ML111091152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
AMERENUE (Callaway Plant Unit 2)
AP1000 DESIGN CERTIFICATION AMENDMENT
(10 C.F.R. Part 52)
CALVERT CLIFFS NUCLEAR PROJECT, L.L.C.
(Calvert Cliffs Nuclear Power Plant, Unit 3)
DETROIT EDISON CO.
(Fermi Nuclear Power Plant, Unit 3)
DUKE ENERGY CAROLINAS, L.L.C. (William States Lee III Nuclear Station, Units 1 and 2)
ENERGY NORTHWEST (Columbia Generating Station)
ENTERGY NUCLEAR GENERATION CO. and    ENTERGY NUCLEAR OPERATIONS, INC. (Pilgrim Nuclear Power Station)
ENTERGY NUCLEAR OPERATIONS, INC.
(Indian Point Nuclear Generating Station, Units 2 and 3)
ESBWR DESIGN CERTIFICATION AMENDMENT
(10 C.F.R. Part 52)
FIRSTENERGY NUCLEAR OPERATING CO.
(Davis-Besse Nuclear Power Station, Unit 1)
FLORIDA POWER AND LIGHT CO.
(Turkey Point, Units 6 and 7)
LUMINANT GENERATION CO. L.L.C. (Comanche Peak Nuclear Power Plant, Units 3 and 4)
NEXTERA ENERGY SEABROOK, L.L.C.
(Seabrook Station, Unit 1)
PACIFIC GAS AND ELECTRIC CO. (Diablo Canyon Power Plant, Units 1 and 2)
  ) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
) ) )
Docket No. 52-037-COL
NRC-2010-0131
RIN 3150-A18
Docket No. 52-016-COL
Docket No. 52-033-COL
Docket Nos. 52-018-COL,                    52-019-COL
Docket No. 50-397-LR
Docket No. 50-293-LR
Docket Nos. 50-247-LR, 50-286-LR NRC-2010-0135 RIN-3150-AI85
Docket No. 50-346-LR
Docket Nos. 52-040-COL, 52-035-COL
Docket Nos. 52-034-COL,                      52-035-COL
Docket No. 50-443-LR
Docket Nos. 50-275-LR,                      50-323-LR
PPL BELL BEND, L.L.C. (Bell Bend Nuclear Power Plant)
PROGRESS ENERGY CAROLINAS, INC.
(Shearon Harris Nuclear Power Plant, Units 2 and 3)
PROGRESS ENERGY FLORIDA, INC.
(Levy County Nuclear Power Plant, Units 1 and 2)
SOUTH CAROLINA ELECTRIC AND GAS CO. and SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (also referred to as SANTEE COOPER)
(Virgil C. Summer Nuclear Station, Units 1 and 2)
SOUTHERN NUCLEAR OPERATING CO.
(Vogtle Electric Generating Plant, Units 3 and 4)
SOUTH TEXAS PROJECT NUCLEAR OPERATING CO.
(South Texas Project, Units 3 and 4)
TENNESSEE VALLEY AUTHORITY (Bellefonte Nuclear Power Plant, Units 3 and 4)
TENNESSEE VALLEY AUTHORITY (Watts Bar, Unit 2)
VIRGINIA ELECTRIC AND POWER CO. d/b/a DOMINION VIRGINIA POWER and  OLD DOMINION ELECTRIC COOPERATIVE (North Anna, Unit 3)
) )
)
)
) ) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
)
) ) )
)
) Docket No. 52-039-COL
Docket Nos. 52-022-COL, 52-023-COL Docket Nos. 52-029-COL, 52-030-COL
Docket Nos. 52-027-COL,                      52-028-COL
Docket Nos. 52-025-COL, 52-026-COL Docket Nos. 52-012-COL, 52-013-COL
Docket Nos. 52-014-COL,                      52-015-COL
Docket No. 50-391-OL
Docket No. 52-017-COL
ORDER  The Commission is in receipt of a petition to suspend adjudicatory, licensing, and rulemaking activities, and requesting other relief, in the captioned matters.
1  This order is to set a schedule for further briefing. Any supplements to the petition may be filed no later than 1 See generally Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions Pending Investigation of Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident (served in various dockets between April 14, and April 18, 2011) (Petition). The Commission received a corrected petition on April 18, 2011. Thursday, April 21, 2011.
2  Any person may file an answer to the petition, or a brief amicus curiae, no later than Monday, May 2, 2011. This order is issued pursuant to my authority under 10 C.F.R. §§ 2.346 (a) and (j).
IT IS SO ORDERED.      For the Commission NRC SEAL                 
/RA/      ___________________________      Annette L. Vietti-Cook Secretary of the Commission
Dated at Rockville, Maryland, this 19th day of April, 2011
2 See, e.g., Petition at 4 n.2.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of      )
        )
ENTERGY NUCLEAR GENERATION CO.    )
AND        )
ENTERGY NUCLEAR OPERATIONS, INC.  )  Docket No. 50-293-LR          ) (Pilgrim Nuclear Power Station)    )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing SCHEDULING ORDER OF THE SECRETARY REGARDING PETITIONS TO SUSPEND ADJUDICATORY, LICENSING AND RULEMAKING ACTIVITIES in the above captioned proceeding have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.
U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel
Mail Stop - T-3 F23 Washington, DC  20555-0001 Administrative Judge
Ann Marshall Young, Chair
E-mail: Ann.Young@nrc.gov Administrative Judge Richard F. Cole
E-mail: Richard.Cole@nrc.gov
Administrative Judge
Paul B. Abramson E-mail:  Paul.Abramson@nrc.gov
Katherine Tucker, Law Clerk katie.tucker@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop:  O-15 D21 Washington, DC  20555-0001 Susan L. Uttal, Esq.
E-mail:  Susan.Uttall@nrc.gov Andrea Z. Jones, Esq.
E-mail:  axj4@nrc.gov Beth N. Mizuno, Esq.
E-mail:  beth.mizuno@nrc.gov
Brian G. Harris, Esq.
brian.harris@nrc.gov Brian Newell, Paralegal E-mail:  Brian.Newell@nrc.gov
E-mail: OGCMailCenter.Resource@nrc.gov U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop:  O-16C1 Washington, DC  20555-0001
E-mail:  OCAAMail.Resource@nrc.gov
U.S. Nuclear Regulatory Commission Office of Secretary of the Commission Mail Stop:  O-16C1 Washington, DC  20555-0001
E-mail:  hearingdocket@nrc.gov
Docket No. 50-293-LR SCHEDULING ORDER OF THE SECRETARY REGARDING PETITIONS TO SUSPEND ADJUDICATORY, LICENSING AND RULEMAKING ACTIVITIES 2 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop:  O11-F1 Washington, DC 20555-0001 Lisa Regner
Senior Project Manager Division of License Renewal
E-mail:  Lisa.Regner@nrc.gov Pillsbury, Winthrop, Shaw, Pittman, LLP
2300 N. Street, N.W.
Washington, DC 20037-1128
David R. Lewis, Esq.
E-mail: david.lewis@pillsburylaw.com Paul A. Gaukler, Esq.
E-mail: paul.gaukler@pillsburylaw.com Jason B. Parker, Esq.
E-mail: jason.parker@pillsburylaw.com Entergy Nuclear 1340 Echelon Parkway Mail Stop M-ECH-62 Jackson, MS  39213
Terence A. Burke, Esq.
E-mail: tburke@entergy.com Office of the Attorney General Environmental Protection Division One Ashburton Place, 18 th Floor Boston, MA 02108
Matthew Brock, Assistant Attorney General E-mail: matthew.brock@ago.state.ma.us Duxbury Emergency Management Agency 
668 Tremont Street
Duxbury, MA 02332 Kevin M. Nord, Fire Chief & Director
E-mail: nord@town.duxbury.ma.us Town of Plymouth MA Town Manager's Office 11 Lincoln Street Plymouth, MA  02360
Melissa Arrighi, ActingTown Manager
E-mail: marrighi@townhall.plymouth.ma.us Pilgrim Watch 148 Washington Street Duxbury, MA  02332
Mary E. Lampert, Director
E-mail: mary.lampert@comcast.net Duane Morris, LLP Town of Plymouth MA
505 9 th Street, NW, Suite 1000 Washington, DC  20004-2166
Sheila Slocum Hollis, Esq.
E-mail: sshollis@duanemorris.com
Docket No. 50-293-LR SCHEDULING ORDER OF THE SECRETARY REGARDING PETITIONS TO SUSPEND ADJUDICATORY, LICENSING AND RULEMAKING ACTIVITIES 3 3 Town of Duxbury Nuclear Advisory
Committee
31 Deerpath Trl.
North Duxbury, MA  02332
Rebecca Chin, Vice Chair E-mail:  rebeccajchin@hotmail.com
                                                                              [Original signed by Nancy Greathead]
_________________________________
Office of the Secretary of the Commission
Dated at Rockville, Maryland
this 19 th day of April 2011}}

Revision as of 14:06, 8 August 2018

Scheduling Order of the Secretary Re Petitions to Suspend Adjudicatory, Licensing, and Rulemaking Activities
ML111091152
Person / Time
Site: Pilgrim
Issue date: 04/19/2011
From: Vietti-Cook A L
NRC/SECY
To:
SECY RAS
References
RAS 19968, 50-293-LR, ASLBP 06-848-02-LR, NRC-2010-0135, RIN 3150-AI85
Download: ML111091152 (6)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

AMERENUE (Callaway Plant Unit 2)

AP1000 DESIGN CERTIFICATION AMENDMENT

(10 C.F.R. Part 52)

CALVERT CLIFFS NUCLEAR PROJECT, L.L.C.

(Calvert Cliffs Nuclear Power Plant, Unit 3)

DETROIT EDISON CO.

(Fermi Nuclear Power Plant, Unit 3)

DUKE ENERGY CAROLINAS, L.L.C. (William States Lee III Nuclear Station, Units 1 and 2)

ENERGY NORTHWEST (Columbia Generating Station)

ENTERGY NUCLEAR GENERATION CO. and ENTERGY NUCLEAR OPERATIONS, INC. (Pilgrim Nuclear Power Station)

ENTERGY NUCLEAR OPERATIONS, INC.

(Indian Point Nuclear Generating Station, Units 2 and 3)

ESBWR DESIGN CERTIFICATION AMENDMENT

(10 C.F.R. Part 52)

FIRSTENERGY NUCLEAR OPERATING CO.

(Davis-Besse Nuclear Power Station, Unit 1)

FLORIDA POWER AND LIGHT CO.

(Turkey Point, Units 6 and 7)

LUMINANT GENERATION CO. L.L.C. (Comanche Peak Nuclear Power Plant, Units 3 and 4)

NEXTERA ENERGY SEABROOK, L.L.C.

(Seabrook Station, Unit 1)

PACIFIC GAS AND ELECTRIC CO. (Diablo Canyon Power Plant, Units 1 and 2)

) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

) ) )

)

Docket No. 52-037-COL

NRC-2010-0131

RIN 3150-A18

Docket No. 52-016-COL

Docket No. 52-033-COL

Docket Nos. 52-018-COL, 52-019-COL

Docket No. 50-397-LR

Docket No. 50-293-LR

Docket Nos. 50-247-LR, 50-286-LR NRC-2010-0135 RIN-3150-AI85

Docket No. 50-346-LR

Docket Nos. 52-040-COL, 52-035-COL

Docket Nos. 52-034-COL, 52-035-COL

Docket No. 50-443-LR

Docket Nos. 50-275-LR, 50-323-LR

PPL BELL BEND, L.L.C. (Bell Bend Nuclear Power Plant)

PROGRESS ENERGY CAROLINAS, INC.

(Shearon Harris Nuclear Power Plant, Units 2 and 3)

PROGRESS ENERGY FLORIDA, INC.

(Levy County Nuclear Power Plant, Units 1 and 2)

SOUTH CAROLINA ELECTRIC AND GAS CO. and SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (also referred to as SANTEE COOPER)

(Virgil C. Summer Nuclear Station, Units 1 and 2)

SOUTHERN NUCLEAR OPERATING CO.

(Vogtle Electric Generating Plant, Units 3 and 4)

SOUTH TEXAS PROJECT NUCLEAR OPERATING CO.

(South Texas Project, Units 3 and 4)

TENNESSEE VALLEY AUTHORITY (Bellefonte Nuclear Power Plant, Units 3 and 4)

TENNESSEE VALLEY AUTHORITY (Watts Bar, Unit 2)

VIRGINIA ELECTRIC AND POWER CO. d/b/a DOMINION VIRGINIA POWER and OLD DOMINION ELECTRIC COOPERATIVE (North Anna, Unit 3)

) )

)

)

) ) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

)

) ) )

)

) Docket No. 52-039-COL

Docket Nos. 52-022-COL, 52-023-COL Docket Nos. 52-029-COL, 52-030-COL

Docket Nos. 52-027-COL, 52-028-COL

Docket Nos. 52-025-COL, 52-026-COL Docket Nos. 52-012-COL, 52-013-COL

Docket Nos. 52-014-COL, 52-015-COL

Docket No. 50-391-OL

Docket No. 52-017-COL

ORDER The Commission is in receipt of a petition to suspend adjudicatory, licensing, and rulemaking activities, and requesting other relief, in the captioned matters.

1 This order is to set a schedule for further briefing. Any supplements to the petition may be filed no later than 1 See generally Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions Pending Investigation of Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident (served in various dockets between April 14, and April 18, 2011) (Petition). The Commission received a corrected petition on April 18, 2011. Thursday, April 21, 2011.

2 Any person may file an answer to the petition, or a brief amicus curiae, no later than Monday, May 2, 2011. This order is issued pursuant to my authority under 10 C.F.R. §§ 2.346 (a) and (j).

IT IS SO ORDERED. For the Commission NRC SEAL

/RA/ ___________________________ Annette L. Vietti-Cook Secretary of the Commission

Dated at Rockville, Maryland, this 19th day of April, 2011

2 See, e.g., Petition at 4 n.2.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

ENTERGY NUCLEAR GENERATION CO. )

AND )

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR ) (Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing SCHEDULING ORDER OF THE SECRETARY REGARDING PETITIONS TO SUSPEND ADJUDICATORY, LICENSING AND RULEMAKING ACTIVITIES in the above captioned proceeding have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.

U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel

Mail Stop - T-3 F23 Washington, DC 20555-0001 Administrative Judge

Ann Marshall Young, Chair

E-mail: Ann.Young@nrc.gov Administrative Judge Richard F. Cole

E-mail: Richard.Cole@nrc.gov

Administrative Judge

Paul B. Abramson E-mail: Paul.Abramson@nrc.gov

Katherine Tucker, Law Clerk katie.tucker@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop: O-15 D21 Washington, DC 20555-0001 Susan L. Uttal, Esq.

E-mail: Susan.Uttall@nrc.gov Andrea Z. Jones, Esq.

E-mail: axj4@nrc.gov Beth N. Mizuno, Esq.

E-mail: beth.mizuno@nrc.gov

Brian G. Harris, Esq.

brian.harris@nrc.gov Brian Newell, Paralegal E-mail: Brian.Newell@nrc.gov

E-mail: OGCMailCenter.Resource@nrc.gov U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: O-16C1 Washington, DC 20555-0001

E-mail: OCAAMail.Resource@nrc.gov

U.S. Nuclear Regulatory Commission Office of Secretary of the Commission Mail Stop: O-16C1 Washington, DC 20555-0001

E-mail: hearingdocket@nrc.gov

Docket No. 50-293-LR SCHEDULING ORDER OF THE SECRETARY REGARDING PETITIONS TO SUSPEND ADJUDICATORY, LICENSING AND RULEMAKING ACTIVITIES 2 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop: O11-F1 Washington, DC 20555-0001 Lisa Regner

Senior Project Manager Division of License Renewal

E-mail: Lisa.Regner@nrc.gov Pillsbury, Winthrop, Shaw, Pittman, LLP

2300 N. Street, N.W.

Washington, DC 20037-1128

David R. Lewis, Esq.

E-mail: david.lewis@pillsburylaw.com Paul A. Gaukler, Esq.

E-mail: paul.gaukler@pillsburylaw.com Jason B. Parker, Esq.

E-mail: jason.parker@pillsburylaw.com Entergy Nuclear 1340 Echelon Parkway Mail Stop M-ECH-62 Jackson, MS 39213

Terence A. Burke, Esq.

E-mail: tburke@entergy.com Office of the Attorney General Environmental Protection Division One Ashburton Place, 18 th Floor Boston, MA 02108

Matthew Brock, Assistant Attorney General E-mail: matthew.brock@ago.state.ma.us Duxbury Emergency Management Agency

668 Tremont Street

Duxbury, MA 02332 Kevin M. Nord, Fire Chief & Director

E-mail: nord@town.duxbury.ma.us Town of Plymouth MA Town Manager's Office 11 Lincoln Street Plymouth, MA 02360

Melissa Arrighi, ActingTown Manager

E-mail: marrighi@townhall.plymouth.ma.us Pilgrim Watch 148 Washington Street Duxbury, MA 02332

Mary E. Lampert, Director

E-mail: mary.lampert@comcast.net Duane Morris, LLP Town of Plymouth MA

505 9 th Street, NW, Suite 1000 Washington, DC 20004-2166

Sheila Slocum Hollis, Esq.

E-mail: sshollis@duanemorris.com

Docket No. 50-293-LR SCHEDULING ORDER OF THE SECRETARY REGARDING PETITIONS TO SUSPEND ADJUDICATORY, LICENSING AND RULEMAKING ACTIVITIES 3 3 Town of Duxbury Nuclear Advisory

Committee

31 Deerpath Trl.

North Duxbury, MA 02332

Rebecca Chin, Vice Chair E-mail: rebeccajchin@hotmail.com

[Original signed by Nancy Greathead]

_________________________________

Office of the Secretary of the Commission

Dated at Rockville, Maryland

this 19 th day of April 2011