ML21089A173: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:2020 ANNUAL ASSESSMENT MCGUIRE              CATAWBA    OCONEE Reactor Oversight Process ML21089A173 Nuclear Regulatory Commission - Region II
{{#Wiki_filter:}}
 
PURPOSE Discuss licensee    Address findings and  Information Meeting performance in 2020 Performance Indicators
 
AGENDA
* Introductions
* Review Reactor Oversight Process
* NRC Response to COVID-19
* Annual Assessment Summary
* Catawba Nuclear Station
* McGuire Nuclear Station
* Oconee Nuclear Station
* Closing Remarks
* NRC available for public questions
 
===Introductions===
* Regional Personnel
* Jared Nadel - Acting Branch Chief
* Jannette Worosilo - Senior Project Engineer
* Catawba Nuclear Station Resident Inspectors
* Joseph Austin - Senior Resident Inspector
* Christian Scott - Resident Inspector
 
===Introductions===
* McGuire Nuclear Station Resident Inspectors
* Andy Hutto - Senior Resident Inspector
* Ronald Cureton - Resident Inspector
* Oconee Nuclear Station Resident Inspectors
* Adam Ruh - Acting Senior Resident Inspector
 
NRC REACTOR OVERSIGHT PROCESS 1
NRC 2                                          NRC 3
4 Implemented in each of  Involves inspection and  Executed by regional the NRCs four regions  assessment activities  and resident inspectors
 
Reactor Oversight Framework Reactor Oversight Inputs and Oversight INCREASING SAFETY SIGNIFICANCE GREEN                      WHITE                  YELLOW                  RED Performance  Performance within an        Performance outside      Related cornerstone      Signals a significant Indicators        expected level;            expected range;      objectives are being met;  reduction in safety Cornerstone objectives      Cornerstone objectives  Minimal reduction in the    margin in the area are met              are still being met          safety margin            measured Findings    Very low safety or security Low to moderate safety      Substantial safety or  High safety or security significance          or security significance  security significance        significance Oversight      Baseline Inspection      Requires additional NRC    Requires more NRC        Requires most NRC oversight                oversight              oversight INCREASING NRC OVERSIGHT
 
RESIDENT INSPECTOR PROGRAM
* Resident inspectors live in the communities they serve
* Perform inspections at McGuire, Catawba, &
Oconee Nuclear Stations
* Provide daily oversight of plant activities
 
RESPONSE TO COVID-19 Monitor plant activities through  Maintain emergency      Risk-informing inspections & oversight        response capabilities "eyes on" inspections
 
RESPONSE TO COVID-19 Expanded use of telework Dedicated Continuity of    Coordinated with where appropriate        Operations Plan      industry best practices
 
NRC Annual Assessment Summary Annual Assessment Summary CATAWBA NUCLEAR STATION Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment All findings associated with Catawba Nuclear Station in 2020 were Green
 
Findings and Performance Indicators CATAWBA NUCLEAR STATION 1 - Green non-cited violation identified in 2020 1 - Green finding identified in 2020 All Performance Indicators were Green
 
Annual Assessment Summary CATAWBA NUCLEAR STATION Catawba Units 1 and 2 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2020 NRC plans to conduct routine baseline inspections at the Catawba Nuclear Station for 2021
 
QUESTIONS?
NRC Annual Assessment Summary NRC Annual Assessment Summary MCGUIRE NUCLEAR STATION
* Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment
* All findings associated with McGuire Nuclear Station in 2020 were Green
 
Findings and Performance Indicators MCGUIRE NUCLEAR STATION
* 1 - Green non-cited violation identified in 2020
* 1 - Severity Level IV non-cited violation identified in 2020
* All Performance Indicators were Green
 
NRC Annual Assessment Summary MCGUIRE NUCLEAR STATION
* McGuire Units 1 and 2 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2020
* NRC plans to conduct routine baseline inspections at the McGuire Nuclear Station for 2021
 
QUESTIONS?
NRC Annual Assessment Summary NRC Annual Assessment Summary OCONEE NUCLEAR STATION
* Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment
* All findings associated with Oconee Nuclear Station in 2020 were Green
 
Findings and Performance Indicators OCONEE NUCLEAR STATION
* 5 - Green non-cited violations identified in 2020
* 1 - Severity Level IV non-cited violation in 2020
* 1 - Green finding in 2020
* 1 - Green cited violation in 2020
* All Performance Indicators were Green
 
NRC Annual Assessment Summary OCONEE NUCLEAR STATION
* Oconee Units 1, 2, and 3 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2020
* NRC plans to conduct routine baseline inspections at the Oconee Nuclear Station for 2021
* In addition to ROP baseline inspections, the NRC plans to conduct IP 93100, Safety-Conscious Work Environment Issue of Concern Follow up.
 
Safety Conscious Work Environment Assessment OCONEE NUCLEAR STATION
* In August 2020 NRC inspectors assessed the Safety Conscious Work Environment within the Operations Department
* NRC inspectors concluded that warning signs existed in the Operations Department that were indicative of a degraded Safety Conscious Work Environment.
* Once the licensee completes their corrective actions, NRC will conduct a follow-up assessment to determine whether the actions taken are adequate.
 
QUESTIONS?
NRC ON SOCIAL MEDIA Twitter: https://twitter.com/nrcgov Facebook: https://www.facebook.com/nrcgov/
YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/
GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new
 
CONTACT THE NRC Catawba NRC resident inspectors
* Phone (404) 997-5130
* Phone (404) 997-5131 McGuire NRC resident inspectors
* Phone (404) 997-5171
* Phone (404) 997-5173 Oconee NRC resident inspectors
* Phone (404) 997-5211
* Phone (404) 997-5213
* Phone (404) 997-5214
 
QUESTIONS AND FEEDBACK Through any computer by going to the Public Meeting Schedule and pressing the Meeting Feedback link for this meeting, or pressing the [more] link for this meeting and then pressing the Meeting Feedback link on the Meeting Details page.
 
QUESTIONS?}}

Revision as of 22:53, 17 January 2022

EOC Slides Final
ML21089A173
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 03/30/2021
From:
NRC/RGN-II
To:
References
Download: ML21089A173 (31)


Text