IR 05000298/2020301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20203M152
| number = ML20259A483
| issue date = 07/21/2020
| issue date = 09/15/2020
| title = NRC Initial Operator Licensing Examination Approval 05000298/2020301
| title = NRC Examination Report 05000298/2020301
| author name = Werner G
| author name = Werner G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
Line 10: Line 10:
| license number = DPR-046
| license number = DPR-046
| contact person =  
| contact person =  
| document report number = IR 2020301
| case reference number = 50-298/20-301, EPID L-2020-OLL-0013
| document type = Letter
| document report number = 50-298/OL-20
| page count = 3
| document type = Letter, License-Operator Examination Report
| page count = 9
}}
}}


Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:July 21, 2020
{{#Wiki_filter:September 15, 2020


==SUBJECT:==
==SUBJECT:==
COOPER NUCLEAR STATION - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000298/2020301
COOPER NUCLEAR STATION - NRC EXAMINATION REPORT 05000298/2020301


==Dear Mr. Dent:==
==Dear Mr. Dent:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Cooper Nuclear Station.
On August 18, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Cooper Nuclear Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 29, 2020, with Mr. K. Dia, General Manager, Plant Operations, and other members of your staff. A telephonic exit meeting was conducted on August 18, 2020, with Mr. K. Dia, who was provided the NRC licensing decisions.


The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. James Florence, Superintendent, Simulator and Training Support. Note that any examination waivers and application denials have been addressed in separate correspondence.
The examination included the evaluation of three applicants for reactor operator licenses and two applicants for upgrade senior reactor operator license. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.


The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, on August 4, 2020. The NRC staff will administer the operating tests during the week of July 27, 2020. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817-200-1159.
No findings were identified during this examination.


J. Dent, Jr. 2 Please contact Thomas Farina, Chief Examiner, at 817-200-1117, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant approved to take the examination.
J. Dent, Jr. 2 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Gregory E. Werner Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 05000298 License No. DPR-46 cc:
Sincerely, Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 05000298 License No. DPR-46
James Florence Superintendent, Simulator and Training Support Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 Electronic distribution via LISTSERV
 
===Enclosure:===
Examination Report 05000298/2020301 w/attachment: Supplemental Information
 
==Inspection Report==
Docket Number: 05000298 License Number: DPR-46 Report Number: 05000298/2020301 Enterprise Identifier: L-2020-OLL-0013 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: Brownville, Nebraska Inspection Dates: July 27, 2020, to August 18, 2020 Inspectors: T. Farina, Senior Operations Engineer (Chief Examiner)
J. Kirkland, Senior Operations Engineer M. Hayes, Operations Engineer Approved By: Gregory E. Werner Chief, Operations Branch Division of Reactor Safety Enclosure
 
=SUMMARY=
ER 05000298/2020301; July 27, 2020, to August 18, 2020; Cooper Nuclear Station; Initial
 
Operator Licensing Examination Report The NRC examiners evaluated the competency of three applicants for reactor operator licenses and two applicants for upgrade senior reactor operator licenses at Cooper Nuclear Station.
 
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on August 4, 2020. The NRC examiners administered the operating tests on July 27-29, 2020.
 
The NRC examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
 
===NRC-Identified and Self-Revealing Findings===
 
None.
 
===Licensee-Identified Violations===
 
None.
 
=REPORT DETAILS=
 
==OTHER ACTIVITIES==
- INITIAL LICENSE EXAM
 
===.1 License Applications===
 
====a. Scope====
The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
 
====b. Findings====
No findings were identified.
 
===.2 Examination Development===
 
====a. Scope====
The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of the operating tests.
 
====b. Findings====
The NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
 
The NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
 
===.3 Operator Knowledge and Performance===
 
====a. Scope====
On August 4, 2020, the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on August 13, 2020.
 
The NRC examination team administered the various portions of the operating tests to all applicants on July 27-29, 2020.
 
====b. Findings====
No findings were identified.
 
All applicants passed the written examination and all parts of the operating tests.
 
The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
 
The examination team noted three generic weaknesses associated with applicant performance on the walkthrough portion of the operating test.
* Two applicants did not initially recognize that reactor building floor drain sump level was greater than max safe operating water level (MSOWL) when procedurally directed to verify.
* Two applicants did not immediately recognize reactor scram criteria were met with two control rods drifting in.
* Two applicants could not properly interpret a semi-log graph for projected drywell Curie content vs effective age.
 
Post-examination analysis revealed three generic weaknesses associated with applicant performance on the written examination.
* Three applicants did not understand the impact of a group 2 isolation when residual heat removal was intertied with fuel pool cooling.
* Three applicants did not understand what the lowest value of torus level would not require entry into TS 3.6.2.2, Suppression Pool Water Level.
* Three applicants did not understand what systems must be declared inoperable on a loss of 250 VDC bus 1B, and the associated completion time for TS 3.8.7, Distribution Systems - Operating.
 
Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training. These deficiencies were captured in the licensees corrective action program as Condition Reports CNS-2020-03322.
 
===.4 Simulation Facility Performance===
 
====a. Scope====
The NRC examiners observed simulator performance with regard to plant fidelity during      examination validation and administration.
 
====b. Findings====
No findings were identified.
 
===.5 Examination Security===
 
====a. Scope====
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.
 
====b. Findings====
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
 
===Exit Meeting Summary===
 
The chief examiner presented the preliminary examination results to Mr. K. Dia, General Manager, Plant Operations, and other members of the staff on July 29, 2020. A telephonic exit was conducted on August 18, 2020, between Mr. T. Farina, chief examiner, and Mr. K. Dia. The licensee did not identify any information or materials used during the examination as proprietary.
 
=SUPPLEMENTAL INFORMATION=
 
==KEY POINTS OF CONTACT==
 
===Licensee Personnel===
: [[contact::M. Joe]], Training Manager
: [[contact::J. Florence]], Simulator and Training Support Superintendent
===NRC Personnel===
: [[contact::A. Siwy]], Senior Resident Inspector
 
==ADAMS DOCUMENTS REFERENCED==


ML20203M152 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: TJF Yes No Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:OB NAME TFarina GWerner SIGNATURE TJF GEW DATE 7/17/2020 07/21/2020
}}
}}

Latest revision as of 19:58, 15 December 2021

NRC Examination Report 05000298/2020301
ML20259A483
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/15/2020
From: Greg Werner
Operations Branch IV
To: Dent J
Nebraska Public Power District (NPPD)
References
50-298/20-301, EPID L-2020-OLL-0013 50-298/OL-20
Download: ML20259A483 (9)


Text

September 15, 2020

SUBJECT:

COOPER NUCLEAR STATION - NRC EXAMINATION REPORT 05000298/2020301

Dear Mr. Dent:

On August 18, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Cooper Nuclear Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 29, 2020, with Mr. K. Dia, General Manager, Plant Operations, and other members of your staff. A telephonic exit meeting was conducted on August 18, 2020, with Mr. K. Dia, who was provided the NRC licensing decisions.

The examination included the evaluation of three applicants for reactor operator licenses and two applicants for upgrade senior reactor operator license. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.

No findings were identified during this examination.

J. Dent, Jr. 2 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 05000298 License No. DPR-46

Enclosure:

Examination Report 05000298/2020301 w/attachment: Supplemental Information

Inspection Report

Docket Number: 05000298 License Number: DPR-46 Report Number: 05000298/2020301 Enterprise Identifier: L-2020-OLL-0013 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: Brownville, Nebraska Inspection Dates: July 27, 2020, to August 18, 2020 Inspectors: T. Farina, Senior Operations Engineer (Chief Examiner)

J. Kirkland, Senior Operations Engineer M. Hayes, Operations Engineer Approved By: Gregory E. Werner Chief, Operations Branch Division of Reactor Safety Enclosure

SUMMARY

ER 05000298/2020301; July 27, 2020, to August 18, 2020; Cooper Nuclear Station; Initial

Operator Licensing Examination Report The NRC examiners evaluated the competency of three applicants for reactor operator licenses and two applicants for upgrade senior reactor operator licenses at Cooper Nuclear Station.

The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on August 4, 2020. The NRC examiners administered the operating tests on July 27-29, 2020.

The NRC examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

NRC-Identified and Self-Revealing Findings

None.

Licensee-Identified Violations

None.

REPORT DETAILS

OTHER ACTIVITIES

- INITIAL LICENSE EXAM

.1 License Applications

a. Scope

The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b. Findings

No findings were identified.

.2 Examination Development

a. Scope

The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of the operating tests.

b. Findings

The NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.

The NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.

.3 Operator Knowledge and Performance

a. Scope

On August 4, 2020, the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on August 13, 2020.

The NRC examination team administered the various portions of the operating tests to all applicants on July 27-29, 2020.

b. Findings

No findings were identified.

All applicants passed the written examination and all parts of the operating tests.

The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.

The examination team noted three generic weaknesses associated with applicant performance on the walkthrough portion of the operating test.

  • Two applicants did not initially recognize that reactor building floor drain sump level was greater than max safe operating water level (MSOWL) when procedurally directed to verify.
  • Two applicants did not immediately recognize reactor scram criteria were met with two control rods drifting in.
  • Two applicants could not properly interpret a semi-log graph for projected drywell Curie content vs effective age.

Post-examination analysis revealed three generic weaknesses associated with applicant performance on the written examination.

  • Three applicants did not understand the impact of a group 2 isolation when residual heat removal was intertied with fuel pool cooling.
  • Three applicants did not understand what the lowest value of torus level would not require entry into TS 3.6.2.2, Suppression Pool Water Level.
  • Three applicants did not understand what systems must be declared inoperable on a loss of 250 VDC bus 1B, and the associated completion time for TS 3.8.7, Distribution Systems - Operating.

Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training. These deficiencies were captured in the licensees corrective action program as Condition Reports CNS-2020-03322.

.4 Simulation Facility Performance

a. Scope

The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.

b. Findings

No findings were identified.

.5 Examination Security

a. Scope

The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.

b. Findings

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

Exit Meeting Summary

The chief examiner presented the preliminary examination results to Mr. K. Dia, General Manager, Plant Operations, and other members of the staff on July 29, 2020. A telephonic exit was conducted on August 18, 2020, between Mr. T. Farina, chief examiner, and Mr. K. Dia. The licensee did not identify any information or materials used during the examination as proprietary.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

M. Joe, Training Manager
J. Florence, Simulator and Training Support Superintendent

NRC Personnel

A. Siwy, Senior Resident Inspector

ADAMS DOCUMENTS REFERENCED