ML20236D034: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _                    _
{{#Wiki_filter:_ _ _ _ _
3
3
                          .I f
.I f
                              !          Docket Nos.                                                     50-275 /
Docket Nos.
ard 50-323 1                                                                                                                   ..
50-275 /
                              !                                                  Olan D. Parr, Chief, Light Water Reacters Project Btunch 1-3, RL IURTH00HING ACRS SUBC0ftGTHE MEETING - DIABLO CANYON NUCLFAR POWER l
ard 50-323 1
Olan D. Parr, Chief, Light Water Reacters Project Btunch 1-3, RL IURTH00HING ACRS SUBC0ftGTHE MEETING - DIABLO CANYON NUCLFAR POWER l
STATION, UNITS 1 AND 2 (OL)
STATION, UNITS 1 AND 2 (OL)
Date and Time:                     Tuesday, February 18, 1975 9:00 A. M. - 7:00 P. M.
Date and Time:
Tuesday, February 18, 1975 9:00 A. M. - 7:00 P. M.
t Wednesday, February 19, 1975 8:30 A. M. - 2:00 P. M.
t Wednesday, February 19, 1975 8:30 A. M. - 2:00 P. M.
Location:                           Royal Inn i                                                                                      214 Madonna Road San Luis Obispo, California
Location:
Royal Inn 214 Madonna Road i
San Luis Obispo, California


==Purpose:==
==Purpose:==
ACRS 9A~=mittee review of the Diablo                                     .{
ACRS 9A~=mittee review of the Diablo
.{
Canyon Nuclear Ibwer Station (See attached agenda)..
Canyon Nuclear Ibwer Station (See attached agenda)..
4
4
Line 36: Line 41:
==Participants:==
==Participants:==
ACRS SUB00ttHTTEE (Dr. D. Okrent, Dr. S. Bush, L. Fox)
ACRS SUB00ttHTTEE (Dr. D. Okrent, Dr. S. Bush, L. Fox)
CONSULT /JES                         .
CONSULT /JES (It'. G. h@>, Dr. B. Page, Dr. J. Wilson, Dr. M. Trifunic, Dr. M. White, K. Steintrugge, J. Ebersol, E. Koffman)
(It'. G. h@>, Dr. B. Page, Dr. J. Wilson, Dr. M. Trifunic, Dr. M. White, K. Steintrugge, J. Ebersol, E. Koffman)
ACRS STAIT (J. Corran)
ACRS STAIT (J. Corran)
PACIFIC GAS AND ELECTRIC COMPANY
PACIFIC GAS AND ELECTRIC COMPANY (W. J. Lirvthlmi, J. B. Hoch, H. J. Gamley, D. Nielsen, E. P. Wollak, R; B. Bettirger, i
                              ,                                                                                      (W. J. Lirvthlmi, J. B. Hoch, H. J. Gamley,                               ;
R. D. Ramsay)
D. Nielsen, E. P. Wollak, R; B. Bettirger,                                 i R. D. Ramsay)
Meq l
Meq                                       l
phl&'
                                                                                                                                            ,                            phl&'
't i
                                                                                                                                                                            't i
/
                                                                                                              /   --
8707300270 870721 PDR FOIA CONNOR87-214 PDR
8707300270 870721                                                             '
_-._____-.___J
PDR                               FOIA CONNOR87-214                                                           PDR
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                                                _          _-._____-.___J


FEB. 061975
FEB. 061975
                                                          -2 CONSULTA!ES (PACIFIC GAS NE) Dll:TRIC COMPA1N)
-2 CONSULTA!ES (PACIFIC GAS NE) Dll:TRIC COMPA1N)
(G. H. Ihmilton, S. W. Smith, R. Jahns)
(G. H. Ihmilton, S. W. Smith, R. Jahns)
WESTIIG OUSE (J. W. Dowycott, D. Peacock)
WESTIIG OUSE (J. W. Dowycott, D. Peacock)
IBC - SIAFF (J. C. Stepp, R. B. McMullen, R. B. Ibfrann, L. G. lidran, M. L. Fliegel, K. K. Yapur, U. h411, H. R. Denton, O. D. Parr, l                                                     D. P. Allison, T. J. Hirors)
IBC - SIAFF (J. C. Stepp, R. B. McMullen, R. B. Ibfrann, L. G. lidran, M. L. Fliegel, K. K. Yapur, U. h411, H. R. Denton, O. D. Parr, l
D. P. Allison, T. J. Hirors)
USGS (F. McKeown, J. Devine, F. Ibuser)
USGS (F. McKeown, J. Devine, F. Ibuser)
Original Signed By Dennis P. Allison
Original Signed By Dennis P. Allison
                                                  -        'Iharas J.11 irons Light Water React xs Project Branch 1-3 Division of React x Licensing
'Iharas J.11 irons Light Water React xs Project Branch 1-3 Division of React x Licensing


==Enclosure:==
==Enclosure:==
Agenia oc w/ercl:
Agenia oc w/ercl:
Mr. John C. Marrissey Philip A. Crarwt, Jr. , Esq.
Mr. John C. Marrissey Philip A. Crarwt, Jr., Esq.
Ardrew J. Skaff, Esq.
Ardrew J. Skaff, Esq.
Mr. Frederick Eiseler Ms. Elizabeth E. Apfelberg Ms. Sandna A. Silver Mr. John Fxster Mr. Loslaie Valentire                                                                                     .
Mr. Frederick Eiseler Ms. Elizabeth E. Apfelberg Ms. Sandna A. Silver Mr. John Fxster Mr. Loslaie Valentire Mr. Utiliam P. Cxmell l
Mr. Utiliam P. Cxmell                                                                                     l Mr. W. J. Lirdblad Mr. J. W. Darrycott Mr. James F. Devine Mr. Fred 1buser l               Mr. Frank McYawn o,,,u ,.        Rh:     . p -3                                                           y
Mr. W. J. Lirdblad Mr. J. W. Darrycott Mr. James F. Devine Mr. Fred 1buser l
        . _ . . . .                          . ga oavi *-          2/.M5                           . . ,
Mr. Frank McYawn Rh:. p -3 y
L.   . , - . . . . . , . . . . . , . . - , .          .
o,,,u,.
 
. ga 2/.M5 oavi *-
                                            *w
L.
                                                              .                                                                            PROPOSED AGENDA
* w PROPOSED AGENDA
                                                                      'r                                             DIABLO CANYON UNITS 1 & 2 SUBCOMMITTEE MEETING
'r DIABLO CANYON UNITS 1 & 2 SUBCOMMITTEE MEETING FEBRUARY 18-19, 1975 - SAN LUIS OBISPO, CALIFORNIA-PRINCIPAL SP0rISMEN:
                          #                                                                                        FEBRUARY 18-19, 1975 - SAN LUIS OBISPO, CALIFORNIA-PRINCIPAL SP0rISMEN:                                                         W. J. Lindblad - PG&E, Project Manager Tom Hirons - Project Manager, Reg. Staf f TUESDAY. FEBRUARY 18, 1975 (30 min.)                                                                         1. Executive Session - CLOSED -(8:30 a.m. - 9:00 a.m.)
W. J. Lindblad - PG&E, Project Manager Tom Hirons - Project Manager, Reg. Staf f TUESDAY. FEBRUARY 18, 1975 (30 min.)
(5 min.)                                                                         II. Introductory Statement                                     (PG&E)
1.
A. Brief Description of Site Location / Layout B. Construction Status - Units 1 & 2                                   !
Executive Session - CLOSED -(8:30 a.m. - 9:00 a.m.)
C. Fuel Lead / Opera tion Schedule (15 min.) III. Project Review Summary and Status Report                                                                                           (DL)
(5 min.)
A. Update on Sept., 1974 SER Unresolved / Outstanding Items   '
II.
B. Resoluiion/ Status of ACRS CP Letter Items (2 hrs.)                                                                       IV. Site Characteristics A. Geology / Seismology                   .
Introductory Statement (PG&E)
                                                                                            -                              1. Detailed Status of DL Review                       (DL/USGS)
A.
: 2. Applicant Presentations                           (PG&E) a) Basic Geologic /Scismic Data b)     Vibratory Ground Motion c)   Surface Faulting d)   Of fshore Seismic Interpretation Program l                                                                                                                               e)   Determination of SSE and Seismic Design "g" Value f or Site l                               (30 min.)                                                                             B. Tsunami Analysis (Model/ Analysis / Review Status) (PG&E/DL) l                               (15 min.)                                                                             C. Tornado Design / Criteria
Brief Description of Site Location / Layout B.
: l. Applicant Presentation                           (PG&E)
Construction Status - Units 1 & 2 C.
: 2. Conformance to Current Criteria                 (DL)
Fuel Lead / Opera tion Schedule (15 min.) III. Project Review Summary and Status Report (DL)
: 3. Systems for safe Shutdown Weakly Protected (PG&E/DL)
A.
(15 min.)                                                                                   D. Other Site Characteristics
Update on Sept., 1974 SER Unresolved / Outstanding Items B.
: 1. Meteorology, Hydrology, Demography, etc.
Resoluiion/ Status of ACRS CP Letter Items (2 hrs.)
IV.
Site Characteristics A.
Geology / Seismology 1.
Detailed Status of DL Review (DL/USGS) 2.
Applicant Presentations (PG&E) a) Basic Geologic /Scismic Data b) Vibratory Ground Motion c) Surface Faulting d) Of fshore Seismic Interpretation Program l
e) Determination of SSE and Seismic Design "g" Value f or Site l
(30 min.)
B.
Tsunami Analysis (Model/ Analysis / Review Status) (PG&E/DL) l (15 min.)
C.
Tornado Design / Criteria l.
Applicant Presentation (PG&E) 2.
Conformance to Current Criteria (DL) 3.
Systems for safe Shutdown Weakly Protected (PG&E/DL)
(15 min.)
D.
Other Site Characteristics 1.
Meteorology, Hydrology, Demography, etc.
(PG&E)
(PG&E)
(1 hr.)                                                                                 V. Seismic Design                                             (PG&E/DL)
(1 hr.)
A. Design Criteria for Containment / Major Components B. Signifi: ant Changes in Design Since CP Stage C. Design Criteria / Qualification Requirements for Safety-Related Instr.
V.
D. Stress Levels at 0.4g/0.5g/ Higher "g" values
Seismic Design (PG&E/DL)
: 1. Safety-Related Systems Most Vulnerable to Seismic Events E. Possible Effect on Non-Seismic Class I System Failure on Safety (15 min.)                                                                               VI. Experimental Confirmation of Seismic Design Aspects (30 min.) VII. Seismic Scram                                                                                                                                 (PG6E/DL)
A.
A. Existing Designs /Available Methods B. Experience 6 Reliability Considerations
Design Criteria for Containment / Major Components B.
Signifi: ant Changes in Design Since CP Stage C.
Design Criteria / Qualification Requirements for Safety-Related Instr.
D.
Stress Levels at 0.4g/0.5g/ Higher "g" values 1.
Safety-Related Systems Most Vulnerable to Seismic Events E.
Possible Effect on Non-Seismic Class I System Failure on Safety (15 min.)
VI.
Experimental Confirmation of Seismic Design Aspects (30 min.) VII. Seismic Scram (PG6E/DL)
A.
Existing Designs /Available Methods B.
Experience 6 Reliability Considerations


1
1
                                                ~
~
        ~* -                           .
~* -
* Proposed' Agenda - Diablo                                                   ' 2-1/28/75 SUBCQ4MITTEE CAUCUS - CLOSED SESSION
* Proposed' Agenda - Diablo
                    - (15 min.) VIII. Systems Interactions                                                                                                                                         (PG&E/DL)
' 2-1/28/75 SUBCQ4MITTEE CAUCUS - CLOSED SESSION
(reference letter, dated 11/8/74. WRS to Muntzing)                                                                                                                                               ,
- (15 min.) VIII. Systems Interactions (PG&E/DL)
y Adjourn meeting at                         7:00 p.m.
(reference letter, dated 11/8/74. WRS to Muntzing) y Adjourn meeting at 7:00 p.m.
WEDNESDAY -~ FEBRUARY 19, 1975                                                                                                         ,.
WEDNESDAY -~ FEBRUARY 19, 1975 j
j i
i (30 min.)
(30 min.)             I. Executive Session - Closed-(8:00 a.m.                           8:30 am)
I.
(30 min.)           II.       Reactor                                                                                                                         (PG&E)
Executive Session - Closed-(8:00 a.m.
A.     Brief Description of Major Features / Comparison with Existing Designs                                       "
8:30 am)
B.     ECCS/LOCA - Appendix K Evaluations.
(30 min.)
: 1. Unit 1/ Unit 2 Results - Comparison with Existing Designs
II.
: 2. Limiting F calculated for Unit 1/ Unit 2
Reactor (PG&E)
: 3. Status /Sch dule for Completion                                                                                                             ;
A.
                                    .                            C.     Power Distribution Control Method - Ex-core /APDMS/                                                                                               l COAC                                                                                                                     (PGE/DL/H)
Brief Description of Major Features / Comparison with Existing Designs B.
D. Significant changes in Design from CP Stage E.     Status of 17xl? Verification / Review (15 min.) III. Electric Power Systems (One Line Diagram)                                                                                                     (PG6E)
ECCS/LOCA - Appendix K Evaluations.
A. Offsite Power                                                                                                                                           ;
1.
B.     Onsite Power                                                                                                                                       j Emergency Power C.
Unit 1/ Unit 2 Results - Comparison with Existing Designs 2.
D.     Reliability Considerations - Diesel Qualifications                                                                                                   j
Limiting F calculated for Unit 1/ Unit 2 3.
                                                                                    '                                                                                                                                    .q (15 min.) IV .               Emergency Plan                                                                                                                   (PG6E)
Status /Sch dule for Completion l
(15 min.)             V. Industrial Security - Closed                                                                                                     (PG&E)
C.
(??           ) VI.         Resolution / Status of Generic Items                                                                                             (PG&E)
Power Distribution Control Method - Ex-core /APDMS/
A.     List ??
COAC (PGE/DL/H)
B. List ??
D.
C. List ??
Significant changes in Design from CP Stage E.
(20 min.) VII.               Plant Items                                                                                                                     (PG&E/DL)
Status of 17xl? Verification / Review (15 min.) III. Electric Power Systems (One Line Diagram)
A. Brief Description of Plant / Layout C. Major Design Changes Since CP Stages C.     Lessons Learned from Operating Experience /Related Design Changes VIII.         Lockout of Power-Operated ESF Valves                                                                                             (PG&E/DL)
(PG6E)
A.
Offsite Power B.
Onsite Power j
C.
Emergency Power D.
Reliability Considerations - Diesel Qualifications j
.q (15 min.) IV.
Emergency Plan (PG6E)
(15 min.)
V.
Industrial Security - Closed (PG&E)
(??
) VI.
Resolution / Status of Generic Items (PG&E)
A.
List ??
B.
List ??
C.
List ??
(20 min.) VII.
Plant Items (PG&E/DL)
A.
Brief Description of Plant / Layout C.
Major Design Changes Since CP Stages C.
Lessons Learned from Operating Experience /Related Design Changes VIII.
Lockout of Power-Operated ESF Valves (PG&E/DL)
Adjourn Meeting at 2:00 p.m.
Adjourn Meeting at 2:00 p.m.
1 j
1 j
_ . _ _ _ _ _ . _ _ _ _ _ _ _ _ . _}}
-}}

Latest revision as of 03:38, 3 December 2024

Notification of ACRS Subcommittee 750218 & 19 Meetings W/ Util,Westinghouse & USGS in San Luis Obispo,Ca for Review of Plant.Proposed Agenda Encl
ML20236D034
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 02/06/1975
From: Hirons T
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML20236A877 List: ... further results
References
FOIA-87-214 NUDOCS 8707300278
Download: ML20236D034 (4)


Text

_ _ _ _ _

3

.I f

Docket Nos.

50-275 /

ard 50-323 1

Olan D. Parr, Chief, Light Water Reacters Project Btunch 1-3, RL IURTH00HING ACRS SUBC0ftGTHE MEETING - DIABLO CANYON NUCLFAR POWER l

STATION, UNITS 1 AND 2 (OL)

Date and Time:

Tuesday, February 18, 1975 9:00 A. M. - 7:00 P. M.

t Wednesday, February 19, 1975 8:30 A. M. - 2:00 P. M.

Location:

Royal Inn 214 Madonna Road i

San Luis Obispo, California

Purpose:

ACRS 9A~=mittee review of the Diablo

.{

Canyon Nuclear Ibwer Station (See attached agenda)..

4

Participants:

ACRS SUB00ttHTTEE (Dr. D. Okrent, Dr. S. Bush, L. Fox)

CONSULT /JES (It'. G. h@>, Dr. B. Page, Dr. J. Wilson, Dr. M. Trifunic, Dr. M. White, K. Steintrugge, J. Ebersol, E. Koffman)

ACRS STAIT (J. Corran)

PACIFIC GAS AND ELECTRIC COMPANY (W. J. Lirvthlmi, J. B. Hoch, H. J. Gamley, D. Nielsen, E. P. Wollak, R; B. Bettirger, i

R. D. Ramsay)

Meq l

phl&'

't i

/

8707300270 870721 PDR FOIA CONNOR87-214 PDR

_-._____-.___J

FEB. 061975

-2 CONSULTA!ES (PACIFIC GAS NE) Dll:TRIC COMPA1N)

(G. H. Ihmilton, S. W. Smith, R. Jahns)

WESTIIG OUSE (J. W. Dowycott, D. Peacock)

IBC - SIAFF (J. C. Stepp, R. B. McMullen, R. B. Ibfrann, L. G. lidran, M. L. Fliegel, K. K. Yapur, U. h411, H. R. Denton, O. D. Parr, l

D. P. Allison, T. J. Hirors)

USGS (F. McKeown, J. Devine, F. Ibuser)

Original Signed By Dennis P. Allison

'Iharas J.11 irons Light Water React xs Project Branch 1-3 Division of React x Licensing

Enclosure:

Agenia oc w/ercl:

Mr. John C. Marrissey Philip A. Crarwt, Jr., Esq.

Ardrew J. Skaff, Esq.

Mr. Frederick Eiseler Ms. Elizabeth E. Apfelberg Ms. Sandna A. Silver Mr. John Fxster Mr. Loslaie Valentire Mr. Utiliam P. Cxmell l

Mr. W. J. Lirdblad Mr. J. W. Darrycott Mr. James F. Devine Mr. Fred 1buser l

Mr. Frank McYawn Rh:. p -3 y

o,,,u,.

. ga 2/.M5 oavi *-

L.

  • w PROPOSED AGENDA

'r DIABLO CANYON UNITS 1 & 2 SUBCOMMITTEE MEETING FEBRUARY 18-19, 1975 - SAN LUIS OBISPO, CALIFORNIA-PRINCIPAL SP0rISMEN:

W. J. Lindblad - PG&E, Project Manager Tom Hirons - Project Manager, Reg. Staf f TUESDAY. FEBRUARY 18, 1975 (30 min.)

1.

Executive Session - CLOSED -(8:30 a.m. - 9:00 a.m.)

(5 min.)

II.

Introductory Statement (PG&E)

A.

Brief Description of Site Location / Layout B.

Construction Status - Units 1 & 2 C.

Fuel Lead / Opera tion Schedule (15 min.) III. Project Review Summary and Status Report (DL)

A.

Update on Sept., 1974 SER Unresolved / Outstanding Items B.

Resoluiion/ Status of ACRS CP Letter Items (2 hrs.)

IV.

Site Characteristics A.

Geology / Seismology 1.

Detailed Status of DL Review (DL/USGS) 2.

Applicant Presentations (PG&E) a) Basic Geologic /Scismic Data b) Vibratory Ground Motion c) Surface Faulting d) Of fshore Seismic Interpretation Program l

e) Determination of SSE and Seismic Design "g" Value f or Site l

(30 min.)

B.

Tsunami Analysis (Model/ Analysis / Review Status) (PG&E/DL) l (15 min.)

C.

Tornado Design / Criteria l.

Applicant Presentation (PG&E) 2.

Conformance to Current Criteria (DL) 3.

Systems for safe Shutdown Weakly Protected (PG&E/DL)

(15 min.)

D.

Other Site Characteristics 1.

Meteorology, Hydrology, Demography, etc.

(PG&E)

(1 hr.)

V.

Seismic Design (PG&E/DL)

A.

Design Criteria for Containment / Major Components B.

Signifi: ant Changes in Design Since CP Stage C.

Design Criteria / Qualification Requirements for Safety-Related Instr.

D.

Stress Levels at 0.4g/0.5g/ Higher "g" values 1.

Safety-Related Systems Most Vulnerable to Seismic Events E.

Possible Effect on Non-Seismic Class I System Failure on Safety (15 min.)

VI.

Experimental Confirmation of Seismic Design Aspects (30 min.) VII. Seismic Scram (PG6E/DL)

A.

Existing Designs /Available Methods B.

Experience 6 Reliability Considerations

1

~

~* -

  • Proposed' Agenda - Diablo

' 2-1/28/75 SUBCQ4MITTEE CAUCUS - CLOSED SESSION

- (15 min.) VIII. Systems Interactions (PG&E/DL)

(reference letter, dated 11/8/74. WRS to Muntzing) y Adjourn meeting at 7:00 p.m.

WEDNESDAY -~ FEBRUARY 19, 1975 j

i (30 min.)

I.

Executive Session - Closed-(8:00 a.m.

8:30 am)

(30 min.)

II.

Reactor (PG&E)

A.

Brief Description of Major Features / Comparison with Existing Designs B.

ECCS/LOCA - Appendix K Evaluations.

1.

Unit 1/ Unit 2 Results - Comparison with Existing Designs 2.

Limiting F calculated for Unit 1/ Unit 2 3.

Status /Sch dule for Completion l

C.

Power Distribution Control Method - Ex-core /APDMS/

COAC (PGE/DL/H)

D.

Significant changes in Design from CP Stage E.

Status of 17xl? Verification / Review (15 min.) III. Electric Power Systems (One Line Diagram)

(PG6E)

A.

Offsite Power B.

Onsite Power j

C.

Emergency Power D.

Reliability Considerations - Diesel Qualifications j

.q (15 min.) IV.

Emergency Plan (PG6E)

(15 min.)

V.

Industrial Security - Closed (PG&E)

(??

) VI.

Resolution / Status of Generic Items (PG&E)

A.

List ??

B.

List ??

C.

List ??

(20 min.) VII.

Plant Items (PG&E/DL)

A.

Brief Description of Plant / Layout C.

Major Design Changes Since CP Stages C.

Lessons Learned from Operating Experience /Related Design Changes VIII.

Lockout of Power-Operated ESF Valves (PG&E/DL)

Adjourn Meeting at 2:00 p.m.

1 j

-