| DRAFT: RAIs for Cooper Nuclear Station Re: LAR for Revised TS Pressure-Temperature Limits (ME7324) Attachments: ME7324 RAIs Email.docx Ed, By letter dated September 22, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11272A057), Nebraska Public Power District submitted a request to amend Facility Operating License DPR-46 for Cooper Nuclear Station (Cooper), pursuant to the provisions 10 CFR 50.90. The license amendment request proposes revisions to the Cooper technical specifications (TS) to include (1) new pressure-temperature (P-T) limit curves that are valid for 32 effective full power years of facility operation, and (2) new TS surveillance requirements for verifying that the reactor vessel (RV) flange and RV head flange temperatures are greater than the revised minimum operating temperature specified for the proposed P-T limit curves. The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation. Please contact me if a clarifying teleconference is needed for the attached RAIs. Thanks Lynnea Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377 | | DRAFT: RAIs for Cooper Nuclear Station Re: LAR for Revised TS Pressure-Temperature Limits (ME7324) Attachments: ME7324 RAIs Email.docx Ed, By letter dated September 22, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11272A057), Nebraska Public Power District submitted a request to amend Facility Operating License DPR-46 for Cooper Nuclear Station (Cooper), pursuant to the provisions 10 CFR 50.90. The license amendment request proposes revisions to the Cooper technical specifications (TS) to include (1) new pressure-temperature (P-T) limit curves that are valid for 32 effective full power years of facility operation, and (2) new TS surveillance requirements for verifying that the reactor vessel (RV) flange and RV head flange temperatures are greater than the revised minimum operating temperature specified for the proposed P-T limit curves. |
| }} | | The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation. |
| | Please contact me if a clarifying teleconference is needed for the attached RAIs. |
| | Thanks Lynnea Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377}} |
Revision as of 13:17, 30 July 2018
Letter Sequence RAI |
---|
|
|
MONTHYEARNLS2011015, License Amendment Request to Revise Technical Specification Pressure/Temperature Limit Curves and Surveillance Requirements2011-09-22022 September 2011 License Amendment Request to Revise Technical Specification Pressure/Temperature Limit Curves and Surveillance Requirements Project stage: Request ML1130815502011-11-0404 November 2011 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature Limits Project stage: Acceptance Review ML1204503792012-02-14014 February 2012 Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI ML1204503532012-02-14014 February 2012 Email, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI ML1205900852012-02-29029 February 2012 Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI NLS2012023, Response to Request for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (Pit) Limits2012-03-30030 March 2012 Response to Request for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (Pit) Limits Project stage: Response to RAI ML1212901232012-05-0707 May 2012 Round 2, Draft Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs Project stage: Draft RAI ML1212900812012-05-0707 May 2012 Email, Round 2, Draft Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs Project stage: Draft RAI ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI NLS2012062, Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits.2012-09-10010 September 2012 Response to Request #2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits. Project stage: Request ML12278A1382012-09-28028 September 2012 Supplement to License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits Project stage: Supplement ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs Project stage: RAI NLS2013001, Response to Request 3 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits2013-01-0303 January 2013 Response to Request #3 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits Project stage: Request ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: Approval ML13085A0962013-03-29029 March 2013 Corrected Technical Specification (TS) and Safety Evaluation Pages for Amendment No. 245, Revise TS 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: Approval 2012-05-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24157A0122024-06-0404 June 2024 NRR E-mail Capture - Cooper - Acceptance Review - License Amendment Request (LAR) to Revise TS Table 3.3.2.1-1 Minimum Critical Power Ratio (MCPR) ML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24081A0372024-03-21021 March 2024 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR to Modify Allowable Value for HPCI Low Flow ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) 2024-06-04
[Table view] |
Text
From: Wilkins, Lynnea Sent: Tuesday, February 14, 2012 11:13 AM To: 'McCutchen, Edward L.' Cc: Lent, Susan; Burkhardt, Janet
Subject:
DRAFT: RAIs for Cooper Nuclear Station Re: LAR for Revised TS Pressure-Temperature Limits (ME7324) Attachments: ME7324 RAIs Email.docx Ed, By letter dated September 22, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11272A057), Nebraska Public Power District submitted a request to amend Facility Operating License DPR-46 for Cooper Nuclear Station (Cooper), pursuant to the provisions 10 CFR 50.90. The license amendment request proposes revisions to the Cooper technical specifications (TS) to include (1) new pressure-temperature (P-T) limit curves that are valid for 32 effective full power years of facility operation, and (2) new TS surveillance requirements for verifying that the reactor vessel (RV) flange and RV head flange temperatures are greater than the revised minimum operating temperature specified for the proposed P-T limit curves.
The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation.
Please contact me if a clarifying teleconference is needed for the attached RAIs.
Thanks Lynnea Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377