|
|
Line 19: |
Line 19: |
| * FAX (925) 866-1716 Sept 28, 2020 ATTENTION: Document Control Desk U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCKET NO. 50-228/LICENSE NO. R-98. | | * FAX (925) 866-1716 Sept 28, 2020 ATTENTION: Document Control Desk U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCKET NO. 50-228/LICENSE NO. R-98. |
| Updated ARRR Security Plan Ladies and Gentlemen: | | Updated ARRR Security Plan Ladies and Gentlemen: |
| Enclosed please find the updated Security Plan for ARRR. The changes comply with .10 CFR 50~54 p(2). This updated plan does not reduce its predecessor's effectiveness (dated July 28, 2020); the changes are a response NRC letter dated September 17, 2020 mainly requesting clarification pf existing information and inclusion of information absent from the previous security plan but present in CMIP. The updated ARRR Security Plan is enclosed and has been placed into service. | | Enclosed please find the updated Security Plan for ARRR. The changes comply with .10 CFR 50~54 p(2). This updated plan does not reduce its predecessor's effectiveness (dated July 28, 2020); the changes are a response NRC {{letter dated|date=September 17, 2020|text=letter dated September 17, 2020}} mainly requesting clarification pf existing information and inclusion of information absent from the previous security plan but present in CMIP. The updated ARRR Security Plan is enclosed and has been placed into service. |
| The changes reflect the actual security system that has been approved and verified meeting tlie requirements of 10 CFR 50.59. New security enhancements that are under construction are not included in this ARRR security plan (or procedures). When the performance of the 1 | | The changes reflect the actual security system that has been approved and verified meeting tlie requirements of 10 CFR 50.59. New security enhancements that are under construction are not included in this ARRR security plan (or procedures). When the performance of the 1 |
| enhancements have been validated, the integrated system will be placed into service. At that time, the ARRR Security plan will be revised and submitted underl O:,CFR 50.54 p(2). | | enhancements have been validated, the integrated system will be placed into service. At that time, the ARRR Security plan will be revised and submitted underl O:,CFR 50.54 p(2). |
Latest revision as of 03:29, 8 March 2021
Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
|
MONTHYEARML18344A0492018-12-0606 December 2018 Letter Requesting Withdrawal of the License Application Project stage: Request ML19084A0512019-03-21021 March 2019 License and TS Amendments Project stage: Other ML19108A4782019-05-29029 May 2019 Supplemental Information Needed for Acceptance of Requested Licensing Application License Amendment Request to Prepare for Fuel Storage and Decommissioning Activities for the Aerotest Radiography and Research Reactor Project stage: Acceptance Review ML19184A1122019-06-28028 June 2019 License and TS Amendments Project stage: Other ML19193A0772019-07-30030 July 2019 Acceptance Review and Milestone Date for Completion of the Review of License Amendment Request Related to Permanent Cessation of Operation of the Aerotest Radiography and Research Reactor, Facility Operating License No. R-98 Project stage: Acceptance Review ML19231A1272019-08-14014 August 2019 Supplemental to License and TS Amendments Project stage: Supplement ML19255F9322019-10-31031 October 2019 Regulatory Audit License Amendment Request for Possession Only Status of the Aerotest Radiography and Research Reactor Project stage: Other ML20017A2782020-02-0303 February 2020 Report on the Regulatory Audit Conducted December 11, 2019 License Amendment Request for Possession Only Status of the Aerotest Radiography and Research Reactor Project stage: Other ML20034G4452020-02-13013 February 2020 Request for Additional Information Amendment Request for Possession Only License for the Aerotest Radiography and Research Reactor Operating License No. R-98 Project stage: RAI ML20097D2792020-03-26026 March 2020 Transmittal of Updated Emergency Plan Project stage: Request ML20134H9462020-03-26026 March 2020 Aerotest Radiography and Research Reactor Docket No. 50-228/License No. R-98 Project stage: Request ML20098D4152020-03-26026 March 2020 Aerotest Radiography and Research Reactor, Response to NRC Staff Request for Additional Information (Redacted Version) March 26, 2020 Project stage: Request ML20112F4892020-04-30030 April 2020 Request for Clarification Amendment Request for Possession Only License for the Aerotest Radiography and Research Reactor Facility Operating License No . R-98 Project stage: Approval ML20177A2032020-07-27027 July 2020 Request for Additional Information Possession-Only License Amendment Request to Use Certified Fuel Handlers for the Aerotest Radiography and Research Reactor Facility Operating License No. R-98 Project stage: RAI ML20248H4602020-08-28028 August 2020 Inc - List of Explanations, Changes, and Justifications for Raj CFH Training and Requalification Program Project stage: Request ML20234A6312020-09-17017 September 2020 Request for Clarification Physical Security Plan Review - Cover Letter - (Public Version) Project stage: Approval ML20276A2472020-09-28028 September 2020 Aerotest Radiography and Research Reactor - Updated Arrr Security Plan Project stage: Request ML20297A3412020-11-23023 November 2020 Order, Safety Evaluation, and Draft Conforming Amendment for Transfer of Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator Project stage: Request ML21004A0792021-01-0707 January 2021 Review of Physical Security Plan in Support of Possession-Only License Amendment Request License No. R-98 Project stage: Approval ML21034A6262021-03-12012 March 2021 Request for Additional Information Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License No. R-098 Project stage: RAI ML21047A4682021-03-30030 March 2021 Request for Additional Information Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License No. R-98 Project stage: RAI ML21098A1572021-03-31031 March 2021 Response to RAI CFH Training and Requalification Program- 3/30/21 Project stage: Request ML21126A1502021-04-28028 April 2021 License and TS Amendments Project stage: Other ML21147A0602021-05-19019 May 2021 Response to RAI 28 and 29 Project stage: Request ML21201A3642021-06-0303 June 2021 Request for Additional Information Regarding Amendment for Possession-Only License Facility Operating License No. R-98 Project stage: RAI ML21181A1232021-06-22022 June 2021 License and TS Amendments Project stage: Other ML21188A2162021-07-0101 July 2021 July 1, 2020 Through June 30, 2021 Summary of Changes, Tests, and Experiments Project stage: Request ML21193A0892021-07-0101 July 2021 Emergency Plan (Redacted) Project stage: Request ML21188A3912021-07-12012 July 2021 Inc. - Revised Completion Date Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License Project stage: Other ML21328A1972021-11-23023 November 2021 NRC Staff Email and Response from Aerotest Aerotest Draft Possession-only License Amendment License Conditions and Technical Specifications, and Opportunity for Conference Call Project stage: Request ML21242A4632021-12-0606 December 2021 Issuance of License Amendment No. 6 to Facility Operating License No. R-98 for the Aerotest Radiography and Research Reactor with Partial Denial of Amendment Request Project stage: Approval 2020-08-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000228/20230012024-02-0505 February 2024 NRC Inspection Report 050-00228/2023-001, Disputed Cited Violation and Minor Violation Revised, EA-23-118 ML23279A1062023-10-0202 October 2023 Response to Violation 05000228/2023001-001B ML23255A0342023-09-0909 September 2023 Response to Violation 050-00228/2023-001-00lA ML23255A0362023-09-0909 September 2023 Response to Inspection Report 050-00228/2023-001 ML23219A1882023-08-24024 August 2023 NRC Inspection Report 05000228/2023001, and Notice of Violation ML23187A0562023-07-0101 July 2023 Radiation Safety Officer Change Update ML23187A0582023-07-0101 July 2023 July 1, 2022 Thru June 30, 2023 Summary of Changes, Tests, and Experiments ML23157A0662023-05-24024 May 2023 Letter from David Slaughter, Aerotest Operations, Inc. Inadequate Oversight of Non-Power Reactor OIG Case No. 21-012 and Requested Payment for Damages Caused by the Nrc'S Inadequate Oversight ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22340A0062022-11-16016 November 2022 Reference Documents from Decommissioning Plan ML22215A1522022-07-21021 July 2022 Aerotest Radiography and Research Reactor - AO RAI Responses for Decommissioning Plan ML22187A0852022-07-0101 July 2022 Inc - July 1, 2021 Thru June 30, 2022 Summary of Changes, Tests, and Experiments ML22152A2522022-06-28028 June 2022 Request for Additional Information on Review of Request for Amendment to Approve Decommissioning Plan, Arrr (License No. R-98, Docket No. 50-228) ML22060A2602022-03-21021 March 2022 Change in NRC Staff Project Management Responsibility for the Aerotest Radiography and Research Reactor ML22040A1992022-03-0909 March 2022 Examination Confirmation Letter No. 50-288/OL-22-03, Reed College ML22025A2002022-01-20020 January 2022 Amendment to AO Decommissioning Plan Submittal Letter Dated July 20, 2021, Agencywide Documents Access, and Management System (ADAMS) Accession No. ML21230A304 ML21307A3242022-01-12012 January 2022 Request for Supplemental Information for Decommissioning Plan, Arrr (License R-98, Docket 50-228) ML21344A0332022-01-0303 January 2022 Aerotest Letter from the Chief Financial Officer Regarding Additional Information for the Fees Assessed Under to Aerotest Operations, Inc. (Aerotest) within Invoice Number Lfb 22-0346 ML21361A0472021-12-21021 December 2021 Response to December 6, 2021 NRC Pol Issuance; the Licensee and Its Reactor Safeguard Committee Request a Reasonable Opportunity to Review and Address Short Comings of the Draft Licensee and Technical Specifications Along with the Draft Sa ML21242A4632021-12-0606 December 2021 Issuance of License Amendment No. 6 to Facility Operating License No. R-98 for the Aerotest Radiography and Research Reactor with Partial Denial of Amendment Request ML21307A1252021-10-28028 October 2021 Letter Regarding Charges Billed ML21209A5192021-07-20020 July 2021 Aerotest Radiography and Research Reactor, Response to NRC Letter Dated July 12, 2021 (ML21188A391) ML21230A3042021-07-20020 July 2021 Decommissioning Plan Submittal (Redacted) ML21147A3732021-07-19019 July 2021 Correction of Letters Regarding Closure of Confirmatory Action Letter No. NRR-04-003 and Review of Physical Security Plan ML21188A3912021-07-12012 July 2021 Inc. - Revised Completion Date Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License ML21188A2162021-07-0101 July 2021 July 1, 2020 Through June 30, 2021 Summary of Changes, Tests, and Experiments ML21193A0892021-07-0101 July 2021 Emergency Plan (Redacted) ML21181A1232021-06-22022 June 2021 License and TS Amendments ML21147A0602021-05-19019 May 2021 Response to RAI 28 and 29 ML21056A3172021-04-30030 April 2021 CFO Response to Aerotest November 11 2020 Letter ML21126A1502021-04-28028 April 2021 License and TS Amendments ML21098A1572021-03-31031 March 2021 Response to RAI CFH Training and Requalification Program- 3/30/21 ML21118A0252021-03-30030 March 2021 Confirmatory Order ML21047A4682021-03-30030 March 2021 Request for Additional Information Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License No. R-98 ML21034A6262021-03-12012 March 2021 Request for Additional Information Possession-Only License Amendment Request for the Aerotest Radiography and Research Reactor Facility Operating License No. R-098 ML21048A1392021-03-0505 March 2021 Acknowledgement of Letter Regarding Decommissioning Plan and Exercise of Enforcement Discretion ML21004A0792021-01-0707 January 2021 Review of Physical Security Plan in Support of Possession-Only License Amendment Request License No. R-98 ML20345A0312020-12-28028 December 2020 CFO Response to Aerotest November 2020 Letter Re Lfb 20-1849 IR 05000228/20202022020-12-10010 December 2020 U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000228/2020202 and Notice of Violation - Non-OUO-SRI (Cover Letter) ML20332A0322020-11-18018 November 2020 Unable to Submit Decommissioning Plan by December 5, 2020 Due to COVID-19 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20325A1762020-11-11011 November 2020 Response to NRC CFO, Letter Dated April 18, 2019 Re Reimbursement Request for Activities Associated with the Fees That Were Not Performed in a Satisfactory Manner ML20325A1342020-11-10010 November 2020 Letter Disputing to Make Payment for Services That Are Not or Poorly Rendered ML20289A4772020-10-23023 October 2020 Aerotest Response Letter from D. Slaughter Dated September 14, 2020 Docket 50-228 ML20304A1532020-10-21021 October 2020 Response to Notice of Violation IR 05000228/20202012020-10-15015 October 2020 U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000228/2020201 and Notice of Violation ML20276A2472020-09-28028 September 2020 Aerotest Radiography and Research Reactor - Updated Arrr Security Plan ML20234A6312020-09-17017 September 2020 Request for Clarification Physical Security Plan Review - Cover Letter - (Public Version) ML20248H4602020-08-28028 August 2020 Inc - List of Explanations, Changes, and Justifications for Raj CFH Training and Requalification Program ML20177A2032020-07-27027 July 2020 Request for Additional Information Possession-Only License Amendment Request to Use Certified Fuel Handlers for the Aerotest Radiography and Research Reactor Facility Operating License No. R-98 2024-02-05
[Table view] |
Text
Safeguard Information-Modified Handing AEROTEST ~OPERATIONS, INC.
3455 FOSTORIA WAY* SAN RAMON, CA 94583 * (925) 866-1212
- FAX (925) 866-1716 Sept 28, 2020 ATTENTION: Document Control Desk U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCKET NO. 50-228/LICENSE NO. R-98.
Updated ARRR Security Plan Ladies and Gentlemen:
Enclosed please find the updated Security Plan for ARRR. The changes comply with .10 CFR 50~54 p(2). This updated plan does not reduce its predecessor's effectiveness (dated July 28, 2020); the changes are a response NRC letter dated September 17, 2020 mainly requesting clarification pf existing information and inclusion of information absent from the previous security plan but present in CMIP. The updated ARRR Security Plan is enclosed and has been placed into service.
The changes reflect the actual security system that has been approved and verified meeting tlie requirements of 10 CFR 50.59. New security enhancements that are under construction are not included in this ARRR security plan (or procedures). When the performance of the 1
enhancements have been validated, the integrated system will be placed into service. At that time, the ARRR Security plan will be revised and submitted underl O:,CFR 50.54 p(2).
I declare under penalty of perjury that the statements made in the enclosures are correct and truthful to the best of my knowledge. Should you have any questions or require additional information regarding this submission, please contact AO President David M. Slaughter, Ph.D. at (801) 631 5919 or drnsraven@gmail.com *
- 3ot> I
~~~d M. Slaughter, Ph.D. .Ab2D President. Reactor Administrator and Manager .
Aerotest Operations, Inc.
/IV If/
Enclosures:
ARRR Security Plan-Contains Safeguards Information-Modified Handling Safeguard Information-Modified Handing When separated from safeguard information designated as safeguard information-modified ,::..
- handing enclosure, this document is decontrolled. .