| | {{#Wiki_filter:Luminant Rafael Flores Senior Vice President& Chief Nuclear Officer rafael.flores@Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose. TX 76043 T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201200331 Log # TXX-12056 Ref. # 10 CFR 50.55a(g)(6)(ii) |
| | April 16, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 |
| | |
| | ==SUBJECT:== |
| | COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-446 CLARIFICATION TO RELIEF REQUEST NO. A-2 FOR THE UNIT 2 SECOND 10 YEAR ISI INTERVAL FROM 10 CFR 50.55a INSPECTION REQUIREMENTS DUE TO GEOMETRIC LIMITATIONS (SECOND INTERVAL START DATE: AUGUST 03, 2004) |
| | |
| | ==REFERENCE:== |
| | |
| | Letter logged TXX-12002 dated January 5, 2012 from Rafael Flores to the NRC submitting Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements due to Geometric Limitations |
| | |
| | ==Dear Sir or Madam:== |
| | Pursuant to 10 CFR 50.55a(g)(6)(ii), Luminant Generation Company, LLC (Luminant Power) submitted Relief Request A-2 (see reference) for Comanche Peak Unit 2 for the second ten year inservice inspection interval. |
| | Luminant Power had determined that certain inspection requirements of ASME Code Case N-729-1, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds, Section XI, Division 1," are impractical due to geometric limitations. |
| | This letter is being submitted to clarify the following statement in TXX-12002: "This letter supersedes TXX-11106 dated December 14, 2011." TXX-11106 had originally been issued on December 14, 2011, submitting Relief Request A-2. However, the enclosure to that letter had a Westinghouse cover letter attached which was stamped "Westinghouse Proprietary Class 3" even though all the information contained in the letter was non-proprietary. |
| | TXX-11106 was rejected by the NRC Document Control due to this proprietary issue. After discussion with the NRR Project Manager, Luminant Power resubmitted Relief Request A-2 in its entirety. |
| | Therefore TXX-11106 is not needed for review and approval of Relief Request A-2 by the NRC.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance A b4-7~Callaway |
| | * Comanche Peak -Diablo Canyon |
| | * Palo Verde |
| | * San Onofre South Texas Project |
| | * Wolf Creek U. S. Nuclear Regulatory Commission TXX-12056 Page 2 04/16/2012 No undue risk to the public health and safety is presented by this request.This communication contains no new licensing basis commitments regarding Comanche Peak Unit 2.Should you have any questions, please contact Mr. Jack Hicks at (254)897-6725. |
| | Sincerely, Luminant Generation Company LLC Rafael Flores By: & 2 W- aA.ýL./ired W. Madden /Director, Oversight |
| | & Regulatory Affairs c -E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Jack Ballard, ANII, Comanche Peak Luis Ponce, TDLR}} |
Revision as of 23:02, 28 July 2018
Letter Sequence Supplement |
---|
|
|
MONTHYEARCP-201200013, Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)2012-01-0505 January 2012 Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004) Project stage: Request ML1203403892012-02-0303 February 2012 Acceptance Review Email, Relief Request No. A-2, Relief from Inspection Requirements of ASME Code Case N-729-1 Due to Geometric Limitations, 2nd 10-Year Inservice Inspection Interval Project stage: Acceptance Review CP-201200331, Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)2012-04-16016 April 2012 Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004) Project stage: Supplement ML1212408402012-05-0303 May 2012 Request for Additional Information, Relief Request No. A-2, Relief from Inspection Requirements of ASME Code Case N-729-1 Due to Geometric Limitations, 2nd 10-Year Inservice Inspection Interval Project stage: RAI ML1212408312012-05-0303 May 2012 Request for Additional Information Email, Relief Request No. A-2, Relief from Inspection Requirements of ASME Code Case N-729-1 Due to Geometric Limitations, 2nd 10-Year Inservice Inspection Interval Project stage: RAI CP-201200483, Response to Request for Additional Information for Relief Request No. A-22012-06-13013 June 2012 Response to Request for Additional Information for Relief Request No. A-2 Project stage: Response to RAI ML12227A3592012-08-0202 August 2012 Clarification to Relief Request No. A-2 Project stage: Supplement ML12215A2492012-08-16016 August 2012 Relief Request No. A-2, Relief from Inspection Requirements of ASME Code Case N-729-1 Due to Geometric Limitations for the Second 10-Year Inservice Inspection Interval Project stage: Other 2012-05-03
[Table View] |
|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] |
Text
Luminant Rafael Flores Senior Vice President& Chief Nuclear Officer rafael.flores@Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose. TX 76043 T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201200331 Log # TXX-12056 Ref. # 10 CFR 50.55a(g)(6)(ii)
April 16, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-446 CLARIFICATION TO RELIEF REQUEST NO. A-2 FOR THE UNIT 2 SECOND 10 YEAR ISI INTERVAL FROM 10 CFR 50.55a INSPECTION REQUIREMENTS DUE TO GEOMETRIC LIMITATIONS (SECOND INTERVAL START DATE: AUGUST 03, 2004)
REFERENCE:
Letter logged TXX-12002 dated January 5, 2012 from Rafael Flores to the NRC submitting Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements due to Geometric Limitations
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(g)(6)(ii), Luminant Generation Company, LLC (Luminant Power) submitted Relief Request A-2 (see reference) for Comanche Peak Unit 2 for the second ten year inservice inspection interval.
Luminant Power had determined that certain inspection requirements of ASME Code Case N-729-1, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds,Section XI, Division 1," are impractical due to geometric limitations.
This letter is being submitted to clarify the following statement in TXX-12002: "This letter supersedes TXX-11106 dated December 14, 2011." TXX-11106 had originally been issued on December 14, 2011, submitting Relief Request A-2. However, the enclosure to that letter had a Westinghouse cover letter attached which was stamped "Westinghouse Proprietary Class 3" even though all the information contained in the letter was non-proprietary.
TXX-11106 was rejected by the NRC Document Control due to this proprietary issue. After discussion with the NRR Project Manager, Luminant Power resubmitted Relief Request A-2 in its entirety.
Therefore TXX-11106 is not needed for review and approval of Relief Request A-2 by the NRC.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance A b4-7~Callaway
- Comanche Peak -Diablo Canyon
- San Onofre South Texas Project
- Wolf Creek U. S. Nuclear Regulatory Commission TXX-12056 Page 2 04/16/2012 No undue risk to the public health and safety is presented by this request.This communication contains no new licensing basis commitments regarding Comanche Peak Unit 2.Should you have any questions, please contact Mr. Jack Hicks at (254)897-6725.
Sincerely, Luminant Generation Company LLC Rafael Flores By: & 2 W- aA.ýL./ired W. Madden /Director, Oversight
& Regulatory Affairs c -E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Jack Ballard, ANII, Comanche Peak Luis Ponce, TDLR