ML20077N055: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:*        -
ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 NRC DOCKET NO. 50 324 OPERATING LICENSE NO. DPR 62 REQUEST FOR LICENSE AMENDMENT FUEL CYCLE 10 RELOAD LICENSING (NRC TAC NO, 80361) l TYPED TEClibitCAL SPECIFICATION PAGE
  \
l l                                                                                                                                                        1 l
l l
l i
l' l
4108140193 910809 i                PDR  ADOCK 05000324 P              PDR j.
 
5.0    DESIGN FEATURES 5.1    SITE FXCLUSION ARFA 5.1.1    The exclusion area shall be as shown in Figure 5.1.1-1.
                    - LOW POPULATION ZONE 5.1.2    The low population zone shall be as shown in Figure 5.1.2-1.
SITE BOUNDARY 5.1.3 The SITE BOUNDARY shall be as shown in Figure 5.1.3-1. For the purpose-of effluent release calculations, the boundary for atmoapheric releases is che SITE BOUNDARY and the boundary for liquid releases is the SITE BOUNDARY prior to dilution in the Atlantic Ocean.
5.2 CONTAINMENT CONFIGURATION 5.2.1    The PRIMARY CONTAINMENT is a steel-lined, reinforced concrete structure composed of a series of vertical right cylinders and truncated cones.which fom a dryvell. This drywell is attached to a suppression chamber through a series of vents. The. suppression chamber is a concrete, steel-lined pressure vessel in the shape of a torus. The primary containment has a minimum free air. volume of 288,000 cubic feet.                                                                                        ,
DESIGN TEMPERATURE AND PRESSURE 5.2.2    The primary containment is designed and shall be maintained for:
: a. Maximum internal pressure 62 psig.
: b. Maximum internal temperature: drywell 300'F suppression chamber 200'F
: c. Maximum external pressure 2 psig.
5.3    REACTOR CORE FUEL ASSEMBLIES 5.3.2    The reactor core shall contain 560 fuel assemblies limited to the followit.- fuel types:    BP8x8R,_GE8x8EB, GE8x8NB, and GE8x8;;B-3.                                                        l BRUNSWICK - UNIT 2                        5-1                                                        Amendment No. 184 r
4                              o-          -__r- _u___.a ,-- as__.,,-_ _ - - - - - - - - . - _ _ - - - - - , - _ _    - _ - - _ - - - - -}}

Revision as of 04:35, 20 May 2020

Retyped Tech Spec Page 5-1 Including Approved Fuel Type GE8x8NB for Use in Fuel Cycle 10 Reload
ML20077N055
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/09/1991
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20077N053 List:
References
TAC-80361, NUDOCS 9108140193
Download: ML20077N055 (2)


Text

  • -

ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 NRC DOCKET NO. 50 324 OPERATING LICENSE NO. DPR 62 REQUEST FOR LICENSE AMENDMENT FUEL CYCLE 10 RELOAD LICENSING (NRC TAC NO, 80361) l TYPED TEClibitCAL SPECIFICATION PAGE

\

l l 1 l

l l

l i

l' l

4108140193 910809 i PDR ADOCK 05000324 P PDR j.

5.0 DESIGN FEATURES 5.1 SITE FXCLUSION ARFA 5.1.1 The exclusion area shall be as shown in Figure 5.1.1-1.

- LOW POPULATION ZONE 5.1.2 The low population zone shall be as shown in Figure 5.1.2-1.

SITE BOUNDARY 5.1.3 The SITE BOUNDARY shall be as shown in Figure 5.1.3-1. For the purpose-of effluent release calculations, the boundary for atmoapheric releases is che SITE BOUNDARY and the boundary for liquid releases is the SITE BOUNDARY prior to dilution in the Atlantic Ocean.

5.2 CONTAINMENT CONFIGURATION 5.2.1 The PRIMARY CONTAINMENT is a steel-lined, reinforced concrete structure composed of a series of vertical right cylinders and truncated cones.which fom a dryvell. This drywell is attached to a suppression chamber through a series of vents. The. suppression chamber is a concrete, steel-lined pressure vessel in the shape of a torus. The primary containment has a minimum free air. volume of 288,000 cubic feet. ,

DESIGN TEMPERATURE AND PRESSURE 5.2.2 The primary containment is designed and shall be maintained for:

a. Maximum internal pressure 62 psig.
b. Maximum internal temperature: drywell 300'F suppression chamber 200'F
c. Maximum external pressure 2 psig.

5.3 REACTOR CORE FUEL ASSEMBLIES 5.3.2 The reactor core shall contain 560 fuel assemblies limited to the followit.- fuel types: BP8x8R,_GE8x8EB, GE8x8NB, and GE8x8;;B-3. l BRUNSWICK - UNIT 2 5-1 Amendment No. 184 r

4 o- -__r- _u___.a ,-- as__.,,-_ _ - - - - - - - - . - _ _ - - - - - , - _ _ - _ - - _ - - - - -