Letter Sequence Acceptance Review |
|---|
|
|
MONTHYEARNLS2011015, License Amendment Request to Revise Technical Specification Pressure/Temperature Limit Curves and Surveillance Requirements2011-09-22022 September 2011 License Amendment Request to Revise Technical Specification Pressure/Temperature Limit Curves and Surveillance Requirements Project stage: Request ML1130815502011-11-0404 November 2011 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature Limits Project stage: Acceptance Review ML1204503792012-02-14014 February 2012 Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI ML1204503532012-02-14014 February 2012 Email, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI ML1205900852012-02-29029 February 2012 Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI NLS2012023, Response to Request for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (Pit) Limits2012-03-30030 March 2012 Response to Request for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (Pit) Limits Project stage: Response to RAI ML1212901232012-05-0707 May 2012 Round 2, Draft Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs Project stage: Draft RAI ML1212900812012-05-0707 May 2012 Email, Round 2, Draft Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs Project stage: Draft RAI ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: RAI NLS2012062, Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits.2012-09-10010 September 2012 Response to Request #2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits. Project stage: Request NLS2012062, Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits2012-09-10010 September 2012 Response to Request 2 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits Project stage: Request ML12278A1382012-09-28028 September 2012 Supplement to License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits Project stage: Supplement ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs Project stage: RAI NLS2013001, Response to Request 3 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits2013-01-0303 January 2013 Response to Request 3 for Additional Information License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits Project stage: Request ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: Approval ML13085A0962013-03-29029 March 2013 Corrected Technical Specification (TS) and Safety Evaluation Pages for Amendment No. 245, Revise TS 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements Project stage: Approval 2012-05-07
[Table View] |
Text
From:
Wilkins, Lynnea Sent:
Friday, November 04, 2011 3:41 PM To:
McCutchen, Edward L.
Cc:
Lent, Susan; Burkhardt, Janet
Subject:
Acceptance of Cooper LAR To Revise Technical Specification Pressure/Temperature Limit Curves and Surveillance Requirements (ME7324)
Ed, By letter dated September 22, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11272A057), Nebraska Public Power District (NPPD) requested an amendment to the Facility Operating License for the Cooper Nuclear Station (CNS). The proposed amendment would revise the curves in Technical Specification (TS) 3.4.9, "RCS Pressure and Temperature (P/T) Limits," to replace the 28 Effective Full Power Years restriction in TS Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3 and revises minimum temperature in Surveillance Requirement (SR) 3.4.9.5, SR 3.4.9.6, and SR 3.4.9.7. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1377.
Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377