MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20213012021-07-29029 July 2021 NRC Retake Examination Report 05000298/2021301 IR 05000298/20203022020-11-18018 November 2020 NRC Examination Report 05000298/2020302 IR 05000298/20203012020-09-15015 September 2020 NRC Examination Report 05000298/2020301 IR 05000298/20183012018-10-16016 October 2018 NRC Examination Report 05000298/2018301 ML18255A2642018-09-12012 September 2018 NRC Initial Operator Licensing Examination Approval 05000298/2018301 IR 05000298/20173012017-05-19019 May 2017 NRC Examination Report 05000298/2017301 IR 05000298/20153032016-01-0808 January 2016 NRC Examination Report 05000298/2015303 ML15153A2072015-06-0202 June 2015 Notification of NRC Initial Operator Licensing Examination 05000298/2015303 IR 05000298/20153022015-05-15015 May 2015 Er 05000298/2015302; January 27 - May 6, 2015; Cooper Nuclear Station; Initial Operator Licensing Retake Examination Report IR 05000298/20143012014-08-28028 August 2014 Er 050002982014301; 07/28/2014 to 08/20/2014; Cooper Nuclear Station; Initial Operator Licensing Examination Report NLS2013073, Preparation and Scheduling of Operator Licensing Examinations2013-07-0202 July 2013 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20123012013-04-10010 April 2013 Er 05000298/12-301, October 30, 2012 to March 21, 2013; Cooper Nuclear Station; Initial Operator Licensing Examination Report IR 05000298/20113012011-07-0808 July 2011 NRC Examination Report 05000298/2011301 IR 05000298/20093012009-11-0404 November 2009 Er 05000298-09-301, on September 21, 2009, Cooper Nuclear Station, Initial Operator Licensing Examination Report IR 05000298/20083012008-04-0707 April 2008 Er 05000298/2008301; March 17-27, 2008; Cooper Nuclear Station; Initial Operator Licensing Examination Report IR 05000298/20073012007-02-23023 February 2007 Er 05000298-07-301; 1/29-30/2007; Cooper Nuclear Station; Initial Operator Licensing Examination Report ML0708005862007-01-31031 January 2007 Init Exam - 01/2007 - Final Exam ML0715504442005-10-31031 October 2005 10/2005 - Final - Outline IR 05000298/20053012005-06-27027 June 2005 NRC Examination Report 05000298-05-301 ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000298/20033012003-07-0101 July 2003 Er 50-298/03-301, on June 16-20, 2003, Nebraska Public Powers District, Cooper Nuclear Station; Initial Operator Licensing Examinations NLS2002100, Nebraska Public Power District Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.2002-08-0606 August 2002 Nebraska Public Power District Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. 2022-08-10
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ber 4, 2009
SUBJECT:
COOPER NUCLEAR STATION - NRC EXAMINATION REPORT 05000298/2009301
Dear Mr. Minahan:
On September 25, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Cooper Nuclear Station. The enclosed report documents the examination findings and licensing decisions. The preliminary examination findings were discussed on September 25, 2009, with yourself and other members of your staff. A telephonic exit meeting was conducted on October 14, 2009, with Mr. M. Joe, who was provided the NRC licensing decisions.
The examination included the evaluation of seven applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report.
No findings of significance were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Stephen M. Garchow, Acting Chief Operations Branch Division of Reactor Safety
Nebraska Public Power District -2-Docket: 50-298 License: DPR-46
Enclosure:
NRC Examination Report 05000298/2009301
REGION IV==
Docket: 50-298 License: DPR-46 Report: 05000298/2009301 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: Brownville, Nebraska Dates: September 21, 2009 Inspectors: S. Garchow, Senior Operations Engineer R. DeVercelly, Senior Technical Training Instructor G. Apger, Operations Engineer Approved By: Stephen M. Garchow, Acting Chief Operations Branch Division of Reactor Safety 1 Enclosure
SUMMARY OF FINDINGS
ER05000298/2009301; September 21, 2009; Cooper Nuclear Station; Initial Operator Licensing
Examination Report.
NRC examiners evaluated the competency of seven applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses at Cooper Nuclear Station.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on September 18, 2009. NRC examiners administered the operating tests on September 21-25, 2009.
The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
The Operating Test submitted was considered unsatisfactory in that it did not meet the requirements of NUREG-1021, Operator Licensing Examination Standards for Power Reactors.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited four of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings of significance were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
The Operating Test submitted by the licensee was considered unsatisfactory because the simulator scenarios did not meet the requirements of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. Specifically, for some individuals there were an insufficient number of events for a valid exam and in some cases the scenarios were not logical. For example, in one scenario a critical task was identified that stated the crew was to emergency depressurize following a large break LOCA. In addition, some individuals were to be given credit for simulator scenario events where there were no required operator actions and this is contrary to the guidance in the examination standard.
.3 Operator Knowledge and Performance
a. Scope
On September 18, 2009, the licensee proctored the administration of the written examinations to all thirteen applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 30, 2009.
The NRC examination team administered the various portions of the operating tests to all thirteen applicants on September 21-25, 2009.
b. Findings
No findings of significance were identified.
All of the applicants passed the written examination and all parts of the operating test.
The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted generic weaknesses in the areas of annunciator control and a quick restart of a reactor feed pump using the hard card.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings of significance were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings of significance were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. Demetrius Willis, Rod Penfield, David VanDerKamp, and other members of the staff on September 25, 2009. A telephonic exit was conducted on October 14, 2009, between Messrs. S.
Garchow, Chief Examiner, and M. Joe.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- M. Joe, Operator Training Supervisor, ILT
- J. Boyd, ILT Program Guardian
- W. Gilbert, Exam Developer
- D. Sealock, Training Manager
- D. Werner, Operator Training Supervisor
NRC Personnel
M. Chambers
ADAMS DOCUMENTS REFERENCED