{{#Wiki_filter:I1Kent Howard - Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA                                           Page 111 From:             Ram Subbaratnam To:               phbl Date:             9/8/2006 3:11:39 PM
{{#Wiki_filter:I1 Kent Howard - Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA Page 111 From:
Ram Subbaratnam To:
phbl Date:
9/8/2006 3:11:39 PM


==Subject:==
==Subject:==
Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA Here it is!
Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA Here it is!
Ram
Ram
              >>> Ram Subbaratnam 09/08/2006 3:06 PM >>>
>>> Ram Subbaratnam 09/08/2006 3:06 PM >>>
Folks:
Folks:
Please find attached one set of formal RAIs on section 3.2.1 and 4.2.1 from the NRC staff on the Pilgrim LRA. These are the last set of RAIs on this LRA and hopefully concludes the staff requests. I am sending you an advance copy so that Entergy can work on the lead in responding to the RAIs. As previously agreed upon, you formal response on docket will be due 30 days from the date of receipt of the RAIs in mail.
Please find attached one set of formal RAIs on section 3.2.1 and 4.2.1 from the NRC staff on the Pilgrim LRA. These are the last set of RAIs on this LRA and hopefully concludes the staff requests. I am sending you an advance copy so that Entergy can work on the lead in responding to the RAIs. As previously agreed upon, you formal response on docket will be due 30 days from the date of receipt of the RAIs in mail.
Line 29: Line 32:
Sincerely yours Ram Subbaratnam PM Pilgrim LRA US NRC, (301) 415 1478
Sincerely yours Ram Subbaratnam PM Pilgrim LRA US NRC, (301) 415 1478


I             0001.TMP                                                                                     Paae 111I c:\temDViWlOOQQl .TMP                                                                                     Paoe 1 II Mail Envelope Properties     (4501C06B.320: 19: 10294)
I 0001.TMP Paae 111I c:\\temDViWlOOQQl.TMP Paoe 1 II Mail Envelope Properties (4501C06B.320: 19: 10294)


==Subject:==
==Subject:==
Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA Creation Date          9/8/2006 3:11:39 PM From:                  Ram Subbaratnam Created By:            RXS2@nrc.gov Recipients                                       Action                Date & Time nrc.gov OWGWPO01.HQGWDO01 PHB 1 (Perry Buckberg)
Creation Date From:
Post Office                                       Delivered              Route OWGWPO01 .HQGWDO01                               Pending               nrc.gov Files                           Size               Date & Time MESSAGE                        1186              9/8/2006 3:11:39 PN RLRCSection3.2.1AdditionalQsFinal.wpd              28831               9/8/2006 2:58:33 PM CVIBectio4.2.lRAIsFinal.rev 1.wpd                38446                9/8/2006 2:58:59 PM Options Auto Delete:                 No Expiration Date:             None Notify Recipients:           Yes Priority:                     Standard ReplyRequested:               No Return Notification:         None Concealed  
Created By:
Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA 9/8/2006 3:11:39 PM Ram Subbaratnam RXS2@nrc.gov Recipients nrc.gov OWGWPO01.HQGWDO01 PHB 1 (Perry Buckberg)
Post Office OWGWPO01.HQGWDO01 Action Date & Time Delivered Pending Route nrc.gov Files Size MESSAGE 1186 RLRCSection3.2.1AdditionalQsFinal.wpd CVIBectio4.2.lRAIsFinal.rev 1.wpd Date & Time 9/8/2006 3:11:39 PN 28831 38446 9/8/2006 2:58:33 PM 9/8/2006 2:58:59 PM Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
ReplyRequested:
Return Notification:
Concealed  


==Subject:==
==Subject:==
No Security:                     Standard To Be Delivered:             Immediate Status Tracking:             Delivered & Opened
Security:
To Be Delivered:
Status Tracking:
No None Yes Standard No None No Standard Immediate Delivered & Opened


September 8, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
September 8, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
Line 45: Line 59:


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==
 
By {{letter dated|date=January 25, 2006|text=letter dated January 25, 2006}}, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information address Sections 3.2 Engineered Safety Features.
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of FederalRegulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information address Sections 3.2 Engineered Safety Features.
These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or e-mail RXS2@nrc.gov.
These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or e-mail RXS2@nrc.gov.
Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293


==Enclosure:==
==Enclosure:==
As Stated cc w/encl: See next page


As Stated cc w/encl: See next page
ML062500431 C:\\temp\\RLRCSection3.2.1 AdditionalQsFinal.wpd OFFICE PM:RLRA:DLR LA:DLR BC:REBB:DLR NAME RSubbaratnam YEdmonds LLund DATE 9/6/06 19/7/06 09/8 /06


ML062500431 C:\temp\RLRCSection3.2.1 AdditionalQsFinal.wpd OFFICE    PM:RLRA:DLR          LA:DLR              BC:REBB:DLR NAME      RSubbaratnam        YEdmonds            LLund DATE      9/6/06            19/7/06                09/8 /06 Letter to Michael Kansler from Ram Subbaratnam dated: September 8, 2006
Letter to Michael Kansler from Ram Subbaratnam dated: September 8, 2006


==SUBJECT:==
==SUBJECT:==
Line 63: Line 77:


Pilgrim Nuclear Power Station cc:
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I     Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road                   One Ashburton Place King of Prussia, PA 19406-1415       Boston, MA 02108 Senior Resident Inspector           Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission   Management Agency Pilgrim Nuclear Power Station       Attn: James Muckerheide Post Office Box 867                 400 Worcester Road Plymouth, MA 02360                   Framingham, MA 01702-5399 Chairman, Board of Selectmen         Mr. William D. Meinert 11 Lincoln Street                    Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman                            P.O. Box 426 Nuclear Matters Committee            Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street                    Mr. Michael A. Balduzzi Plymouth, MA 02360                  Site Vice President Entergy Nuclear Operations, Inc.
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1 M2A 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 878 Tremont Street                  Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner          Director, Nuclear Safety Assurance Massachusetts Department of          Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Environmental Protection            Pilgrim Nuclear Power Station One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General      Mr. Bryan S. Ford One Ashburton Place                  Manager, Licensing 20th Floor                          Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.
Boston, MA 02108                    Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health      Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A          Mr. Gary J. Taylor 529 Main Street                      Chief Executive Officer Charlestown, MA 02129                Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213


Pilgrim Nuclear Power Station     cc:
Pilgrim Nuclear Power Station cc:
Mr. John T. Herron                     Ms. Stacey Lousteau Sr. VP and Chief Operating Officer     Treasury Department Entergy Nuclear Operations, Inc.      Entergy Services, Inc.
Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                    639 Loyola Avenue White Plains, NY 10601                 New Orleans, LA 70113 Mr. Oscar Limpias                     Mr. James Sniezek Vice President, Engineering           5486 Nithsdale Drive Entergy Nuclear Operations, Inc.       Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601                 Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz               Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.
Vice President, Operations Support     440 Hamilton Avenue Entergy Nuclear Operations, Inc.       White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601                 Mr. James Ross Nuclear Energy Institute Mr. John F. McCann                     1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance     Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                   Plymouth Public Library White Plains, NY 10601                 Attn: Dinah O'Brien 132 South Street Ms. Charlene D. Faison                 Plymouth, MA 02360 Manager, Licensing Entergy Nuclear Operations, Inc.       Duxbury Free Library 440 Hamilton Avenue                   ATTN: Ms. Elaine Winquist White Plains, NY 10601                 77 Alden Street Duxbury, MA 02332 Mr. Michael D. Lyster 5931 Barclay Lane                     Kingston Public Library Naples, FL 34110-7306                 ATTN: Reference Librarian 6 Green Street Mr. Michael J. Colomb                 Kingston, MA 02364 Director of Oversight Entergy Nuclear Operations, Inc.       Ms. Mary Lampert 440 Hamilton Avenue                   Duxbury Nuclear Advisory, Chair White Plains, NY 10601                 Pilgrim Watch, Director 148 Washington Street Mr. Kevin H. Bronson                   Duxbury, MA 02332 General Manager, Plant Operations Entergy Nuclear Operations, Inc.       Mr. Garrett D. Edwards Pilgrim Nuclear Power Station          814 Waverly Road 600 Rocky Hill Road                    Kennett Square, PA 19348 Plymouth, MA 02360-5508
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Plymouth Public Library Attn: Dinah O'Brien 132 South Street Plymouth, MA 02360 Duxbury Free Library ATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364 Ms. Mary Lampert Duxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348


REQUESTS FOR ADDITIONAL INFORMATION (RAIs)
REQUESTS FOR ADDITIONAL INFORMATION (RAIs)
PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTIONS 3.2 ENGINEERED SAFETY FEATURES SYSTEMS 3.2 Engineered Safety Features Systems RAI 3.2.1       Piping of the Reactor Core isolation Cooling System is subject to flow accelerated corrosion.
PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTIONS 3.2 ENGINEERED SAFETY FEATURES SYSTEMS 3.2 Engineered Safety Features Systems RAI 3.2.1 Piping of the Reactor Core isolation Cooling System is subject to flow accelerated corrosion.
The applicant in LRA Table 3.2.1 engineered safety feature (ESF) and Table 3.2.1 credit the plant-specific Periodic Surveillance and Preventive Maintenance Program for the management of loss of materials (wall thinning). The GALL report recommends using the Flow-Accelerated Corrosion Program, XI.M17, to manage wall thinning. The Periodic Surveillance and Preventive Maintenance Program provides for inspection for material loss (wall thinning) every 5 years but no Monitoring and Trending activities to predict areas of high wall thinning rates or for trending of thinning as does XI.M17. Please provide justification for not providing for monitoring and trending of wall thinning for reactor core isolation cooling (RCIC) piping.
The applicant in LRA Table 3.2.1 engineered safety feature (ESF) and Table 3.2.1 credit the plant-specific Periodic Surveillance and Preventive Maintenance Program for the management of loss of materials (wall thinning). The GALL report recommends using the Flow-Accelerated Corrosion Program, XI.M17, to manage wall thinning. The Periodic Surveillance and Preventive Maintenance Program provides for inspection for material loss (wall thinning) every 5 years but no Monitoring and Trending activities to predict areas of high wall thinning rates or for trending of thinning as does XI.M17. Please provide justification for not providing for monitoring and trending of wall thinning for reactor core isolation cooling (RCIC) piping.
RAI 3.2.2 The applicant in Table 3.2.1 Item 18 of the PNPS LRA stated that none of the ESF system components are within the scope of the BWR Stress Corrosion Cracking Program. Please provide the details that justify this statement.
RAI 3.2.2 The applicant in Table 3.2.1 Item 18 of the PNPS LRA stated that none of the ESF system components are within the scope of the BWR Stress Corrosion Cracking Program. Please provide the details that justify this statement.
Line 87: Line 107:


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==
 
By {{letter dated|date=January 25, 2006|text=letter dated January 25, 2006}}, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 9f the Code of Federal Regulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information on Time Limited Aging Analysis of Reactor Vessel Internals in License Renewal Section: 4.2.1.
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 9f the Code of FederalRegulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information on Time Limited Aging Analysis of Reactor Vessel Internals in License Renewal Section: 4.2.1.
These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or by e-mail at RXS2@nrc.aov.
These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or by e-mail at RXS2@nrc.aov.
Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293


==Enclosure:==
==Enclosure:==
Requests for Additional Information cc w/encl: See next page
Requests for Additional Information cc w/encl: See next page


Line 103: Line 121:


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==
 
By {{letter dated|date=January 25, 2006|text=letter dated January 25, 2006}}, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information on Time Limited Aging Analysis of Reactor Vessel Internals in License Renewal Section: 4.2.1.
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of FederalRegulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information on Time Limited Aging Analysis of Reactor Vessel Internals in License Renewal Section: 4.2.1.
These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1,478 or by e-mail at RXS2@nrc.aov.
These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1,478 or by e-mail at RXS2@nrc.aov.
Sincerely, IRA/
Sincerely, IRA/
Line 110: Line 127:


==Enclosure:==
==Enclosure:==
 
Requests for Additional Information cc w/encl: See next page ADAMS Accession No.: ML062500401 OFFICE PM:RLRA:DLR LA:RLRA:DLR BC:REBB:DLR NAME RSubbaratnam YEdmonds LLund DATE 09/08/06 09/08/06 09/08/06 OFFICIAL RECbRD COPY
Requests for Additional Information cc w/encl: See next page ADAMS Accession No.: ML062500401 OFFICE     PM:RLRA:DLR         LA:RLRA:DLR       BC:REBB:DLR NAME       RSubbaratnam         YEdmonds           LLund DATE       09/08/06             09/08/06           09/08/06 OFFICIAL RECbRD COPY


Letter to Michael Kansler from Ram Subbaratnam dated: September 8. 2006
Letter to Michael Kansler from Ram Subbaratnam dated: September 8. 2006
Line 122: Line 138:


Pilgrim Nuclear Power Station cc:
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I     Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road                   One Ashburton Place King of Prussia, PA 19406-1415       Boston, MA 02108 Senior Resident Inspector           Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission   Management Agency Pilgrim Nuclear Power Station       Attn: James Muckerheide Post Office Box 867                 400 Worcester Road Plymouth, MA 02360                   Framingham, MA 01702-5399 Chairman, Board of Selectmen         Mr. William D. Meinert 11 Lincoln Street                    Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman                            P.O. Box 426 Nuclear Matters Committee            Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street                    Mr. Michael A. Balduzzi Plymouth, MA 02360                  Site Vice President Entergy Nuclear Operations, Inc.
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1 M2A 529 Main Street '
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 878 Tremont Street                  Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner          Director, Nuclear Safety Assurance Massachusetts Department of          Entergy Nuclear Operations, Inc.
Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Environmental Protection            Pilgrim Nuclear Power Station One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General      Mr. Bryan S. Ford One Ashburton Place                  Manager, Licensing 20th Floor                          Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Boston, MA 02108                    Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health      Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1 M2A        Mr. Gary J. Taylor 529 Main Street '                    Chief Executive Officer Charlestown, MA 02129                Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213


Pilgrim Nuclear Power Station     cc:
Pilgrim Nuclear Power Station cc:
Mr. John T. Herron                     Ms. Stacey Lousteau Sr. VP and Chief Operating Officer     Treasury Department Entergy Nuclear Operations, Inc.      Entergy Services, Inc.
Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                    639 Loyola Avenue White Plains, NY 10601                 New Orleans, LA 70113 Mr. Oscar Limpias                     Mr. James Sniezek Vice President, Engineering           5486 Nithsdale Drive Entergy Nuclear Operations, Inc.       Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601                 Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz                Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.
Vice President, Operations Support    440 Hamilton Avenue Entergy Nuclear Operations, Inc.       White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601                 Mr. James Ross Nuclear Energy Institute Mr. John F. McCann                    1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance    Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                    Plymouth Public Library White Plains, NY 10601                Attn: Dinah O'Brien 132 South Street Ms. Charlene D. Faison                Plymouth, MA 02360 Manager, Licensing Entergy Nuclear Operations, Inc.      Duxbury Free Library 440 Hamilton Avenue                    ATTN: Ms. Elaine Winquist White Plains, NY 10601                77 Alden Street Duxbury, MA 02332 Mr. Michael D. Lyster 5931 Barclay Lane                      Kingston Public Library Naples, FL 34110-7306                  ATTN: Reference Librarian 6 Green Street Mr. Michael J. Colomb                  Kingston, MA 02364 Director of Oversight Entergy Nuclear Operations, Inc.      Ms. Mary Lampert 440 Hamilton Avenue                    Duxbury Nuclear Advisory, Chair White Plains, NY 10601                Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Plymouth Public Library Attn: Dinah O'Brien 132 South Street Plymouth, MA 02360 Duxbury Free Library ATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364 Ms. Mary Lampert Duxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332


I ý REQUESTS FOR ADDITIONAL INFORMATION PILGRIM LICENSE RENEWAL APPLICATION (LRA)
I ý REQUESTS FOR ADDITIONAL INFORMATION PILGRIM LICENSE RENEWAL APPLICATION (LRA)
TIME-LIMITED AGING ANALYSIS (TLAA) OF REACTOR VESSEL (RV) INTERNALS SECTION: 4.2.1 NEUTRON FLUENCE RAI 4.2.2-1 Section 4.2.2 of the Pilgrim Nuclear Power Station (PNPS) License Renewal Application (LRA),
TIME-LIMITED AGING ANALYSIS (TLAA) OF REACTOR VESSEL (RV) INTERNALS SECTION: 4.2.1 NEUTRON FLUENCE RAI 4.2.2-1 Section 4.2.2 of the Pilgrim Nuclear Power Station (PNPS) License Renewal Application (LRA),
    "Pressure-Temperature [P-T] Limits," states that in a license amendment request dated December 4, 2002, PNPS requested to use the present P-T limit curves through the end of operating cycle 16, which corresponds to approximately 23 effective full power years (EFPY) of facility operation. The end of operating cycle 16 is expected to occur in 2007. Section 4.2.2 also states that, in this December 4, 2002 submittal, PNPS committed to develop and submit updated P-T limit curves and revised fluence calculations based on an NRC-approved calculation method that adheres to Regulatory Guide (RG) 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," prior to the end of operating cycle
"Pressure-Temperature [P-T] Limits," states that in a license amendment request dated December 4, 2002, PNPS requested to use the present P-T limit curves through the end of operating cycle 16, which corresponds to approximately 23 effective full power years (EFPY) of facility operation. The end of operating cycle 16 is expected to occur in 2007. Section 4.2.2 also states that, in this December 4, 2002 submittal, PNPS committed to develop and submit updated P-T limit curves and revised fluence calculations based on an NRC-approved calculation method that adheres to Regulatory Guide (RG) 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," prior to the end of operating cycle
: 16. License Amendment 197 granted this request in 2003. Section 4.2.2 then states that recent fluence calculations that were done per RG 1.190 confirm that the fluence for 54 EFPY is less than the fluence used to calculate the P-T limits that were approved for use only through the end of operating cycle 14. Based on the above statements, you conclude that the current Technical Specification (TS) P-T limit curves remain valid for the period of extended operation.
: 16. License Amendment 197 granted this request in 2003. Section 4.2.2 then states that recent fluence calculations that were done per RG 1.190 confirm that the fluence for 54 EFPY is less than the fluence used to calculate the P-T limits that were approved for use only through the end of operating cycle 14. Based on the above statements, you conclude that the current Technical Specification (TS) P-T limit curves remain valid for the period of extended operation.
(a) Please confirm whether the P-T limit curves currently established in the PNPS TSs expire at the end of operating cycle 16 (23 EFPY).
(a) Please confirm whether the P-T limit curves currently established in the PNPS TSs expire at the end of operating cycle 16 (23 EFPY).
Line 142: Line 164:
However, the staff does require NRC approval of the P-T limit curves for the extended period of operation prior to the expiration of the P-T limit curves for 32 EFPY. Please state when you intend to submit P-T limit curves for NRC approval for the extended licensed period of operation (54 EFPY).
However, the staff does require NRC approval of the P-T limit curves for the extended period of operation prior to the expiration of the P-T limit curves for 32 EFPY. Please state when you intend to submit P-T limit curves for NRC approval for the extended licensed period of operation (54 EFPY).
RAI 4.2.4-1 Table 4.2-2 of the PNPS LRA lists initial RTNDT values for the PNPS RV beltline materials. The initial RTNDT values for Lower Intermediate Shell Plate G-3108-1 (Heat No. C-2921-2) and Lower Intermediate Shell Plate G-3108-3 (Heat No. C-2945-2) are less conservative than the corresponding initial RTNDT values established in the NRC staff's reactor vessel integrity database (RVID) for these materials. Section 4.2.4 of the PNPS LRA states that, "initial RTNDT values are from report SIR-00-82, which was submitted in 2001 as part of the PNPS P-T limit change request (Reference 4.2-5)." Reference 4.2-5 points to the April 13, 2001, license amendment issued by the NRC authorizing revised P-T limit curves.
RAI 4.2.4-1 Table 4.2-2 of the PNPS LRA lists initial RTNDT values for the PNPS RV beltline materials. The initial RTNDT values for Lower Intermediate Shell Plate G-3108-1 (Heat No. C-2921-2) and Lower Intermediate Shell Plate G-3108-3 (Heat No. C-2945-2) are less conservative than the corresponding initial RTNDT values established in the NRC staff's reactor vessel integrity database (RVID) for these materials. Section 4.2.4 of the PNPS LRA states that, "initial RTNDT values are from report SIR-00-82, which was submitted in 2001 as part of the PNPS P-T limit change request (Reference 4.2-5)." Reference 4.2-5 points to the April 13, 2001, license amendment issued by the NRC authorizing revised P-T limit curves.
ENCLOSURE
ENCLOSURE Please provide additional information that points to where the NRC staff authorized the use of the specific initial RTNDT values listed in Table 4.2-4 for determining the adjusted reference temperature (ART) values for the PNPS reactor vessel (RV) beltline materials.
 
Please provide additional information that points to where the NRC staff authorized the use of the specific initial RTNDT values listed in Table 4.2-4 for determining the adjusted reference temperature (ART) values for the PNPS reactor vessel (RV) beltline materials.
RAI 4.2.4-2 The %Cu and chemistry factor (CF) values for Lower Shell Axial Welds 2-338A, B, and C from LRA Table 4.2-2 are less conservative than the corresponding %Cu and CF values that were established in the staff's RVID for these welds. Please provide the following information:
RAI 4.2.4-2 The %Cu and chemistry factor (CF) values for Lower Shell Axial Welds 2-338A, B, and C from LRA Table 4.2-2 are less conservative than the corresponding %Cu and CF values that were established in the staff's RVID for these welds. Please provide the following information:
(a) verification of whether the %Cu and CF values listed in Table 4.2-1 are valid for the above welds, (b) justification for the use of these chemistry data for the above welds, including the source of the data, and a specific reference for the documentation/analysis demonstrating that these chemistry data represent the best available estimate of the weld chemistries.
(a) verification of whether the %Cu and CF values listed in Table 4.2-1 are valid for the above
: welds, (b) justification for the use of these chemistry data for the above welds, including the source of the data, and a specific reference for the documentation/analysis demonstrating that these chemistry data represent the best available estimate of the weld chemistries.
RAI 4.2.4-3 Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253) is listed in the NRC staff's RVID. However this weld is not represented in LRA Table 4.2-2 or (LRA Table 4.2-1). Please resolve this discrepancy.
RAI 4.2.4-3 Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253) is listed in the NRC staff's RVID. However this weld is not represented in LRA Table 4.2-2 or (LRA Table 4.2-1). Please resolve this discrepancy.
RAI 4.2.5-1 Section 4.2.5 of the PNPS LRA addresses the TLAA for the RV Circumferential Weld Examination Relief. Table 4.2-3 of the LRA compares the limiting RV circumferential weld parameters for PNPS to those used in the NRC evaluation of the BWRVIP-05 report, "BWR Vessel and Internals Project, BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations." The PNPS limiting RV circumferential weld parameters are based on Lower Intermediate / Lower Shell Circumferential Weld 1-334 (Heat No. 21935), which is the only circumferential weld represented in LRA Table 4.2-2. However, as discussed in RAI 4.2.4-3, the NRC staff's RVID also lists Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253) as one of the RV welds for PNPS. Furthermore, the chemistry and CF data for this weld are more limiting than for the Circumferential Weld 1-334. Please explain why this TLAA did not address Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253).
RAI 4.2.5-1 Section 4.2.5 of the PNPS LRA addresses the TLAA for the RV Circumferential Weld Examination Relief. Table 4.2-3 of the LRA compares the limiting RV circumferential weld parameters for PNPS to those used in the NRC evaluation of the BWRVIP-05 report, "BWR Vessel and Internals Project, BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations." The PNPS limiting RV circumferential weld parameters are based on Lower Intermediate / Lower Shell Circumferential Weld 1-334 (Heat No. 21935), which is the only circumferential weld represented in LRA Table 4.2-2. However, as discussed in RAI 4.2.4-3, the NRC staff's RVID also lists Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253) as one of the RV welds for PNPS. Furthermore, the chemistry and CF data for this weld are more limiting than for the Circumferential Weld 1-334. Please explain why this TLAA did not address Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253).
RAI 4.2.5-2 The NRC staff requires that a request for relief from the American Society of Mechanical Engineer Boiler and Pressure Vessel Code (ASME Code) RV circumferential shell weld examination requirements be submitted prior to the beginning of the extended period of operation. Please state whether you intend to apply for relief from the ASME Code RV circumferential weld examination requirements for the extended licensed period of operation.
RAI 4.2.5-2 The NRC staff requires that a request for relief from the American Society of Mechanical Engineer Boiler and Pressure Vessel Code (ASME Code) RV circumferential shell weld examination requirements be submitted prior to the beginning of the extended period of operation. Please state whether you intend to apply for relief from the ASME Code RV circumferential weld examination requirements for the extended licensed period of operation.
State when you plan to submit this relief request.
State when you plan to submit this relief request.
RAI 4.2.5-3 In the July 28, 1998 SER on BWRVIP-05, the NRC staff concluded that examination of the RV circumferential shell welds would need to be performed if the corresponding volumetric examinations of the RV axial shell welds revealed the presence of an age-related degradation mechanism. Confirm whether or not previous volumetric examinations of the RV axial shell welds have shown any indication of cracking or other age-related degradation mechanisms in the welds.
RAI 4.2.5-3 In the July 28, 1998 SER on BWRVIP-05, the NRC staff concluded that examination of the RV circumferential shell welds would need to be performed if the corresponding volumetric examinations of the RV axial shell welds revealed the presence of an age-related degradation mechanism. Confirm whether or not previous volumetric examinations of the RV axial shell welds have shown any indication of cracking or other age-related degradation mechanisms in the welds.
RAI 4.2.6-1 The limiting axial weld failure probability calculated by the NRC staff in the BWRVIP-05 SER is based on the assumption that "essentially 100 percent" (i.e*, greater than 90 percent) examination coverage of all RV axial welds can be achieved in accordance with ASME Code, Section Xl requirements.
RAI 4.2.6-1 The limiting axial weld failure probability calculated by the NRC staff in the BWRVIP-05 SER is based on the assumption that "essentially 100 percent" (i.e*, greater than 90 percent) examination coverage of all RV axial welds can be achieved in accordance with ASME Code, Section Xl requirements.
State whether your ISI examinations achieve "essentially 100 percent" (i.e., greater than 90.
State whether your ISI examinations achieve "essentially 100 percent" (i.e., greater than 90.
percent) overall examination coverage for the RV axial welds for the duration of the current licensed operating period. If less than 90 percent overall examination coverage is achieved for the RV axial welds, revise this TLAA to account for the effects of the limited scope examination coverage.}}
percent) overall examination coverage for the RV axial welds for the duration of the current licensed operating period. If less than 90 percent overall examination coverage is achieved for the RV axial welds, revise this TLAA to account for the effects of the limited scope examination coverage.}}

Latest revision as of 05:32, 15 January 2025

Email: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA
ML062990446
Person / Time
Site: Pilgrim
Issue date: 09/08/2006
From: Subbaratnam R
Office of New Reactors
To: Perry Buckberg
Office of Nuclear Reactor Regulation
References
%dam200612, TAC MD2296
Download: ML062990446 (16)


Text

I1 Kent Howard - Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA Page 111 From:

Ram Subbaratnam To:

phbl Date:

9/8/2006 3:11:39 PM

Subject:

Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA Here it is!

Ram

>>> Ram Subbaratnam 09/08/2006 3:06 PM >>>

Folks:

Please find attached one set of formal RAIs on section 3.2.1 and 4.2.1 from the NRC staff on the Pilgrim LRA. These are the last set of RAIs on this LRA and hopefully concludes the staff requests. I am sending you an advance copy so that Entergy can work on the lead in responding to the RAIs. As previously agreed upon, you formal response on docket will be due 30 days from the date of receipt of the RAIs in mail.

Thanking you.

Sincerely yours Ram Subbaratnam PM Pilgrim LRA US NRC, (301) 415 1478

I 0001.TMP Paae 111I c:\\temDViWlOOQQl.TMP Paoe 1 II Mail Envelope Properties (4501C06B.320: 19: 10294)

Subject:

Creation Date From:

Created By:

Fwd: Final RAI on Sections 3.2.1 and 4.2.1 on the Pilgrim LRA 9/8/2006 3:11:39 PM Ram Subbaratnam RXS2@nrc.gov Recipients nrc.gov OWGWPO01.HQGWDO01 PHB 1 (Perry Buckberg)

Post Office OWGWPO01.HQGWDO01 Action Date & Time Delivered Pending Route nrc.gov Files Size MESSAGE 1186 RLRCSection3.2.1AdditionalQsFinal.wpd CVIBectio4.2.lRAIsFinal.rev 1.wpd Date & Time 9/8/2006 3:11:39 PN 28831 38446 9/8/2006 2:58:33 PM 9/8/2006 2:58:59 PM Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

No None Yes Standard No None No Standard Immediate Delivered & Opened

September 8, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. MC9669)

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information address Sections 3.2 Engineered Safety Features.

These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or e-mail RXS2@nrc.gov.

Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As Stated cc w/encl: See next page

ML062500431 C:\\temp\\RLRCSection3.2.1 AdditionalQsFinal.wpd OFFICE PM:RLRA:DLR LA:DLR BC:REBB:DLR NAME RSubbaratnam YEdmonds LLund DATE 9/6/06 19/7/06 09/8 /06

Letter to Michael Kansler from Ram Subbaratnam dated: September 8, 2006

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)

HARD COPY DLR R/F E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDIr RidsNrrDIrRlra RidsNrrDIrRIrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff RSubbaratnam SHoffman SUttal JShea AWilliamson JDavis KChang GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1 M2A 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Plymouth Public Library Attn: Dinah O'Brien 132 South Street Plymouth, MA 02360 Duxbury Free Library ATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364 Ms. Mary Lampert Duxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348

REQUESTS FOR ADDITIONAL INFORMATION (RAIs)

PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTIONS 3.2 ENGINEERED SAFETY FEATURES SYSTEMS 3.2 Engineered Safety Features Systems RAI 3.2.1 Piping of the Reactor Core isolation Cooling System is subject to flow accelerated corrosion.

The applicant in LRA Table 3.2.1 engineered safety feature (ESF) and Table 3.2.1 credit the plant-specific Periodic Surveillance and Preventive Maintenance Program for the management of loss of materials (wall thinning). The GALL report recommends using the Flow-Accelerated Corrosion Program, XI.M17, to manage wall thinning. The Periodic Surveillance and Preventive Maintenance Program provides for inspection for material loss (wall thinning) every 5 years but no Monitoring and Trending activities to predict areas of high wall thinning rates or for trending of thinning as does XI.M17. Please provide justification for not providing for monitoring and trending of wall thinning for reactor core isolation cooling (RCIC) piping.

RAI 3.2.2 The applicant in Table 3.2.1 Item 18 of the PNPS LRA stated that none of the ESF system components are within the scope of the BWR Stress Corrosion Cracking Program. Please provide the details that justify this statement.

ENCLOSURE

September 8, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. MC9669)

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 9f the Code of Federal Regulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information on Time Limited Aging Analysis of Reactor Vessel Internals in License Renewal Section: 4.2.1.

These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or by e-mail at RXS2@nrc.aov.

Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Requests for Additional Information cc w/encl: See next page

September 8, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information on Time Limited Aging Analysis of Reactor Vessel Internals in License Renewal Section: 4.2.1.

These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1,478 or by e-mail at RXS2@nrc.aov.

Sincerely, IRA/

Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Requests for Additional Information cc w/encl: See next page ADAMS Accession No.: ML062500401 OFFICE PM:RLRA:DLR LA:RLRA:DLR BC:REBB:DLR NAME RSubbaratnam YEdmonds LLund DATE 09/08/06 09/08/06 09/08/06 OFFICIAL RECbRD COPY

Letter to Michael Kansler from Ram Subbaratnam dated: September 8. 2006

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION.FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)

HARD COPY DLR R/F E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDIr RidsNrrDIrRIra RidsNrrDIrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff RSubbaratnam Shoffman SUttal JShea AWilliamson CSydnor MMtichel GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1 M2A 529 Main Street '

Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Plymouth Public Library Attn: Dinah O'Brien 132 South Street Plymouth, MA 02360 Duxbury Free Library ATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364 Ms. Mary Lampert Duxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332

I ý REQUESTS FOR ADDITIONAL INFORMATION PILGRIM LICENSE RENEWAL APPLICATION (LRA)

TIME-LIMITED AGING ANALYSIS (TLAA) OF REACTOR VESSEL (RV) INTERNALS SECTION: 4.2.1 NEUTRON FLUENCE RAI 4.2.2-1 Section 4.2.2 of the Pilgrim Nuclear Power Station (PNPS) License Renewal Application (LRA),

"Pressure-Temperature [P-T] Limits," states that in a license amendment request dated December 4, 2002, PNPS requested to use the present P-T limit curves through the end of operating cycle 16, which corresponds to approximately 23 effective full power years (EFPY) of facility operation. The end of operating cycle 16 is expected to occur in 2007. Section 4.2.2 also states that, in this December 4, 2002 submittal, PNPS committed to develop and submit updated P-T limit curves and revised fluence calculations based on an NRC-approved calculation method that adheres to Regulatory Guide (RG) 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," prior to the end of operating cycle

16. License Amendment 197 granted this request in 2003. Section 4.2.2 then states that recent fluence calculations that were done per RG 1.190 confirm that the fluence for 54 EFPY is less than the fluence used to calculate the P-T limits that were approved for use only through the end of operating cycle 14. Based on the above statements, you conclude that the current Technical Specification (TS) P-T limit curves remain valid for the period of extended operation.

(a) Please confirm whether the P-T limit curves currently established in the PNPS TSs expire at the end of operating cycle 16 (23 EFPY).

(b) Please explain why the recent fluence calculations that were done per RG 1.190 confirm that the fluence for 54 EFPY is less than the fluence used to calculate the P-T limits that were approved for use through the end of cycle 14. Explain how this information was used to determine that the existing P-T limits remain valid for the period of extended operation.

(c) The staff does not require the P-T limit curves for the extended period of operation to be submitted as part of the applicant's LRA for this time-limited aging analysis (TLAA).

However, the staff does require NRC approval of the P-T limit curves for the extended period of operation prior to the expiration of the P-T limit curves for 32 EFPY. Please state when you intend to submit P-T limit curves for NRC approval for the extended licensed period of operation (54 EFPY).

RAI 4.2.4-1 Table 4.2-2 of the PNPS LRA lists initial RTNDT values for the PNPS RV beltline materials. The initial RTNDT values for Lower Intermediate Shell Plate G-3108-1 (Heat No. C-2921-2) and Lower Intermediate Shell Plate G-3108-3 (Heat No. C-2945-2) are less conservative than the corresponding initial RTNDT values established in the NRC staff's reactor vessel integrity database (RVID) for these materials. Section 4.2.4 of the PNPS LRA states that, "initial RTNDT values are from report SIR-00-82, which was submitted in 2001 as part of the PNPS P-T limit change request (Reference 4.2-5)." Reference 4.2-5 points to the April 13, 2001, license amendment issued by the NRC authorizing revised P-T limit curves.

ENCLOSURE Please provide additional information that points to where the NRC staff authorized the use of the specific initial RTNDT values listed in Table 4.2-4 for determining the adjusted reference temperature (ART) values for the PNPS reactor vessel (RV) beltline materials.

RAI 4.2.4-2 The %Cu and chemistry factor (CF) values for Lower Shell Axial Welds 2-338A, B, and C from LRA Table 4.2-2 are less conservative than the corresponding %Cu and CF values that were established in the staff's RVID for these welds. Please provide the following information:

(a) verification of whether the %Cu and CF values listed in Table 4.2-1 are valid for the above

welds, (b) justification for the use of these chemistry data for the above welds, including the source of the data, and a specific reference for the documentation/analysis demonstrating that these chemistry data represent the best available estimate of the weld chemistries.

RAI 4.2.4-3 Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253) is listed in the NRC staff's RVID. However this weld is not represented in LRA Table 4.2-2 or (LRA Table 4.2-1). Please resolve this discrepancy.

RAI 4.2.5-1 Section 4.2.5 of the PNPS LRA addresses the TLAA for the RV Circumferential Weld Examination Relief. Table 4.2-3 of the LRA compares the limiting RV circumferential weld parameters for PNPS to those used in the NRC evaluation of the BWRVIP-05 report, "BWR Vessel and Internals Project, BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations." The PNPS limiting RV circumferential weld parameters are based on Lower Intermediate / Lower Shell Circumferential Weld 1-334 (Heat No. 21935), which is the only circumferential weld represented in LRA Table 4.2-2. However, as discussed in RAI 4.2.4-3, the NRC staff's RVID also lists Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253) as one of the RV welds for PNPS. Furthermore, the chemistry and CF data for this weld are more limiting than for the Circumferential Weld 1-334. Please explain why this TLAA did not address Lower Intermediate / Upper Shell Circumferential Weld 3-339B (Heat No. 13253).

RAI 4.2.5-2 The NRC staff requires that a request for relief from the American Society of Mechanical Engineer Boiler and Pressure Vessel Code (ASME Code) RV circumferential shell weld examination requirements be submitted prior to the beginning of the extended period of operation. Please state whether you intend to apply for relief from the ASME Code RV circumferential weld examination requirements for the extended licensed period of operation.

State when you plan to submit this relief request.

RAI 4.2.5-3 In the July 28, 1998 SER on BWRVIP-05, the NRC staff concluded that examination of the RV circumferential shell welds would need to be performed if the corresponding volumetric examinations of the RV axial shell welds revealed the presence of an age-related degradation mechanism. Confirm whether or not previous volumetric examinations of the RV axial shell welds have shown any indication of cracking or other age-related degradation mechanisms in the welds.

RAI 4.2.6-1 The limiting axial weld failure probability calculated by the NRC staff in the BWRVIP-05 SER is based on the assumption that "essentially 100 percent" (i.e*, greater than 90 percent) examination coverage of all RV axial welds can be achieved in accordance with ASME Code, Section Xl requirements.

State whether your ISI examinations achieve "essentially 100 percent" (i.e., greater than 90.

percent) overall examination coverage for the RV axial welds for the duration of the current licensed operating period. If less than 90 percent overall examination coverage is achieved for the RV axial welds, revise this TLAA to account for the effects of the limited scope examination coverage.