ML20197B023: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20197B023
| number = ML20197B023
| issue date = 10/23/1978
| issue date = 10/23/1978
| title = Responds to 780929 Ltr Advising That NEDO-24048, Evaluation of Acoustic Pressure Loads on BWR/6 Internal Components Part of Gessar Docket & Fee Exempt.Concurs on Fee Exemption
| title = Responds to Advising That NEDO-24048, Evaluation of Acoustic Pressure Loads on BWR/6 Internal Components Part of Gessar Docket & Fee Exempt.Concurs on Fee Exemption
| author name = Parr O
| author name = Parr O
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7811010213
| document report number = NUDOCS 7811010213
| title reference date = 09-29-1978
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 00:27, 9 December 2021

Responds to Advising That NEDO-24048, Evaluation of Acoustic Pressure Loads on BWR/6 Internal Components Part of Gessar Docket & Fee Exempt.Concurs on Fee Exemption
ML20197B023
Person / Time
Site: 05000447, 05000550
Issue date: 10/23/1978
From: Parr O
Office of Nuclear Reactor Regulation
To: Sherwood G
GENERAL ELECTRIC CO.
References
NUDOCS 7811010213
Download: ML20197B023 (1)


Text

. _ _ _ _ -

J % t UNITE D ST ATES l 3' 4>k R!UCLEAR REGULATORY COMMisSIOrd

h. O WASHINGTON, D, C. 20555 y [h ).i NRC PDR s, g g. f OCT 2 31978 Central Files - Topical Reports fg ,, '

,7. . L., . -

Dr. G. G. Sherwood -

Manager - Safety and Licensing General Electric Company 175 Curtner Avenue San Jose, California 95114

Dear Dr. Sherwood:

SUBJECT:

GENERAL ELECTRIC TOPICAL REPORT NED0-24048, " EVALUATION OF ACOUSTIC PRESSURE LOADS ON BWR/6 INTERNAL COMPONENTS" Your letter (J. F. Quirk to 0. D. Parr) dated September 29, 1978 forwarded the subject topical report. You stated that the report was being submitted in response to a specific NRC request as part of the GESSAR dockets and that General Electric considers the report exempt from any fee charges.

We agree that since the matter covered by this topical report is an extension of the PDA review of GESSAR and since the GESSAR review was started prior to the effective date of the new fee schedule regulation, NED0-24048 is exempt from fee charges.

Sincerely, kOlanL9 .P D. Parr, ief Light Water Reactors Branch No. 3 Division of Project Management cc: Mr. L. Gifford General Electric Company

. 4720 Montgomery Lane I Bethesda, Maryland 20014 l

1 siiv, l

,1

- u i

w

- _ _ _ _ _ - _ - - - _ _ _ _ _ _ _ _ - - - _ -