ML20203M908: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:[ k, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION O R WASHINGTON, D. C. 20655 k, . . . . . ,o CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT DOCKET NO. 50-213 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 75 License No. DPR-61 | ||
: 1. The Nuclear Regulatory Commissica (the Consnission) has found that: | |||
A. The application for amendment by Connecticut Yankee Atomic Power Company (the licensee) dated February 21, 1986, complies with the standards and requirem' e nts of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. | |||
8605020134 860429 PDR ADOCK0500g3 P | |||
: 2. Accordingly, the license is amended by changes to the technical specificati6ns as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-61 is hereby amended to read as follows: | |||
(2) Technical Specifications The technical specifications contained in Appendix A, as revised through Amendment No. 75, are hereby incorporated in the license. | |||
The licensee shall operate the facility in accordance with the Technical Spccifications. | |||
: 3. This license amendment is effective as of the date of its issuance. | |||
FOR THE NUCLEAR REGULATORY COMMISSION bAAA 1AA.A 1. | |||
Christopher I. Grimes, Dire tor , | |||
Integrated Safety Assessment Project Directorate Division of PWR Licensing - B | |||
==Attachment:== | |||
Changes to the Technical Specifications Date of Issuance: April 29,1986 | |||
,s | |||
= | |||
l I | |||
r i | |||
ATTACHMENT TO LICENSE AMENDMENT NO. 75 FACILITY OPERATING LICENSE NO. DPR-61 DOCKET N0. 50-213 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by the captioned amendment number and contain vertical lines indicating the area of change. | |||
REMOVE INSERT 3-44 3-44 Table 3.22-2 Table 3.22-2 d | |||
i | |||
= | |||
k | |||
, , - - - - - - , , - , , - - - - - ~ ,,-,--a ,n ,, . - , -- - . . , - . . - | |||
TABLE 3.22-2 1 | |||
FIRE DETECTION INSTRUMENTS Minimum Number Minimum Number Smoke Detectors Heat Detectors Operable / Detectors Operable / Detectors Location Available Available | |||
: 1. Containment ~19/23* 24/32** | |||
: 2. Cable Spreading Area 21/28* | |||
L | |||
: 3. I A Diesel Generator Room 4/5 | |||
: 4. IB Diesel Generator Room 4/5 | |||
: 5. Switchgear Room 26/32' | |||
: 6. Containment Cable Vault 3/4 , | |||
. 7. Waste Disposal Building 2/3 . | |||
: 8. Auxiliary Feedwater Pump Room - | |||
1/2 | |||
-(Fire Zone) | |||
: 9. Primary Auxiliary Building Zone 1 (A-1A) 1/2 Zone 2 (A-1B) 3/4 Zone 3 (A-1C) 1/1 , | |||
Zone 4 (A-4) 1/1 , | |||
Zone 5 (A-9) 2/3 7, Zone 6 (A-11) 2/3 Zone 7 (A-13) 1/2 Zone 8 (A-14, A-15) 1/1 - | |||
: 10. Control Room S/10 o | |||
: 11. Screen Well Building Zone 1 (P-1) 2/3 Zone 2 (P-3) 1/1 . | |||
: 12. Spent Fuel Building 5/6 | |||
*No two adjacent detectors shall be Inoperable at the same time. | |||
** Minimum 6 heat detectors per reactor coolant pump must be operable. | |||
Amendment No. N 75 | |||
, , _ n , -.. , - , - ,.... | |||
G. Spray and/or Sprinkler Systems G.1 The particular spray and/or sprinkler systems located in the following areas shall be operable at all times when a fire hazard exists within the area protected by the applicable spray and/or sprinkler system: | |||
: a. Maintenance Shop Amex (old warehouse) | |||
: b. High-Pressure Turbine Housing l | |||
: c. Hydrogen Seal Oil Unit | |||
: d. Turbine Lube Oil Reservoir i | |||
l | |||
: e. Turbine Building El. 21'.- 6" | |||
: f. Turbine Building Mezzanine | |||
: g. Turbine Building beneath the Turbine Floor and mder the High- I J | |||
Pressure Turbine | |||
: h. Turbine BuildinfMezzanine under Generator - | |||
\ | |||
: 1. Oil Storage Room ' | |||
l | |||
: j. Turbine Building Crane Well | |||
: k. Cable Spreading Area (Mezzanine Level)* j l | |||
: 1. Diesel Generator Room A - | |||
l | |||
: m. Diesel Generator Room B ' | |||
: n. Primary Auxiliary Building Sprinkler System * | |||
: o. Service Building Sprinkler System | |||
: p. Chemistry Lab Sprinkler System | |||
: q. Machine Shop Sprinkler System 1 | |||
: r. Intake Structure (Diesel Fue,1 Storage Room) j | |||
: s. Diesel Fire Pump Sprinkler System i | |||
i t. Cable Spreading. Area Hallway * | |||
: u. Intake Structure (Service Water Pumps Water Curtain)* | |||
l | |||
* Areas where ' redundant systems or components could be damaged. | |||
344 , | |||
Amendment flo.J#, Jff, g, 75 l | |||
. - - . - . .. . .-.-____.._-...--.--1}} |
Latest revision as of 05:19, 31 December 2020
ML20203M908 | |
Person / Time | |
---|---|
Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
Issue date: | 04/29/1986 |
From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
To: | |
Shared Package | |
ML20203M906 | List: |
References | |
NUDOCS 8605020134 | |
Download: ML20203M908 (5) | |
Text
[ k, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION O R WASHINGTON, D. C. 20655 k, . . . . . ,o CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT DOCKET NO. 50-213 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 75 License No. DPR-61
- 1. The Nuclear Regulatory Commissica (the Consnission) has found that:
A. The application for amendment by Connecticut Yankee Atomic Power Company (the licensee) dated February 21, 1986, complies with the standards and requirem' e nts of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8605020134 860429 PDR ADOCK0500g3 P
- 2. Accordingly, the license is amended by changes to the technical specificati6ns as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-61 is hereby amended to read as follows:
(2) Technical Specifications The technical specifications contained in Appendix A, as revised through Amendment No. 75, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Spccifications.
- 3. This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION bAAA 1AA.A 1.
Christopher I. Grimes, Dire tor ,
Integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Attachment:
Changes to the Technical Specifications Date of Issuance: April 29,1986
,s
=
l I
r i
ATTACHMENT TO LICENSE AMENDMENT NO. 75 FACILITY OPERATING LICENSE NO. DPR-61 DOCKET N0. 50-213 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by the captioned amendment number and contain vertical lines indicating the area of change.
REMOVE INSERT 3-44 3-44 Table 3.22-2 Table 3.22-2 d
i
=
k
, , - - - - - - , , - , , - - - - - ~ ,,-,--a ,n ,, . - , -- - . . , - . . -
TABLE 3.22-2 1
FIRE DETECTION INSTRUMENTS Minimum Number Minimum Number Smoke Detectors Heat Detectors Operable / Detectors Operable / Detectors Location Available Available
- 1. Containment ~19/23* 24/32**
- 2. Cable Spreading Area 21/28*
L
- 3. I A Diesel Generator Room 4/5
- 4. IB Diesel Generator Room 4/5
- 5. Switchgear Room 26/32'
- 6. Containment Cable Vault 3/4 ,
. 7. Waste Disposal Building 2/3 .
- 8. Auxiliary Feedwater Pump Room -
1/2
-(Fire Zone)
- 9. Primary Auxiliary Building Zone 1 (A-1A) 1/2 Zone 2 (A-1B) 3/4 Zone 3 (A-1C) 1/1 ,
Zone 4 (A-4) 1/1 ,
Zone 5 (A-9) 2/3 7, Zone 6 (A-11) 2/3 Zone 7 (A-13) 1/2 Zone 8 (A-14, A-15) 1/1 -
- 10. Control Room S/10 o
- 11. Screen Well Building Zone 1 (P-1) 2/3 Zone 2 (P-3) 1/1 .
- 12. Spent Fuel Building 5/6
- No two adjacent detectors shall be Inoperable at the same time.
- Minimum 6 heat detectors per reactor coolant pump must be operable.
Amendment No. N 75
, , _ n , -.. , - , - ,....
G. Spray and/or Sprinkler Systems G.1 The particular spray and/or sprinkler systems located in the following areas shall be operable at all times when a fire hazard exists within the area protected by the applicable spray and/or sprinkler system:
- a. Maintenance Shop Amex (old warehouse)
- b. High-Pressure Turbine Housing l
- c. Hydrogen Seal Oil Unit
- d. Turbine Lube Oil Reservoir i
l
- e. Turbine Building El. 21'.- 6"
- f. Turbine Building Mezzanine
- g. Turbine Building beneath the Turbine Floor and mder the High- I J
Pressure Turbine
- h. Turbine BuildinfMezzanine under Generator -
\
- 1. Oil Storage Room '
l
- j. Turbine Building Crane Well
- k. Cable Spreading Area (Mezzanine Level)* j l
- 1. Diesel Generator Room A -
l
- m. Diesel Generator Room B '
- n. Primary Auxiliary Building Sprinkler System *
- o. Service Building Sprinkler System
- p. Chemistry Lab Sprinkler System
- q. Machine Shop Sprinkler System 1
- r. Intake Structure (Diesel Fue,1 Storage Room) j
- s. Diesel Fire Pump Sprinkler System i
i t. Cable Spreading. Area Hallway *
- u. Intake Structure (Service Water Pumps Water Curtain)*
l
- Areas where ' redundant systems or components could be damaged.
344 ,
Amendment flo.J#, Jff, g, 75 l
. - - . - . .. . .-.-____.._-...--.--1