ML22200A272

From kanterella
Jump to navigation Jump to search
High Energy Arcing Faults LIC-504 Team Recommendations
Date released: 07/27/2022 Download: ML22200A272


Enclosure 4 - HEAF Management Decision Signed 07-21-2022cgm
ML22202A493
Person / Time
Issue date: 07/21/2022
From: Mike Franovich, Chris Miller
NRC/NRR/DRA, NRC/NRR/DRO
To:
Weerakkody S D, NRR/DRA, 415-2870
References
Download: ML22202A493 (1)
Enclosure 3: Summary of the Evaluation of Recommendations
ML22201A003
Person / Time
Issue date: 07/22/2022
From: Reinaldo Rodriguez, Sunil Weerakkody
NRC/NRR/DRA, NRC/NRR/DRA/APOB
To: Franovich M X, Christopher Miller
NRC/NRR/DRA, NRC/NRR/DRO
Weerakkody S D
References
Download: ML22201A003 (4)
Enclosure 2: Risk Insights Based on Ope Including ASP
ML22201A002
Person / Time
Issue date: 07/22/2022
From: Reinaldo Rodriguez, Sunil Weerakkody
NRC/NRR/DRA, NRC/NRR/DRA/APOB
To: Franovich M X, Christopher Miller
NRC/NRR/DRA, NRC/NRR/DRO
Weerakkody S D
References
Download: ML22201A002 (11)
Enclosure 1: Quantitative Risk Assessment Based on Reference Plants
ML22201A001
Person / Time
Issue date: 07/22/2022
From: Reinaldo Rodriguez, Sunil Weerakkody
NRC/NRR/DRA, NRC/NRR/DRA/APOB
To: Franovich M X, Christopher Miller
NRC/NRR/DRA, NRC/NRR/DRO
Weerakkody S D
References
Download: ML22201A001 (9)
High Energy Arcing Faults LIC-504 Team Recommendations Memorandum
ML22201A000
Person / Time
Issue date: 07/22/2022
From: Reinaldo Rodriguez, Sunil Weerakkody
NRC/NRR/DRA, NRC/NRR/DRA/APOB
To: Franovich M X, Christopher Miller
NRC/NRR/DRA, NRC/NRR/DRO
Weerakkody S D
References
Download: ML22201A000 (13)