{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:ML22326A204 | ||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | NUCLEAR REGULATORY COMMISSION | ||
| Line 20: | Line 22: | ||
OFFICE OF NUCLEAR REACTOR REGULATION | OFFICE OF NUCLEAR REACTOR REGULATION | ||
WASHINGTON, DC 20555-0001 | WASHINGTON, DC 20555-0001 | ||
NRC INFORMATION NOTICE 2023-01: | March 10, 2023 NRC INFORMATION NOTICE 2023-01: | ||
RISK INSIGHTS FROM HIGH ENERGY ARCING | |||
FAULT OPERATING EXPERIENCE AND | FAULT OPERATING EXPERIENCE AND | ||
| Line 31: | Line 32: | ||
==ADDRESSEES== | ==ADDRESSEES== | ||
All holders of and applicants for an operating license or | All holders of and applicants for an operating license or construction permit for a nuclear power | ||
reactor issued under Title 10 of the Code of Federal | reactor issued under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic | ||
licensing of production and utilization facilities. | licensing of production and utilization facilities. | ||
All holders of and applicants for a power reactor combined | All holders of and applicants for a power reactor combined license, standard design approval, or | ||
manufacturing license under 10 CFR Part 52, Licenses, | manufacturing license under 10 CFR Part 52, Licenses, certifications, and approvals for | ||
nuclear power plants. All applicants for a standard design | nuclear power plants. All applicants for a standard design certification, including such | ||
applicants after initial issuance of a design certification | applicants after initial issuance of a design certification rule. | ||
==PURPOSE== | ==PURPOSE== | ||
The U.S. Nuclear Regulatory Commission (NRC) is issuing this | The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to share | ||
international and domestic operating experience relating to | international and domestic operating experience relating to high energy arcing faults (HEAFs). | ||
This IN discusses qualitative and quantitative risk insights | This IN discusses qualitative and quantitative risk insights derived from operating experience | ||
using the NRCs Office of Nuclear Reactor Regulations (NRRs) | using the NRCs Office of Nuclear Reactor Regulations (NRRs) Office Instruction LIC-504, Integrated Risk-Informed Decisionmaking Process for Emergent Issues, Revision 5 (Reference 1). This IN also provides information about the availability of the new HEAF | ||
probabilistic risk assessment ( PRA) methodology developed by the NRCs Office of Nuclear | probabilistic risk assessment (PRA) methodology developed by the NRCs Office of Nuclear | ||
Regulatory Research (RES) in collaboration with the Electric | Regulatory Research (RES) in collaboration with the Electric Power Research Institute (EPRI). | ||
This new PRA methodology was derived from recent operating | This new PRA methodology was derived from recent operating experience, HEAF-related | ||
testing, enhanced analytical modeling using state-of-the-art | testing, enhanced analytical modeling using state-of-the-art methods, and lessons learned from | ||
the implementation of previous fire PRA guidance. | the implementation of previous fire PRA guidance. | ||
The NRC is issuing this IN to inform addressees of issues | The NRC is issuing this IN to inform addressees of issues associated with HEAF operating | ||
experience beyond those included in IN 2017-04, High-Energy | experience beyond those included in IN 2017-04, High-Energy Arcing Faults in Electrical | ||
Equipment Containing Aluminum Components (Reference 2) and | Equipment Containing Aluminum Components (Reference 2) and other INs included in the | ||
reference section of this IN. The NRC expects that recipients | reference section of this IN. The NRC expects that recipients will review the information for | ||
applicability to their facilities and consider actions, as | applicability to their facilities and consider actions, as appropriate. INs may not impose new | ||
requirements, and nothing in this IN should be interpreted to | requirements, and nothing in this IN should be interpreted to require specific action. | ||
==DESCRIPTION OF CIRCUMSTANCES== | ==DESCRIPTION OF CIRCUMSTANCES== | ||
In June 2013, the Organization for Economic Co-operation and | In June 2013, the Organization for Economic Co-operation and Development (OECD) issued | ||
the report NEA/CSNI/R (2013)6, OECD Topical Report No. 1, Analysis of High Energy Arcing | |||
Fault Fire Events (Reference 3), on international operating experience that documented | |||
48 HEAF events. The document stated that these events accounted for approximately | |||
10 percent of all fire events collected in OECDs fire events database. These HEAF events were sometimes accompanied by a loss of essential power and complicated shutdowns. | |||
NEA/CSNI/R(2013)6 recommended performance of carefully designed | NEA/CSNI/R(2013)6 recommended performance of carefully designed experiments to better | ||
characterize HEAF events to obtain comprehensive scientific | characterize HEAF events to obtain comprehensive scientific fire data that would support the | ||
development of more realistic models to account for failure | development of more realistic models to account for failure modes and consequences of HEAF | ||
and provide better characterization of HEAF in fire PRA. | and provide better characterization of HEAF in fire PRA. Between 2014 and 2016, the NRC led | ||
the first phase of an international experimental campaign to | the first phase of an international experimental campaign to examine whether the PRA | ||
methodology for HEAF analysis in NUREG/CR-6850, EPRI/NRC-RES Fire PRA Methodology | methodology for HEAF analysis in NUREG/CR-6850, EPRI/NRC-RES Fire PRA Methodology | ||
for Nuclear Power Facilities, and its Supplement 1 (References | for Nuclear Power Facilities, and its Supplement 1 (References 4 through 6) could be | ||
enhanced to include more recent information. The preliminary | enhanced to include more recent information. The preliminary results of these experiments | ||
indicated a potential for an increase in the Zones of Influence | indicated a potential for an increase in the Zones of Influence (ZOIs) for aluminum components | ||
in or near electrical equipment, as well as the potential for | in or near electrical equipment, as well as the potential for new equipment failure mechanisms. | ||
These issues are described in detail in IN 2017-04. | These issues are described in detail in IN 2017-04. | ||
==BACKGROUND== | ==BACKGROUND== | ||
In March 2016, the NRC evaluated the additional risk associated | In March 2016, the NRC evaluated the additional risk associated with aluminum using the | ||
NRCs Generic Issues Program (GIP) (Reference 7). Upon further | NRCs Generic Issues Program (GIP) (Reference 7). Upon further review, the NRC staff | ||
determined that the HEAF issue no longer met the criteria for | determined that the HEAF issue no longer met the criteria for timely resolution prescribed by the | ||
GIP, as documented in an August 2021 memorandum (Reference 8). | GIP, as documented in an August 2021 memorandum (Reference 8). The staff exited the GIP | ||
and leveraged a two-pronged approach by (1) initiating the LIC- | and leveraged a two-pronged approach by (1) initiating the LIC-504 process to develop and | ||
document risk-informed options to disposition the HEAF issues | document risk-informed options to disposition the HEAF issues using the best available | ||
information and (2) in parallel, completing a suite of improved | information and (2) in parallel, completing a suite of improved HEAF data, tools, and methods in | ||
collaboration with EPRI. | collaboration with EPRI. | ||
==DISCUSSION== | ==DISCUSSION== | ||
In accordance with LIC-504, the NRC staff examined the | In accordance with LIC-504, the NRC staff examined the potential change in the estimated fire | ||
risk associated with HEAF events based on recent operating | risk associated with HEAF events based on recent operating experience, testing, and enhanced | ||
analytical tools. The results of the NRC staffs evaluation can | analytical tools. The results of the NRC staffs evaluation can be found in the memorandum | ||
High Energy Arcing Fault LIC-504 Team Recommendations ( | High Energy Arcing Fault LIC-504 Team Recommendations (Reference 9). | ||
The initial focus of the NRC staffs analysis was to develop | The initial focus of the NRC staffs analysis was to develop and document risk-informed options | ||
to disposition the potential increases in estimated risk due to | to disposition the potential increases in estimated risk due to the differences in HEAF ZOIs | ||
between copper and aluminum conductors. This concern arose | between copper and aluminum conductors. This concern arose because the differences in | ||
physical properties between copper and aluminum. For example, | physical properties between copper and aluminum. For example, differences in oxidation rates | ||
and heats of combustion can result in a more energetic plasma | and heats of combustion can result in a more energetic plasma development during a HEAF | ||
event involving aluminum and result in transport of high energy | event involving aluminum and result in transport of high energy particles and plasma further | ||
than previously assumed. However, concurrent with the LIC-504 | than previously assumed. However, concurrent with the LIC-504 evaluation, the NRC/EPRI | ||
HEAF working group determined that the difference in ZOIs for | HEAF working group determined that the difference in ZOIs for aluminum conductors and | ||
copper conductors is not significant based on the limited | copper conductors is not significant based on the limited experimental data, state-of-knowledge, and results from analytical methods. The NRC/EPRI working group concluded that aluminum | ||
bus duct enclosures can result in a larger ZOI than a | bus duct enclosures can result in a larger ZOI than a comparable steel enclosure. As a result, the focus of the LIC-504 evaluation was modified to estimate the change in risk based on the | ||
current state of knowledge, and to develop and document risk- | current state of knowledge, and to develop and document risk-informed insights, including | ||
options to disposition any safety or regulatory implications | options to disposition any safety or regulatory implications associated with the changes in the | ||
estimated risk between the new HEAF PRA methodology (draft | estimated risk between the new HEAF PRA methodology (draft issued for public comment) | ||
(Reference 10) and the current HEAF PRA methodology in NUREG/CR -6850 and | (Reference 10) and the current HEAF PRA methodology in NUREG/CR-6850 and | ||
Supplement 1. | Supplement 1. | ||
The NRC staff used the best available information from various sources to conduct the LIC-504 analysis. To gain additional insights related to the | The NRC staff used the best available information from various sources to conduct the LIC-504 analysis. To gain additional insights related to the application of the analysis methods to U.S. operating light water reactors, the NRC staff secured the support of two reference nuclear | ||
power plants (NPPs) to obtain plant-specific information and | power plants (NPPs) to obtain plant-specific information and insights to improve the realism of | ||
the analysis and the usefulness of the insights. Furthermore, | the analysis and the usefulness of the insights. Furthermore, to ensure that risk insights from | ||
operating U.S. plants were considered, the LIC-504 team | operating U.S. plants were considered, the LIC-504 team evaluated the Accident Sequence | ||
Precursors (ASPs) related to HEAF events documented in the ASP | Precursors (ASPs) related to HEAF events documented in the ASP database. | ||
Review of Operating Experience | |||
During the LIC-504 analysis, the staff identified four sources | During the LIC-504 analysis, the staff identified four sources of HEAF-related information that | ||
may enable licensees to obtain risk-informed insights and | may enable licensees to obtain risk-informed insights and identify plant components that | ||
contributed the most to HEAF risks. The LIC-504 team performed | contributed the most to HEAF risks. The LIC-504 team performed a comprehensive review of | ||
recent as well as past HEAF events to obtain and document risk- | recent as well as past HEAF events to obtain and document risk-informed insights related to | ||
preventive or mitigative measures. | preventive or mitigative measures. | ||
The first source, the ASP Program Dashboard (maintained by the | The first source, the ASP Program Dashboard (maintained by the NRC on the public webpage | ||
at https://www.nrc.gov/about-nrc/regulatory/research/asp.html ), provides an interactive | at https://www.nrc.gov/about-nrc/regulatory/research/asp.html), provides an interactive | ||
database of all accident precursors since 1969. The ASP program | database of all accident precursors since 1969. The ASP program systematically evaluates U.S. | ||
nuclear power plant operating experience to identify, document, | nuclear power plant operating experience to identify, document, and rank operational events by | ||
calculating a conditional core damage probability or an | calculating a conditional core damage probability or an increase in core damage probability. | ||
Therefore, the ASP database provides the subset of domestic | Therefore, the ASP database provides the subset of domestic HEAF events that are of relatively | ||
high risk significance. The staff conducted a thorough review | high risk significance. The staff conducted a thorough review of the HEAF events in the ASP | ||
database in addition to reviewing the HEAF events documented in | database in addition to reviewing the HEAF events documented in the OECD report discussed | ||
above to obtain risk-informed insights. | above to obtain risk-informed insights. | ||
The second source was a report prepared by EPRI entitled, | The second source was a report prepared by EPRI entitled, Critical Maintenance Insights on | ||
Preventing High Energy Arcing Faults issued in March 2019 ( | Preventing High Energy Arcing Faults issued in March 2019 (EPRI Report No. 3002015559) | ||
(Reference 11). This report identified a subset of plant | (Reference 11). This report identified a subset of plant components that could significantly | ||
influence plant risk and emphasized the importance of | influence plant risk and emphasized the importance of maintenance on the components to | ||
preventing HEAF events. | preventing HEAF events. | ||
The third source of risk-informed insights was the NRCs report , Operating Experience | The third source of risk-informed insights was the NRCs report, Operating Experience | ||
Assessment: Energetic Faults in 4.16 kV to 13.8 kV Switchgear | Assessment: Energetic Faults in 4.16 kV to 13.8 kV Switchgear and Bus Ducts That Caused | ||
Fires in Nuclear Power Plants 1986-2001, February 2002 ( | Fires in Nuclear Power Plants 1986-2001, February 2002 (Reference 12), which provides | ||
information about selected HEAF events. | information about selected HEAF events. | ||
Finally, the team examined the HEAF scenarios identified in the | Finally, the team examined the HEAF scenarios identified in the two reference plants Fire | ||
PRAs. The team found that these scenarios were a valuable | PRAs. The team found that these scenarios were a valuable source that provided plant-specific | ||
risk-informed insights as discussed below. | risk-informed insights as discussed below. | ||
| Line 231: | Line 230: | ||
Risk-Informed Insights | Risk-Informed Insights | ||
The following risk-informed insights are based on a review of | The following risk-informed insights are based on a review of HEAF events performed during | ||
the staffs LIC-504 evaluation, | the staffs LIC-504 evaluation, | ||
* | * | ||
A focus on preventing HEAF events remains an important aspect of HEAF risk | |||
management. Frequently, HEAF events, even those that are not | management. Frequently, HEAF events, even those that are not initially risk significant, can | ||
cause subsequent failures due to explosion effects, smoke, and | cause subsequent failures due to explosion effects, smoke, and ionized gases. These | ||
subsequent failures can create a chain of events that can pose | subsequent failures can create a chain of events that can pose special challenges to | ||
operators. Furthermore, some HEAF events involve operator | operators. Furthermore, some HEAF events involve operator errors that further contribute to | ||
the risk significance of the event. These subsequent failures, | the risk significance of the event. These subsequent failures, that can involve complex | ||
interactions among the operators, fire phenomenology, and | interactions among the operators, fire phenomenology, and mitigation capability, can be challenging. Due to these factors, it is important to prepare for and mitigate the | ||
consequences of a HEAF. | consequences of a HEAF. | ||
The following risk-informed insights were based on reviews of | The following risk-informed insights were based on reviews of the HEAF scenarios of the | ||
reference plants, the EPRI maintenance report, and the HEAF | reference plants, the EPRI maintenance report, and the HEAF event that occurred at the | ||
Maanshan site in 2001. These risk insights focus on design and | Maanshan site in 2001. These risk insights focus on design and maintenance resources in a | ||
subset of potential HEAF locations, which could contribute to a | subset of potential HEAF locations, which could contribute to a large fraction of the plants | ||
HEAF risks: | HEAF risks: | ||
* | * | ||
HEAFs that could lead to station blackouts (SBOs), like the one that occurred at Maanshan | |||
in 2001, are likely to initiate at buses or switchgear that are | in 2001, are likely to initiate at buses or switchgear that are essential in supplying alternating | ||
current power from both preferred and standby power sources. | current power from both preferred and standby power sources. Minimizing the likelihood of | ||
HEAF occurrence at those essential switchgear and buses (e.g., | HEAF occurrence at those essential switchgear and buses (e.g., improved preventive and | ||
predictive electrical | predictive electrical maintenance) could reduce HEAF-related risks. Minimizing the | ||
possibility of a HEAF at essential emergency buses, would also | possibility of a HEAF at essential emergency buses, would also reduce the potential for a | ||
failure of redundant electrical buses (e.g., due to smoke, or | failure of redundant electrical buses (e.g., due to smoke, or design deficiencies) and could | ||
minimize the SBO-related HEAF risks. | minimize the SBO-related HEAF risks. | ||
* | * | ||
Maintenance of breakers that are used to isolate the main generator power supply from | |||
essential electrical safety buses is important. Failure of | essential electrical safety buses is important. Failure of these breakers during a HEAF event | ||
could lead to an extended duration HEAF event due to the | could lead to an extended duration HEAF event due to the generator continuing to provide | ||
power to the electrical fault. Operating experience has shown | power to the electrical fault. Operating experience has shown that these breakers are more | ||
likely to fail during automatic transfers. | likely to fail during automatic transfers. | ||
* | * | ||
The supply circuit breakers to a switchgear lineup carry higher currents and are susceptible | |||
to higher energy faults with larger damage footprints. In | to higher energy faults with larger damage footprints. In addition, proper operation of supply | ||
breakers is needed to isolate faults. Accordingly, proper | breakers is needed to isolate faults. Accordingly, proper maintenance of supply breakers is | ||
especially important. | especially important. | ||
The NRC staff observed the following based on information | The NRC staff observed the following based on information obtained by reviewing the HEAF | ||
scenarios at the two reference plants: | scenarios at the two reference plants: | ||
* | * | ||
Comprehensively modeling a full scope of HEAF scenarios within the fire PRA facilitates | |||
identification of a subset of components that can significantly | identification of a subset of components that can significantly impact plant risk. This | ||
information may allow licensees to minimize HEAF risks by | information may allow licensees to minimize HEAF risks by focusing their resources (e.g., | ||
preventive maintenance) on that subset of components. | |||
With respect to mitigating the effect of HEAF events, NRC staff | With respect to mitigating the effect of HEAF events, NRC staff observed the following based on | ||
information obtained by reviewing the HEAF scenarios at the two | information obtained by reviewing the HEAF scenarios at the two reference plants and the | ||
design objective used to develop FLEX strategies: | design objective used to develop FLEX strategies: | ||
* | * | ||
In general, HEAFs leading to SBOs constitute the highest HEAF-related risks. Therefore, effective use of plant design and operational changes that have been adopted to enhance | |||
the mitigation of beyond design basis accidents rule (10 CFR 50 | the mitigation of beyond design basis accidents rule (10 CFR 50.155 Mitigation of beyond- design-basis events) are likely to reduce HEAF-related risks. | ||
New HEAF PRA Methodology | |||
A new HEAF PRA methodology was developed as a result of a | A new HEAF PRA methodology was developed as a result of a multistep research plan | ||
implemented in collaboration with EPRI. Specific activities | implemented in collaboration with EPRI. Specific activities included (1) development of a Computational Fluid Dynamics HEAF model capable of calculating the incident energy for a | ||
variety of equipment configurations and materials; (2) survey | variety of equipment configurations and materials; (2) survey of U.S. NPP electrical applications | ||
and configurations; (3) conduct of physical testing needed to | and configurations; (3) conduct of physical testing needed to inform and validate the HEAF | ||
hazard model and assess component fragility; and (4) updates to | hazard model and assess component fragility; and (4) updates to PRA data and methods to | ||
improve the realism and fidelity of the HEAF hazard model. The | improve the realism and fidelity of the HEAF hazard model. The LIC-504 team used the new | ||
HEAF PRA methodology published for public comment (Reference 10 | HEAF PRA methodology published for public comment (Reference 10) in collaboration with the | ||
PRA staff of the refence plants to support the LIC-504 project | PRA staff of the refence plants to support the LIC-504 project activities. | ||
Some of the key advances of the new HEAF PRA methodology | Some of the key advances of the new HEAF PRA methodology include: 1) changes to HEAF | ||
frequencies and non-suppression failure probabilities using | frequencies and non-suppression failure probabilities using recent operating experience; 2) | ||
substantial changes to the ZOIs for non-segregated bus ducts | substantial changes to the ZOIs for non-segregated bus ducts and for low- and medium-voltage | ||
switchgear; 3) crediting Electrical Raceway Fire Barriers | switchgear; 3) crediting Electrical Raceway Fire Barriers Systems (ERFBS) in the HEAF ZOI as | ||
a means of preventing damage from HEAF effects on systems and | a means of preventing damage from HEAF effects on systems and components; and 4) the | ||
ability to evaluate variation in HEAF-related damage due to | ability to evaluate variation in HEAF-related damage due to fault clearing times. Some of these | ||
changes may increase or decrease the estimated HEAF risk. For | changes may increase or decrease the estimated HEAF risk. For example, refined analysis | ||
methods that reflect potential ZOI changes of non-segregated | methods that reflect potential ZOI changes of non-segregated bus ducts could increase the | ||
estimated HEAF risk. Conversely, the allowable ERFBS credit in | estimated HEAF risk. Conversely, the allowable ERFBS credit in the new methodology may | ||
decrease the estimated HEAF-related risk. Whether the resulting | decrease the estimated HEAF-related risk. Whether the resulting overall estimated HEAF- | ||
related risk would increase, or decrease will be highly | related risk would increase, or decrease will be highly dependent on the plant-specific | ||
configurations. | configurations. | ||
The change in risk due to HEAF events at the two reference | The change in risk due to HEAF events at the two reference plants was estimated by applying | ||
the new HEAF PRA methodology and comparing it to the estimated | the new HEAF PRA methodology and comparing it to the estimated risk using the 2005 and | ||
2010 guidance documented in Appendix M of NUREG/CR-6850 and | 2010 guidance documented in Appendix M of NUREG/CR-6850 and Sections 4 and 7 of | ||
NUREG/CR-6850, Supplement 1. The following insights were | NUREG/CR-6850, Supplement 1. The following insights were identified: | ||
* | * | ||
A major enhancement in the new methodology is the consideration of fault clearing times. | |||
This enhancement more realistically models HEAF-related damage | This enhancement more realistically models HEAF-related damage based on plant-specific | ||
characteristics related to the duration of the clearing times, | characteristics related to the duration of the clearing times, which can increase or decrease | ||
the ZOIs and associated risk compared to the NUREG/CR-6850 | the ZOIs and associated risk compared to the NUREG/CR-6850 method. Plants with | ||
relatively long fault clearing times, resulting in larger ZOIs, | relatively long fault clearing times, resulting in larger ZOIs, may have an increase in | ||
estimated HEAF risk compared to | estimated HEAF risk compared to the risk previously estimated using the NUREG/CR-6850 | ||
methods. | |||
* | * | ||
The new methodology moves the point of origin for the zone of influence in non-segregated | |||
bus ducts. Moving the ZOI point of origin to the exterior | bus ducts. Moving the ZOI point of origin to the exterior surface of the bus duct may, for | ||
some plant configurations with targets in this area, result in | some plant configurations with targets in this area, result in including additional equipment | ||
within the HEAF damage zone. | within the HEAF damage zone. | ||
* | * | ||
Application of the new methodology for switchgear HEAFs showed increases and decreases | |||
in estimated risk based on specific circumstances. The vertical | in estimated risk based on specific circumstances. The vertical ZOIs above the switchgear | ||
consistently result in smaller values in comparison to those | consistently result in smaller values in comparison to those values that result from the | ||
application of the methodology in NUREG/CR-6850. Additionally, | application of the methodology in NUREG/CR-6850. Additionally, the new methodology | ||
predicts fire damage from HEAF in a region near (just above and | predicts fire damage from HEAF in a region near (just above and in front of) the cabinet that | ||
was not covered previously by the NUREG/CR-6850 methodology. | was not covered previously by the NUREG/CR-6850 methodology. For plant configurations | ||
with additional targets in this region, the switchgear HEAFs | with additional targets in this region, the switchgear HEAFs could potentially see a | ||
significant increase in risk with the new methodology depending | significant increase in risk with the new methodology depending on the importance of those | ||
targets. * | targets. * | ||
The new HEAF PRA methodology credits ERFBS for preventing damage to protected | |||
cables within the ZOI of bus ducts and switchgear HEAFs, unlike | cables within the ZOI of bus ducts and switchgear HEAFs, unlike the current guidance in | ||
NUREG/CR-6850 and its Supplement 1 | NUREG/CR-6850 and its Supplement 1 which does not allow credit for ERFBS in preventing | ||
damage. Including credit for ERFBS may result in a substantial | damage. Including credit for ERFBS may result in a substantial estimated risk reduction due | ||
to HEAF. | to HEAF. | ||
* | * | ||
Due to the cumulative impact of the items described above, the estimated risk could be | |||
higher or lower than calculated under the previous methodology | higher or lower than calculated under the previous methodology and could vary significantly | ||
based on plant configuration. | based on plant configuration. | ||
GENERIC IMPLICATIONS | |||
The risk insights documented in | The risk insights documented in this IN derived from operating experience, such as those from | ||
the EPRI maintenance report and the ASP database review, are | the EPRI maintenance report and the ASP database review, are broadly applicable, independent of the existence of a Fire PRA used to meet the licensing basis of the facility. | ||
U.S. NPPs licensed under 10 CFR 50 are not required to develop | U.S. NPPs licensed under 10 CFR 50 are not required to develop Fire PRAs. However, licensees who choose to adopt certain voluntary risk-informed programs, such as Risk-Informed | ||
Completion Times (RITS-4b) and the risk-informed, performance- | Completion Times (RITS-4b) and the risk-informed, performance-based fire protection licensing | ||
basis under 10 CFR 50.48(c) (NFPA 805), developed Fire PRAs in | basis under 10 CFR 50.48(c) (NFPA 805), developed Fire PRAs in order to receive NRC staff | ||
approval to establish and implement these programs. Furthermore | approval to establish and implement these programs. Furthermore, licensees may have used | ||
their fire PRA models to receive staff approval to adopt other | their fire PRA models to receive staff approval to adopt other risk-informed programs, such as | ||
10 CFR 50.69, Risk-Informed Categorization of Structures, | 10 CFR 50.69, Risk-Informed Categorization of Structures, Systems, and Components at | ||
Nuclear Plants, and to risk-inform their surveillance | Nuclear Plants, and to risk-inform their surveillance frequencies (RITS-5b). | ||
Licensees who have approved risk-informed initiatives such as | Licensees who have approved risk-informed initiatives such as RITS-4b, RITS-5b, 10 CFR | ||
50.69 and NFPA 805 are required to maintain their PRAs to | 50.69 and NFPA 805 are required to maintain their PRAs to reflect the as-built, as-operated, and as-maintained plant. | ||
Licensees are expected to | Licensees are expected to review the information provided in this IN as it relates to the | ||
operating experience for | operating experience for applicability to their facilities and consider any actions, as appropriate. | ||
However, as discussed above nothing in this IN should be | However, as discussed above nothing in this IN should be interpreted to require specific action. | ||
REFERENCES | REFERENCES | ||
1. | 1. U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Office | ||
Instruction LIC-504, Integrated Risk-Informed Decisionmaking | Instruction LIC-504, Integrated Risk-Informed Decisionmaking Process for Emergent | ||
Issues, Revision 5, March | Issues, Revision 5, March 2020 (Agencywide Document Access and Management System | ||
(ADAMS) Accession No. ML19253D401). | (ADAMS) Accession No. ML19253D401). | ||
2. | 2. U.S. Nuclear Regulatory Commission, Information Notice 2017-04, High Energy Arcing | ||
Faults in Electrical Equipment Containing Aluminum Components, | Faults in Electrical Equipment Containing Aluminum Components, August 2017 (ADAMS | ||
Accession No. ML17058A343). | Accession No. ML17058A343). | ||
3. | 3. Organization for Economic Cooperation and Development, report NEA/CSNI/R (2013)6, OECD Topical Report No. 1, Analysis of High Energy Arcing Fault Fire Events, June 2013, publicly available at www.oecd-nea.org. 4. U.S. Nuclear Regulatory Commission, NUREG/CR-6850, "EPRI/NRC-RES Fire PRA | ||
Methodology for Nuclear Power Facilities, Volume 1: Summary and | Methodology for Nuclear Power Facilities, Volume 1: Summary and Overview," NUREG/CR- | ||
6850, September 2005 (ADAMS Accession No. ML052580075). | |||
5. | 5. U.S. Nuclear Regulatory Commission, NUREG/CR-6850, "EPRI/NRC-RES Fire PRA | ||
Methodology for Nuclear Power Facilities, Volume 2: Detailed | Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology," September | ||
2005 (ADAMS Accession No. ML052580118). | 2005 (ADAMS Accession No. ML052580118). | ||
6. | 6. U.S. Nuclear Regulatory Commission, NUREG/CR-6850, Supplement 1, "Fire Probabilistic | ||
Risk Assessment Methods Enhancements," September 2010 (ADAMS | Risk Assessment Methods Enhancements," September 2010 (ADAMS Accession No. | ||
ML103090242). | ML103090242). | ||
7. | 7. Giitter, Joseph, U.S. Nuclear Regulatory Commission, memorandum to Correia, Richard, U.S. Nuclear Regulatory Commission, Path Forward for Regulatory Treatment of High | ||
Energy Arcing Fault Tests Results | Energy Arcing Fault Tests Results That Involve Aluminum, March 2016 (ADAMS Accession | ||
No. ML16064A250). | No. ML16064A250). | ||
8. | 8. Furstenau, Raymond, U.S. Nuclear Regulatory Commission, memorandum to Veil, Andrea, U.S. Nuclear Regulatory Commission, Closure of Proposed Generic Issue PRE-GI-018, High- Energy Arc Faults Involving Aluminum, August 2021 (ADAMS Accession No. | ||
ML21237A360). | ML21237A360). | ||
9. | 9. Rodriguez, Reinaldo, and Weerakkody, Sunil, U.S. Nuclear Regulatory Commission, memorandum to Franovich, Michael, and Miller, Christopher, U.S. Nuclear Regulatory | ||
Commission, High Energy Arcing Fault LIC-504 Team | Commission, High Energy Arcing Fault LIC-504 Team Recommendations, July 2022 (ADAMS Accession No. ML22200A272). | ||
10. U.S. Nuclear Regulatory Commission, NUREG-2262, High | 10. U.S. Nuclear Regulatory Commission, NUREG-2262, High Energy Arcing Fault Frequency | ||
and Consequence Modeling, Month | and Consequence Modeling, Month Year (ADAMS Accession No. ML22158A071). | ||
11. Electric Power Research Institute, Report No. 3002015459, | 11. Electric Power Research Institute, Report No. 3002015459, Critical Maintenance Insights | ||
on Preventing High Energy Arcing Faults, March 2019, publicly | on Preventing High Energy Arcing Faults, March 2019, publicly available at www.epri.com. | ||
12. U.S. Nuclear Regulatory Commission, Operating Experience | 12. U.S. Nuclear Regulatory Commission, Operating Experience Assessment Energetic Faults | ||
in 4.16 kV to 13.8 kV Switchgear and Bus Ducts That Caused | in 4.16 kV to 13.8 kV Switchgear and Bus Ducts That Caused Fires in Nuclear Power Plants | ||
1986-2001, February 2002 (ADAMS Accession No. ML021290358). | 1986-2001, February 2002 (ADAMS Accession No. ML021290358). | ||
13. IN 2002-01, Metalclad Switchgear Failures and Consequent | 13. IN 2002-01, Metalclad Switchgear Failures and Consequent Losses of Offsite Power, dated January 8, 2002 (ADAMS Accession No. ML013540193). | ||
14. IN 2002-27, Recent Fires at Commercial Nuclear Power | 14. IN 2002-27, Recent Fires at Commercial Nuclear Power Plants in the United States, dated | ||
September 20, 2002 (ADAMS Accession No. ML022630147). | September 20, 2002 (ADAMS Accession No. ML022630147). | ||
15. IN 2005-21, Plant Trip and Loss of Preferred AC Power from | 15. IN 2005-21, Plant Trip and Loss of Preferred AC Power from Inadequate Switchyard | ||
Maintenance, dated July 21, 2005 (ADAMS Accession No. | Maintenance, dated July 21, 2005 (ADAMS Accession No. ML051740051). | ||
16. IN 2005-15, Three-Unit Trip and Loss of Offsite Power at | 16. IN 2005-15, Three-Unit Trip and Loss of Offsite Power at Palo Verde Nuclear Generating | ||
Station, dated June 1, 2005 (ADAMS Accession No. ML050490364). 17. IN 2006-18, Supplement 1, Significant Loss of Safety- | Station, dated June 1, 2005 (ADAMS Accession No. ML050490364). 17. IN 2006-18, Supplement 1, Significant Loss of Safety-Related Electrical Power at Forsmark | ||
Unit 1 in Sweden, August 10, 2007 (ADAMS Accession No. | Unit 1 in Sweden, August 10, 2007 (ADAMS Accession No. ML071900368). | ||
18. IN 2006-31, Inadequate Fault Interrupting Rating of | 18. IN 2006-31, Inadequate Fault Interrupting Rating of Breakers, dated December 26, 2006 (ADAMS Accession No. ML063000104). | ||
19. IN 2007-14, Loss of Offsite Power and Dual-Unit Trip at | 19. IN 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating | ||
Station, dated March 30, 2007(ADAMS Accession No. ML070610424) | Station, dated March 30, 2007(ADAMS Accession No. ML070610424). | ||
20. IN 2008-18, Loss of Safety-Related Motor Control Center | 20. IN 2008-18, Loss of Safety-Related Motor Control Center Caused by a Bus Fault, dated | ||
December 1, 2008 (ADAMS Accession No. ML082540130). | December 1, 2008 (ADAMS Accession No. ML082540130). | ||
| Line 537: | Line 547: | ||
S | S | ||
Please direct any questions about this matter to the technical | Please direct any questions about this matter to the technical contacts listed below. | ||
Technical Contacts: | |||
Sunil Weerakkody, NRR | |||
301-415-2870 | |||
Sunil.Weerakkody@nrc.gov | |||
Charles Moulton, NRR | |||
301-415-2751 Charles.Moulton@nrc.gov | |||
Reinaldo Rodriguez, NRR | |||
404-997-4498 Reinaldo.Rodriguez@nrc.gov | |||
Phyllis Clark, NRR | |||
301-415-6447 Phyllis.Clark@nrc.gov | |||
/RA/ | /RA/ | ||
Russell Felts, Director | Russell Felts, Director | ||
| Line 557: | Line 576: | ||
Office of Nuclear Reactor Regulation | Office of Nuclear Reactor Regulation | ||
ML22326A204 | ML22326A204 | ||
EPIDS No. L-2022-GEN-0006 OFFICE | |||
NRR/DRO/IOLB | |||
NRR/DRA/APLB | |||
NRR/DRA | |||
RGN-II/DRP/RPB6 NAME | |||
IBetts | |||
JRobinson | |||
CWeerakkody | |||
RRodriguez | |||
DATE | |||
2/15/2023 | |||
2/10/2023 | |||
2/9/2023 | |||
2/9/2023 OFFICE | |||
NRR/DRA/APOB | |||
NRR/DRA/APLB | |||
JPeralta | |||
NRR/DRA | |||
NAME | |||
AZoulis | |||
CMoulton | |||
OE/EB | |||
MFranovich | |||
DATE | |||
2/9/2023 | |||
2/9/2023 | |||
2/15/2023 | |||
3/7/2023 OFFICE | |||
NRR/DRO | |||
RES/DRA | |||
NAME | |||
RFelts | |||
JTappert | |||
DATE | |||
3/8/2023 | |||
3/10/2023}} | |||
{{Information notice-Nav}} | {{Information notice-Nav}} | ||
Latest revision as of 12:04, 27 November 2024
| ML22326A204 | |
| Person / Time | |
|---|---|
| Issue date: | 03/10/2023 |
| From: | Russell Felts NRC/NRR/DRO |
| To: | |
| References | |
| IN 2023-01 | |
| Download: ML22326A204 (9) | |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, DC 20555-0001
March 10, 2023 NRC INFORMATION NOTICE 2023-01:
RISK INSIGHTS FROM HIGH ENERGY ARCING
FAULT OPERATING EXPERIENCE AND
ANALYSES
ADDRESSEES
All holders of and applicants for an operating license or construction permit for a nuclear power
reactor issued under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic
licensing of production and utilization facilities.
All holders of and applicants for a power reactor combined license, standard design approval, or
manufacturing license under 10 CFR Part 52, Licenses, certifications, and approvals for
nuclear power plants. All applicants for a standard design certification, including such
applicants after initial issuance of a design certification rule.
PURPOSE
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to share
international and domestic operating experience relating to high energy arcing faults (HEAFs).
This IN discusses qualitative and quantitative risk insights derived from operating experience
using the NRCs Office of Nuclear Reactor Regulations (NRRs) Office Instruction LIC-504, Integrated Risk-Informed Decisionmaking Process for Emergent Issues, Revision 5 (Reference 1). This IN also provides information about the availability of the new HEAF
probabilistic risk assessment (PRA) methodology developed by the NRCs Office of Nuclear
Regulatory Research (RES) in collaboration with the Electric Power Research Institute (EPRI).
This new PRA methodology was derived from recent operating experience, HEAF-related
testing, enhanced analytical modeling using state-of-the-art methods, and lessons learned from
the implementation of previous fire PRA guidance.
The NRC is issuing this IN to inform addressees of issues associated with HEAF operating
experience beyond those included in IN 2017-04, High-Energy Arcing Faults in Electrical
Equipment Containing Aluminum Components (Reference 2) and other INs included in the
reference section of this IN. The NRC expects that recipients will review the information for
applicability to their facilities and consider actions, as appropriate. INs may not impose new
requirements, and nothing in this IN should be interpreted to require specific action.
DESCRIPTION OF CIRCUMSTANCES
In June 2013, the Organization for Economic Co-operation and Development (OECD) issued
the report NEA/CSNI/R (2013)6, OECD Topical Report No. 1, Analysis of High Energy Arcing
Fault Fire Events (Reference 3), on international operating experience that documented
48 HEAF events. The document stated that these events accounted for approximately
10 percent of all fire events collected in OECDs fire events database. These HEAF events were sometimes accompanied by a loss of essential power and complicated shutdowns.
NEA/CSNI/R(2013)6 recommended performance of carefully designed experiments to better
characterize HEAF events to obtain comprehensive scientific fire data that would support the
development of more realistic models to account for failure modes and consequences of HEAF
and provide better characterization of HEAF in fire PRA. Between 2014 and 2016, the NRC led
the first phase of an international experimental campaign to examine whether the PRA
methodology for HEAF analysis in NUREG/CR-6850, EPRI/NRC-RES Fire PRA Methodology
for Nuclear Power Facilities, and its Supplement 1 (References 4 through 6) could be
enhanced to include more recent information. The preliminary results of these experiments
indicated a potential for an increase in the Zones of Influence (ZOIs) for aluminum components
in or near electrical equipment, as well as the potential for new equipment failure mechanisms.
These issues are described in detail in IN 2017-04.
BACKGROUND
In March 2016, the NRC evaluated the additional risk associated with aluminum using the
NRCs Generic Issues Program (GIP) (Reference 7). Upon further review, the NRC staff
determined that the HEAF issue no longer met the criteria for timely resolution prescribed by the
GIP, as documented in an August 2021 memorandum (Reference 8). The staff exited the GIP
and leveraged a two-pronged approach by (1) initiating the LIC-504 process to develop and
document risk-informed options to disposition the HEAF issues using the best available
information and (2) in parallel, completing a suite of improved HEAF data, tools, and methods in
collaboration with EPRI.
DISCUSSION
In accordance with LIC-504, the NRC staff examined the potential change in the estimated fire
risk associated with HEAF events based on recent operating experience, testing, and enhanced
analytical tools. The results of the NRC staffs evaluation can be found in the memorandum
High Energy Arcing Fault LIC-504 Team Recommendations (Reference 9).
The initial focus of the NRC staffs analysis was to develop and document risk-informed options
to disposition the potential increases in estimated risk due to the differences in HEAF ZOIs
between copper and aluminum conductors. This concern arose because the differences in
physical properties between copper and aluminum. For example, differences in oxidation rates
and heats of combustion can result in a more energetic plasma development during a HEAF
event involving aluminum and result in transport of high energy particles and plasma further
than previously assumed. However, concurrent with the LIC-504 evaluation, the NRC/EPRI
HEAF working group determined that the difference in ZOIs for aluminum conductors and
copper conductors is not significant based on the limited experimental data, state-of-knowledge, and results from analytical methods. The NRC/EPRI working group concluded that aluminum
bus duct enclosures can result in a larger ZOI than a comparable steel enclosure. As a result, the focus of the LIC-504 evaluation was modified to estimate the change in risk based on the
current state of knowledge, and to develop and document risk-informed insights, including
options to disposition any safety or regulatory implications associated with the changes in the
estimated risk between the new HEAF PRA methodology (draft issued for public comment)
(Reference 10) and the current HEAF PRA methodology in NUREG/CR-6850 and
Supplement 1.
The NRC staff used the best available information from various sources to conduct the LIC-504 analysis. To gain additional insights related to the application of the analysis methods to U.S. operating light water reactors, the NRC staff secured the support of two reference nuclear
power plants (NPPs) to obtain plant-specific information and insights to improve the realism of
the analysis and the usefulness of the insights. Furthermore, to ensure that risk insights from
operating U.S. plants were considered, the LIC-504 team evaluated the Accident Sequence
Precursors (ASPs) related to HEAF events documented in the ASP database.
Review of Operating Experience
During the LIC-504 analysis, the staff identified four sources of HEAF-related information that
may enable licensees to obtain risk-informed insights and identify plant components that
contributed the most to HEAF risks. The LIC-504 team performed a comprehensive review of
recent as well as past HEAF events to obtain and document risk-informed insights related to
preventive or mitigative measures.
The first source, the ASP Program Dashboard (maintained by the NRC on the public webpage
at https://www.nrc.gov/about-nrc/regulatory/research/asp.html), provides an interactive
database of all accident precursors since 1969. The ASP program systematically evaluates U.S.
nuclear power plant operating experience to identify, document, and rank operational events by
calculating a conditional core damage probability or an increase in core damage probability.
Therefore, the ASP database provides the subset of domestic HEAF events that are of relatively
high risk significance. The staff conducted a thorough review of the HEAF events in the ASP
database in addition to reviewing the HEAF events documented in the OECD report discussed
above to obtain risk-informed insights.
The second source was a report prepared by EPRI entitled, Critical Maintenance Insights on
Preventing High Energy Arcing Faults issued in March 2019 (EPRI Report No. 3002015559)
(Reference 11). This report identified a subset of plant components that could significantly
influence plant risk and emphasized the importance of maintenance on the components to
preventing HEAF events.
The third source of risk-informed insights was the NRCs report, Operating Experience
Assessment: Energetic Faults in 4.16 kV to 13.8 kV Switchgear and Bus Ducts That Caused
Fires in Nuclear Power Plants 1986-2001, February 2002 (Reference 12), which provides
information about selected HEAF events.
Finally, the team examined the HEAF scenarios identified in the two reference plants Fire
PRAs. The team found that these scenarios were a valuable source that provided plant-specific
risk-informed insights as discussed below.
Risk-Informed Insights
The following risk-informed insights are based on a review of HEAF events performed during
the staffs LIC-504 evaluation,
A focus on preventing HEAF events remains an important aspect of HEAF risk
management. Frequently, HEAF events, even those that are not initially risk significant, can
cause subsequent failures due to explosion effects, smoke, and ionized gases. These
subsequent failures can create a chain of events that can pose special challenges to
operators. Furthermore, some HEAF events involve operator errors that further contribute to
the risk significance of the event. These subsequent failures, that can involve complex
interactions among the operators, fire phenomenology, and mitigation capability, can be challenging. Due to these factors, it is important to prepare for and mitigate the
consequences of a HEAF.
The following risk-informed insights were based on reviews of the HEAF scenarios of the
reference plants, the EPRI maintenance report, and the HEAF event that occurred at the
Maanshan site in 2001. These risk insights focus on design and maintenance resources in a
subset of potential HEAF locations, which could contribute to a large fraction of the plants
HEAF risks:
HEAFs that could lead to station blackouts (SBOs), like the one that occurred at Maanshan
in 2001, are likely to initiate at buses or switchgear that are essential in supplying alternating
current power from both preferred and standby power sources. Minimizing the likelihood of
HEAF occurrence at those essential switchgear and buses (e.g., improved preventive and
predictive electrical maintenance) could reduce HEAF-related risks. Minimizing the
possibility of a HEAF at essential emergency buses, would also reduce the potential for a
failure of redundant electrical buses (e.g., due to smoke, or design deficiencies) and could
minimize the SBO-related HEAF risks.
Maintenance of breakers that are used to isolate the main generator power supply from
essential electrical safety buses is important. Failure of these breakers during a HEAF event
could lead to an extended duration HEAF event due to the generator continuing to provide
power to the electrical fault. Operating experience has shown that these breakers are more
likely to fail during automatic transfers.
The supply circuit breakers to a switchgear lineup carry higher currents and are susceptible
to higher energy faults with larger damage footprints. In addition, proper operation of supply
breakers is needed to isolate faults. Accordingly, proper maintenance of supply breakers is
especially important.
The NRC staff observed the following based on information obtained by reviewing the HEAF
scenarios at the two reference plants:
Comprehensively modeling a full scope of HEAF scenarios within the fire PRA facilitates
identification of a subset of components that can significantly impact plant risk. This
information may allow licensees to minimize HEAF risks by focusing their resources (e.g.,
preventive maintenance) on that subset of components.
With respect to mitigating the effect of HEAF events, NRC staff observed the following based on
information obtained by reviewing the HEAF scenarios at the two reference plants and the
design objective used to develop FLEX strategies:
In general, HEAFs leading to SBOs constitute the highest HEAF-related risks. Therefore, effective use of plant design and operational changes that have been adopted to enhance
the mitigation of beyond design basis accidents rule (10 CFR 50.155 Mitigation of beyond- design-basis events) are likely to reduce HEAF-related risks.
A new HEAF PRA methodology was developed as a result of a multistep research plan
implemented in collaboration with EPRI. Specific activities included (1) development of a Computational Fluid Dynamics HEAF model capable of calculating the incident energy for a
variety of equipment configurations and materials; (2) survey of U.S. NPP electrical applications
and configurations; (3) conduct of physical testing needed to inform and validate the HEAF
hazard model and assess component fragility; and (4) updates to PRA data and methods to
improve the realism and fidelity of the HEAF hazard model. The LIC-504 team used the new
HEAF PRA methodology published for public comment (Reference 10) in collaboration with the
PRA staff of the refence plants to support the LIC-504 project activities.
Some of the key advances of the new HEAF PRA methodology include: 1) changes to HEAF
frequencies and non-suppression failure probabilities using recent operating experience; 2)
substantial changes to the ZOIs for non-segregated bus ducts and for low- and medium-voltage
switchgear; 3) crediting Electrical Raceway Fire Barriers Systems (ERFBS) in the HEAF ZOI as
a means of preventing damage from HEAF effects on systems and components; and 4) the
ability to evaluate variation in HEAF-related damage due to fault clearing times. Some of these
changes may increase or decrease the estimated HEAF risk. For example, refined analysis
methods that reflect potential ZOI changes of non-segregated bus ducts could increase the
estimated HEAF risk. Conversely, the allowable ERFBS credit in the new methodology may
decrease the estimated HEAF-related risk. Whether the resulting overall estimated HEAF-
related risk would increase, or decrease will be highly dependent on the plant-specific
configurations.
The change in risk due to HEAF events at the two reference plants was estimated by applying
the new HEAF PRA methodology and comparing it to the estimated risk using the 2005 and
2010 guidance documented in Appendix M of NUREG/CR-6850 and Sections 4 and 7 of
NUREG/CR-6850, Supplement 1. The following insights were identified:
A major enhancement in the new methodology is the consideration of fault clearing times.
This enhancement more realistically models HEAF-related damage based on plant-specific
characteristics related to the duration of the clearing times, which can increase or decrease
the ZOIs and associated risk compared to the NUREG/CR-6850 method. Plants with
relatively long fault clearing times, resulting in larger ZOIs, may have an increase in
estimated HEAF risk compared to the risk previously estimated using the NUREG/CR-6850
methods.
The new methodology moves the point of origin for the zone of influence in non-segregated
bus ducts. Moving the ZOI point of origin to the exterior surface of the bus duct may, for
some plant configurations with targets in this area, result in including additional equipment
within the HEAF damage zone.
Application of the new methodology for switchgear HEAFs showed increases and decreases
in estimated risk based on specific circumstances. The vertical ZOIs above the switchgear
consistently result in smaller values in comparison to those values that result from the
application of the methodology in NUREG/CR-6850. Additionally, the new methodology
predicts fire damage from HEAF in a region near (just above and in front of) the cabinet that
was not covered previously by the NUREG/CR-6850 methodology. For plant configurations
with additional targets in this region, the switchgear HEAFs could potentially see a
significant increase in risk with the new methodology depending on the importance of those
targets. *
The new HEAF PRA methodology credits ERFBS for preventing damage to protected
cables within the ZOI of bus ducts and switchgear HEAFs, unlike the current guidance in
NUREG/CR-6850 and its Supplement 1 which does not allow credit for ERFBS in preventing
damage. Including credit for ERFBS may result in a substantial estimated risk reduction due
to HEAF.
Due to the cumulative impact of the items described above, the estimated risk could be
higher or lower than calculated under the previous methodology and could vary significantly
based on plant configuration.
GENERIC IMPLICATIONS
The risk insights documented in this IN derived from operating experience, such as those from
the EPRI maintenance report and the ASP database review, are broadly applicable, independent of the existence of a Fire PRA used to meet the licensing basis of the facility.
U.S. NPPs licensed under 10 CFR 50 are not required to develop Fire PRAs. However, licensees who choose to adopt certain voluntary risk-informed programs, such as Risk-Informed
Completion Times (RITS-4b) and the risk-informed, performance-based fire protection licensing
basis under 10 CFR 50.48(c) (NFPA 805), developed Fire PRAs in order to receive NRC staff
approval to establish and implement these programs. Furthermore, licensees may have used
their fire PRA models to receive staff approval to adopt other risk-informed programs, such as
10 CFR 50.69, Risk-Informed Categorization of Structures, Systems, and Components at
Nuclear Plants, and to risk-inform their surveillance frequencies (RITS-5b).
Licensees who have approved risk-informed initiatives such as RITS-4b, RITS-5b, 10 CFR
50.69 and NFPA 805 are required to maintain their PRAs to reflect the as-built, as-operated, and as-maintained plant.
Licensees are expected to review the information provided in this IN as it relates to the
operating experience for applicability to their facilities and consider any actions, as appropriate.
However, as discussed above nothing in this IN should be interpreted to require specific action.
REFERENCES
1. U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Office
Instruction LIC-504, Integrated Risk-Informed Decisionmaking Process for Emergent
Issues, Revision 5, March 2020 (Agencywide Document Access and Management System
(ADAMS) Accession No. ML19253D401).
2. U.S. Nuclear Regulatory Commission, Information Notice 2017-04, High Energy Arcing
Faults in Electrical Equipment Containing Aluminum Components, August 2017 (ADAMS
Accession No. ML17058A343).
3. Organization for Economic Cooperation and Development, report NEA/CSNI/R (2013)6, OECD Topical Report No. 1, Analysis of High Energy Arcing Fault Fire Events, June 2013, publicly available at www.oecd-nea.org. 4. U.S. Nuclear Regulatory Commission, NUREG/CR-6850, "EPRI/NRC-RES Fire PRA
Methodology for Nuclear Power Facilities, Volume 1: Summary and Overview," NUREG/CR-
6850, September 2005 (ADAMS Accession No. ML052580075).
5. U.S. Nuclear Regulatory Commission, NUREG/CR-6850, "EPRI/NRC-RES Fire PRA
Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology," September
2005 (ADAMS Accession No. ML052580118).
6. U.S. Nuclear Regulatory Commission, NUREG/CR-6850, Supplement 1, "Fire Probabilistic
Risk Assessment Methods Enhancements," September 2010 (ADAMS Accession No.
7. Giitter, Joseph, U.S. Nuclear Regulatory Commission, memorandum to Correia, Richard, U.S. Nuclear Regulatory Commission, Path Forward for Regulatory Treatment of High
Energy Arcing Fault Tests Results That Involve Aluminum, March 2016 (ADAMS Accession
No. ML16064A250).
8. Furstenau, Raymond, U.S. Nuclear Regulatory Commission, memorandum to Veil, Andrea, U.S. Nuclear Regulatory Commission, Closure of Proposed Generic Issue PRE-GI-018, High- Energy Arc Faults Involving Aluminum, August 2021 (ADAMS Accession No.
9. Rodriguez, Reinaldo, and Weerakkody, Sunil, U.S. Nuclear Regulatory Commission, memorandum to Franovich, Michael, and Miller, Christopher, U.S. Nuclear Regulatory
Commission, High Energy Arcing Fault LIC-504 Team Recommendations, July 2022 (ADAMS Accession No. ML22200A272).
10. U.S. Nuclear Regulatory Commission, NUREG-2262, High Energy Arcing Fault Frequency
and Consequence Modeling, Month Year (ADAMS Accession No. ML22158A071).
11. Electric Power Research Institute, Report No. 3002015459, Critical Maintenance Insights
on Preventing High Energy Arcing Faults, March 2019, publicly available at www.epri.com.
12. U.S. Nuclear Regulatory Commission, Operating Experience Assessment Energetic Faults
in 4.16 kV to 13.8 kV Switchgear and Bus Ducts That Caused Fires in Nuclear Power Plants
1986-2001, February 2002 (ADAMS Accession No. ML021290358).
13. IN 2002-01, Metalclad Switchgear Failures and Consequent Losses of Offsite Power, dated January 8, 2002 (ADAMS Accession No. ML013540193).
14. IN 2002-27, Recent Fires at Commercial Nuclear Power Plants in the United States, dated
September 20, 2002 (ADAMS Accession No. ML022630147).
15. IN 2005-21, Plant Trip and Loss of Preferred AC Power from Inadequate Switchyard
Maintenance, dated July 21, 2005 (ADAMS Accession No. ML051740051).
16. IN 2005-15, Three-Unit Trip and Loss of Offsite Power at Palo Verde Nuclear Generating
Station, dated June 1, 2005 (ADAMS Accession No. ML050490364). 17. IN 2006-18, Supplement 1, Significant Loss of Safety-Related Electrical Power at Forsmark
Unit 1 in Sweden, August 10, 2007 (ADAMS Accession No. ML071900368).
18. IN 2006-31, Inadequate Fault Interrupting Rating of Breakers, dated December 26, 2006 (ADAMS Accession No. ML063000104).
19. IN 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating
Station, dated March 30, 2007(ADAMS Accession No. ML070610424).
20. IN 2008-18, Loss of Safety-Related Motor Control Center Caused by a Bus Fault, dated
December 1, 2008 (ADAMS Accession No. ML082540130).
CONTACT
S
Please direct any questions about this matter to the technical contacts listed below.
Technical Contacts:
301-415-2870
Sunil.Weerakkody@nrc.gov
301-415-2751 Charles.Moulton@nrc.gov
404-997-4498 Reinaldo.Rodriguez@nrc.gov
301-415-6447 Phyllis.Clark@nrc.gov
/RA/
Russell Felts, Director
Division of Reactor Oversight
Office of Nuclear Reactor Regulation
EPIDS No. L-2022-GEN-0006 OFFICE
NRR/DRO/IOLB
NRR/DRA/APLB
NRR/DRA
RGN-II/DRP/RPB6 NAME
IBetts
JRobinson
CWeerakkody
RRodriguez
DATE
2/15/2023
2/10/2023
2/9/2023
2/9/2023 OFFICE
NRR/DRA/APOB
NRR/DRA/APLB
JPeralta
NRR/DRA
NAME
AZoulis
CMoulton
OE/EB
MFranovich
DATE
2/9/2023
2/9/2023
2/15/2023
3/7/2023 OFFICE
NRR/DRO
RES/DRA
NAME
RFelts
JTappert
DATE
3/8/2023
3/10/2023