OPERATING DATA REPORT l
DOCKET NO. 050-237            .
l
                                                                                                    -  DATE Feb.1,1983 COMPLETED BY B. A. Schrceder TELEPHONE (815) 942-2920 OPERATING STATUS NOTES
: 1. Unit Name:      Dresden II
: 2. Reporting " Period: January, 1983 3    Licensed Thermal Power (MWt): 2,527
: 4. Nameplate Rating (Gross MWe): 828 5    Design Electrical Rating (Net MWe): 794
: 6. Maximum Dependable Capacity (Gross MWe): 812
: 7. Maximum Dependable Capacity (Net MWe): 772
: 8. If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:
N/A 9    Power Level to Which Restricted, if Any (Net MWe):                  N/A
: 10. Reasons For Restrictions, if Any:      N/A This Month                    Yr-to-Date        Cumulative.
: 11. Hours in Reporting Period                          744                        744            111.504
: 12. Number of Hours Reactor Was Critical              168.3                      168.3            87.027.2 13      Reactor Reserve Shutdown Hours                          0                        0              0
: 14. Hours Generator On-Line                            168.1                      168.1            82,988.4 15      Unit Reserve Shutdown Hours
                            ~
0                        0              0
: 16. Gross Thermal Energy Generated (MWH)            227,620                    227,620          165,709,129 17      Gross Electrical Energy Generated (MWH)          69,769                    69,769          52,958.035
: 18. Net Electrical Energy Generated. (MWH)            61,304                    61,304          50,058,494 19      Unit Service Factor                                22.6                        22.6              74.4
: 20. Unit Availability Factor                          22.6                        22.6              74.4
: 21. Unit Capacity Factor (Using MDC Net)              10.7                        10.7              58.2
: 22. Unit Capacity Factor (Us;ng DER Net)              10.4                        10.4              56.5 23      Unit Forced Outage Rate                            0.0                          0.0            11.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
January. 1983 Refueline Outane 0 12 Weeks 25      If Shut Down At End Of Report Period, Estimated Date of Startup:                      April, 1983 8302150606 830201 PDR ADOCK 05000237 R                    PDR
 
OPERATING DATA REPORT DOCKEi NO.                                      050-249 DATE                          Feb.                              1. 1983 COMPLETED BY B. A. Schroeder TELEPHONE                          (gsqgg7_79hn OPERATING STATUS NOTES I. Unit Name:    Dresden III
: 2.      Reporting  Period: January. 1983 3      Licensed Thermal Power (MWt):    2,527
: 4.      Nameplate Rating (Gross MWe):    828                                                                                                                        -
5      Design Electrical Rating (Net MWe): 794
: 6. Maximum Dependable Capacity (Gross Mwe): 812 7      Maximum Dependable Capacity (Net MWe): 773
: 8.      If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:
N/A 9      Power Level to Which Restricted, if Any (Net MWe):        N/A
: 10.      Reasons For Restrictions, If Any:      N/A This Month          Yr-to-Date                                                                  Cumulative.
I
: 11. Hours in Reporting Period                        744                      744                                                                  101.089
: 12. Number of Hours Reactor Was Critical            744                      744                                                                    77.134.7 13      Reactor Reserve Shutdown Hours                    0                        0                                                                        0
: 14. Hours Generator On-Line                          744    _
744                                                                    74.202.0 15      Unit Reserve Shutdown Hours                      0                        0                                                                        0
: 16. Gross Thermal Energy Generated (MWH)          1,751,251          1.751.251                                                        148.0_16.981 17      Gross Electrical Energy Generated (MWH)          575,508                575.508                                                            48.140.639
: 18. Net Electrical Energy Generated.(MWH)            550.645                550,645                                                          45.633.290 i    19      Unit Service Factor                              100.0                    100.0                                                                  73.4 l  , 20. Unit Availability Factor                        100.0                  100.0                                                                    73.4
: 21. Unit Capacity Factor (Using MDC Net)              95.7                    95.7                                                                  58.4
: 22. U.1it Capacity Factor (Using DER Net)            93.2                    93.2                                                                  56.9 23      Unit Forced Outage Rate                            0.0                      0.0                                                                  13.3
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25      If Shut Down At End Of Report Period, Estimated Date of Startup:                      N/A 1
l l
l
 
DOCKET No. 050-237
'                                                                                                                                              UNIT NAME Dresden II          -
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                DATE Feb. 1, 1983 4
  '                                                                                                                                          COMPLETED BY B. A. Schroeder
    '                                                                                                                                            TELEPHONE (815) 942-2920      -
REPORT MONTH            JANUARY. 1983 METHOD OF            LICENSEE                                                  CAUSE & CORRECTIVE NO. DATE      TYPEl  DURATION    REASON 2            SHUTTING                EVENT                    SYSTEM  COMPONENT                ACTION TO i
(HOURS)                    DOWN REACTOR 3            REPORT #                      CODE 4    CODES            PREVENT RECURRENCE 1    83-1-8      S      575.9        C                        3                  --                        --      --
Refueling and Turbine overhaul outage.
l J
I 1
I i
i' 4
4                                                                                                                                                      ,
1                    2                                                                        3                                4 F: Forced            Reason:                                -
Method:                    Exhibit G-Instructions for l          S: Scheduled        A-Equipment Failure (Explain)                                                    1-Manual                      Preparation of Data l                              B-Maintenance on Test)                                                          2-Manual Scram            Entry Sheets for Licensee
,                            ' C-Refueling                      '
                                                                                                              .3-Automatic Scram          ' Event Report (            ) File
}                              D-Regulatory Restriction                                                      '4-Other (Explain)              (NUREG-0161)
!                              E-Operator Training & License Examination                        .
F-Administrative G-Operational Error                                                ,
i                              H-Other (Explain)                                                          ,
i
 
DOCKET NO.      050-249 UNIT NAME Drerden III UNIT SHUTDOWNS AND POWER REDUCTIONS                        DATE      Feb. 1, 1983 COMPLETED BY      B. A. Schroeder '
* TELEPHONE (815) 942-2920 REPORT MONTH      JANUARY, 1983 METHOD OF        LICENSEE                              CAUSE & CORRECTIVE NO. DATE  TYPEl  DURATION  REASON 2  SHUTTING          EVENT        SYSTEM  COMPONENT            ACTION TO (HOURS)            DOWN REACTOR 3    REPORT #      CODE 4    CODES        PREVENT RECURRENCE NONE 1                2                                                    3                      4
!      F: Forced          Reason:                  -
Method:                Exhibit G-Instructions for
!      S: Scheduled      A-Equipment Failure (Explain)                      1-Manual                Preparation of Data B-MaintenanceorTest)                              2-Manual Scram        Entry Sheets for Licensee C-Refueling                                        3- Automatic Scram    Event Report (      ) File D-Regulatory Restriction                          4-Other (Explain)      (NUREG-0161)
E-Operator Training & License Examination    .
l                        F-Administrative
* G-Operational Error                            ,
!                        H-Other (Explain)
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-237 UlliT II DATE Feb.1,1983 COMPLETED BY B. A. .Schroeder TELEPHONE 815/942-2920 MONTH  JANUARY, 1983 DAY  AVERAGE DAILY POWER LEVEL                                                DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                (MWe-Net) 1                              399                                            17            0 2                              394                                            18            0 3                              394                                            19            0 4                              394                                            20            0 388                                            21            0 5
387                                            22            0 6
0 7                              357                                            23 0                                            24            0 8
0                                                          0 9                                                                              25 0                                            26            0 10
'                                                                  0                                            27            0 11 0                                            28            0 12 0                                                          0 13                                                                              29 0                                                          0 14                                                                              30 0                                                          0 15                                                                              31 0
16 I
o J
  -~ - - . . - - - . . . . ~ .            _ , . , . . . . , , , ,        , , , . _ . , _ _ , _ _ _ _ , . _ , , ,
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-249 UNIT III DATE Feb.1,1983 COMPLETED BY B. A. Schroeder TELEPHONE 815/942-2920 MONTH    JANUARY, 1983 DAY  AVERAGE DAILY POWER LEVEL              DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)                                    (MWe-Net) 1            739                            17            787 2            781                            18            784 3            791                            19            791 4            793                            20            787 5            789                            21            759 6            775                            22            370 7            778                            23            488 8            789                            24            560 9            751                            25            659 10            701                            26            764 765                                            782 11                                            27 12            778                            28            793 790                                            789 13                                            29 14            790                                            759 30 748                                            791 15                                            31 16            774
 
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - JANUARY, 1983                                          -
NATURE OF                                      LER OR OUTAGE        MALFUNCTION EQUIPMENT                MAINTENANCE                                        NUMBER        CAUSE        RESULT                  CORRECTIVE ACTION 2B C.C.S.W    Preventive W.R. #14939                                                            N/A          N/A    Adjusted packing on 2B C.C.S.W. pump.
Pump Back-up Scram  Preventive W.R. #24742                                                            N/A          N/A    Tightened union and various packing nuts Valve 19B                                                                                                              on valves.
MO-2-1501-38B  Preventive W.R. #24598                                                            N/A          N/A    Replaced shaft gear with new one and filled cavity with grease.
Scram Outlet  Preventive W.R. #24695                                                            N/A          N/A    Scram tested per DTS 300-2.
Valve Scram Outlet  Preventive W.R. #24694                                                            N/A          N/A    Adjusted valve by extending length of Valve                                                                                                                  stem one-half turn.
U-2 "C"        Preventive W.R. #15805                                                            N/A          N/A    Rebuilt pump. Coupling reading set C.C.S.W. P.P.                                                                                                          thrust at .010. Original thrus' was
                                                                                                                      .056.
Scram Air Sys. Preventive W.R. #24745                                                            N/A          N/A    Cycled valves per procedure. Operated ok.
Mode Switch    Preventive W.R. #24619                                                            N/A          N/A    Visually inspected switch contacts.
Contacts are clean and free of any foreign matter switch to be changed out during Unit 2 outage.
Fuel Handling  Preventive W.R. #22938                                                            N/A          N/A    Removed Temp. Feed II 33-82, installed Grapple                                                                                                                Normal Feed II 34-82 and II 31a-82, installed track SW II 32-82. Grapple returned to normal.
Control Rod    Preventive W.R. #22327                                                            N/A          N/A    Replaced switch.
Movement                                                                                        1 Switch
 
DRESDEN UNIT 2 o
SAFETY RELATED MAINTENANCE - JANUARY. 1983                                            -
NATURE OF                      LER OR OUTACE        E FUNCTION EQUIPMENT        MAINTENANCE                        NUMBER          CAUSE      RESULT                  CORRECTIVE ACTION Refueling    Preventive W.R. #23803                                  N/A        N/A      Repaired limit switch on book.- replaced.
Bridge LPCI MO Suc-  Preventive W.R. #24569                                  N/A        N/A      Dirty contacts. Cleaned and cycled three tion Valve                                                                                  times.
1501-5C MO-2-1501-5C  Preventive W.R. #24609                                  N/A        N/A      Found interlock contact HFA relay 5 and 6 not making up electrically all the time.
                                                                                            . Adjusted and now works properly.
Refueling    Preventive W.R. #23605                      ,            N/A        N/A      Replaced switch. Operates ok.
Bridge LPCI 1501-11A Preventive W.R. #24597                                  N/A        N/A      Motor bridged and mcggered ok.
Breaker 1
 
DRESDEN UNIT 3 SAFETY RELATED MAINTENANCE - JANUARY, 1983 NATURE OF                                            LER OR OUTAGE          MALFUNCTION EQUIPMENT                                                                    MAINTENANCE                                              NUMBER        CAUSE        RESULT              CORRECTIVE ACTION U-3 Grapple                                                                Preventive W.R. #22307                                                          N/A          N/A  Performed electrical inspection and com-pleted checklist. Performed mechanical inspection per DMP 800-2.
3A and B SBLC                                                              Preventive W.R. #24827                                                          N/A          N/A  Adjusted both pumps. "B" pump did not PPs                                                                                                                                                                          heat up, "A" pump heated slightly before finishing.
Rx Head                                                                    Preventive W.R. #13898                                                          N/A          N/A  Removed Rx head per procedure.
Accumulator                                                                Preventive W.R. #24873                                                          N/A          N/A ' Repacked N2 valve as requested, #10-23 10-23                                                                                                                                        ,                              Rev. Manuel, pages 5-23.
D-3 DG Air                                                                Preventive W.R. #24587                                                        N/A          N/A  Installed two rebuilt air start motors on Start Motors                                                                                                                                                                D-3 DC. Opened air start valve for visual inspection. Did not see any traces of damage. Cleaned seating surfaces and re-assembled air start valve.
U-3 D/W Equip.                                                            Preventive W.R. #22602                                                        N/A          N/A  Mounted solenoids to valves.
Drain Sump D-3 SDV Mag-                                                              Preventive W.R. #23786                                                        N/A          N/A  Checked above listed switch four times and netrols                                                                                                                                                                      found operating properly.
Refuel Grapple                                                            Preventive W.R. #22845                                                        N/A          N/A  Replaced return spring.
U-3 Grapple                                                                Preventive W.R. #23872                                                        N/A          N/A  Replaced control cable and rollers for monorail hoist.
5
 
DRESDEN UNIT 2/3 SAFETY RELATED MAINTENANCE - JANUARY, 1983                                          -
NATURE OF          LER OR OUTAGE        MALFUNCTION EQUIPMENT                                                                                                        MAINTENANCE            NUMBER        CAUSE        RESULT                CORRECTIVE ACTION Spare Electro-                                                                                                            Preventive W.R. #22741                      N/A          N/A    Overhauled spare electromatic valve matic Relief                                                                                                                                                                                #BK7051 as per DMP 200-35, Rev. 1.
Spare Diesel                                                                                                              Preventive W.R. #24596                      N/A          N/A    Rebuilt (2) air start motors as requested.
Air Starters                                                                                                                                                                                Replaced parts as needed.
Spare Recire.                                                                                                            Preventive W.R. #23660                      N/A          N/A    Disassembled and rebuilt as per procedure.
PP Seal
                                                                                                                                                                                )
 
r
 
==SUMMARY==
OF OPERATING EXPERIENCE UNIT TWO
{
JANUARY, 1983 1-1 to 1-8  Unit Two entered the month operating at 426 MWe. On i                  January 8, 1983, at 0008 hours, the turbine was removed
;                  from service. At 0020 hours, the reactor was shutdown for a normal refueling outage.
1-8 to 1-31 Maintenance to be performed will include: . turbine overhaul, reactor refueling, and Inservice Inspection. At the end of the reporting period, all fuel has been removed and work is j                  being accomplished as scheduled..
i I
l
 
r
        <s e .
 
==SUMMARY==
OF OPERATING EXPERIENCE UNIT THREE JANUARY, 1983 1-1 to 1-31  Unit Three entered the month operating at a power level of 720 MWe and operated continuously throughout the entire month (with normal power. reductions on weekends for surveil-lances), reaching a power level of 835 MWe with a capacity factor of 92.97% and an availability of 100%.
    - , --              -  ,,.c -
                                          . , - - - - -                      -}}

Latest revision as of 12:54, 6 January 2021

Monthly Operating Repts for Jan 1983
ML20064M668
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/01/1983
From: Schroeder B
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20064M646 List:
References
NUDOCS 8302150606
Download: ML20064M668 (13)


Text

_ _ - _ _ _ _ _

OPERATING DATA REPORT l

DOCKET NO. 050-237 .

l

- DATE Feb.1,1983 COMPLETED BY B. A. Schrceder TELEPHONE (815) 942-2920 OPERATING STATUS NOTES

1. Unit Name: Dresden II
2. Reporting " Period: January, 1983 3 Licensed Thermal Power (MWt): 2,527
4. Nameplate Rating (Gross MWe): 828 5 Design Electrical Rating (Net MWe): 794
6. Maximum Dependable Capacity (Gross MWe): 812
7. Maximum Dependable Capacity (Net MWe): 772
8. If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:

N/A 9 Power Level to Which Restricted, if Any (Net MWe): N/A

10. Reasons For Restrictions, if Any: N/A This Month Yr-to-Date Cumulative.
11. Hours in Reporting Period 744 744 111.504
12. Number of Hours Reactor Was Critical 168.3 168.3 87.027.2 13 Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 168.1 168.1 82,988.4 15 Unit Reserve Shutdown Hours

~

0 0 0

16. Gross Thermal Energy Generated (MWH) 227,620 227,620 165,709,129 17 Gross Electrical Energy Generated (MWH) 69,769 69,769 52,958.035
18. Net Electrical Energy Generated. (MWH) 61,304 61,304 50,058,494 19 Unit Service Factor 22.6 22.6 74.4
20. Unit Availability Factor 22.6 22.6 74.4
21. Unit Capacity Factor (Using MDC Net) 10.7 10.7 58.2
22. Unit Capacity Factor (Us;ng DER Net) 10.4 10.4 56.5 23 Unit Forced Outage Rate 0.0 0.0 11.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

January. 1983 Refueline Outane 0 12 Weeks 25 If Shut Down At End Of Report Period, Estimated Date of Startup: April, 1983 8302150606 830201 PDR ADOCK 05000237 R PDR

OPERATING DATA REPORT DOCKEi NO. 050-249 DATE Feb. 1. 1983 COMPLETED BY B. A. Schroeder TELEPHONE (gsqgg7_79hn OPERATING STATUS NOTES I. Unit Name: Dresden III

2. Reporting Period: January. 1983 3 Licensed Thermal Power (MWt): 2,527
4. Nameplate Rating (Gross MWe): 828 -

5 Design Electrical Rating (Net MWe): 794

6. Maximum Dependable Capacity (Gross Mwe): 812 7 Maximum Dependable Capacity (Net MWe): 773
8. If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:

N/A 9 Power Level to Which Restricted, if Any (Net MWe): N/A

10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative.

I

11. Hours in Reporting Period 744 744 101.089
12. Number of Hours Reactor Was Critical 744 744 77.134.7 13 Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 744 _

744 74.202.0 15 Unit Reserve Shutdown Hours 0 0 0

16. Gross Thermal Energy Generated (MWH) 1,751,251 1.751.251 148.0_16.981 17 Gross Electrical Energy Generated (MWH) 575,508 575.508 48.140.639
18. Net Electrical Energy Generated.(MWH) 550.645 550,645 45.633.290 i 19 Unit Service Factor 100.0 100.0 73.4 l , 20. Unit Availability Factor 100.0 100.0 73.4
21. Unit Capacity Factor (Using MDC Net) 95.7 95.7 58.4
22. U.1it Capacity Factor (Using DER Net) 93.2 93.2 56.9 23 Unit Forced Outage Rate 0.0 0.0 13.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A 1

l l

l

DOCKET No. 050-237

' UNIT NAME Dresden II -

UNIT SHUTDOWNS AND POWER REDUCTIONS DATE Feb. 1, 1983 4

' COMPLETED BY B. A. Schroeder

' TELEPHONE (815) 942-2920 -

REPORT MONTH JANUARY. 1983 METHOD OF LICENSEE CAUSE & CORRECTIVE NO. DATE TYPEl DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO i

(HOURS) DOWN REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE 1 83-1-8 S 575.9 C 3 -- -- --

Refueling and Turbine overhaul outage.

l J

I 1

I i

i' 4

4 ,

1 2 3 4 F: Forced Reason: -

Method: Exhibit G-Instructions for l S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data l B-Maintenance on Test) 2-Manual Scram Entry Sheets for Licensee

, ' C-Refueling '

.3-Automatic Scram ' Event Report ( ) File

} D-Regulatory Restriction '4-Other (Explain) (NUREG-0161)

! E-Operator Training & License Examination .

F-Administrative G-Operational Error ,

i H-Other (Explain) ,

i

DOCKET NO. 050-249 UNIT NAME Drerden III UNIT SHUTDOWNS AND POWER REDUCTIONS DATE Feb. 1, 1983 COMPLETED BY B. A. Schroeder '

  • TELEPHONE (815) 942-2920 REPORT MONTH JANUARY, 1983 METHOD OF LICENSEE CAUSE & CORRECTIVE NO. DATE TYPEl DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO (HOURS) DOWN REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE NONE 1 2 3 4

! F: Forced Reason: -

Method: Exhibit G-Instructions for

! S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data B-MaintenanceorTest) 2-Manual Scram Entry Sheets for Licensee C-Refueling 3- Automatic Scram Event Report ( ) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)

E-Operator Training & License Examination .

l F-Administrative

  • G-Operational Error ,

! H-Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-237 UlliT II DATE Feb.1,1983 COMPLETED BY B. A. .Schroeder TELEPHONE 815/942-2920 MONTH JANUARY, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 399 17 0 2 394 18 0 3 394 19 0 4 394 20 0 388 21 0 5

387 22 0 6

0 7 357 23 0 24 0 8

0 0 9 25 0 26 0 10

' 0 27 0 11 0 28 0 12 0 0 13 29 0 0 14 30 0 0 15 31 0

16 I

o J

-~ - - . . - - - . . . . ~ . _ , . , . . . . , , , , , , , . _ . , _ _ , _ _ _ _ , . _ , , ,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-249 UNIT III DATE Feb.1,1983 COMPLETED BY B. A. Schroeder TELEPHONE 815/942-2920 MONTH JANUARY, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 739 17 787 2 781 18 784 3 791 19 791 4 793 20 787 5 789 21 759 6 775 22 370 7 778 23 488 8 789 24 560 9 751 25 659 10 701 26 764 765 782 11 27 12 778 28 793 790 789 13 29 14 790 759 30 748 791 15 31 16 774

DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - JANUARY, 1983 -

NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION 2B C.C.S.W Preventive W.R. #14939 N/A N/A Adjusted packing on 2B C.C.S.W. pump.

Pump Back-up Scram Preventive W.R. #24742 N/A N/A Tightened union and various packing nuts Valve 19B on valves.

MO-2-1501-38B Preventive W.R. #24598 N/A N/A Replaced shaft gear with new one and filled cavity with grease.

Scram Outlet Preventive W.R. #24695 N/A N/A Scram tested per DTS 300-2.

Valve Scram Outlet Preventive W.R. #24694 N/A N/A Adjusted valve by extending length of Valve stem one-half turn.

U-2 "C" Preventive W.R. #15805 N/A N/A Rebuilt pump. Coupling reading set C.C.S.W. P.P. thrust at .010. Original thrus' was

.056.

Scram Air Sys. Preventive W.R. #24745 N/A N/A Cycled valves per procedure. Operated ok.

Mode Switch Preventive W.R. #24619 N/A N/A Visually inspected switch contacts.

Contacts are clean and free of any foreign matter switch to be changed out during Unit 2 outage.

Fuel Handling Preventive W.R. #22938 N/A N/A Removed Temp. Feed II 33-82, installed Grapple Normal Feed II 34-82 and II 31a-82, installed track SW II 32-82. Grapple returned to normal.

Control Rod Preventive W.R. #22327 N/A N/A Replaced switch.

Movement 1 Switch

DRESDEN UNIT 2 o

SAFETY RELATED MAINTENANCE - JANUARY. 1983 -

NATURE OF LER OR OUTACE E FUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Refueling Preventive W.R. #23803 N/A N/A Repaired limit switch on book.- replaced.

Bridge LPCI MO Suc- Preventive W.R. #24569 N/A N/A Dirty contacts. Cleaned and cycled three tion Valve times.

1501-5C MO-2-1501-5C Preventive W.R. #24609 N/A N/A Found interlock contact HFA relay 5 and 6 not making up electrically all the time.

. Adjusted and now works properly.

Refueling Preventive W.R. #23605 , N/A N/A Replaced switch. Operates ok.

Bridge LPCI 1501-11A Preventive W.R. #24597 N/A N/A Motor bridged and mcggered ok.

Breaker 1

DRESDEN UNIT 3 SAFETY RELATED MAINTENANCE - JANUARY, 1983 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION U-3 Grapple Preventive W.R. #22307 N/A N/A Performed electrical inspection and com-pleted checklist. Performed mechanical inspection per DMP 800-2.

3A and B SBLC Preventive W.R. #24827 N/A N/A Adjusted both pumps. "B" pump did not PPs heat up, "A" pump heated slightly before finishing.

Rx Head Preventive W.R. #13898 N/A N/A Removed Rx head per procedure.

Accumulator Preventive W.R. #24873 N/A N/A ' Repacked N2 valve as requested, #10-23 10-23 , Rev. Manuel, pages 5-23.

D-3 DG Air Preventive W.R. #24587 N/A N/A Installed two rebuilt air start motors on Start Motors D-3 DC. Opened air start valve for visual inspection. Did not see any traces of damage. Cleaned seating surfaces and re-assembled air start valve.

U-3 D/W Equip. Preventive W.R. #22602 N/A N/A Mounted solenoids to valves.

Drain Sump D-3 SDV Mag- Preventive W.R. #23786 N/A N/A Checked above listed switch four times and netrols found operating properly.

Refuel Grapple Preventive W.R. #22845 N/A N/A Replaced return spring.

U-3 Grapple Preventive W.R. #23872 N/A N/A Replaced control cable and rollers for monorail hoist.

5

DRESDEN UNIT 2/3 SAFETY RELATED MAINTENANCE - JANUARY, 1983 -

NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Spare Electro- Preventive W.R. #22741 N/A N/A Overhauled spare electromatic valve matic Relief #BK7051 as per DMP 200-35, Rev. 1.

Spare Diesel Preventive W.R. #24596 N/A N/A Rebuilt (2) air start motors as requested.

Air Starters Replaced parts as needed.

Spare Recire. Preventive W.R. #23660 N/A N/A Disassembled and rebuilt as per procedure.

PP Seal

)

r

SUMMARY

OF OPERATING EXPERIENCE UNIT TWO

{

JANUARY, 1983 1-1 to 1-8 Unit Two entered the month operating at 426 MWe. On i January 8, 1983, at 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the turbine was removed

from service. At 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, the reactor was shutdown for a normal refueling outage.

1-8 to 1-31 Maintenance to be performed will include: . turbine overhaul, reactor refueling, and Inservice Inspection. At the end of the reporting period, all fuel has been removed and work is j being accomplished as scheduled..

i I

l

r

<s e .

SUMMARY

OF OPERATING EXPERIENCE UNIT THREE JANUARY, 1983 1-1 to 1-31 Unit Three entered the month operating at a power level of 720 MWe and operated continuously throughout the entire month (with normal power. reductions on weekends for surveil-lances), reaching a power level of 835 MWe with a capacity factor of 92.97% and an availability of 100%.