{{#Wiki_filter:NEXTera POINT BEACH August28,2013 NRC 2013-0083 10 CFR 50.71(e) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71(e), NextEra Energy Point Beach, LLC (NextEra),
is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2012, through December 31, 2012. NextEra previously submitted the TRM change summary for January 1, 2011, through December 31, 2011, on June 12, 2012 (ML 12164A752).
This letter contains no new commitments and no revisions to existing commitments.
If you have questions or require additional information, please contact Michael Millen at 920/755-7845
. Very truly yours, NextEra Energy Point Beach, LLC Michael Millen Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector
, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Date of Change 11/16/12 11/16/12 3/26/12 3/26/12 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENT MANUAL CHANGE SUMMARY FOR 2012 Affected Affected Section Pages(s)
Summary 2.1 4, 5, 10, Core operating limits report (COLR) for Unit 2 cycle 33. 12-15 3.5.1 3.5.1-4 Revised Table 3.5.1-1, Boric Acid Storage Tank Minimum Volume/Temperature
/Concentration.
3.7.3 All Changed the TLCO limit of steam generator secondary side pressure to :::; 170 psig. 3.7.6 3.7.6-8 Added Reference 9, Westinghouse letter WEP-11-81, dated December 14, 2011. Page 1 of 1}}

Revision as of 09:52, 4 July 2018

Point Beach, Units 1 and 2 - Technical Requirements Manual Change Summary
ML13241A199
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/28/2013
From: Millen M
Point Beach
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NRC 2013-0083
Download: ML13241A199 (2)


Text

NEXTera POINT BEACH August28,2013 NRC 2013-0083 10 CFR 50.71(e) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71(e), NextEra Energy Point Beach, LLC (NextEra),

is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2012, through December 31, 2012. NextEra previously submitted the TRM change summary for January 1, 2011, through December 31, 2011, on June 12, 2012 (ML 12164A752).

This letter contains no new commitments and no revisions to existing commitments.

If you have questions or require additional information, please contact Michael Millen at 920/755-7845

. Very truly yours, NextEra Energy Point Beach, LLC Michael Millen Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector

, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Date of Change 11/16/12 11/16/12 3/26/12 3/26/12 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENT MANUAL CHANGE SUMMARY FOR 2012 Affected Affected Section Pages(s)

Summary 2.1 4, 5, 10, Core operating limits report (COLR) for Unit 2 cycle 33. 12-15 3.5.1 3.5.1-4 Revised Table 3.5.1-1, Boric Acid Storage Tank Minimum Volume/Temperature

/Concentration.

3.7.3 All Changed the TLCO limit of steam generator secondary side pressure to :::; 170 psig. 3.7.6 3.7.6-8 Added Reference 9, Westinghouse letter WEP-11-81, dated December 14, 2011. Page 1 of 1