{{#Wiki_filter:August 05, 2021
Mr. John Dent, Jr., Vice President
and Chief Nuclear Officer
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT:        COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC
                INSPECTION REPORT 05000298/2021004) AND REQUEST FOR
                INFORMATION
Dear Mr. Dent:
During the week of October 4, 2021, three inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Cooper Nuclear Station, using NRC Inspection Procedure 71111.11B, Licensed
Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. To minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
These documents have been divided into three groups:
    *  The first group (Section A of the enclosure) identifies information to be provided prior to
        the inspection to ensure that the inspectors are adequately prepared.
    *  The second group (Section B of the enclosure) identifies the information the inspectors
        will need upon arrival at the site.
    *  The third group (Section C of this enclosure) identifies the items which are necessary to
        close out the inspection and are usually sent a few weeks after the inspectors have left
        the site.
It is important that all these documents are up to date and complete to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Jim Florence of your training
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact me, Thomas Farina, at (817) 200-1117 (thomas.farina@nrc.gov).
 
J. Dent                                      2
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                                  Sincerely,
                                                  Thomas Farina, Senior Operations Engineer
                                                  Operations Branch
                                                  Division of Reactor Safety
Docket No. 50-298
License No. DPR-46
Enclosure:
Initial Request for Information
  Biennial Requalification Inspection
 
                                  Initial Request for Information
                                Biennial Requalification Inspection
                                      Cooper Nuclear Station
Inspection Report:                      05000298/2021004
Inspection Dates:                      October 4-8, 2021
Inspection Procedure:                  IP 71111.11B, Licensed Operator Requalification
                                        Program
Lead Inspector:                        Thomas Farina, Senior Operations Engineer
A. The following information is requested to support inspection preparation activities.
    These items are listed by section as they appear in the inspection module (i.e. 03.04a,
    03.04b, etc.). Requested materials should uploaded to the NRC BOX server, via a link
    provided by the lead inspector, no later than September 24, 2021. Alternately, it may
    be sent in an electronic format on CD/DVD to the Region IV office.
      *  CD/DVD to: US Nuclear Regulatory Commission, Region IV
                          ATTN: Thomas Farina
                          1600 E. Lamar Blvd
                          Arlington, TX 76011
    General Requests:
      *  List of licensed operators (SRO & RO) by crew (operating & staff)
      *  Training and Operations Department organization charts (with qualified LOR
          evaluators identified)
      *  Procedures that identify process for revising and maintaining LO continuing training
          program up to date
      *  List of outstanding LOR program changes
      *  List of plant events and industry operating experience incorporated into LOR
          program since last BRQ
      *  Audits and/or self-assessment reports addressing the licensed operator
          requalification training program
      *  Last 2 years of Simulator Review Committee (or equivalent) meeting minutes
      *  Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
      *  A summary report of all condition reports related to operator actions/errors in the
          control room
                                                                                    Enclosure
 
  *  Any revised requalification training that was based on licensed operator performance
      issues
03.04a: Biennial Requalification Written Examinations
  *  The current and approved biennial written examination schedule
  *  The current requalification cycle written examination results for both SRO & RO that
      have already been administered up to the week prior to the inspectors arrival onsite.
  *  All written examinations that have been approved for administration up to and
      including the week before the inspectors are onsite. This will need to have adequate
      password protection or double envelope protection if mailed via regular mail per
      NUREG-1021.
  *  The current requalification cycle examination methodology (sample plan)
03.04b: Annual Requalification Operating Tests
  *  The schedule for the operating tests (JPMs & scenarios) to be given the week of
      October 4, 2021.
  *  The operating tests (JPMs & scenarios) (password protected and provide separately
      via telephone at later date) to be given the week of October 4, 2021.
  *  Current requalification cycle operating tests (SRO & RO) and results up to the week
      prior to the inspection inspectors arrival onsite
  *  All 2020 NRC required annual operating tests
  *  Current requalification cycle operating test methodology (sample plan)
  *  All portions of the UFSAR that identify operator response times for time critical
      operator actions
03.04c: Administration of an Annual Requalification Operating Test
  *  All procedures used to administer the annual operating test
  *  All procedures used to assess operator performance
  *  All procedures that describe conduct of simulator training
  *  All procedures used to test, operate, and maintain the simulator
03.04d: Requalification Examination Security
  *  Submit any tracking tools that you use to prevent excessive overlap on the written
      examinations and meet the intent of sampling all required topics on a periodic basis.
  *  Submit any tracking tools that you use to prevent excessive overlap on the operating
      tests and meet the intent of sampling all required malfunctions (including major
      events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
                                              2
 
  *  All procedures that describe examination security, including procedures used to
      develop the examinations that include guidelines on overlap between examinations
      in current exam cycle tests and prior year examinations
  *  List of all condition reports since the last biennial requalification inspection related to
      examination security and overlap
03.04e: Remedial Training and Re-Examinations
  *  List of remedial training conducted or planned since last requalification exam
      (includes training provided to operators to enable passing requalification exam and
      training provided to correct generic or individual weaknesses observed during
      previous requalification exam cycle)
  *  Remediation plans (lesson plans, reference materials, and attendance
      documentation)
03.04f: Operator License Conditions
  *  All procedures and program documentation for maintaining active operator licenses,
      tracking training attendance, and ensuring medical fitness of licensed operators
  *  All procedures and associated documentation that supports reactivation of any
      SRO/RO license (operating or staff crew) since the last biennial inspection
03.04g: Control Room Simulator
  *  An index of the most recent operability test packages required by ANSI 3.5 2009
      Appendix B, including performance and approval dates, and results.
  *  A list of simulator baseline data sources (ANSI 3.5 2009 5.1.1) for the transient
      performance tests required by ANSI 3.5 2009 Appendix B.3.2.1.
  *  All simulator management and configuration procedures if not already provided
  *  Simulator discrepancy report summary list for all open discrepancy reports and
      summary list for those items closed since October 1, 2019.
  *  Primary parameters tested to verify core physics parameters (such as moderator
      temperature coefficient, integral rod worth)). The applicable reference graphs from
      the plant physics data book (electronic or other means as available) should also be
      included as well as the test procedures used and the acceptance criteria with results.
  *  All simulator modification packages that are on hold, delayed, or not completed in the
      last 2 years
  *  A list of simulator modification packages completed in the last two-year window
                                              3
 
      *  An index of Post-Event Simulator Testing conducted since October 1, 2019.
      *  Current Simulator Differences List / Lesson plan used in training.
The following information is requested to support the onsite inspection activities.
Requested materials should be available to the inspectors, either electronically or
hardcopy, upon site arrival on October 4, 2021.
  03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
          Exam and Annual Requalification Operating Tests Quality
      *  All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
          onsite week, if available
      *  All results up to the day the inspectors leave the site
  03.04f: Conformance with Operator License Conditions
      *  Access to licensed operators records (operating and staff crews)
      *  Access to licensed operators training attendance records
      *  Access to licensed operators medical records
  03.04g: Control Room Simulator Performance
      *  Simulator discrepancies from October 1, 2019. This should include all open and
          closed simulator discrepancy reports, including the documentation/justification for
          closure.
      *  Acceptance test documentation, including hardware and software model revisions at
          the time of acceptance (as available)
      *  Documentation that validates current models, including the thermal-hydraulics and
          neutronics models, to the actual plant
      *  All current model deficiencies, including FSAR vs design differences in the simulator
          (any documentation on this)
      *  Summary list of modifications from October 1, 2019.
      *  Plant modifications (both hardware and software) completed on the simulator by due
          date from October 1, 2019.
      *  Simulator differences lesson plan used in training (current to October 4, 2021.
      *  The complete book of all simulator annual performance test packages (usually in a
          single book but may be electronic or in single test packages), complete with all
          transient tests, steady state tests, and malfunction tests. This should also include
          the test procedures for each test, the acceptance criteria, and results.
                                                4
 
      *    For each transient test, the reference chart should be included or an equivalent
          subject matter expert review versus the simulator results with a write-up for any
          differences beyond the ANSI standard requirements.
      *    All test packages used to verify core physics parameters (such as moderator
          temperature coefficient and integral rod worth). The applicable reference graphs
          from the plant physics data book (electronic or other means as available) should also
          be included as well as the test procedures used and the acceptance criteria with
          results.
      *    All simulator tests, configuration management, and related documents available in
          the room for inspectors to review. This includes training needs analysis packages,
          Simulator Review Committee meeting minutes, etc.
      *    Current copy of ANSI 3.5 standard you are committed to for simulator testing
B. Cooper Nuclear Station is required to send the final results summary (see Table 1
  below) and any remaining exams and operating tests that have not been reviewed to
  the regional office lead inspector for this inspection for final review and comparison
  against the Significance Determination Tools to communicate the exit results for the
  inspection.
      TABLE 1: EXAMINATION RESULTS
        1. Total number of licensed operators.
        2. Number of licensed operators administered a requalification
            examination required by 10 CFR 55.59(a).
        3. Number of individual licensed operators who failed any portion of a
            requalification examination (written, JPM, or individual simulator
            scenario failures).
        4. Divide line 3 by line 2 to obtain the individual requalification
            examination failure rate. Line 3/Line 2.                                        %
        5. Number of crews administered simulator scenarios as part of a
            requalification examination required by 10 CFR 55.59(a).
        6. Number of crews who performed unsatisfactorily on the
            simulator scenarios.
        7. Divide line 6 by line 5 to obtain the crew simulator scenario
            failure rate. Line 6/Line 5.                                                    %
                                                  5
 
 
ML21217A118
SUNSI Review          ADAMS:      Non-Publicly Available  Non-Sensitive Keyword:
  By: TJF              Yes  No  Publicly Available      Sensitive      NRC-002
OFFICE        SOE:DRS/OB
NAME            TFarina
SIGNATURE          tjf
DATE            8/3/2021
}}
}}

Revision as of 01:26, 9 September 2021

Notification of Inspection (NRC Inspection Report 05000298/2021004) and Request for Information
ML21217A118
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/05/2021
From: Thomas Farina
Division of Reactor Safety IV
To: Dent J
Nebraska Public Power District (NPPD)
References
IR 2021004
Download: ML21217A118 (8)


See also: IR 05000298/2021004

Text

August 05, 2021

Mr. John Dent, Jr., Vice President

and Chief Nuclear Officer

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000298/2021004) AND REQUEST FOR

INFORMATION

Dear Mr. Dent:

During the week of October 4, 2021, three inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at Cooper Nuclear Station, using NRC Inspection Procedure 71111.11B, Licensed

Operator Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. To minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into three groups:

  • The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

  • The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

  • The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the inspectors have left

the site.

It is important that all these documents are up to date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Jim Florence of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact me, Thomas Farina, at (817) 200-1117 (thomas.farina@nrc.gov).

J. Dent 2

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Thomas Farina, Senior Operations Engineer

Operations Branch

Division of Reactor Safety

Docket No. 50-298

License No. DPR-46

Enclosure:

Initial Request for Information

Biennial Requalification Inspection

Initial Request for Information

Biennial Requalification Inspection

Cooper Nuclear Station

Inspection Report: 05000298/2021004

Inspection Dates: October 4-8, 2021

Inspection Procedure: IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector: Thomas Farina, Senior Operations Engineer

A. The following information is requested to support inspection preparation activities.

These items are listed by section as they appear in the inspection module (i.e. 03.04a,

03.04b, etc.). Requested materials should uploaded to the NRC BOX server, via a link

provided by the lead inspector, no later than September 24, 2021. Alternately, it may

be sent in an electronic format on CD/DVD to the Region IV office.

  • CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Thomas Farina

1600 E. Lamar Blvd

Arlington, TX 76011

General Requests:

  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR

evaluators identified)

  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program

  • Last 2 years of Simulator Review Committee (or equivalent) meeting minutes
  • Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
  • A summary report of all condition reports related to operator actions/errors in the

control room

Enclosure

  • Any revised requalification training that was based on licensed operator performance

issues

03.04a: Biennial Requalification Written Examinations

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspectors arrival onsite.

  • All written examinations that have been approved for administration up to and

including the week before the inspectors are onsite. This will need to have adequate

password protection or double envelope protection if mailed via regular mail per

NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

03.04b: Annual Requalification Operating Tests

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of

October 4, 2021.

  • The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of October 4, 2021.

  • Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection inspectors arrival onsite

  • All 2020 NRC required annual operating tests
  • Current requalification cycle operating test methodology (sample plan)
  • All portions of the UFSAR that identify operator response times for time critical

operator actions

03.04c: Administration of an Annual Requalification Operating Test

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All procedures used to test, operate, and maintain the simulator

03.04d: Requalification Examination Security

  • Submit any tracking tools that you use to prevent excessive overlap on the written

examinations and meet the intent of sampling all required topics on a periodic basis.

  • Submit any tracking tools that you use to prevent excessive overlap on the operating

tests and meet the intent of sampling all required malfunctions (including major

events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.

2

  • All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all condition reports since the last biennial requalification inspection related to

examination security and overlap

03.04e: Remedial Training and Re-Examinations

  • List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

  • Remediation plans (lesson plans, reference materials, and attendance

documentation)

03.04f: Operator License Conditions

  • All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

  • All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

03.04g: Control Room Simulator

  • An index of the most recent operability test packages required by ANSI 3.5 2009

Appendix B, including performance and approval dates, and results.

performance tests required by ANSI 3.5 2009 Appendix B.3.2.1.

  • All simulator management and configuration procedures if not already provided
  • Simulator discrepancy report summary list for all open discrepancy reports and

summary list for those items closed since October 1, 2019.

  • Primary parameters tested to verify core physics parameters (such as moderator

temperature coefficient, integral rod worth)). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

  • All simulator modification packages that are on hold, delayed, or not completed in the

last 2 years

  • A list of simulator modification packages completed in the last two-year window

3

  • An index of Post-Event Simulator Testing conducted since October 1, 2019.
  • Current Simulator Differences List / Lesson plan used in training.

The following information is requested to support the onsite inspection activities.

Requested materials should be available to the inspectors, either electronically or

hardcopy, upon site arrival on October 4, 2021.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

  • All operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week, if available

  • All results up to the day the inspectors leave the site

03.04f: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews)
  • Access to licensed operators training attendance records
  • Access to licensed operators medical records

03.04g: Control Room Simulator Performance

  • Simulator discrepancies from October 1, 2019. This should include all open and

closed simulator discrepancy reports, including the documentation/justification for

closure.

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

  • All current model deficiencies, including FSAR vs design differences in the simulator

(any documentation on this)

  • Summary list of modifications from October 1, 2019.
  • Plant modifications (both hardware and software) completed on the simulator by due

date from October 1, 2019.

  • Simulator differences lesson plan used in training (current to October 4, 2021.
  • The complete book of all simulator annual performance test packages (usually in a

single book but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results.

4

  • For each transient test, the reference chart should be included or an equivalent

subject matter expert review versus the simulator results with a write-up for any

differences beyond the ANSI standard requirements.

  • All test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs

from the plant physics data book (electronic or other means as available) should also

be included as well as the test procedures used and the acceptance criteria with

results.

  • All simulator tests, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis packages,

Simulator Review Committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for simulator testing

B. Cooper Nuclear Station is required to send the final results summary (see Table 1

below) and any remaining exams and operating tests that have not been reviewed to

the regional office lead inspector for this inspection for final review and comparison

against the Significance Determination Tools to communicate the exit results for the

inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.  %

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.  %

5

ML21217A118

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: TJF Yes No Publicly Available Sensitive NRC-002

OFFICE SOE:DRS/OB

NAME TFarina

SIGNATURE tjf

DATE 8/3/2021