestablish sufficient pressurizer level,RCSpressureisdecreased byopeningthepressurizer PORV.5.Terminate SItostopprimarytosecondary leakage(steps21-23).Thepreviousactionswillhaveestablished adequateRCSsubcooling, secondary sideheatsink;andreactorcoolantinventory following anSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted, SIflowmustbestoppedtoprevent'epressurization oftheRCSandtoterminate primarytosecondary leakage.Primarytosecondary leakagewillcontinueafterSIflowisstoppeduntilRCSpressureandrupturedsteamgenerator pressures equalize.
Chargingflow,letdown,andpressurizer heaterswillthenbecontrolled topreventrepressurization oftheRCS'ndreinitiation ofleakageintotherupturedsteam.generator.
SincethesemajorrecoveryactionswillbemodelledintheSGTRanalysis, itisnecessary toestablish thetimesrequiredtoperformtheseactions.Althoughtheintermediate stepsbetweenthemajoractionswillnotbeexplicitly
: modelled, itisalsonecessary toaccountforthetimerequiredtoperformthesteps,Itisnotedthatthetotaltimerequiredtocompletetherecovery-operations consistsofbothoperatoractiontimeandsystem,orplant,responsetime;Forinstance, thetimeforeachofthemajorrecoveryoperations (i.e.,RCScooldown, RCSdepressurization,'tc.)
isprimarily duetothetimerequiredforthesystemresponse, whereastheoperatoractiontimeisreflected bythetimerequiredfortheoperatortoperformtheintermediate actionsteps.'TheoperatoractiontimestoinitiateRCScooldown, RCSdepressurization andsafetyinjection termination weredeveloped inreference 1andarelistedinTableII.1.Inadditiontotheoperatoractiontimesdeveloped inreference 1,Rochester GasandElectricsuppliedtheoperatoraction1074v:1D/112087 MESTINGHOUSE PROPRIETARY CLASS2timesassociated withrecovering fromthesinglefailures(Reference 3).[Theseoperator'actions, whichwouldoccuroutsidethecontrolroom,includelocallyopeningtheintactsteamgenerator PORV,locallyclosingtheintactsteamgenerator PORVblockvalveandlocallyclosingthefaultedsteamgenerator PORVblockvalve.]'hetimesassociated withperforming theseoperatoractionsarelistedinTableII.2.[Itisnotedthatthe20minutestoopentheintactsteamgenerator PORVconsistsof10minutestoidentifyandlocatethevalveand10minutestolinearlyopenthePORV.Duetolimitations ofLOFTTR2,theoperatoractiontoopentheintactsteamgenerator PORVwassimulated asastepopeningaftera15minutedelay,whichresultsinanequivalent integrated steamflowthroughthePORVattheendofthe20minuteperiod.]'074v:io/11208710 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.1OPERATORACTIONTIMESFORDESIGNBASISSGTRANALYSISActionTimeminIdentifyandisolaterupturedSGHaximumof10minorcalculated timetoreach334narrowrangelevelintherupturedSGOperatoractiontimetoinitiatecooldownCooldownCalculated timeforRCScooldownOperatoractiontimetoinitiatedepressurization Depressurization Calculated timeforRCSdepressurization OperatoractiontimetoinitiateSItermination SItermination andpressureequalization Calculated timeforSItermination andequalization ofRCSandrupturedSGpressures 1074v:1D/112087 WESTINGHOUSE PROPRIETARY CLASS2TABLEII.2ActionGINNASPECIFICOPERATORACTIONTIMESTimeminQ,CFaultedSteamGenerator PORVBlockValveClosing-Local Action15IntactSteamGenerator PORVOpening-Local Action20IntactSteamGenerator PORVBlockValveClosing-Local Action1074v:1D/112087 12 II'ESTINGHOUSE PROPRIETARY CLASS2D.Transient Descrition-Case1[Case1addresses aSGTRinwhichthesinglefailureassumedisthattheintactsteamgenerator PORVfailstoopenondemandandmustbelocallyopened.]'hesequence, ofeventsforCase1ispresented inTableII.3.Following thetuberupture,reactorcoolantflowsfromtheprimaryintothesecondary sideoftherupturedsteamgenerator sincetheprimarypressureisgreaterthanthesteamgenerator pressure.
Inresponsetothislossofreactorcoolant,pressurizer leveldecreases asshowninFigureII.1.TheRCSpressurealsodecreases asshowninFigureII.2asthesteambubbleinthepressurizer expands.AstheRCSpressuredecreases duetothecontinued primarytosecondary leakage,automatic reactortripoccursonanovertemperature delta-Ttripsignal.Afterreactortrip,corepowerrapidlydecreases todecayheatlevels.Theturbinestopvalvescloseandsteamflowtotheturbineisterminated.
Thesteamdumpsystemisdesignedtoactuatefollowing reactortriptolimittheincreaseinsecondary
: pressure, butthesteamdumpvalvesremainclosedduetothelossofcondenser vacuumresulting fromtheassumedlossofoffsitepoweratthetimeofreactortrip.Thus,theenergytransferfromtheprimarysystemcausesthesecondary sidepressuretoincreaserapidlyafter'reactortripuntilthesteamgenerator.
PORVslifttodissipate theenergy,asshowninFigureII.3.TheRCSpressuredecreases morerapidlyafterreactortripasenergytransfertothesecondary shrinksthereactorcoolantandtheleakflowcontinues todepleteprimaryinventory.
ThedecreaseinRCSinventory resultsinalowpressurizer pressureSIsignal.Pressurizer levelalsodecreases morerapidlyfollowing reactortripandthepressurizer eventually emptiesasshowninFigureII.1.Afterthepressurizer empties,theRCSpressurerapidlydecreases asshowninFigureII.2.1074v:10/120487 13 WESTINGHOUSE PROPRIETARY CLASS2Sinceoffsitepowerisassumedlostatreactor-trip, theRCPstripandagradualtransition tonaturalcirculation flowoccurs.Immediately following reactortripthetemperature riseacrossthecoredecreases ascorepowerdecays(seeFigure11.4),however,thetemperature risesubsequently increases asnaturalcirculation flowdevelops.
Thecoldlegtemperatures trendtowardthesteamgenerator temperature asthefluidresidence timeinthetuberegionincreases.
TheRCStemperatures continuetoslowlydecreaseduetothecontinued additionoftheauxiliary feedwater tothesteamgenerators untiloperatoractionsareinitiated tocooldowntheRCS.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGenerator Onceatuberupturehasbeenidentified, recoveryactionsbeginbyisolating steamflowfromtherupturedsteamgenerator and.throttling theauxiliary feedwater flowtotherupturedsteamgenerator.
Asindicated previously, therupturedsteamgenerator isassumedtobeidentified andisolatedwhenthenarrowrangelevelreaches[33%]'ntherupturedsteamgenerator orat[10]'inutesafter.initiation oftheSGTR,whichever islonger.ForGinna,thetimetoreach[33%]'slessthan[10]'inutes,thustherupturedsteamgenerator isassumedtobeisolatedat[10]'inutes.2.CooldowntheRCStoEstablish Subcooling MarginAfterisolation oftherupturedsteamgenerator, thereisa[5]'inuteoperator.
actiontimeimposedpriortoinitiating thecooldown.
Theactualdelaytimeusedintheanalysisis4secondslongerbecauseofthecomputerprogramrequirements forsimulating theoperatoractions.Afterthistime,actionsaretakentocooltheRCSasrapidlyaspossiblebydumpingsteamfromtheintactsteamgenerators.
Sinceoffsitepowerislost,theRCSiscooledbydumpingsteamtotheatmosphere usingthePORVontheintactsteamgenerator.
[ForCase1,aspreviously noted,theintactsteamgenerator]
'074v:1D/112487 14 MESTINGHOUSE PROPRIETARY CLASS2[PORVfailstoopen.Fortheanalysis, itwasassumedthatthevalvewasfullyopenedafteranadditional periodof15minutes(seepg.10).Thusat1804secondstheintactsteamgenerator PORVisopenedforRCScooldown.]
'hecooldowniscontinued unti1RCSsubcooling attherupturedsteamgenerator pressureis20'Fplusanallowance of17'Fforsubcooling uncertainty.
[Whentheseconditions aresatisfied itisassumedthatittakestheoperatorfiveminutestoclosetheintactsteamgenerator PORVblockvalve.]'tisnotedthatoverfilloftherupturedsteamgenerator occursduringthistimeperiodat'[2372]'econds,asshowninFigureII.6.Thiscooldownensuresthattherewillbeadequatesubcooling intheRCSafterthesubsequent depressurization oftheRCStotherupturedsteamgenerator pressure.
Thereduction intheintactsteamgenerator pressurerequiredtoaccomplish thecooldownisshowninFigureII.3,andtheeffectofthecooldownontheRCStemperature isshowninFigureII.4.TheRCSpressurealsodecreases duringthiscooldownprocessduetoshrinkage ofthereactorcoolantasshowninFigureII.2.3,Depressurize RCStoRestoreInventory AftertheRCScooldown, a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.
TheRCSisdepressurized at2688secondstoassureadequatecoolantinventory priortoterminating SIflow.MiththeRCPsstopped,normalpressurizer'pray isnotavailable andthustheRCSisdepressurized byopeningapressurizer PORV.Thedepressurization iscontinued untilanyofthefollowing conditions aresatisfied:
RCSpressureislessthantherupturedsteamgenerator pressureandpressurizer levelisgreaterthan0%plusanallowance of3%forpressurizer leveluncertainty, orpressurizer, levelisgreaterthan80%minusanallowance of3%forpressurizer leveluncertainty, orRCSsubcooling islessthanthe17'Fallowance forsubcooling uncertainty.
TheRCSdepressurization reducesthebreakflowasshowninFigureII.5andincreases SIflowtorefillthepressurizer, asshowninFigureII.1.1074v:10/112487 15 WESTINGHOUSE PROPRIETARY CLASS24.Terminate SItoStopPrimarytoSecondary LeakageThepreviousactionsshouldhaveestablished adequateRCSsubcooling, verifiedasecondary sideheatsink,andrestoredthereactorcoolantinventory following aSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted, theSIflowmustbestoppedtopreventrepressurization oftheRCSandtoterminate "primarytosecondary leakage.TheSIflowisterminated whentheRCSpressureincreases,,minimum AFWflowisavailable andatleastoneintactsteamgenerator levelisinthenarrowrange,RCSsubcooling isgreaterthanthe17'Fallowance forsubcooling uncertainty, andthepressurizer levelisgreaterthanthe3Xallowance forpressurizer leveluncertainty.
ToassurethattheRCSpressureisincreasing, SIwasnotterminated intheanalysisuntiltheRCSpressureincreased to50psiabovetherupturedsteamgenerator pressure.
Afterdepressurization iscompleted, anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.
Theprimarytosecondary leakagecontinues aftertheSIflowisterminated untiltheRCSandrupturedsteamgenerators equalize.
Thisoccurswhen'theintactsteamgenerator PORVislocallyopenedtocooldowntheRCSsothatsubcooling maybemaintained.
WhenthePORVisopenedtheincreased energytransferfromprimarytosecondary depressurizes theRCStotheruptured.steamgenerator pressure.
1074v:10/112087 16 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.3SEQUENCEOFEVENTSEVENTCASE1Timesecd.,CReactorTrip50Ruptured.
SGIsolated600IntactSGPORVOpened1804OverfillRupturedSG2372IntactSGPORVIsolatedPRZRPORVOpenedPRZRPORVClosed256826882738SITerminated 2798IntactPORVOpened3288BreakFlowTerminated 34281074v:1D/112087 17 WESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1188.88~78.68.4J68.t448.38.18~8.8..1Ei84.2E+84TINE(SEC).3Ei84.4E~84FigureII.1Pressurizer Level-Case11074v:1D/112087 18 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASEI.25E+84.225Ei84.2E84.175E'84.15E+84Ld~,12SE~84LJOf~o.1E84Of758.588.258..IE~84.2E84.3E~84TIME(SEC).4E84FigureII.2RCSPressure-Case11074v:10/112087 19 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALYSISISPERCENTTUBEPLUGGINGCASEI.I4E84.12Ei84RUPTUREDLOOP.1E~84888.INTACTLOOPOCC)ill688.488.288.8..IE~84.2E84.3E~84.4E~84TINE(SEC)FigureII.3Secondary Pressure-Case11074v:1D/11208l 20 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAi1GENERATOR TUBERUPTUREANALYSISPERCENTTUBEPLUGGINGCASE1658.688.~558.4JCD588.~458.IX488.C)358.CDCD~388.258~288'..1E~84..2E~84TI11E(SEC).3E~84~4E~84FigureII.4IntactLoopHotandColdLegRCSTemperatures
-Case11074v:10/112087 21 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAI1GENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1168.I48.128'SSUEUlKlD88.C)68~hCEZIIJm48.28.-28...IE~84.2E~84TIt1EISEC).3E84.4E+84FigureII.5PrimarytoSecondary Leakage-Case11074v:1D/112087 22 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAI1GENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1.6E84.SE84~.4E~84~.3'40.2Ei84.1E84.lE.84.2E~B4.3E~84.4E~84TlNEtSEC)FigureII.SRupturedSGRaterVolume-Case11074v:1D/112081 23 WESTINGHOUSE PROPRIETARY CLASS2E.Transient Descrition-Case2[Case2addresses aSGTRinwhichthesinglefailureassumedisthatthefaultedsteamgenerator PORVfailsopenatthetimethefaultedsteamgenerator isisolated.]
'hus,theCase2transient issimilartotheCase1transient untilthattime..ThesequenceofeventsforCase2isIpresented inTableII.4.Following thetuberupturetheRCSpressuredecreases asshowninFigure11.7duetotheprimarytosecondary leakage.Inresponsetothisdepressurization, thereactortripsonovertemperature delta-T.Afterreactortrip,corepowerrapidlydecreases todecayheatlevelsandtheRCSdepressurization becomesmorerapid.Thesteamdumpsystemisinoperable duetotheassumedlossofoffsitepower,whichresultsinthesecondary pressurerisingtothesteamgenerator PORVsetpointasshowninFigure11.8.Thedecreasing pressurizer pressureleadstoanautomatic SIsignalonlowpressurizer pressure.
Pressurizer levelalsodecreases morerapidlyfollowing reactortripuntiliteventually empties,asshowninFigure11.9.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGenerator Therupturedsteamgenerator isassumedtobeidentified andisolatedat[10minutesaftertheinitiation oftheSGTRorwhenthenarrowrangelevelreaches33%,whichever timeisgreater.]
'orthiscase,thetimetoreach[33/]'arrowrangelevelis[652]'econds,andthus,itwasassumedthattherupturedsteamgenerator isisolatedatthattime.[Therupturedsteamgenerator PORVisalsoassumedtofailopenatthistime.]'hefailurecausesthesteamgenerator torapidlydepressurize, whichresultsinanincreaseinprimarytosecondary leakage.Thedepressu'rization oftherupturedsteamgenerator increases'he breakflowandenergytransferfromprimarytosecondary whichresultsinRCSpressureandtemperature decreasing morerapidlythaninCase1.Therupturedsteamgenerator 1074v:10/120487 24 MESTINGHOUSE PROPRIETARY CLASS2depressurization causesacooldownintheintactsteamgenerator loop.Asthe'ntact steamgenerator hotlegtemperature decreases belowthesteamgenerator watertemperature reverseheattransfertakesplaceasshowninFigureII.10.[Itisassumedthatthetimerequiredfortheoperatortoidentifythattherupturedsteamgenerator PORVisopenandtoclosetheassociated blockvalveis15minutes.Thus,at1558secondsthedepressurization ofrupturedsteamgenerator isterminated.]
',c2.CoolDowntheRCStoestablish Subcooling Margin[Aftertherupturedsteamgenerator PORVblockvalveisclosed,'here isa5minuteoperatoractiontimeimposedpriortoinitiation ofcooldown.]
'hedepressurization oftherupturedsteamgenerator affectstheRCScooldowntargettemperature sincethetemperature isdependent uponthepressureintherupturedsteamgenerator.
Since'ffsitepowerislosttheRCSiscooledbydumpingsteamtotheatmosphere usingtheintactsteamgenerator PORV.Thecooldowniscontinued untilRCSsubcooling attherupturedsteamgenerator pressureis20'Fplusanallowance of17'Fforinstrument uncertainty.
Hecauseofthelowerpressureintherupturedsteamgenerator theassociated temperature theRCSmustbecooledtoisalsolower,whichhastheneteffectofextending thetimeforcooldown.
ForCase2cooldownbeginsat[1858]'econds'andiscompleted at[2852]'econds.Thereduction intheintactsteamgenerator pressurerequiredtoaccomplish thecooldownisshowninFigureII.8,andtheeffectofthecooldownontheRCStemperature isshowninFigureII.10.TheRCSpressurealsodecreases duringthiscooldownprocessduetoshrinkage ofthereactorcoolantasshowninFigureII.7.3.Depressurize toRestoreInventory AftertheRCScooldown, a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.
TheRCSisdepressurized at[2974]'econdstoassureadequatecoolantinventory priorto1074v:10/112487 25 HESTINGHOUSE PROPRIETARY CLASS2terminating SIflow,-HiththeRCPsstopped,normalpressurizer sprayisnotavailable andthustheRCSisdepressurized byopeningapressurizer PORV.Thedepressurization iscontinued untilanyofthefollowing conditions aresatisfied:
RCSpressureislessthantherupturedsteamgenerator pressureandpressurizer levelisgreaterthan0%plusanallowance of3%forpressurizer leveluncertainty, orpressurizer levelisgreaterthan80%minusanallowance of3%forpressurizer leveluncertainty, orRCSsubcooling islessthanthe17'Fallowance forsubcooling uncertainty.
TheRCSdepressurization reducesthebreakflowasshowninFigureII.11andincreases SIflowtorefillthepressurizer, asshowninFigure11.9.4.Terminate SItoStopPrimarytoSecondary Leakage,Thepreviousactionsshouldhaveestablished adequateRCSsubcooling, verifiedasecondary sideheatsink,andrestoredthereactorcoolantinventory following anSGTRtoensurethatSIflowisnolongerneeded.Nhentheseactionshavebeencompleted, theSIflowmustbestoppedtopreventrepressurization oftheRCSandtoterminate primarytosecondary leakage.TheSIflowisterminated whentheRCSpressureincreases,'minimum AFHflowisavailable andatleastoneintactsteamgenerator levelisinthenarrowrange,RCSsubcooling isgreaterthanthe17'Fallowance forsubcooling uncertainty, andthepressurizer levelisgreaterthanthe3%allowance forpressurizer leveluncertainty.
ToassurethattheRCSpressureisincreasing, SIwasnotterminated untiltheRCSpressureincreased to50psiabovetherupturedsteamgenerator pressure.
Afterdepressurization iscompleted, anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.
FigureII.11showsthattheprimarytosecondary leakagecontinues aftertheSIflowisstoppeduntiltheRCSandrupturedsteamgenerator pressureequalize.
TherupturedsteamwatervolumeisshowninFigureII.12.ForCase2,therupturedsteamgenerator doesnotoverfill.
1074v:1D/112487 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.4SEQUENCEOFEVENTSCASE2EVENTTIMEsecReactorTrip49.4RupturedSGIsolatedRupturedSGPORVFailsOpena.cRupturedSGBlockValveClosed1558IntactSGPORVOpenedIntactSGPORVClosed18582852PRZRPORVOpenedPRZRPORVClosed29743006SITerminated 3066BreakFlowTerminated 34381D74v:1O/112087 27 WESTINGHOUSE PROPRIETARY CLASS2GINNASTEAt1GENERATOR TUBERUPTURE4NAL'/SIS 15PERCENTTUBEPLUGGING2588.2258.CASE2-2888.CCl758.1588.~1258.cnI888.758.588.258.8.8.588.1888.l588.2888'588.5888.5588."4888.TIME(SEC)
FigureII.7RCSPressure-Case21074v:10/112087 28 HESTINGHOUSE PROPRIETARY CLASS21488.GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE21288.-l888.w888.688.w488,RUPTUREDLOOPINTACTLOOP288,8.588.1888.:l588.
2888.2588.3888.3588.4888.TIME(SEC)
FigureII.8Secondary Pressure-Case21074v:10/112087 29 WESTINGHOUSE PROPRIETARY CLASS2G1NNASTEANGENERATOR TUBERUPTUREANALYS1515PERCENTTUBEPLUGGING188.CASE298.e8.78.LJw68.'58.48~38.028.18.8.8.588.1888.1588.2888'588.3888.3588.4888.TINE(SEC)FigureII.9Pressurizer Level-Case.21074v:10/1 1ZOST30 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALVSIS15PERCENTTUBEPLUGGING658.CASE2688.~558.O588.~z.458.o488.xIo358,388.TCOLDTHOTTHOT,TCOLDTHOTTCOLD258'88.8.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.10IntactLoopHotandColdLegRCSTemperatures
-Case21074v:1D/1 1208731 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALVSIS15PERCENTTUBEPLUGGINGCASE278.w68~58.o48.38.oc28.I8,-18.-288.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)
FigureII.11PrimarytoSecondary Leakage-Case21074v:1D/112087 32 MESTINGHOUSE PROPRIETARY CLASS26888.GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGING'ASE2H)I~5888.Ko4888.~5888.~g2888~I888.8.588.1888.1588.2888.2588.5888.5588.4888.,TIME(SEC)Figure11,12RupturedSGMaterVolume-Case21074v:1D/112087 33 WESTINGHOUSE PROPRIETARY CLASS2F.MassReleasesThemassreleasesweredetermined foreachofthesinglefailurecasesforuseinevaluating theexclusion areaboundaryandlowpopulation zoneradiation exposure.
Thesteamreleasesfromtherupturedandintactsteamgenerators, thefeedwater flowstotherupturedandintactsteamgenerators, andprimarytosecondary breakflowintotherupturedsteamgenerator weredetermined fortheperiodfromaccidentinitiation until2hoursaftertheaccidentandfrom2to8hoursaftertheaccident.
Thereleasesfor0-2.hoursareusedtocalculate theradiation dosesattheexclusion areaboundaryfora2hourexposure, andthereleasesfor0-8hoursareusedtocalculate theradiation dosesatthelowpopulation zoneforthedurationoftheaccident.
IntheLOFTTR2analyses, theSGTRrecoveryactionsintheE-3guideline weresimulated untilthetermination ofprimarytosecondary leakage.Aftertheprimarytosecondary leakageisterminated, theoperators willcontinuetheSGTRrecoveryactionsintheE-3guideline topreparetheplantforcooldowntocoldshutdownconditions.
Theseactionsincludeestablishing normalChemicalandVolumeControlSystem(CVCS)operation toprovidereactorcoolantinventory controlandaborationpath;restarting areac'torcoolantpump(RCP),ifnonearerunning,toensurehomogeneous RCSconditions andtoprovidenormalpressurizer spray;orstoppingoneRCP,ifbotharerunning,tominimizetheheatinput'uring thesubsequent cooldown; andtheactionsnecessary to'inimize thespreadofcontamination onthesecondary side.Whentheinstructions providedinE-3arecompleted, theplantshouldbecooledanddepressurized tocoldshutdownconditions.
Therearethreealternate meansofperforming thepost-SGTR cooldownprovidedintheWOGEmergency ResponseGuidelines.
Theguidelines are:ES-3.1,POST-SGTR COOLDOWNUSINGBACKFILL; ES-3.2,POST-SGTR COOLDOWNUSINGBLOWDOWN; andES-3.3,POST-SGTR COOLDOWNUSINGSTEAMDUMP.Thepreferred methodsareusingbackfillorblowdownsincethesemethodsminimizetheradioactivity releasedtotheatmosphere.
TheES-3.3guideline usingsteamdumpprovidesthefastestmethodfor1074v:1D/112087 34 WESTINGHOUSE PROPRIETARY CLASS2depressurizing theRCSandrupturedsteamgenerator.
Thismethodalsoresultsintheworstradiological
: releases, especially ifsteamdumptothecondenser isunavailable.
Therefore, themethodusingsteamdumpwasselectedforevaluation ofthelong-term massreleasessincethisproducesconservative resultsfortheoffsitedoseevaluation.
Itisnotedthattheuseofthesteamdumpmethodwouldnotbepermitted ifsteamgenerator overfilloccursandwaterentersthemainsteamlines.
ThehighlevelactionsfortheES-3.3guideline arediscussed below,1.PrepareforCooldowntoColdShutdownTheinitialstepstoprepareforcooldowntocoldshutdownareperformed intheE-3guideline following SItermination, andthesestepswillbecontinued inES-3.3iftheyhavenotalreadybeencompleted.
Afewadditional stepsarealsoperformed inES-3.3prior.toinitiating cooldown.
Theseincludeisolating thecoldleg.SIaccumulators topreventunnecessary injection, energizing pressurizer heatersasnecessary tosaturatethepressurizer waterandtoprovideforbetterpressurecontrol,andassuringadequateshutdownmarginintheeventofpotential borondilutionduetoin-leakage fromthe'ruptured steamgenerator.
2.CooldownRCStoResidualHeatRemoval(RHR)SystemTemperature TheRCSiscooledbysteamingandfeedingtheintactsteamgenerator similartoanormalcooldown.
Sinceallimmediate safetyconcernshavebeenresolved, thecooldownrateshouldbemaintained lessthanthemaximumallowable rateof100'F/hr.
Thepreferred meansforcoolingtheRCSissteamdumptothecondenser sincethisminimizes theradiological releasesandconserves feedwater supply.ThePORVfortheintactsteamgenerator canalsobeusedifsteamdumptothecondenser isunavailable.
WhentheRHRsystemoperating temperature isreached,thecooldownisstoppeduntilRCSpressurecanalsobedecreased.
Thisensuresthatpressure/temperature limitswillnotbeexceeded.
1074v:1D/112087 35 WESTINGHOUSE PROPRIETARY CLASS23.Depressurize RCStoRHRSystemPressureWhenthecooldowntoRHRsystemtemperature iscompleted, thepressureintherupturedsteamgenerator isdecreased byreleasing steamfromtherupturedsteamgenerator.
Steamreleasetothecondenser ispreferred sincethisminimizes radiological releases.
However,steamcanalsobereleasedtotheatmosphere usingthePORVontherupturedsteamgenerator.
Anevaluation ofthepotential radiological consequences shouldbeperformed beforereleasing steamfromtherupturedsteamgenerator totheatmosphere.
Astherupturedsteamgenerator pressureisreduced,theRCSpressureismaintained equaltothepressureintherupturedsteamgenerator inordertopreventin-leakage ofsecondary sidewateroradditional primarytosecondary leakage.Normalpressurizer sprayisthepreferred meansofRCSpressurecontrolsincethisconserves coolantinventory.
Ifpressurizer sprayisnotavailable, apressurizer PORVorauxiliary spraycanbeusedtocontrolRCSpressure.
Whenoverfilloftherupturedsteamgenerator occurs,aswithCase1,guideline ES-3.1POST-SGTR COOLDOWNUSINGBACKFILLisassumedtobeused.ThehighlevelactionsforES-3.1aresimilartoES-3.3.However,themethodbywhichES-3.1instructs theoperatortodepressurize therupturedsteamgenerator differsfromES-3.3.InGuideline ES-3.1theRCSisdepressurized topromotebackflowthroughthefailedtubewhichdepressurizes therupturedsteamgenerator withoutsteamreleasestotheatmosphere.
4.CooldowntoColdShutdownWhenRCStemperature andpressurehavebeenreducedtotheRHRsystemin-service values,RHRsystemcoolingisinitiated tocompletethecooldowntocoldshutdown.
Whencoldshutdownconditions areachieved, thepressurizer canbecooledtoterminate theevent.1074v:1O/112087 36 WESTINGHOUSE PROPRIETARY CLASS2F.1Methodology forCalculation ofMassReleasesTheoperatoractionsfortheSGTRrecoveryuptothetermination ofprimarytosecondary leakagearesimulated intheLOFTTR2analyses.
Thus,thesteamreleasesfromtherupturedandintactsteamgenerators, thefeedwater flowstotherupturedandintactsteamgenerators, andtheprimarytosecondary leakageintotherupturedsteamgenerator weredetermined fromtheLOFTTR2resultsfortheperiodfromtheinitiation oftheaccidentuntiltheleakageisterminated.
L2,CFollowing thetermination ofleakage,theoperators areassumedtocompletethestepsintheE-3andES-3.3orES-3.1guidelines toprepareforcooldowntocoldshutdown.
Thetimefromleakagetermination untiltheinitiation ofcooldownwasassumedtobe20minutes(seeReference 2).Theassumedtimeof20minutestoinitiatethecooldownisconsidered tobeconservative, sincetheactualtimeisexpectedtobelongerforanactualeventbecauseanevaluation ofthepotential offsiteradiation doseswouldberequiredpriortousingthesteamdumpmethodforthepost-SGTR cooldown.
ItwasassumedthattheRCSandintactsteamgenerator conditions aremaintained stableduringthe20minuteperioduntilthecooldownisinitiated.
ThePORVfortheintactsteamgenerator wasthenassumedtobeusedtocooldowntheRCStotheRHRsystemoperating temperature of332'F,atthemaximumallowable cooldownrateof100'F/hr..
TheRCSandtheintactsteamgenerator temperatures at2hourswerethendetermined usingtheRCSandintactsteamgenerator parameters atthetimeofleakagetermination andtheRCScooldownrate.'hesteamreleasesandthefeedwater flowsfortheintactsteamgenerator fortheperiodfromleakagetermination until2hoursweredetermined fromamassandenergybalanceusingthecalculated RCSandintactsteamgenerator conditions atthetimeofleakagetermination andat2hours.Thecoredecayheatandtheheataddedfromtheoperation ofoneRCPwereincludedintheenergybalanceforthistimeperiod.Sincetherupturedsteamgenerator isisolated, nochangeintherupturedsteamgenerator conditions isassumedtooccuruntilsubsequent depressurization.
Theassumptions ofareasonably shortpreparation timeforcooldownandthemaximumcooldownrateresultinminimumRCSandsteamgenerator temperatures at2hours,andtherefore, aconservative estimateofthesteamreleasedtotheatmosphere duringthefirst2hours.1074v:1D/112087 37 HESTINGHOUSE PROPRIETARY CLASS2a,c'TheRCScooldownwasassumedtobecontinued after2hoursuntiltheRHRsystemin-service temperature of332'Fisreached.Depressurization oftherupturedsteamgenerator wasthenassumedtobeperformed immediately following thecompletion oftheRCScooldown.
Therupturedsteamgenerator wasassumedtobedepressurized totheRHRin-service pressureof343psiaviasteamreleasefromtherupturedsteamgenerator PORV,sincethismaximizes thesteamreleasefromrupturedsteamgenerator totheatmosphere whichisconservative fortheevaluation oftheoffsiteradiation doses.TheRCSpressureisalsoassumedtobereducedconcurrently astherupturedsteamgenerator isdepressurized tominimizeflowbetweentheRCSandtherupturedsteamgenerator.
Itisassumedthatthecontinuation oftheRCScooldownanddepressurization toRHRoperating conditions arecompleted within8hoursaftertheaccidentsincethereisampletimetocompletetheoperations duringthistimeperiod.Thesteamreleasesandfeedwater flowsfrom2to8hoursweredetermined fortheintactsteamgenerator fromamassandenergybalanceusingtheRCSandsteamgenerator conditions at2hoursandattheRHRsystemin-service conditions.
Thecoredecayheatandtheheatadditionduetotheoperation ofoneRCPwerealsoincludedintheenergybalanceforthistimeinterval.
Thesteamreleasedfromtherupturedsteamgenerator from2to8hourswasdetermined.
based'namassandenergybalancefortherupturedsteamgenerator usingtheconditions atthetimeofleakagetermination andsaturated conditions attheRHRin-service pressure.
After8hours,itisassumedthatfurtherplantcooldowntocoldshutdownaswellaslong-term coolingisprovidedbytheRHRsystem.Therefore, thesteam~releasestotheatmosphere areterminated afterRHRin-service conditions areassumedtobe.reachedat8hours.F.2HassReleaseResultsThemassreleasecalculations wereperformed forbothsinglefailurecasesusingthemethodology discussed above.Forthetimeperiodfrominitiation oftheaccidentuntilleakagetermination, thereleasesweredetermined fromtheLOFTTR2resultsfortwoseparateperiodsforuseinthedosecalculations.
Thefirsttimeperiodconsidered isfromaccidentinitiation untilreactortrip.Sincethecondenser isinserviceuntilreactortrip,anyradioactivity 1074v:1D/112087 38 WESTINGHOUSE PROPRIETARY CLASS2releasedtotheatmosphere priortoreactortripwillbethrough'he condenser airejector.Afterreactortrip,'hereleasestotheatmosphere areassumedtobeviathesteamgenerator PORVs.Themassreleasescalculated fromthetimeofleakagetermination until2hoursandfrom2-8hoursarealsoassumedtobereleasedtotheatmosphere viathesteamgenerator PORVs.ThemassreleasesfortheSGTRevent[assuming delayeduseoftheintactsteamgenerator PORV]'Case1)arepresented inTableII.5.Theresultsindicatethatapproximately
[21,990]'bmofsteamand[23,710]'bmofwaterisreleasedfromtherupturedsteamgenerator totheatmosphere inthefirst2hours.Atotalof[129,300]
'bmofprimarywateristransferred tothesecondary sideoftherupturedsteam.generator beforethebreakflowisterminated.
ThemassreleasesfortheSGTReventassuming[failureandisolation oftherupturedsteamgenerator PORV]'Case2)arepresented inTableII.6.Theresultsindicatethatapproximately
[62,480]'bmofsteamisreleasedtotheatmosphere fromtherupturedsteamgenerator withinthefirst2hours.After2hours[33,300]'bmisreleasedtotheatmosphere fromtherupturedsteamgenerator.
Atotalof[172,800]
'bmofprimarywateristransferred tothesecondary sideoftherupturedsteamgenerator beforebreakflowisterminated.
1074v:1D/112087 39 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.5CASE1MASSRELEASES0-TRIPTOTALMASSFLOW(POUNDS)TIMEPERIODTRIPTMSEP-OVFILL-TTBRK-T2HRSTMSEPOVFILLTTBRKT2HRS'RHRFaultedSGCondenser Atmosphere Feedwater 47,80000015,450654043,60030,50000023,710*'00PICIntactSGCondenser Atmosphere 47,150Feedwater47,1500000014,73032,95013,450151,870505,50046,04029,61017,900158,700513,500BreakFlow421647,57453,71023,800TRIPTMSEPOVFILLTTBRKT2HRSTRHR=Timeofreactortrip=[50]'ec.=Timewhenwaterreachesthemoistureseparators
=[1086]'ec.=Timewhensteamgenerator overfills
=[2372]'ec.=Timewhenbreakflowisterminated
=[3428]'ec.=Timeat2hours=7200sec.=TimetoreachRHRin-service conditions, 8hours=28,800sec.*Ha'ter1074v:1D/1120Sl 40 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.6CASE2MASSRELEASES~TOTALMASSFLOM(POUNDS)TIMEPERIOD0-TRIPTRIPTMSEP"TTBRK-T2HRSTMSEPTTBRKT2HRSTRHRFaultedSGCondenser Atmosphere Feedwater 46,8800062,09039042,74033,260033,300CL,CIntactSGCondenser Atmosphere Feedwater 46,220000035,43018,450153,920457,00046,22097,78019,700160,300457,700BreakFlow4134132,66636,00000TRIP=TimeTMSEP=TimeTTBRK=TimeT2HRS=TimeTRHR=Timeofreactortrip=[49.4]'ec.whenwaterreachesthemoistureseparators
=[2372]'ec.whenbreakflowisterminated
=[3438]'ec.at2hours=7200sec.toreachRHRin-service conditions, 8hours=28,800sec.1074v:1D/112087 41 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.7SUMMARIZED MASSRELEASESTOTALMASSFLOM(POUNDS)CASE1CASE2FaultedSG0-TTBRKTTBRK-2HRS-2HRS8HRS0-TTBRK-2HRSTTBRK2HRS8HRSCondenser 47,82046,880Atmosphere 45,700*62,48033,300Feedwater 74,10076,000IntactSGCondenser 47,15046,2200Atmosphere 61,130151,870505,500Feedwater 122,800158,700513,50053,880153,920457,000163,700160,300.457,700BreakFlow129,3000172,800023,710ibmofthisiswater.1074v:10/1120S7 42 WESTINGHOUSE PROPRIETARY CLASS2III.RADIOLOGICAL CONSEQUENCES ANALYSISTheevaluation oftheradiological consequences ofasteamgenerator tuberupture,assumesthatthereactorhasbeenoperating attheproposedTechnical Specification limitforprimarycoolantactivityandattheexistingTechnical Specification limitforprimarytosecondary leakageforsufficient timetoestablish equilibrium concentrations ofradionuclides inthereactorcoolantandinthesecondary coolant.Radionuclides fromtheprimarycoolantenterthesteamgenerator, viatherupturedtube,andarereleasedtotheatmosphere throughthesteamgenerator safetyorpoweroperatedreliefvalvesandviathe4condenser airejector,exhaust.Thequantityofradioactivity releasedtotheenvironment, duetoaSGTR,dependsuponprimaryandsecondary coolantactivity, iodinespikingeffects,primarytosecondary breakflow,breakflowflashingfractions, attenuation ofiodinecarriedbytheflashedportionofthebreakflow,partitioning ofiodinebetweentheliquidandsteamphases,themassoffluidreleasedfromthegenerator andliquid-vapor partitioning intheturbinecondenser hotwell.Alloftheseparameters wereconservatively evaluated foradesignbasisdoubleendedruptureofasingletube.A.'esinBasisAnalticalAssumtionsThemajor'assumptions andparameters usedintheanalysisareitemizedinTable111.1.Thefollowing isadiscussion ofthesourceterm.SourceTermCalculations Theradionuclide concentrations intheprimaryandsecondary system,priortoandfollowing theSGTRaredetermined asfollows:a.Theiodineconcentrations inthereactorcoolantwillbebaseduponpreaccident andaccidentinitiated iodinespikes.1074v:1D/112087 43 MESTINGHOUSE PROPRIETARY CLASS2AccidentInitiated Spike-Theinitialprimarycoolantiodineconcentration is1yCi/gmofDoseEquivalent (D.E.)I-131.Following theprimarysystemdepressurization associated withtheSGTR,aniodinespikeisinitiated intheprimarysystemwhichincreases theiodinereleaseratefromthefueltothecoolanttoavalue500timesgreaterthanthereleaseratecorresponding totheinitialprimarysystemiodineconcentration.
Thedurationofthespike,[3.31'ours,issufficient toincreasetheinitialRCSI-131inventory byafactorof[100]'ii.Preaccident Spike-Areactortransient hasoccuredpriortotheSGTRandhasraisedtheprimarycoolantiodineconcentration from1to60yCi/gramofD.E.I-131.b.Theinitialsecondary coolantiodineconcentration is0.1yCi/gramofD.E.I-131.c.Thechemicalformofiodineintheprimaryandsecondary coolantisassumedtobeelemental.
4DoseCalculations Thefollowing assumptions andparameters wereusedtocalculate theactivityreleasedtotheatmosphere andtheoffsitedosesfollowing aSGTR.1.Themassofreactorcoolantdischarged intothesecondary systemthroughtheruptureandthemassofsteamreleasedfromtheintactandrupturedsteamgenerators totheatmosphere arepresented inTableII.5andII.G.2.Thetimedependent fractionofruptureflowthatflashestosteamandisimmediately releasedtotheenvironment ispresented inFigureIII.1.3.Thetimedependent iodineremovalefficiency forscrubbing ofsteambubblesas'heyrisefromtheleaksite[(assumed tobeatthetopofthetubebundle)]'othewatersurfacewasalsodetermined foreach,1074v:10/112087 MESTINGHOUSE PROPRIETARY CLASS2case.,Theiodineremovalefficiency isdetermined bythe.methodsuggested byPostmaandTam(Ref.6).Theiodineremovalefficiencies areshowninFigureIII.2.4.The0.2gpmprimarytosecondary leakisassumedtobesplitevenlybetweenthesteamgenerators.
5.Theiodinepartition factorbetweentheliquidandsteamoftherupturedandintactsteamgenerators isassumedtobe1DO.6.Nocredit'as takenforradioactive decayduringreleaseandtransport, orforclouddepletion bygrounddeposition duringtransport tothesiteboundaryorouterboundaryofthelowpopulation zone.7.Short-term atmospheric dispersion factors(x/gs)foraccidentanalysisandbreathing ratesareprovidedinTableIII.4.Thebreathing rateswereobtainedfromNRCRegulatory Guide1.4,(Ref.4).OffsiteThroidDoseCalculation ModelOffsitethyroiddosesarecalculated usingthe~uation:ThgtDCF,.g(IAR);.(BR).(x/()).]1Jwhere(IAR)..=integrated activityofisotopeireleasedduring'the 1Jtimeintervalj'nCi>>F*Nocreditistakenforclouddepletion bygrounddeposition orbyradioactive decayduringtransport totheexclusion areaboundaryortotheouterboundaryofthelow-population zone.1074v:1D/112087 45 WESTINGHOUSE PROPRIETARY CLASS2(BR)~breathing rateduringtimeinterval' inmeter/second(TableIII.4)(x/Q)=atmospheric dispersion factorduringtimeintervaljJinsecond/meter (TableIII.4)(DCF).=thyroiddoseconversion factorviainhalation for1isotopeiinrem/Ci(TableIII.5)thyroiddoseviainhalation inremResultsThyroiddosesattheExclusion AreaBoundaryandLowPopulation Zonearepresented inTableIII.6.Alldosesarewellwithintheallowable guidelines asspecified byStandardReviewPlan15.6e3and10CFR100.
1074v:1D/112487 46 WESTINGHOUSE PROPRIETARY CLASS2TABLEIII.1PARAMETERS USEDINEVALUATING THERADIOLOGICAL CONSEQUENCES OFASTEAMGENERATOR TUBERUPTUREI.SourceDataA.Corepowerlevel,MWt1520B.Totalsteamgenerator tubeleakage,priortoaccident, gpm0.2C.Reactorcoolantiodineactivity:
1.AccidentInitiated SpikeTheinitialRCiodineactivities basedon1I>Ci/gramofD.E.I-131arepresented inTableIII.3.Theiodineappearance ratesassumedfortheaccidentinitiated spikearepresented inTableIII.2.2,Pre-Accident SpikePrimarycoolantiodineactivities basedon60gCi/gramofD.E.I-131arepresented inTableIII.3.,D.Secondary systeminitialactivityDoseequivalent of0.1yCi/gmofI-131,presented inTableIII.3.1074v:1D/112087 47 HESTINGHOUSE PROPRIETARY CLASS2TABLEIII.l(Sheet2)E.Reactorcoolantmass,gramsF.Steamgenerator mass(each),grams1.27x103.39x10G.Offsitepow'erLostattimeofreactortripH.Primary-to-secondary leakagedurationforintactSG,hrs.I.Speciesofiodine100percentelemental II.ActivityReleaseDataA.Faultedsteamgenerator 1.Ruptureflow2.RuptureflowflashingfractionSeeTableII.5orII.GSeeFigureIII.13.Iodinescrubbing plusmoistureseparator removalefficiency SeeFigureIII.24.Totalsteamrelease,lbsSeeTableII.5orII.G5.Iodinepartition factora.Priortooverfillb.Afteroverfill100-1.0-SeeFigureIII.36.Locationoftuberupture[TopofBundle]'074v:10/1120S748 MESTINGHOUSE.PROPRIETARY CLASS2TABLEIII.1(Sheet3)B.Intactsteamgenerator 1.Primary-to-secondary leakage,gpm0.12.Totalsteamrelease,lbsSeeTable11.5or11.63.Iodinepartition factor100C.Condenser 1.Iodinepartition factor100D.Atmospheric Oispersion FactorsSeeTableIII,41074v:lo/112087 49 MESTINGHOUSE PROPRIETARY CLASS2TABLEIII.2IODINESPIKEAPPEARANCE RATES(CURIES/SECOND) 1-1323-133I"1340.942.221.743.071074v:1D/112087 50 MESTINGHOUSE PROPRIETARY CLASS2TABLEIII.3IODINESPECIFICACTIVITIES IN(yCi/gm)THEPRIMARYANDSECONDARY COOLANTBASEDON1,60AND0.1yCi/gramOFD.E.I-131Nuclide~Pit11~luCD/m60uCi/cDmSecondarCoolant0,1wCi/(1m0.7947.10.079I-1320.3520.70.0351.0160.70.1010.2012.20.020I-1350.7947.10.0791074v:1D/1 1208751 MESTINGHOUSE PROPRIETARY CLASS2TABLEIII.4ATMOSPHERIC DISPERSION FACTORSANDBREATHING RATESTimeExclusion AreaBoundaryLowPopulation (hours)x/Q(Sec/m)3Zonex/Q(Sec/m)3Breathing Rate(m/Sec)[4]0-22-84.8x103x103x103.47x103.47x101074v:1D/112087 52 WESTINGHOUSE PROPRIETARY CLASS2TABLEIII.5THYROIDDOSECONVERSION FACTORS(Rem/Curie)
[51Nuclide~I-131I-1341.49x101.43x102.69x103.73x105.60x101074v:1D/112087 53 NESTINGHOUSE PROPRIETARY CLASS2TABLEIII.6RESULTSOosesRemAllowable Case1Case2Guideline Valuel.AccidentInitiated IodineSikeExclusion AreaBoundary(0-2hr.)Thyroid26.43.830LowPopulation Zone(0-8hr.)Thyroid1.70.3302.Pre-Accident IodineSikeExclusion AreaBoundary(0-2hr.)Thyroid102.122.1300,LowPopulation Zone(0-8hr.)Thyroid6.41.4300~1074v:1D/112487 54 WESTINGHOUSE PROPRIETARY CLASS2GINN4SGTRIS%TUBEPLUGGING-C4SER4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAKFLOWFL4SNINGFR4CTION~ISCase1e.~It~Si,tt&~tt~S4,lt~SiTIICItttlGINN4SGTRISZTUBEPLUGGINGCASE2R4OIGLOOICALCONSEOUENCES EVALUATIONBREAKFLOWFLASHINGFR4CTION~ISCase2~ItH,tt14~StSI,ateiTletItttIFigureIII.1BreakFlowFlashingFraction1074v:1D/112087 55 HESTINGHOUSE PROPRIETARY CLASS2GL,GCASE1o5~2081eeeTINE(SECONDS) 1588288~5CASE24Z.(~2VM'I01088TINEISECONDSI 1508288FigureIII.2SrubbingEfficiency 1074v:1D/112087 WESTINGHOUSE PROPRIETARY CLASS2IE+2CASE11E+120~aC<LE+8ZIHE(HOURS)1.5JE+2CASE21E+120CC+IE+8TIHE(HOURS)FigureIII.3FaultedSGIodinePartition Factors1074v:1D/112087 57 WESTINGHOUSE PROPRIETARY CLASS2IV.CONCLUSION Thepotential radiological consequences ofasteamgenerator tubefailurewereevaluated fortheR.E.Ginnanuclearpowerplanttodemonstrate thattheuseoftheStandardTechnical Specification (STS)primarycoolantactivitylimitof1yCi/gramofdoseequivalent I-131willresult.inoffsitedosesthatarewithintheappropriate guidelines, Themassreleasesforadesignbasisdoubleendedruptureofasingletubewithalossofoffsitepowerwereconservatively calculated usingthecomputercodeLOFTTR2.Twocaseswereconsidered:
[1)intactsteamgenerator PORVfailsclosedandmustbelocally1opened,and2)rupturedsteamgenerator PORVfailsopenandmustbelocallyisolated.]
'heanalysisexplicitly modeledthetimeneededforthe'perators toperformtherecoverystepsoutlinedinguideline E-3ofRevision1oftheWestinghouse OwnersGroupEmergency ResponseGuidelines.
Theresulting dosesattheexclusion areaboundaryandlowpopulation zonearewithintheallowable guidelines asspecified byStandardReviewPlan15.6.3andlOCFR100.
Consequently, theSTSprimarycoolantactivitylimitissufficiently lowtoensurethattheradiological consequences ofasteamgenerator tuberuptureattheR.E,Ginnaplantwillbewithintheguidelines.
1074v:1D/112087 58 HESTINGHOUSE PROPRIETARY CLASS2V.REFERENCES 1.Lewis,Huang,Behnke,Fittante, Gelman,"SGTRAnalysisMethodology toDetermine theMargintoSteamGenerator Overfill,"
HCAP-10698-P-A, August1987.[PROPRIETARY'.
Lewis,Huang,Rubin,"Evaluation ofOffsiteRadiation DosesforaSteamGenerator TubeRuptureAccident,"
Supplement 1toHCAP-10698-P-A, March1986.[PROPRIETARY]
3.R.Elaisz,LetterfromRGEtoHestinghouse concerning GinnaspecificoperatoractiontimesforSGTRanalysis, February7,1985.4.NRCRegulatory Guide1.4,Rev.2,"Assumptions UsedforEvaluating thePotential Radiological Consequences ofaLOCAforPressurized HaterReactors",
Jun'e1974.5.NRCRegulatory Guide1.109,Rev.1,"Calculation ofAnnualDosestoManFromRoutine,ReleasesofReactorEffluents forthePurposeofEvaluating Compliance with10CFRPart50AppendixI",October1977.6.Postma,A.K.,Tam,P.S.,"IodineBehaviorinaPHRCoolingSystemFollowing aPostulated SteamGenerator TubeRupture",
NUREG-0409.
1074v:1D/120487 59 IraV0;Jih}}

Revision as of 11:05, 29 June 2018

Forwards Application for Amend to License DPR-18,increasing Allowable RCA to Improved TS Values (NUREG-1431). Westinghouse Proprietary Rept WCAP-11668 & Nonproprietary Rept WCAP-11678 Encl.Proprietary Rept WCAP-11668 Withheld
ML17309A545
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/23/1994
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A656 List:
References
RTR-NUREG-1431 NUDOCS 9405310164
Download: ML17309A545 (71)


Text

..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEMJIREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9405310164 DOC.DATE:

94/05/23NOTARIZED:

YESDOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.*NAME AUTHORAFFILIATION MECREDY,R.C.

Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

ProjectDirectorate I-3+5R

SUBJECT:

Forwardsapplication foramendtolicenseDPR-18,increasing allowable RCAtoimprovedTSvalues(NUREG-1431).

IWestinghouse proprietary reptWCAP-11668 6nonproprietary reptWCAP-11678 encl.Proprietary reptWCAP-11668 withheld.

DDISTRIBUTION CODE:AP01DCOPIESRECEIVED:LTR JENCLLSIZE:/STITLE:Proprietary ReviewDistribution

-PreOperating License6Operating R/NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

05000244ARECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A COPIESLTTRENCL1133RECIPIENT IDCODE/NAME PD1-3PDCOPIESLTTRENCL11DDINTERNAL:

AEO~DOA~GFfQEEXTERNALNRCPDR01111110OGC/HDS110DSNOTETOALL"RIDS"RECIPIENTS:

DDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR9ENCL7 Itg~0<~

/////I///////

'g//Z1//I///I/I///////////

i////I//////SKfROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER N.Y.14649-0001 ROBERTC.MECREDYVicePresident ClnnaNuclearProduction May23,1994TELEPHONE hREACODE7tB5462700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555

Subject:

Application forAmendment toOperating LicenseReactorCoolantActivityTechnical Specifications Rochester GasandElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244Ref.(a):NRCLetter,C.RossitoA.Ladieu(WOG),"Acceptance forReferencing ofLicensing TopicalReportWCAP-10698...",

March30,1987.(b):NUREG-0916, "SafetyEvaluation ReportRelatedtotheRestartofR.E.GinnaNuclearPowerPlant",May1982.(c):RG&ELetter,R.MecredytoA.Johnson(NRC),"Emergency ResponseCapability...",

October14,1992.(d):NRCLetter,A.JohnsontoR.Mecredy(RG&E),Emergency ResponseCapability

-Conformance toRegulatory Guide1.97,revision3",February24,1993.(e):WOGLetter,L.WalshandA.EngeltoR.Jones(NRC),"Westinghouse OwnersGroupSteamGenerator TubeUncoveryIssue",March31,1992.(f):NRCLetter,R.JonestoL.Walsh(WOG),"Westinghouse OwnersGroup,SteamGenerator TubeUncoveryIssue",March10,1993.

DearMr.Johnson:

WCAP-11668 (Proprietary)/WCAP-11678 (Non-Proprietary) evaluatethepotential radiological consequences duetoasteamgenerator tuberupture(SGTR)fortheR.E.GinnaNuclearPowerPlant.Thisg'Ti4053101b4'Tl40523 PDR"ADOt"K'05000244 Thepurposeofthisapplication forAmendment toOperating LicenseistoamendAppendixAofthatLicensetoincreasetheTechnical Specification allowable primarycoolantiodine(I-131)activitylimitfrom0.2pC+igmto1.0pCi/gm; andthetotalprimarycoolantactivityfrom84/EpCi/gmtotheStandardTechnical Specification valueof100/EpCi/gm,consistent withtheImprovedTechnical Specifications (NUREG-1431).

evaluation utilizestheanalysismethodology ofWCAP-10698-P-A "SGTRAnalysisMethodology toDetermine theMargintoSteamGenerator Overfill."

RG&Ehasmettherequirements forusageofWCAP-10698 asoutlinedinNuclearRegulatory Commission letterfromC.E.Rossi(NRC)toA.E.Ladieu(WOG),(Reference a).Theletterrequiredeachutilitytoprovidefiveplantspecificinputs:1.Demonstration thatcriticaloperatoractiontimesusedintheanalysisarerealistic andconsistent withthoseobservedduringsimulator exercises.

2.AsitespecificSteamGenerator TubeRuptureradiological offsiteconsequence analysis.

3.Astructural, analysisofthemainsteam'inesdemonstrating adequacyunderwater-filled conditions.

4.Alistofsystems,components, andinstrumentation creditedforaccidentmitigation andthespecified safetygradeforeach.5.Acomparison oftheplanttothe"bounding plant"usedinWCAP-10698.

Items2and5areaddressed in.thesitespecificanalysisbeingsubmitted withthisletter,WCAP-11668 (Proprietary).

Item3wasaddressed duringthereviewoftheSteamGenerator TubeRuptureincidentatGinnaStation.Itsacceptability isdocumented inNUREG-0916, (Reference b).Item4iscontained inourpost-accidentinstrumentation submittal (Reference c)(re.Regulatory Guide1.97).NRCreviewandacceptance ofthisinformation isdocumented inreference d.Item1isdiscussed below.DuringtheweekofAugust19through23,1991simulator runsofthetwomostlimitingcasesidentified inWCAP-11668 (Proprietary)/

WCAP-11678 (Non-Proprietary),

weremadetovalidateassumedoperatorresponsetimes.Thesesimulator runsdemonstrated thatnotonlyweretheoperatorresponsetimesassumedintheWCAPsconservative withadequatemargin,butalsothatrecentrefinements intheemergency operating procedures havefurtherreducedthelikelihood ofoverfilling therupturedsteamgenerator.

Forthetwolimitingcasesidentified operatorresponseprevented overfillwithsignificant margin,andterminated breakflowinunder45minutes.Inbothcasesitwasnecessary tousetheWCAPassumedtimesforoperatoractionoutsidethecontrolroom.Thesetimeswerethelimitingfactorsinthescenarios, ascontrolroomoperators hadtowaittoproceedwithfurthermitigating actionsuntiltheseactionswereassumedtobecompleted.

Operatorcritiquefollowing thesessionsindicated thattheyfeltthesetimeswereunrealistically conservative.

We,therefore, feelthatactualmitigation timeswouldbeevenlessthanthosedemonstrated duringthesimulator exercise.

WCAP-11668/11678 assumesthetuberuptureremainscoveredthrough-ItI outtheevent.Morerecentlyithasbeensuggested that,thisassumption maynotbeconservative.

TheWestinghouse OwnersGroup(WOG)hasundertaken aprogramtoassesstheconsequences oftuberuptureuncovery.

Theresultsindicatethattheincreaseindosesisinsignificant.

Theseresultsweretransmitted tothestaff(Reference e).Thestaffhasreviewedandapprovedthistransmittal (reference f).Therefore, wefeelthisissuehasbeenadequately addressed.

ItshouldbenotedthataproposaltomodifySection3.1.4.3.a hasalreadybeensubmitted totheNRCvialetterMay13,1994.Page3.1-21ofAttachments BandCisbeingsubmitted inbothversions, sothatapprovalisnotdependent onthesequenceofproposedLicenseAmendment Requestreviews.WerequestthatuponNRCapproval, thisamendment shouldbeconsidered effective immediately andimplemented within60days.Veryrulyyours,oertc.ecryBJF/190Attachment

Enclosures:

1~One(1)submittal ofanApplication forAmendment toOperating Licenseandassociated safetyevaluation.

2~3~4~One(1)copyofanApplication forWithholding, CAW-87-123, datedDecember3,1987,accompanying Affidavit, andProprietary Information NoticeOne(1)copyofWCAP-11668, "LOFTTR2AnalysisofPotential Radiological Consequences Following aSteamGenerator TubeRuptureattheR.E.GinnaNuclearPlant",November1987(Proprietary).

One(1)copyofWCAP-11678, "LOFTTR2AnalysisofPotential Radiological Consequences Following aSteamGenerator TubeRuptureat,theR.E.GinnaNuclearPlant",November1987(Non-Proprietary).

xc>>Mr.AllenR.Johnson(MailStop14Dl)ProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector WESTINGHOUSE PROPRIETARY CLASS2WCAP"1166874>5'9QVLOFTTR2ANALYSISOFPOTENTIAL RADIOLOGICAL CONSEQUENCES FOLLOWING ASTEAMGENERATOR TUBERUPTUREATTHER.E.GINNANUCLEARPOWERPLANT0.J.MendlerK.RubinNOVEMBER1987NuclearSafetyDepartment Thisdocumentcontainsinformation proprietary toWestinghouse ElectricCorporation; itissubmitted in.confidence andistobeusedsolelyforthepurposeforwhichitisfurnished andreturneduponrequest.Thisdocumentandsuchinformation isnottobereproduced, transmitted, disclosed orusedotherwise inwholeorinpartwithoutauthorization ofWestinghouse ElectricCorporation, NuclearEnergySystems.Westinghouse ElectricCorporation NuclearEnergySystemsP.O.Box355Pittsburgh, Pennsylvania 152301987byWestinghouse ElectricCorporation 1074v:1OP/120487 IP.'\10 WESTINGHOUSE PROPRIETARY CLASS2Thisdocumentcontainsmaterialthatisproprietary totheWestinghouse ElectricCorporation.

Thispropr'ietary information hasbeenmarkedbymeansofbrackets.

Thebasisformarkingthematerialproprietary isidentified bymarginalnotesreferring tothestandards inSection8oftheaffidavit ofR.A.Wiesemann ofrecord"IntheHatterofAcceptance CriteriaforEmergency

.CoreCoolingSystemsforLightWaterCooledNuclearPowerReactors(DocketNo.RH-50-1)"

atteanscript pages3706through3710(February 24,1972).'Duetotheproprietary natureofthematerialcontained inthisreportwhichwasobtainedatconsiderable Westinghouse expenseandthereleaseofwhichwouldseriously affectourcompetitive

position, werequestthisinformation tobewithheldfrompublicdisclosure inaccordance withtheRulesofPractice, 10CFR2.790,andthattheinformation presented thereinbesafeguarded inaccordance with10CFR2.903.Webelievethatwithholding thisinformation willnotadversely affectthepublicinterest.

Thisinformation isforyourinternaluseonlyandshouldnotbereleasedtopersonsororganizations outsidethedirectorate ofRegulation andtheACRSwithoutpriorapprovalofWestinghouse ElectricCorporation.

Shoulditbecome1necessary toreleasethisinformation tosuchpersonsaspartofthereviewprocedure, pleasecontactWestinghouse ElectricCorporation andtheywillmakethenecessary arrangements requiredtoprotecttheirproprietary'nterests.

1D74v:1D/7120B7 WESTINGHOUSE PROPRIETARY CLASS2TABLEOFCONTENTSPacaesI.INTRODUCTION II.THERHALHYDRAULIC ANALYSISA.B.C.D.E.F.DesignBasisAccidentConservative Assumptions OperatorActionTimesTransient Description

-Case1Transient Description

-Case2HassReleases236132434III.RADIOLOGICAL CONSEQUENCES ANALYSISIV.CONCLUSION 4358V.REFERENCES 591074v:1D/112087 00-WESTINGHOUSE PROPRIETARY CLASS2I.INTRODUCTION Anevaluation ofthepotential radiological consequences duetoasteamgenerator tuberupture(SGTR)eventhasbeenperformed fortheR.E.Ginnanuclearpowerplanttodemonstrate thattheoffsiteradiation doseswillbelessthantheallowable guidelines basedontheStandardTechnical Specification limitonprimarycoolantactivity.

Theevaluation discussed hereinassumesthat151.ofthesteamgenerator tubesareplugged.Adesignbasissteamgenerator tuberupturewasanalyzedforGinnausingthemethodology developed inMCAP-10698 (reference 1)andthesupplement toHCAP-10698 (reference 2).Twosinglefailurecaseswereconsidered todetermine whichisthemostlimitingsinglefailureforGinnawithrespecttoradiological.

consequences.

Thetwocasesexaminedwere:a,cCase1Intactsteamgenerator poweroperatedreliefvalve(PORV)failsclosedandmustbelocallyopened.Case2Rupturedsteamgenerator poweroperatedreliefvalvefailsopenandmustbelocallyisolated.

PlantresponsetotheeventwasmodeledusingtheLOFTTR2computercodewithconservative assumptions ofbreaksizeandlocation, condenser availability andinitialsecondary watermassinthefaultedsteamgenerator.

Theanalysismethodology includesthesimulation oftheoperatoractionsforrecoveryfrom'steamgenerator tuberupturebasedontheWestinghouse OwnersGroupEmergency ResponseGuidelines, whicharethebasisfortheGinnaEmergency Operating Procedures.

Themassreleaseswerecalculated withtheLOFTTR2~programfromtheinitiation oftheeventuntiltermination ofthebreakflow.Forthetimeperiodfollowing breakflowtermination, steamreleasesandfeedwater flowsfromtheintactandfaultedsteamgenerators weredetermined fromamassandenergybalanceusingthecalculated RCSandsteamgenerator conditions atthetimeofleakagetermination.

Themassreleasesforbothcaseswereusedtodetermine theradiation dosesattheexclusion areaboundaryandlowpopulation zoneassumingthattheprimarycoolantactivity'isattheStandardTechnical Specification limitpriortotheaccident.

1074v:1D/112087 MESTINGHOUSE PROPRIETARY CLASS2II.THERMALHYDRAULIC ANALYSISIntegrated massreleasestotheatmosphere andcondenser duringasteamgenerator tuberuptureeventwerecalculated forvarioustimeperiodsduringtheaccident.

Thissectionincludesthemethodsandassumptions usedtomodeltheSGTReventandcalculate themassreleases, aswellasthesequenceofeventsfortherecovery.

A.DesinBasisAccidentTheaccidentmodeledisthecompleteseverance ofasteamgenerator tubelocatedatthetubesheetonthecoldlegside.Itwasalsoassumedthatlossofoffsitepoweroccurredatthetimeofreactortrip,andtheworstrodwasassumedtobestuckatreactortrip.a,cThemostlimitingsinglefailurewithrespecttosteamgenerator overfillwasdetermined byreference 1tobeafailedclosedPORVontheintactsteamgenerator.

SinceGinnaisatwoloopplant,theintactsteamgenerator PORVmustbelocallyopenedbeforeRCScooldowncanbegin.Thisadditional timetolocallyopentheintactsteamgenerator PORVwilldelayRCSdepressurization, causinganincreaseintotalprimarytosecondary leakage.Consequently, morewaterwillaccumulate inthefaultedsteamgenerator.

Thecasewheretheintactsteamgenerator PORVfailstoopenondemandandmustbelocallyopenedwillbereferredtoasCase1.Themostlimitingsinglefailurewithrespecttooffsitedoseswasdetermined byreference 2tobeafailedopenPORVonthefaulte'dsteamgenerator.

FailureofthisPORVwillcauseanuncontrolled depressurization ofthefaultedsteamgenerator whichwillincreaseprimarytosecondary leakage.Pressureintherupturedsteamgenerator willremainbelowthatintheprimarysystemuntilthefailedPORVcanbeisolated, andrecoveryactionscompleted.

Thecasewherethefaulted'team generator PORVfailsopenandmustbelocallyisolatedwillbereferredtoasCase2.1074v:1D/112087 WESTINGHOUSE PROPRIETARY CLASS2B.Conservative AssumtionsPlantresponses andmassreleasesfromtheintactandfaultedsteamgenerator priortobreakflowtermination werecalculated usingLOFTTR2.WhilemodelingtheSGTReventthefollowing assumptions weremade:1.ReactorTrionOvertemeratureDelta-Ta,cAturbinerunbackcanbeinitiated automatically ortheoperatorcanmanuallyreducetheturbineloadtoattempttopreventareactortriponovertemperature delta-T.Althoughturbinerunbackissimulated inthisanalysis, creditis.nottakenfordelayingreactortrip.Reactortripisassumedtooccuronovertemperature delta-T.Duetotheassumedlossofoffsitepowerthecondenser isnotavailable forsteamreleasesoncethereactoristripped.Consequently, afterreactortripthesteamgenerator PORYsareusedforsteamreleases.

Thusanearliertriptimeleadstomoresteamreleasedtotheatmosphere fromthefaultedandintactsteamgenerators.

2.PoweraTheinitialsteamgenerator watermassdecreases withincreasing powerlevel.,Thus,alowerinitialpowerresultsinahigherinitialsteamgenerator secondary watermasswhichisconservative.

Onthisbasis,100%nominalpowerwasassumedfortheanalysisratherthanconsidering anoverpower factor.3.Pressurizer WaterLevelTheRCSdepressurization rateincreases afterthepressurizer empties.Ahigherpressurizer waterlevelwillincreasethetimerequiredforthepressurizer toempty.Thisresultsinmaintaining ahigherprimarytosecondary pressuredifferential andthusalargerbreakflowrateforalongertimeperiod.Therefore, itisconcluded thatmaximizing thepressurizer waterlevelisconservative.

a,c1074v:1D/112087 HESTINGHOUSE PROPRIETARY CLASS24.SteamGenerator Seoond~ar MassAhigherinitialsecondary watermassintherupturedsteamgenerator wasdetermined byReference 1tobeconservative foroverfill.

FortheCase1analysisturbinerunbackwasassumedinitiated andwassimulated byartificially increasing initialsteamgenerator watermass.Theinitialsteamgenerator totalfluidmasswasassumedtobelOAabovenominalvalueplusthedifferential massbetween100%powerand70Ãpowertosimulateturbinerunback.However,ifsteamgenerator overfilldoesnotoccur,alowerinitialmassintheruptur'ed steamgenerator resultsinaconservative prediction ofoffsitedoses..Thus,forCase2theinitialsecondary masswasassumedtocorrespond tooperation at10Kbelownominalsteamgenerator watermass.a,c5.BreakLocationThetuberuptureanalyzedisadouble-ended breakofonesteamgenerator tubelocatedatthetopofthetubesheetontheoutletsideofthesteamgenerator.

Thelocationofthebreakonthecoldsideofthesteamgenerator resultsinhigherprimarytosecondary leakagethanabreakonthehotsideofthesteamgenerator asdetermined byreference 1.Therefore, itisconcluded thatthecoldlegsidebreaklocationisconservative.

4i,C6.ReactorTriOelaAsnotedpreviously, theresultsforcaseswhichproduceanearlierreactortriparemoreconservative withrespecttotheradiological consequences fromaSGTR.Thus,aminimumdelaytimefromthereactortripsignaltoreactortripisconservative fortheanalysis.

Inaddition, asnotedabove,nocreditistakenforturbinerunbackdelayingreactortrip.a,c.1074v:10/112387 ttESTINGHOUSE PROPRIETARY CLASS27.T~tiTiD1Following areactortrip,theturbinewillbeautomatically trippedafterasuitabledelaytime.Minimizing thedelaytimebetweenreactortripandturbinetripreducestheamountofsteamflowtotheturbineandincreases the.secondary waterinventory.

Thus,aminimumdelaytimebetweenreactortripandturbinetripisconservative fortheSGTRanalysis.

a,c8.SteamGenerator ReliefValvePressureSetointHithalossofoffsitepower,thesecondary pressurewillincreasefollowing reactorandturbinetrip,andsteamwillberelievedthroughthesteamgenerator PORVsandsafetyvalves.Alowersteamgenerator reliefvalvepressuresetpointleadstoahigherprimarytosecondary pressuredifferential andthushigherprimarytosecondary leakage.Thus,theuseofthelowestsetpointforthesteamgenerator.

reliefvalvesisconservative fortheanalysis.

SincethePORVsetpointislowerthan.thesafetyvalvesetpoints, theuseofthePORVsetpointof1050psigforsteamreliefismoreconservative, 9.Pressurizer PressureforSIInitiation Theuseofthemaximumpressurizer pressuresetpointforSIinitiation resultsinearlieractuation oftheSIsystem.Thisleadstothemaintenance ofahigherprimarytosecondary pressuredifferential andconsequently ahigherbreakflowrateforalongertimeperiod.Thus,theuseofthemaximumpressurizer pressuresetpointforSIinitiation

.intheanalysisisconservative.

a,c10.LeakaeafterOverfilla,cOverfillisassumedtooccuriftherupturedsteamgenerator becomeswatersolid.Nocreditistakenforsteamlinevolume.1074v:10/1 12087 WESTINGHOUSE PROPRIETARY CLASS211.FlashinFractiona,cWhencalculating theamountofbreakflowthatflashestosteam,100percentofthebreakflowisassumedtocomefromthehotlegsideofthebreak.Sincethetuberuptureflowactuallyconsistsofflowfromthehotlegandcoldlegsidesofthesteamgenerator, thetemperature ofthecombinedflowwillbelessthanthehotlegtemperature andtheflashingfractionwillbecorrespondingly lower.Thustheassumption that100percentofthebreakflowcomesfromthehotlegisconservative foraSGTRanalysis.

C.eratorActionTimesIntheeventofanSGTR,theoperatorisrequiredtotakeactionstostabilize theplantandterminate theprimarytosecondary leakage.Anevaluation hasbeenperformed (reference 1)toestablish theoperatoractiontimesfor'useintheanalysisofadesignbasisSGTRevent.TheoperatoractionswhicharerequiredforrecoveryfromanSGTRandtheavailable dataonthetimestoperformtheseactionshaveb'eenreviewed.

Theavailable dataonoperatoractiontimesforanSGTRincludesinformation whichhasbeenobtainedfromreactorplantsimulator studiesaswellasplantdatafromfiveactualSGTRevents.Usingthisdata,operator-actiontimeshavebeenestablished.

whichareconsidered tobeappropriate foradesignbasisSGTRevent.TheseoperatoractiontimeswerebeusedasinputfortheanalysisofthedesignbasisSGTRevent.ThemajoroperatoractionsforSGTRrecoverywhichareincludedintheE-3guideline oftheWestinghouse OwnersGroupEmergency ResponseGuidelines wereexplicitly modeledintheanalysis.

Theoperatoractionsmodeledincludeidentification andisolation oftherupturedsteamgenerator, cooldownanddepressurization oftheRCStorestoreinventory, andtermination ofSItostopprimarytosecondary leakage.Theseoperatoractionsaredescribed below.1074v:1D/112087 MESTINGHOUSE PROPRIETARY CLASS21.I.dentify therupturedsteamgenerator (step2).Highsecondary sideactivity, asindicated bythesteamgenerator blowdownlineradiation monitororairejectorradiation monitor,typically willprovidethefirstindication ofanSBTRevent.Therupturedsteamgenerator canbeidentified byhighactivityinthecorresponding steamgenerator blowdownline,mainsteamline, orwatersample.ForanSBTRthatresultsinahighpowerreactortrip,thesteamgenerator waterlevelwilldecreaseoff-scale onthenarrowrangeforbothsteamgenerators.

Theauxiliary feedwater (AFM)flowwillbegintorefillthesteamgenerators, typically distributing approximately equalflowtobothsteamgenerators.

Sinceprimarytosecondary leakageaddsadditional inventory whichaccumulates intherupturedsteamgenerator, levelwillreturntothenarrowrangeinthatsteamgenerator significantly earlierandwillcontinuetoincreasemorerapidly.Thisresponseprovidesconfirmation of.anSGTReventandalsoidentifies therupturedsteamgenerator.

2.Isolatetherupturedsteamgenerator fromtheintactsteamgenerator andisolatefeedwater totherupturedsteamgenerator.(steps 3and4).Onceatuberupturehasbeenidentified, recoveryactionsbeginbyisolating steamflowfromandstoppingfeedwater flowtotherupturedsteamgenerator.

Inadditiontominimizing radiological

releases, thisalsoreducesthepossibility offillingtherupturedsteamgenerator withwaterby1)minimizing theaccumulation offeedwater flowand2)enablingtheoperatortoestablish apressuredifferential betweentherupturedandintactsteamgenerators asanecessary steptowardterminating primarytosecondary leakage.Intheguideline forsteamgenerator tuberupturerecoveryintheERGs,theoperatorisdirectedtomaintainthelevelintherupturedsteamgenerator betweenjustonspanand50%onthenarrowrangeinstrument.

Reference 1assumedthattherupturedsteamgenerator wouldbeisolatedwhenlevelinthesteamgenerator reached[midwaybetweenthesepoints]'074v:1D/112487 WESTINGHOUSE PROPRIETARY CLASS2[(33%narrowrangelevel).]'orGinnaitwasalsoconservative touse[33percent]'flevelforisolation.

Therupturedsteamgenerator wasassumedtobeisolatedat[33percentnarrowrangelevelorat10minutes,whichever waslonger.]'.CooldowntheReactorCoolantSystem(RCS)usingtheintactsteamgenerator (step14).Afterisolation oftherupturedsteamgenerator, theRCSiscooledasrapidlyaspossibletolessthansaturation temperature corresponding totherupturedsteamgenerator pressurebydumpingsteamfromonlytheintactsteamgenerator

.Thisensuresadequatesubcooling inthe.RCSafterdepressurization totherupturedsteamgenerator pressureinsubsequent actions.,

Withoffsitepoweravailable, thenormalsteamdumpsystemtothecondenser willprovidesufficient capacitytoperformthiscooldownrapidly'.

Ifoffsitepowerislost,theRCSiscooledusingthepower-operated reliefvalve(PORV)ontheintactsteamgenerator sinceneitherthesteamdumpvalvesnorthecondenser wouldbeavailable.

ItisnotedthatRCSpressurewilldecreaseduringthecooldownasshrinkage ofthereactorcoolantexpandsthesteambubbleinthepressurizer.

4.Depressurize theRCStorestorereactorcoolantinventory (steps17or18).Whenthecooldowniscompleted, SIflowwillincreaseRCSpressureuntilbreakflowmatchesSIflow.Consequently, SI'flowmustbeterminated tostopprimarytosecondary leakage.However,adequatereactorcoolantinventory mustfirstbeassured.Thisincludesbothsufficient reactorcoolantsubcooling andpressurizer inventory tomaintainareliablepressurizer levelindication afterSIflowisstopped.SinceleakagefromtheprimarysidewillcontinueafterSIflowisstoppeduntilRCSandrupturedsteamgenerator pressures

equalize, an"excess"amountofinventory isneededtoensure1074v:10/112487 WESTINGHOUSE PROPRIETARY CLASS2pressurizer levelremainsonspan.The"excess"amountrequireddependsonRCSpressureandreducestozerowhenRCSpressureequalsthepressureintherupturedsteamgenerator.

Toreducebreakflowandestablish sufficient pressurizer level,RCSpressureisdecreased byopeningthepressurizer PORV.5.Terminate SItostopprimarytosecondary leakage(steps21-23).Thepreviousactionswillhaveestablished adequateRCSsubcooling, secondary sideheatsink;andreactorcoolantinventory following anSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted, SIflowmustbestoppedtoprevent'epressurization oftheRCSandtoterminate primarytosecondary leakage.Primarytosecondary leakagewillcontinueafterSIflowisstoppeduntilRCSpressureandrupturedsteamgenerator pressures equalize.

Chargingflow,letdown,andpressurizer heaterswillthenbecontrolled topreventrepressurization oftheRCS'ndreinitiation ofleakageintotherupturedsteam.generator.

SincethesemajorrecoveryactionswillbemodelledintheSGTRanalysis, itisnecessary toestablish thetimesrequiredtoperformtheseactions.Althoughtheintermediate stepsbetweenthemajoractionswillnotbeexplicitly

modelled, itisalsonecessary toaccountforthetimerequiredtoperformthesteps,Itisnotedthatthetotaltimerequiredtocompletetherecovery-operations consistsofbothoperatoractiontimeandsystem,orplant,responsetime;Forinstance, thetimeforeachofthemajorrecoveryoperations (i.e.,RCScooldown, RCSdepressurization,'tc.)

isprimarily duetothetimerequiredforthesystemresponse, whereastheoperatoractiontimeisreflected bythetimerequiredfortheoperatortoperformtheintermediate actionsteps.'TheoperatoractiontimestoinitiateRCScooldown, RCSdepressurization andsafetyinjection termination weredeveloped inreference 1andarelistedinTableII.1.Inadditiontotheoperatoractiontimesdeveloped inreference 1,Rochester GasandElectricsuppliedtheoperatoraction1074v:1D/112087 MESTINGHOUSE PROPRIETARY CLASS2timesassociated withrecovering fromthesinglefailures(Reference 3).[Theseoperator'actions, whichwouldoccuroutsidethecontrolroom,includelocallyopeningtheintactsteamgenerator PORV,locallyclosingtheintactsteamgenerator PORVblockvalveandlocallyclosingthefaultedsteamgenerator PORVblockvalve.]'hetimesassociated withperforming theseoperatoractionsarelistedinTableII.2.[Itisnotedthatthe20minutestoopentheintactsteamgenerator PORVconsistsof10minutestoidentifyandlocatethevalveand10minutestolinearlyopenthePORV.Duetolimitations ofLOFTTR2,theoperatoractiontoopentheintactsteamgenerator PORVwassimulated asastepopeningaftera15minutedelay,whichresultsinanequivalent integrated steamflowthroughthePORVattheendofthe20minuteperiod.]'074v:io/11208710 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.1OPERATORACTIONTIMESFORDESIGNBASISSGTRANALYSISActionTimeminIdentifyandisolaterupturedSGHaximumof10minorcalculated timetoreach334narrowrangelevelintherupturedSGOperatoractiontimetoinitiatecooldownCooldownCalculated timeforRCScooldownOperatoractiontimetoinitiatedepressurization Depressurization Calculated timeforRCSdepressurization OperatoractiontimetoinitiateSItermination SItermination andpressureequalization Calculated timeforSItermination andequalization ofRCSandrupturedSGpressures 1074v:1D/112087 WESTINGHOUSE PROPRIETARY CLASS2TABLEII.2ActionGINNASPECIFICOPERATORACTIONTIMESTimeminQ,CFaultedSteamGenerator PORVBlockValveClosing-Local Action15IntactSteamGenerator PORVOpening-Local Action20IntactSteamGenerator PORVBlockValveClosing-Local Action1074v:1D/112087 12 II'ESTINGHOUSE PROPRIETARY CLASS2D.Transient Descrition-Case1[Case1addresses aSGTRinwhichthesinglefailureassumedisthattheintactsteamgenerator PORVfailstoopenondemandandmustbelocallyopened.]'hesequence, ofeventsforCase1ispresented inTableII.3.Following thetuberupture,reactorcoolantflowsfromtheprimaryintothesecondary sideoftherupturedsteamgenerator sincetheprimarypressureisgreaterthanthesteamgenerator pressure.

Inresponsetothislossofreactorcoolant,pressurizer leveldecreases asshowninFigureII.1.TheRCSpressurealsodecreases asshowninFigureII.2asthesteambubbleinthepressurizer expands.AstheRCSpressuredecreases duetothecontinued primarytosecondary leakage,automatic reactortripoccursonanovertemperature delta-Ttripsignal.Afterreactortrip,corepowerrapidlydecreases todecayheatlevels.Theturbinestopvalvescloseandsteamflowtotheturbineisterminated.

Thesteamdumpsystemisdesignedtoactuatefollowing reactortriptolimittheincreaseinsecondary

pressure, butthesteamdumpvalvesremainclosedduetothelossofcondenser vacuumresulting fromtheassumedlossofoffsitepoweratthetimeofreactortrip.Thus,theenergytransferfromtheprimarysystemcausesthesecondary sidepressuretoincreaserapidlyafter'reactortripuntilthesteamgenerator.

PORVslifttodissipate theenergy,asshowninFigureII.3.TheRCSpressuredecreases morerapidlyafterreactortripasenergytransfertothesecondary shrinksthereactorcoolantandtheleakflowcontinues todepleteprimaryinventory.

ThedecreaseinRCSinventory resultsinalowpressurizer pressureSIsignal.Pressurizer levelalsodecreases morerapidlyfollowing reactortripandthepressurizer eventually emptiesasshowninFigureII.1.Afterthepressurizer empties,theRCSpressurerapidlydecreases asshowninFigureII.2.1074v:10/120487 13 WESTINGHOUSE PROPRIETARY CLASS2Sinceoffsitepowerisassumedlostatreactor-trip, theRCPstripandagradualtransition tonaturalcirculation flowoccurs.Immediately following reactortripthetemperature riseacrossthecoredecreases ascorepowerdecays(seeFigure11.4),however,thetemperature risesubsequently increases asnaturalcirculation flowdevelops.

Thecoldlegtemperatures trendtowardthesteamgenerator temperature asthefluidresidence timeinthetuberegionincreases.

TheRCStemperatures continuetoslowlydecreaseduetothecontinued additionoftheauxiliary feedwater tothesteamgenerators untiloperatoractionsareinitiated tocooldowntheRCS.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGenerator Onceatuberupturehasbeenidentified, recoveryactionsbeginbyisolating steamflowfromtherupturedsteamgenerator and.throttling theauxiliary feedwater flowtotherupturedsteamgenerator.

Asindicated previously, therupturedsteamgenerator isassumedtobeidentified andisolatedwhenthenarrowrangelevelreaches[33%]'ntherupturedsteamgenerator orat[10]'inutesafter.initiation oftheSGTR,whichever islonger.ForGinna,thetimetoreach[33%]'slessthan[10]'inutes,thustherupturedsteamgenerator isassumedtobeisolatedat[10]'inutes.2.CooldowntheRCStoEstablish Subcooling MarginAfterisolation oftherupturedsteamgenerator, thereisa[5]'inuteoperator.

actiontimeimposedpriortoinitiating thecooldown.

Theactualdelaytimeusedintheanalysisis4secondslongerbecauseofthecomputerprogramrequirements forsimulating theoperatoractions.Afterthistime,actionsaretakentocooltheRCSasrapidlyaspossiblebydumpingsteamfromtheintactsteamgenerators.

Sinceoffsitepowerislost,theRCSiscooledbydumpingsteamtotheatmosphere usingthePORVontheintactsteamgenerator.

[ForCase1,aspreviously noted,theintactsteamgenerator]

'074v:1D/112487 14 MESTINGHOUSE PROPRIETARY CLASS2[PORVfailstoopen.Fortheanalysis, itwasassumedthatthevalvewasfullyopenedafteranadditional periodof15minutes(seepg.10).Thusat1804secondstheintactsteamgenerator PORVisopenedforRCScooldown.]

'hecooldowniscontinued unti1RCSsubcooling attherupturedsteamgenerator pressureis20'Fplusanallowance of17'Fforsubcooling uncertainty.

[Whentheseconditions aresatisfied itisassumedthatittakestheoperatorfiveminutestoclosetheintactsteamgenerator PORVblockvalve.]'tisnotedthatoverfilloftherupturedsteamgenerator occursduringthistimeperiodat'[2372]'econds,asshowninFigureII.6.Thiscooldownensuresthattherewillbeadequatesubcooling intheRCSafterthesubsequent depressurization oftheRCStotherupturedsteamgenerator pressure.

Thereduction intheintactsteamgenerator pressurerequiredtoaccomplish thecooldownisshowninFigureII.3,andtheeffectofthecooldownontheRCStemperature isshowninFigureII.4.TheRCSpressurealsodecreases duringthiscooldownprocessduetoshrinkage ofthereactorcoolantasshowninFigureII.2.3,Depressurize RCStoRestoreInventory AftertheRCScooldown, a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.

TheRCSisdepressurized at2688secondstoassureadequatecoolantinventory priortoterminating SIflow.MiththeRCPsstopped,normalpressurizer'pray isnotavailable andthustheRCSisdepressurized byopeningapressurizer PORV.Thedepressurization iscontinued untilanyofthefollowing conditions aresatisfied:

RCSpressureislessthantherupturedsteamgenerator pressureandpressurizer levelisgreaterthan0%plusanallowance of3%forpressurizer leveluncertainty, orpressurizer, levelisgreaterthan80%minusanallowance of3%forpressurizer leveluncertainty, orRCSsubcooling islessthanthe17'Fallowance forsubcooling uncertainty.

TheRCSdepressurization reducesthebreakflowasshowninFigureII.5andincreases SIflowtorefillthepressurizer, asshowninFigureII.1.1074v:10/112487 15 WESTINGHOUSE PROPRIETARY CLASS24.Terminate SItoStopPrimarytoSecondary LeakageThepreviousactionsshouldhaveestablished adequateRCSsubcooling, verifiedasecondary sideheatsink,andrestoredthereactorcoolantinventory following aSGTRtoensurethatSIflowisnolongerneeded.Whentheseactionshavebeencompleted, theSIflowmustbestoppedtopreventrepressurization oftheRCSandtoterminate "primarytosecondary leakage.TheSIflowisterminated whentheRCSpressureincreases,,minimum AFWflowisavailable andatleastoneintactsteamgenerator levelisinthenarrowrange,RCSsubcooling isgreaterthanthe17'Fallowance forsubcooling uncertainty, andthepressurizer levelisgreaterthanthe3Xallowance forpressurizer leveluncertainty.

ToassurethattheRCSpressureisincreasing, SIwasnotterminated intheanalysisuntiltheRCSpressureincreased to50psiabovetherupturedsteamgenerator pressure.

Afterdepressurization iscompleted, anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.

Theprimarytosecondary leakagecontinues aftertheSIflowisterminated untiltheRCSandrupturedsteamgenerators equalize.

Thisoccurswhen'theintactsteamgenerator PORVislocallyopenedtocooldowntheRCSsothatsubcooling maybemaintained.

WhenthePORVisopenedtheincreased energytransferfromprimarytosecondary depressurizes theRCStotheruptured.steamgenerator pressure.

1074v:10/112087 16 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.3SEQUENCEOFEVENTSEVENTCASE1Timesecd.,CReactorTrip50Ruptured.

SGIsolated600IntactSGPORVOpened1804OverfillRupturedSG2372IntactSGPORVIsolatedPRZRPORVOpenedPRZRPORVClosed256826882738SITerminated 2798IntactPORVOpened3288BreakFlowTerminated 34281074v:1D/112087 17 WESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1188.88~78.68.4J68.t448.38.18~8.8..1Ei84.2E+84TINE(SEC).3Ei84.4E~84FigureII.1Pressurizer Level-Case11074v:1D/112087 18 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASEI.25E+84.225Ei84.2E84.175E'84.15E+84Ld~,12SE~84LJOf~o.1E84Of758.588.258..IE~84.2E84.3E~84TIME(SEC).4E84FigureII.2RCSPressure-Case11074v:10/112087 19 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALYSISISPERCENTTUBEPLUGGINGCASEI.I4E84.12Ei84RUPTUREDLOOP.1E~84888.INTACTLOOPOCC)ill688.488.288.8..IE~84.2E84.3E~84.4E~84TINE(SEC)FigureII.3Secondary Pressure-Case11074v:1D/11208l 20 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAi1GENERATOR TUBERUPTUREANALYSISPERCENTTUBEPLUGGINGCASE1658.688.~558.4JCD588.~458.IX488.C)358.CDCD~388.258~288'..1E~84..2E~84TI11E(SEC).3E~84~4E~84FigureII.4IntactLoopHotandColdLegRCSTemperatures

-Case11074v:10/112087 21 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAI1GENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1168.I48.128'SSUEUlKlD88.C)68~hCEZIIJm48.28.-28...IE~84.2E~84TIt1EISEC).3E84.4E+84FigureII.5PrimarytoSecondary Leakage-Case11074v:1D/112087 22 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAI1GENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE1.6E84.SE84~.4E~84~.3'40.2Ei84.1E84.lE.84.2E~B4.3E~84.4E~84TlNEtSEC)FigureII.SRupturedSGRaterVolume-Case11074v:1D/112081 23 WESTINGHOUSE PROPRIETARY CLASS2E.Transient Descrition-Case2[Case2addresses aSGTRinwhichthesinglefailureassumedisthatthefaultedsteamgenerator PORVfailsopenatthetimethefaultedsteamgenerator isisolated.]

'hus,theCase2transient issimilartotheCase1transient untilthattime..ThesequenceofeventsforCase2isIpresented inTableII.4.Following thetuberupturetheRCSpressuredecreases asshowninFigure11.7duetotheprimarytosecondary leakage.Inresponsetothisdepressurization, thereactortripsonovertemperature delta-T.Afterreactortrip,corepowerrapidlydecreases todecayheatlevelsandtheRCSdepressurization becomesmorerapid.Thesteamdumpsystemisinoperable duetotheassumedlossofoffsitepower,whichresultsinthesecondary pressurerisingtothesteamgenerator PORVsetpointasshowninFigure11.8.Thedecreasing pressurizer pressureleadstoanautomatic SIsignalonlowpressurizer pressure.

Pressurizer levelalsodecreases morerapidlyfollowing reactortripuntiliteventually empties,asshowninFigure11.9.majorOperatorActions1.IdentifyandIsolatetheRupturedSteamGenerator Therupturedsteamgenerator isassumedtobeidentified andisolatedat[10minutesaftertheinitiation oftheSGTRorwhenthenarrowrangelevelreaches33%,whichever timeisgreater.]

'orthiscase,thetimetoreach[33/]'arrowrangelevelis[652]'econds,andthus,itwasassumedthattherupturedsteamgenerator isisolatedatthattime.[Therupturedsteamgenerator PORVisalsoassumedtofailopenatthistime.]'hefailurecausesthesteamgenerator torapidlydepressurize, whichresultsinanincreaseinprimarytosecondary leakage.Thedepressu'rization oftherupturedsteamgenerator increases'he breakflowandenergytransferfromprimarytosecondary whichresultsinRCSpressureandtemperature decreasing morerapidlythaninCase1.Therupturedsteamgenerator 1074v:10/120487 24 MESTINGHOUSE PROPRIETARY CLASS2depressurization causesacooldownintheintactsteamgenerator loop.Asthe'ntact steamgenerator hotlegtemperature decreases belowthesteamgenerator watertemperature reverseheattransfertakesplaceasshowninFigureII.10.[Itisassumedthatthetimerequiredfortheoperatortoidentifythattherupturedsteamgenerator PORVisopenandtoclosetheassociated blockvalveis15minutes.Thus,at1558secondsthedepressurization ofrupturedsteamgenerator isterminated.]

',c2.CoolDowntheRCStoestablish Subcooling Margin[Aftertherupturedsteamgenerator PORVblockvalveisclosed,'here isa5minuteoperatoractiontimeimposedpriortoinitiation ofcooldown.]

'hedepressurization oftherupturedsteamgenerator affectstheRCScooldowntargettemperature sincethetemperature isdependent uponthepressureintherupturedsteamgenerator.

Since'ffsitepowerislosttheRCSiscooledbydumpingsteamtotheatmosphere usingtheintactsteamgenerator PORV.Thecooldowniscontinued untilRCSsubcooling attherupturedsteamgenerator pressureis20'Fplusanallowance of17'Fforinstrument uncertainty.

Hecauseofthelowerpressureintherupturedsteamgenerator theassociated temperature theRCSmustbecooledtoisalsolower,whichhastheneteffectofextending thetimeforcooldown.

ForCase2cooldownbeginsat[1858]'econds'andiscompleted at[2852]'econds.Thereduction intheintactsteamgenerator pressurerequiredtoaccomplish thecooldownisshowninFigureII.8,andtheeffectofthecooldownontheRCStemperature isshowninFigureII.10.TheRCSpressurealsodecreases duringthiscooldownprocessduetoshrinkage ofthereactorcoolantasshowninFigureII.7.3.Depressurize toRestoreInventory AftertheRCScooldown, a[2]'inuteoperatoractiontimeisincludedpriortodepressurization.

TheRCSisdepressurized at[2974]'econdstoassureadequatecoolantinventory priorto1074v:10/112487 25 HESTINGHOUSE PROPRIETARY CLASS2terminating SIflow,-HiththeRCPsstopped,normalpressurizer sprayisnotavailable andthustheRCSisdepressurized byopeningapressurizer PORV.Thedepressurization iscontinued untilanyofthefollowing conditions aresatisfied:

RCSpressureislessthantherupturedsteamgenerator pressureandpressurizer levelisgreaterthan0%plusanallowance of3%forpressurizer leveluncertainty, orpressurizer levelisgreaterthan80%minusanallowance of3%forpressurizer leveluncertainty, orRCSsubcooling islessthanthe17'Fallowance forsubcooling uncertainty.

TheRCSdepressurization reducesthebreakflowasshowninFigureII.11andincreases SIflowtorefillthepressurizer, asshowninFigure11.9.4.Terminate SItoStopPrimarytoSecondary Leakage,Thepreviousactionsshouldhaveestablished adequateRCSsubcooling, verifiedasecondary sideheatsink,andrestoredthereactorcoolantinventory following anSGTRtoensurethatSIflowisnolongerneeded.Nhentheseactionshavebeencompleted, theSIflowmustbestoppedtopreventrepressurization oftheRCSandtoterminate primarytosecondary leakage.TheSIflowisterminated whentheRCSpressureincreases,'minimum AFHflowisavailable andatleastoneintactsteamgenerator levelisinthenarrowrange,RCSsubcooling isgreaterthanthe17'Fallowance forsubcooling uncertainty, andthepressurizer levelisgreaterthanthe3%allowance forpressurizer leveluncertainty.

ToassurethattheRCSpressureisincreasing, SIwasnotterminated untiltheRCSpressureincreased to50psiabovetherupturedsteamgenerator pressure.

Afterdepressurization iscompleted, anoperatoractiontimeof[1]'inuteisimposedpriortoSItermination.

FigureII.11showsthattheprimarytosecondary leakagecontinues aftertheSIflowisstoppeduntiltheRCSandrupturedsteamgenerator pressureequalize.

TherupturedsteamwatervolumeisshowninFigureII.12.ForCase2,therupturedsteamgenerator doesnotoverfill.

1074v:1D/112487 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.4SEQUENCEOFEVENTSCASE2EVENTTIMEsecReactorTrip49.4RupturedSGIsolatedRupturedSGPORVFailsOpena.cRupturedSGBlockValveClosed1558IntactSGPORVOpenedIntactSGPORVClosed18582852PRZRPORVOpenedPRZRPORVClosed29743006SITerminated 3066BreakFlowTerminated 34381D74v:1O/112087 27 WESTINGHOUSE PROPRIETARY CLASS2GINNASTEAt1GENERATOR TUBERUPTURE4NAL'/SIS 15PERCENTTUBEPLUGGING2588.2258.CASE2-2888.CCl758.1588.~1258.cnI888.758.588.258.8.8.588.1888.l588.2888'588.5888.5588."4888.TIME(SEC)

FigureII.7RCSPressure-Case21074v:10/112087 28 HESTINGHOUSE PROPRIETARY CLASS21488.GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGINGCASE21288.-l888.w888.688.w488,RUPTUREDLOOPINTACTLOOP288,8.588.1888.:l588.

2888.2588.3888.3588.4888.TIME(SEC)

FigureII.8Secondary Pressure-Case21074v:10/112087 29 WESTINGHOUSE PROPRIETARY CLASS2G1NNASTEANGENERATOR TUBERUPTUREANALYS1515PERCENTTUBEPLUGGING188.CASE298.e8.78.LJw68.'58.48~38.028.18.8.8.588.1888.1588.2888'588.3888.3588.4888.TINE(SEC)FigureII.9Pressurizer Level-Case.21074v:10/1 1ZOST30 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALVSIS15PERCENTTUBEPLUGGING658.CASE2688.~558.O588.~z.458.o488.xIo358,388.TCOLDTHOTTHOT,TCOLDTHOTTCOLD258'88.8.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)FigureII.10IntactLoopHotandColdLegRCSTemperatures

-Case21074v:1D/1 1208731 MESTINGHOUSE PROPRIETARY CLASS2GINNASTEAMGENERATOR TUBERUPTUREANALVSIS15PERCENTTUBEPLUGGINGCASE278.w68~58.o48.38.oc28.I8,-18.-288.588.1888.1588.2888.2588.3888.3588.4888.TIME(SEC)

FigureII.11PrimarytoSecondary Leakage-Case21074v:1D/112087 32 MESTINGHOUSE PROPRIETARY CLASS26888.GINNASTEAMGENERATOR TUBERUPTUREANALYSIS15PERCENTTUBEPLUGGING'ASE2H)I~5888.Ko4888.~5888.~g2888~I888.8.588.1888.1588.2888.2588.5888.5588.4888.,TIME(SEC)Figure11,12RupturedSGMaterVolume-Case21074v:1D/112087 33 WESTINGHOUSE PROPRIETARY CLASS2F.MassReleasesThemassreleasesweredetermined foreachofthesinglefailurecasesforuseinevaluating theexclusion areaboundaryandlowpopulation zoneradiation exposure.

Thesteamreleasesfromtherupturedandintactsteamgenerators, thefeedwater flowstotherupturedandintactsteamgenerators, andprimarytosecondary breakflowintotherupturedsteamgenerator weredetermined fortheperiodfromaccidentinitiation until2hoursaftertheaccidentandfrom2to8hoursaftertheaccident.

Thereleasesfor0-2.hoursareusedtocalculate theradiation dosesattheexclusion areaboundaryfora2hourexposure, andthereleasesfor0-8hoursareusedtocalculate theradiation dosesatthelowpopulation zoneforthedurationoftheaccident.

IntheLOFTTR2analyses, theSGTRrecoveryactionsintheE-3guideline weresimulated untilthetermination ofprimarytosecondary leakage.Aftertheprimarytosecondary leakageisterminated, theoperators willcontinuetheSGTRrecoveryactionsintheE-3guideline topreparetheplantforcooldowntocoldshutdownconditions.

Theseactionsincludeestablishing normalChemicalandVolumeControlSystem(CVCS)operation toprovidereactorcoolantinventory controlandaborationpath;restarting areac'torcoolantpump(RCP),ifnonearerunning,toensurehomogeneous RCSconditions andtoprovidenormalpressurizer spray;orstoppingoneRCP,ifbotharerunning,tominimizetheheatinput'uring thesubsequent cooldown; andtheactionsnecessary to'inimize thespreadofcontamination onthesecondary side.Whentheinstructions providedinE-3arecompleted, theplantshouldbecooledanddepressurized tocoldshutdownconditions.

Therearethreealternate meansofperforming thepost-SGTR cooldownprovidedintheWOGEmergency ResponseGuidelines.

Theguidelines are:ES-3.1,POST-SGTR COOLDOWNUSINGBACKFILL; ES-3.2,POST-SGTR COOLDOWNUSINGBLOWDOWN; andES-3.3,POST-SGTR COOLDOWNUSINGSTEAMDUMP.Thepreferred methodsareusingbackfillorblowdownsincethesemethodsminimizetheradioactivity releasedtotheatmosphere.

TheES-3.3guideline usingsteamdumpprovidesthefastestmethodfor1074v:1D/112087 34 WESTINGHOUSE PROPRIETARY CLASS2depressurizing theRCSandrupturedsteamgenerator.

Thismethodalsoresultsintheworstradiological

releases, especially ifsteamdumptothecondenser isunavailable.

Therefore, themethodusingsteamdumpwasselectedforevaluation ofthelong-term massreleasessincethisproducesconservative resultsfortheoffsitedoseevaluation.

Itisnotedthattheuseofthesteamdumpmethodwouldnotbepermitted ifsteamgenerator overfilloccursandwaterentersthemainsteamlines.

ThehighlevelactionsfortheES-3.3guideline arediscussed below,1.PrepareforCooldowntoColdShutdownTheinitialstepstoprepareforcooldowntocoldshutdownareperformed intheE-3guideline following SItermination, andthesestepswillbecontinued inES-3.3iftheyhavenotalreadybeencompleted.

Afewadditional stepsarealsoperformed inES-3.3prior.toinitiating cooldown.

Theseincludeisolating thecoldleg.SIaccumulators topreventunnecessary injection, energizing pressurizer heatersasnecessary tosaturatethepressurizer waterandtoprovideforbetterpressurecontrol,andassuringadequateshutdownmarginintheeventofpotential borondilutionduetoin-leakage fromthe'ruptured steamgenerator.

2.CooldownRCStoResidualHeatRemoval(RHR)SystemTemperature TheRCSiscooledbysteamingandfeedingtheintactsteamgenerator similartoanormalcooldown.

Sinceallimmediate safetyconcernshavebeenresolved, thecooldownrateshouldbemaintained lessthanthemaximumallowable rateof100'F/hr.

Thepreferred meansforcoolingtheRCSissteamdumptothecondenser sincethisminimizes theradiological releasesandconserves feedwater supply.ThePORVfortheintactsteamgenerator canalsobeusedifsteamdumptothecondenser isunavailable.

WhentheRHRsystemoperating temperature isreached,thecooldownisstoppeduntilRCSpressurecanalsobedecreased.

Thisensuresthatpressure/temperature limitswillnotbeexceeded.

1074v:1D/112087 35 WESTINGHOUSE PROPRIETARY CLASS23.Depressurize RCStoRHRSystemPressureWhenthecooldowntoRHRsystemtemperature iscompleted, thepressureintherupturedsteamgenerator isdecreased byreleasing steamfromtherupturedsteamgenerator.

Steamreleasetothecondenser ispreferred sincethisminimizes radiological releases.

However,steamcanalsobereleasedtotheatmosphere usingthePORVontherupturedsteamgenerator.

Anevaluation ofthepotential radiological consequences shouldbeperformed beforereleasing steamfromtherupturedsteamgenerator totheatmosphere.

Astherupturedsteamgenerator pressureisreduced,theRCSpressureismaintained equaltothepressureintherupturedsteamgenerator inordertopreventin-leakage ofsecondary sidewateroradditional primarytosecondary leakage.Normalpressurizer sprayisthepreferred meansofRCSpressurecontrolsincethisconserves coolantinventory.

Ifpressurizer sprayisnotavailable, apressurizer PORVorauxiliary spraycanbeusedtocontrolRCSpressure.

Whenoverfilloftherupturedsteamgenerator occurs,aswithCase1,guideline ES-3.1POST-SGTR COOLDOWNUSINGBACKFILLisassumedtobeused.ThehighlevelactionsforES-3.1aresimilartoES-3.3.However,themethodbywhichES-3.1instructs theoperatortodepressurize therupturedsteamgenerator differsfromES-3.3.InGuideline ES-3.1theRCSisdepressurized topromotebackflowthroughthefailedtubewhichdepressurizes therupturedsteamgenerator withoutsteamreleasestotheatmosphere.

4.CooldowntoColdShutdownWhenRCStemperature andpressurehavebeenreducedtotheRHRsystemin-service values,RHRsystemcoolingisinitiated tocompletethecooldowntocoldshutdown.

Whencoldshutdownconditions areachieved, thepressurizer canbecooledtoterminate theevent.1074v:1O/112087 36 WESTINGHOUSE PROPRIETARY CLASS2F.1Methodology forCalculation ofMassReleasesTheoperatoractionsfortheSGTRrecoveryuptothetermination ofprimarytosecondary leakagearesimulated intheLOFTTR2analyses.

Thus,thesteamreleasesfromtherupturedandintactsteamgenerators, thefeedwater flowstotherupturedandintactsteamgenerators, andtheprimarytosecondary leakageintotherupturedsteamgenerator weredetermined fromtheLOFTTR2resultsfortheperiodfromtheinitiation oftheaccidentuntiltheleakageisterminated.

L2,CFollowing thetermination ofleakage,theoperators areassumedtocompletethestepsintheE-3andES-3.3orES-3.1guidelines toprepareforcooldowntocoldshutdown.

Thetimefromleakagetermination untiltheinitiation ofcooldownwasassumedtobe20minutes(seeReference 2).Theassumedtimeof20minutestoinitiatethecooldownisconsidered tobeconservative, sincetheactualtimeisexpectedtobelongerforanactualeventbecauseanevaluation ofthepotential offsiteradiation doseswouldberequiredpriortousingthesteamdumpmethodforthepost-SGTR cooldown.

ItwasassumedthattheRCSandintactsteamgenerator conditions aremaintained stableduringthe20minuteperioduntilthecooldownisinitiated.

ThePORVfortheintactsteamgenerator wasthenassumedtobeusedtocooldowntheRCStotheRHRsystemoperating temperature of332'F,atthemaximumallowable cooldownrateof100'F/hr..

TheRCSandtheintactsteamgenerator temperatures at2hourswerethendetermined usingtheRCSandintactsteamgenerator parameters atthetimeofleakagetermination andtheRCScooldownrate.'hesteamreleasesandthefeedwater flowsfortheintactsteamgenerator fortheperiodfromleakagetermination until2hoursweredetermined fromamassandenergybalanceusingthecalculated RCSandintactsteamgenerator conditions atthetimeofleakagetermination andat2hours.Thecoredecayheatandtheheataddedfromtheoperation ofoneRCPwereincludedintheenergybalanceforthistimeperiod.Sincetherupturedsteamgenerator isisolated, nochangeintherupturedsteamgenerator conditions isassumedtooccuruntilsubsequent depressurization.

Theassumptions ofareasonably shortpreparation timeforcooldownandthemaximumcooldownrateresultinminimumRCSandsteamgenerator temperatures at2hours,andtherefore, aconservative estimateofthesteamreleasedtotheatmosphere duringthefirst2hours.1074v:1D/112087 37 HESTINGHOUSE PROPRIETARY CLASS2a,c'TheRCScooldownwasassumedtobecontinued after2hoursuntiltheRHRsystemin-service temperature of332'Fisreached.Depressurization oftherupturedsteamgenerator wasthenassumedtobeperformed immediately following thecompletion oftheRCScooldown.

Therupturedsteamgenerator wasassumedtobedepressurized totheRHRin-service pressureof343psiaviasteamreleasefromtherupturedsteamgenerator PORV,sincethismaximizes thesteamreleasefromrupturedsteamgenerator totheatmosphere whichisconservative fortheevaluation oftheoffsiteradiation doses.TheRCSpressureisalsoassumedtobereducedconcurrently astherupturedsteamgenerator isdepressurized tominimizeflowbetweentheRCSandtherupturedsteamgenerator.

Itisassumedthatthecontinuation oftheRCScooldownanddepressurization toRHRoperating conditions arecompleted within8hoursaftertheaccidentsincethereisampletimetocompletetheoperations duringthistimeperiod.Thesteamreleasesandfeedwater flowsfrom2to8hoursweredetermined fortheintactsteamgenerator fromamassandenergybalanceusingtheRCSandsteamgenerator conditions at2hoursandattheRHRsystemin-service conditions.

Thecoredecayheatandtheheatadditionduetotheoperation ofoneRCPwerealsoincludedintheenergybalanceforthistimeinterval.

Thesteamreleasedfromtherupturedsteamgenerator from2to8hourswasdetermined.

based'namassandenergybalancefortherupturedsteamgenerator usingtheconditions atthetimeofleakagetermination andsaturated conditions attheRHRin-service pressure.

After8hours,itisassumedthatfurtherplantcooldowntocoldshutdownaswellaslong-term coolingisprovidedbytheRHRsystem.Therefore, thesteam~releasestotheatmosphere areterminated afterRHRin-service conditions areassumedtobe.reachedat8hours.F.2HassReleaseResultsThemassreleasecalculations wereperformed forbothsinglefailurecasesusingthemethodology discussed above.Forthetimeperiodfrominitiation oftheaccidentuntilleakagetermination, thereleasesweredetermined fromtheLOFTTR2resultsfortwoseparateperiodsforuseinthedosecalculations.

Thefirsttimeperiodconsidered isfromaccidentinitiation untilreactortrip.Sincethecondenser isinserviceuntilreactortrip,anyradioactivity 1074v:1D/112087 38 WESTINGHOUSE PROPRIETARY CLASS2releasedtotheatmosphere priortoreactortripwillbethrough'he condenser airejector.Afterreactortrip,'hereleasestotheatmosphere areassumedtobeviathesteamgenerator PORVs.Themassreleasescalculated fromthetimeofleakagetermination until2hoursandfrom2-8hoursarealsoassumedtobereleasedtotheatmosphere viathesteamgenerator PORVs.ThemassreleasesfortheSGTRevent[assuming delayeduseoftheintactsteamgenerator PORV]'Case1)arepresented inTableII.5.Theresultsindicatethatapproximately

[21,990]'bmofsteamand[23,710]'bmofwaterisreleasedfromtherupturedsteamgenerator totheatmosphere inthefirst2hours.Atotalof[129,300]

'bmofprimarywateristransferred tothesecondary sideoftherupturedsteam.generator beforethebreakflowisterminated.

ThemassreleasesfortheSGTReventassuming[failureandisolation oftherupturedsteamgenerator PORV]'Case2)arepresented inTableII.6.Theresultsindicatethatapproximately

[62,480]'bmofsteamisreleasedtotheatmosphere fromtherupturedsteamgenerator withinthefirst2hours.After2hours[33,300]'bmisreleasedtotheatmosphere fromtherupturedsteamgenerator.

Atotalof[172,800]

'bmofprimarywateristransferred tothesecondary sideoftherupturedsteamgenerator beforebreakflowisterminated.

1074v:1D/112087 39 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.5CASE1MASSRELEASES0-TRIPTOTALMASSFLOW(POUNDS)TIMEPERIODTRIPTMSEP-OVFILL-TTBRK-T2HRSTMSEPOVFILLTTBRKT2HRS'RHRFaultedSGCondenser Atmosphere Feedwater 47,80000015,450654043,60030,50000023,710*'00PICIntactSGCondenser Atmosphere 47,150Feedwater47,1500000014,73032,95013,450151,870505,50046,04029,61017,900158,700513,500BreakFlow421647,57453,71023,800TRIPTMSEPOVFILLTTBRKT2HRSTRHR=Timeofreactortrip=[50]'ec.=Timewhenwaterreachesthemoistureseparators

=[1086]'ec.=Timewhensteamgenerator overfills

=[2372]'ec.=Timewhenbreakflowisterminated

=[3428]'ec.=Timeat2hours=7200sec.=TimetoreachRHRin-service conditions, 8hours=28,800sec.*Ha'ter1074v:1D/1120Sl 40 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.6CASE2MASSRELEASES~TOTALMASSFLOM(POUNDS)TIMEPERIOD0-TRIPTRIPTMSEP"TTBRK-T2HRSTMSEPTTBRKT2HRSTRHRFaultedSGCondenser Atmosphere Feedwater 46,8800062,09039042,74033,260033,300CL,CIntactSGCondenser Atmosphere Feedwater 46,220000035,43018,450153,920457,00046,22097,78019,700160,300457,700BreakFlow4134132,66636,00000TRIP=TimeTMSEP=TimeTTBRK=TimeT2HRS=TimeTRHR=Timeofreactortrip=[49.4]'ec.whenwaterreachesthemoistureseparators

=[2372]'ec.whenbreakflowisterminated

=[3438]'ec.at2hours=7200sec.toreachRHRin-service conditions, 8hours=28,800sec.1074v:1D/112087 41 MESTINGHOUSE PROPRIETARY CLASS2TABLEII.7SUMMARIZED MASSRELEASESTOTALMASSFLOM(POUNDS)CASE1CASE2FaultedSG0-TTBRKTTBRK-2HRS-2HRS8HRS0-TTBRK-2HRSTTBRK2HRS8HRSCondenser 47,82046,880Atmosphere 45,700*62,48033,300Feedwater 74,10076,000IntactSGCondenser 47,15046,2200Atmosphere 61,130151,870505,500Feedwater 122,800158,700513,50053,880153,920457,000163,700160,300.457,700BreakFlow129,3000172,800023,710ibmofthisiswater.1074v:10/1120S7 42 WESTINGHOUSE PROPRIETARY CLASS2III.RADIOLOGICAL CONSEQUENCES ANALYSISTheevaluation oftheradiological consequences ofasteamgenerator tuberupture,assumesthatthereactorhasbeenoperating attheproposedTechnical Specification limitforprimarycoolantactivityandattheexistingTechnical Specification limitforprimarytosecondary leakageforsufficient timetoestablish equilibrium concentrations ofradionuclides inthereactorcoolantandinthesecondary coolant.Radionuclides fromtheprimarycoolantenterthesteamgenerator, viatherupturedtube,andarereleasedtotheatmosphere throughthesteamgenerator safetyorpoweroperatedreliefvalvesandviathe4condenser airejector,exhaust.Thequantityofradioactivity releasedtotheenvironment, duetoaSGTR,dependsuponprimaryandsecondary coolantactivity, iodinespikingeffects,primarytosecondary breakflow,breakflowflashingfractions, attenuation ofiodinecarriedbytheflashedportionofthebreakflow,partitioning ofiodinebetweentheliquidandsteamphases,themassoffluidreleasedfromthegenerator andliquid-vapor partitioning intheturbinecondenser hotwell.Alloftheseparameters wereconservatively evaluated foradesignbasisdoubleendedruptureofasingletube.A.'esinBasisAnalticalAssumtionsThemajor'assumptions andparameters usedintheanalysisareitemizedinTable111.1.Thefollowing isadiscussion ofthesourceterm.SourceTermCalculations Theradionuclide concentrations intheprimaryandsecondary system,priortoandfollowing theSGTRaredetermined asfollows:a.Theiodineconcentrations inthereactorcoolantwillbebaseduponpreaccident andaccidentinitiated iodinespikes.1074v:1D/112087 43 MESTINGHOUSE PROPRIETARY CLASS2AccidentInitiated Spike-Theinitialprimarycoolantiodineconcentration is1yCi/gmofDoseEquivalent (D.E.)I-131.Following theprimarysystemdepressurization associated withtheSGTR,aniodinespikeisinitiated intheprimarysystemwhichincreases theiodinereleaseratefromthefueltothecoolanttoavalue500timesgreaterthanthereleaseratecorresponding totheinitialprimarysystemiodineconcentration.

Thedurationofthespike,[3.31'ours,issufficient toincreasetheinitialRCSI-131inventory byafactorof[100]'ii.Preaccident Spike-Areactortransient hasoccuredpriortotheSGTRandhasraisedtheprimarycoolantiodineconcentration from1to60yCi/gramofD.E.I-131.b.Theinitialsecondary coolantiodineconcentration is0.1yCi/gramofD.E.I-131.c.Thechemicalformofiodineintheprimaryandsecondary coolantisassumedtobeelemental.

4DoseCalculations Thefollowing assumptions andparameters wereusedtocalculate theactivityreleasedtotheatmosphere andtheoffsitedosesfollowing aSGTR.1.Themassofreactorcoolantdischarged intothesecondary systemthroughtheruptureandthemassofsteamreleasedfromtheintactandrupturedsteamgenerators totheatmosphere arepresented inTableII.5andII.G.2.Thetimedependent fractionofruptureflowthatflashestosteamandisimmediately releasedtotheenvironment ispresented inFigureIII.1.3.Thetimedependent iodineremovalefficiency forscrubbing ofsteambubblesas'heyrisefromtheleaksite[(assumed tobeatthetopofthetubebundle)]'othewatersurfacewasalsodetermined foreach,1074v:10/112087 MESTINGHOUSE PROPRIETARY CLASS2case.,Theiodineremovalefficiency isdetermined bythe.methodsuggested byPostmaandTam(Ref.6).Theiodineremovalefficiencies areshowninFigureIII.2.4.The0.2gpmprimarytosecondary leakisassumedtobesplitevenlybetweenthesteamgenerators.

5.Theiodinepartition factorbetweentheliquidandsteamoftherupturedandintactsteamgenerators isassumedtobe1DO.6.Nocredit'as takenforradioactive decayduringreleaseandtransport, orforclouddepletion bygrounddeposition duringtransport tothesiteboundaryorouterboundaryofthelowpopulation zone.7.Short-term atmospheric dispersion factors(x/gs)foraccidentanalysisandbreathing ratesareprovidedinTableIII.4.Thebreathing rateswereobtainedfromNRCRegulatory Guide1.4,(Ref.4).OffsiteThroidDoseCalculation ModelOffsitethyroiddosesarecalculated usingthe~uation:ThgtDCF,.g(IAR);.(BR).(x/()).]1Jwhere(IAR)..=integrated activityofisotopeireleasedduring'the 1Jtimeintervalj'nCi>>F*Nocreditistakenforclouddepletion bygrounddeposition orbyradioactive decayduringtransport totheexclusion areaboundaryortotheouterboundaryofthelow-population zone.1074v:1D/112087 45 WESTINGHOUSE PROPRIETARY CLASS2(BR)~breathing rateduringtimeinterval' inmeter/second(TableIII.4)(x/Q)=atmospheric dispersion factorduringtimeintervaljJinsecond/meter (TableIII.4)(DCF).=thyroiddoseconversion factorviainhalation for1isotopeiinrem/Ci(TableIII.5)thyroiddoseviainhalation inremResultsThyroiddosesattheExclusion AreaBoundaryandLowPopulation Zonearepresented inTableIII.6.Alldosesarewellwithintheallowable guidelines asspecified byStandardReviewPlan15.6e3and10CFR100.

1074v:1D/112487 46 WESTINGHOUSE PROPRIETARY CLASS2TABLEIII.1PARAMETERS USEDINEVALUATING THERADIOLOGICAL CONSEQUENCES OFASTEAMGENERATOR TUBERUPTUREI.SourceDataA.Corepowerlevel,MWt1520B.Totalsteamgenerator tubeleakage,priortoaccident, gpm0.2C.Reactorcoolantiodineactivity:

1.AccidentInitiated SpikeTheinitialRCiodineactivities basedon1I>Ci/gramofD.E.I-131arepresented inTableIII.3.Theiodineappearance ratesassumedfortheaccidentinitiated spikearepresented inTableIII.2.2,Pre-Accident SpikePrimarycoolantiodineactivities basedon60gCi/gramofD.E.I-131arepresented inTableIII.3.,D.Secondary systeminitialactivityDoseequivalent of0.1yCi/gmofI-131,presented inTableIII.3.1074v:1D/112087 47 HESTINGHOUSE PROPRIETARY CLASS2TABLEIII.l(Sheet2)E.Reactorcoolantmass,gramsF.Steamgenerator mass(each),grams1.27x103.39x10G.Offsitepow'erLostattimeofreactortripH.Primary-to-secondary leakagedurationforintactSG,hrs.I.Speciesofiodine100percentelemental II.ActivityReleaseDataA.Faultedsteamgenerator 1.Ruptureflow2.RuptureflowflashingfractionSeeTableII.5orII.GSeeFigureIII.13.Iodinescrubbing plusmoistureseparator removalefficiency SeeFigureIII.24.Totalsteamrelease,lbsSeeTableII.5orII.G5.Iodinepartition factora.Priortooverfillb.Afteroverfill100-1.0-SeeFigureIII.36.Locationoftuberupture[TopofBundle]'074v:10/1120S748 MESTINGHOUSE.PROPRIETARY CLASS2TABLEIII.1(Sheet3)B.Intactsteamgenerator 1.Primary-to-secondary leakage,gpm0.12.Totalsteamrelease,lbsSeeTable11.5or11.63.Iodinepartition factor100C.Condenser 1.Iodinepartition factor100D.Atmospheric Oispersion FactorsSeeTableIII,41074v:lo/112087 49 MESTINGHOUSE PROPRIETARY CLASS2TABLEIII.2IODINESPIKEAPPEARANCE RATES(CURIES/SECOND) 1-1323-133I"1340.942.221.743.071074v:1D/112087 50 MESTINGHOUSE PROPRIETARY CLASS2TABLEIII.3IODINESPECIFICACTIVITIES IN(yCi/gm)THEPRIMARYANDSECONDARY COOLANTBASEDON1,60AND0.1yCi/gramOFD.E.I-131Nuclide~Pit11~luCD/m60uCi/cDmSecondarCoolant0,1wCi/(1m0.7947.10.079I-1320.3520.70.0351.0160.70.1010.2012.20.020I-1350.7947.10.0791074v:1D/1 1208751 MESTINGHOUSE PROPRIETARY CLASS2TABLEIII.4ATMOSPHERIC DISPERSION FACTORSANDBREATHING RATESTimeExclusion AreaBoundaryLowPopulation (hours)x/Q(Sec/m)3Zonex/Q(Sec/m)3Breathing Rate(m/Sec)[4]0-22-84.8x103x103x103.47x103.47x101074v:1D/112087 52 WESTINGHOUSE PROPRIETARY CLASS2TABLEIII.5THYROIDDOSECONVERSION FACTORS(Rem/Curie)

[51Nuclide~I-131I-1341.49x101.43x102.69x103.73x105.60x101074v:1D/112087 53 NESTINGHOUSE PROPRIETARY CLASS2TABLEIII.6RESULTSOosesRemAllowable Case1Case2Guideline Valuel.AccidentInitiated IodineSikeExclusion AreaBoundary(0-2hr.)Thyroid26.43.830LowPopulation Zone(0-8hr.)Thyroid1.70.3302.Pre-Accident IodineSikeExclusion AreaBoundary(0-2hr.)Thyroid102.122.1300,LowPopulation Zone(0-8hr.)Thyroid6.41.4300~1074v:1D/112487 54 WESTINGHOUSE PROPRIETARY CLASS2GINN4SGTRIS%TUBEPLUGGING-C4SER4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAKFLOWFL4SNINGFR4CTION~ISCase1e.~It~Si,tt&~tt~S4,lt~SiTIICItttlGINN4SGTRISZTUBEPLUGGINGCASE2R4OIGLOOICALCONSEOUENCES EVALUATIONBREAKFLOWFLASHINGFR4CTION~ISCase2~ItH,tt14~StSI,ateiTletItttIFigureIII.1BreakFlowFlashingFraction1074v:1D/112087 55 HESTINGHOUSE PROPRIETARY CLASS2GL,GCASE1o5~2081eeeTINE(SECONDS) 1588288~5CASE24Z.(~2VM'I01088TINEISECONDSI 1508288FigureIII.2SrubbingEfficiency 1074v:1D/112087 WESTINGHOUSE PROPRIETARY CLASS2IE+2CASE11E+120~aC<LE+8ZIHE(HOURS)1.5JE+2CASE21E+120CC+IE+8TIHE(HOURS)FigureIII.3FaultedSGIodinePartition Factors1074v:1D/112087 57 WESTINGHOUSE PROPRIETARY CLASS2IV.CONCLUSION Thepotential radiological consequences ofasteamgenerator tubefailurewereevaluated fortheR.E.Ginnanuclearpowerplanttodemonstrate thattheuseoftheStandardTechnical Specification (STS)primarycoolantactivitylimitof1yCi/gramofdoseequivalent I-131willresult.inoffsitedosesthatarewithintheappropriate guidelines, Themassreleasesforadesignbasisdoubleendedruptureofasingletubewithalossofoffsitepowerwereconservatively calculated usingthecomputercodeLOFTTR2.Twocaseswereconsidered:

[1)intactsteamgenerator PORVfailsclosedandmustbelocally1opened,and2)rupturedsteamgenerator PORVfailsopenandmustbelocallyisolated.]

'heanalysisexplicitly modeledthetimeneededforthe'perators toperformtherecoverystepsoutlinedinguideline E-3ofRevision1oftheWestinghouse OwnersGroupEmergency ResponseGuidelines.

Theresulting dosesattheexclusion areaboundaryandlowpopulation zonearewithintheallowable guidelines asspecified byStandardReviewPlan15.6.3andlOCFR100.

Consequently, theSTSprimarycoolantactivitylimitissufficiently lowtoensurethattheradiological consequences ofasteamgenerator tuberuptureattheR.E,Ginnaplantwillbewithintheguidelines.

1074v:1D/112087 58 HESTINGHOUSE PROPRIETARY CLASS2V.REFERENCES 1.Lewis,Huang,Behnke,Fittante, Gelman,"SGTRAnalysisMethodology toDetermine theMargintoSteamGenerator Overfill,"

HCAP-10698-P-A, August1987.[PROPRIETARY'.

Lewis,Huang,Rubin,"Evaluation ofOffsiteRadiation DosesforaSteamGenerator TubeRuptureAccident,"

Supplement 1toHCAP-10698-P-A, March1986.[PROPRIETARY]

3.R.Elaisz,LetterfromRGEtoHestinghouse concerning GinnaspecificoperatoractiontimesforSGTRanalysis, February7,1985.4.NRCRegulatory Guide1.4,Rev.2,"Assumptions UsedforEvaluating thePotential Radiological Consequences ofaLOCAforPressurized HaterReactors",

Jun'e1974.5.NRCRegulatory Guide1.109,Rev.1,"Calculation ofAnnualDosestoManFromRoutine,ReleasesofReactorEffluents forthePurposeofEvaluating Compliance with10CFRPart50AppendixI",October1977.6.Postma,A.K.,Tam,P.S.,"IodineBehaviorinaPHRCoolingSystemFollowing aPostulated SteamGenerator TubeRupture",

NUREG-0409.

1074v:1D/120487 59 IraV0;Jih