ML080170291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Appendix D         Scenario Outline         Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc
{{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc  


Appendix D                                       Scenario Outline                               Form ES-D-1 Facility:         San Onofre                       Scenario No.:         1   Op Test No.:       NRC Examiners:                                                     Operators:
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Facility:
San Onofre Scenario No.:
1 Op Test No.:
NRC Examiners:
Operators:
Initial Conditions:
Initial Conditions:
* 99.5% power MOC - RCS Boron is 883 ppm (by sample)
99.5% power MOC - RCS Boron is 883 ppm (by sample)
* Train A Component Cooling Water Pump (P-025) in service
Train A Component Cooling Water Pump (P-025) in service Train A Containment Spray Pump (P-012) OOS Train A High Pressure Safety Injection Pump (P-017) OOS Condenser Air Ejector Low Range Radiation Monitor (RM-7818) OOS Fire Computer OOS Turnover:
* Train A Containment Spray Pump (P-012) OOS
Maintain steady-state power conditions.
* Train A High Pressure Safety Injection Pump (P-017) OOS
* Condenser Air Ejector Low Range Radiation Monitor (RM-7818) OOS
* Fire Computer OOS Turnover:             Maintain steady-state power conditions.
Critical Tasks:
Critical Tasks:
* Transfer the Non-Critical Loop (Train A Critical Loop rupture).
Transfer the Non-Critical Loop (Train A Critical Loop rupture).
* Trip any RCP not satisfying RCP operating limits.
Trip any RCP not satisfying RCP operating limits.
* Manually initiate MSIS (Auto actuation failure).
Manually initiate MSIS (Auto actuation failure).
* Stabilize RCS temperature/pressure following loss of heat removal from the faulted Steam Generator.
Stabilize RCS temperature/pressure following loss of heat removal from the faulted Steam Generator.
* Isolate the most affected Steam Generator (ESDE).
Isolate the most affected Steam Generator (ESDE).
Event No.     Malf. No.       Event Type*                         Event Description 1       CH04A         TS (CRS)               Containment Pressure Transmitter (PT-0352-1) fails high.
Event No.
+ 10 min 2      CV16A         I (RO, CRS)           VCT Level Instrument fails low (LT-0226).
Malf. No.
+ 20 min 3      SEIS OBE     C (BOP, CRS)           Seismic event without Main Feedwater Pump trip.
Event Type*
+ 35 min    FW25          TS (CRS)              Auxiliary Feedwater Pump (P-140) trip.
Event Description 1  
4                     R (RO)                 Initiate Rapid Power Reduction at 15% per hour.
+ 10 min CH04A TS (CRS)
+ 65 min                   N (BOP, CRS) 5      CC03A        C (BOP, CRS)           Rupture of Component Cooling Water line to the Shutdown
Containment Pressure Transmitter (PT-0352-1) fails high.
+ 75 min                  TS (CRS)              Cooling Heat Exchanger.
2
6       MS03B         M (ALL)               Excess Steam Demand Event on Steam Generator (E-089)
+ 20 min CV16A I (RO, CRS)
+ 105 min                                          inside Containment.
VCT Level Instrument fails low (LT-0226).
7       RP01C         C (RO)                 Train B High Pressure Safety Injection Pump (P-019) start
3
+ 105 min                                         failure.
+ 35 min SEIS OBE FW25 C (BOP, CRS)
8      RPS LP       I (BOP)               Main Steam Isolation Signal fails to actuate, manual actuation
TS (CRS)
+ 105 min                                          required.
Seismic event without Main Feedwater Pump trip.
    *    (N)ormal, (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor, (TS) Technical Specifications SONGS-12-2007-FINAL-SCENARIOS.doc
Auxiliary Feedwater Pump (P-140) trip.
4  
+ 65 min R (RO)
N (BOP, CRS)
Initiate Rapid Power Reduction at 15% per hour.
5
+ 75 min CC03A C (BOP, CRS)
TS (CRS)
Rupture of Component Cooling Water line to the Shutdown Cooling Heat Exchanger.
6  
+ 105 min MS03B M (ALL)
Excess Steam Demand Event on Steam Generator (E-089) inside Containment.
7  
+ 105 min RP01C C (RO)
Train B High Pressure Safety Injection Pump (P-019) start failure.
8
+ 105 min RPS LP I (BOP)
Main Steam Isolation Signal fails to actuate, manual actuation required.
(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS) Technical Specifications  


Appendix D                                 Scenario Outline                       Form ES-D-1 SCENARIO  
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc SCENARIO  


==SUMMARY==
==SUMMARY==
Line 57: Line 76:
The scenario is terminated when the crew stabilizes RCS temperature and pressure following loss of heat removal from the faulted Steam Generator. The final action is isolation of SG E-089.
The scenario is terminated when the crew stabilizes RCS temperature and pressure following loss of heat removal from the faulted Steam Generator. The final action is isolation of SG E-089.
Risk Significance:
Risk Significance:
* Risk important components out of service:         CS P-012, HPSI P-017
Risk important components out of service:
* Failure of risk important system prior to trip:   Loss of CCW Train due to rupture
CS P-012, HPSI P-017 Failure of risk important system prior to trip:
* Risk significant core damage sequence:             ESDE without MSIS
Loss of CCW Train due to rupture Risk significant core damage sequence:
* Risk significant operator actions:                 Transfer the Non-Critical Loop Manually start HPSI Pump Manually initiate MSIS Stabilize RCS temp following ESDE SONGS-12-2007-FINAL-SCENARIOS.doc
ESDE without MSIS Risk significant operator actions:
Transfer the Non-Critical Loop Manually start HPSI Pump Manually initiate MSIS Stabilize RCS temp following ESDE  


Scenario Event Description NRC Scenario 1 SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 1 Machine Operator: EXECUTE IC #181 and NRC Scenario #1 SETUP file to align components.
Scenario Event Description NRC Scenario 1 SONGS-12-2007-FINAL-SCENARIOS.doc SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 1 Machine Operator:
EXECUTE IC #181 and NRC Scenario #1 SETUP file to align components.
HANG Control Board Tags on P-012 and P-017.
HANG Control Board Tags on P-012 and P-017.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.
Line 69: Line 90:
VERIFY Master Alarm Keylock Switch in NORMAL.
VERIFY Master Alarm Keylock Switch in NORMAL.
PLACE procedures in progress on the RO desk:
PLACE procedures in progress on the RO desk:
                  -  Copy of SO32-5-1.7, Power Operations open to Section 6.4, Guidelines for Steady State Operation.
Copy of SO32-5-1.7, Power Operations open to Section 6.4, Guidelines for Steady State Operation.
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).
Control Room Annunciators in Alarm at 100%:
Control Room Annunciators in Alarm at 100%:
57A52 - CONTAINMENT SPRAY SYS TRAIN A INOPERABLE SONGS-12-2007-FINAL-SCENARIOS.doc
57A52 - CONTAINMENT SPRAY SYS TRAIN A INOPERABLE  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:       NRC     Scenario #   1     Event #       1               Page 5   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
1 Page 5
of 72 Event


== Description:==
== Description:==
Containment Pressure Transmitter Failure Time         Position                         Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.
Containment Pressure Transmitter Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.  
                          - CH04A, Cont. Pressure Transmitter (PT-0352-1) fails high Indications available:
- CH04A, Cont. Pressure Transmitter (PT-0352-1) fails high Indications available:
56A08 - CTMT PRESS HI HI ESFAS CHANNEL TRIP 56A18 - CTMT PRESS HI HI ESFAS PRETRIP 56B06 - PPS CHANNEL 1 TROUBLE 63B02 - UNIT 2 CRITICAL PARAMETER PROBLEM
56A08 - CTMT PRESS HI HI ESFAS CHANNEL TRIP 56A18 - CTMT PRESS HI HI ESFAS PRETRIP 56B06 - PPS CHANNEL 1 TROUBLE 63B02 - UNIT 2 CRITICAL PARAMETER PROBLEM  
+ 1 min           RO       REFER to Annunciator Response Procedures.
+ 1 min RO REFER to Annunciator Response Procedures.
RECOGNIZE Containment Pressure Channel failure and RO INFORM the CRS AOI SO23-13-18 entry required.
RO RECOGNIZE Containment Pressure Channel failure and INFORM the CRS AOI SO23-13-18 entry required.
DIRECT performance of AOI SO23-13-18, Reactor Protection CRS System Failure/Loss of Vital Bus.
CRS DIRECT performance of AOI SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus.
DETERMINE failure by observing instrumentation for the RO        affected channel and alternate redundant indications monitoring the same parameter.
RO DETERMINE failure by observing instrumentation for the affected channel and alternate redundant indications monitoring the same parameter.
RO       IDENTIFY Containment Pressure Channel PT-0352-1 failure.
RO IDENTIFY Containment Pressure Channel PT-0352-1 failure.
REFER to Attachment 5 and DETERMINE Functional Unit(s)
CRS REFER to Attachment 5 and DETERMINE Functional Unit(s) affected.
CRS affected.
RO PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Reactor Protection System.
PLACE the affected Functional Unit in BYPASS per RO SO23-3-2.12, Reactor Protection System.
M.O. Cue:
M.O. Cue:         When directed, EXECUTE the following Remote Functions:
When directed, EXECUTE the following Remote Functions:
RP51 = OPEN             (PPS Door Open Annunciator 56B46)
RP51 = OPEN (PPS Door Open Annunciator 56B46)
RP52S = BYPASS (Containment Pressure Channel A)
RP52S = BYPASS (Containment Pressure Channel A)
Delete RP51             (PPS Door Open Annunciator 56B46)
Delete RP51 (PPS Door Open Annunciator 56B46)  


Appendix D                             Operator Action                         Form ES-D-2 Op Test No.:       NRC   Scenario #   1     Event #     1               Page 6   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
1 Page 6
of 72 Event


== Description:==
== Description:==
Containment Pressure Transmitter Failure Time         Position                       Applicants Actions or Behavior RO     VERIFY the Trip Channel Bypassed Annunciator alarm.
Containment Pressure Transmitter Failure Time Position Applicants Actions or Behavior RO VERIFY the Trip Channel Bypassed Annunciator alarm.
* 56A29 - PPS CHANNEL 1 TRIP BYPASSED LOG the bypass and the reason for the bypass in the Control RO Operators Log.
56A29 - PPS CHANNEL 1 TRIP BYPASSED RO LOG the bypass and the reason for the bypass in the Control Operators Log.
CRS     INITIATE a LCOAR or follow guidelines of SO123-0-A5.
CRS INITIATE a LCOAR or follow guidelines of SO123-0-A5.  
+ 10 min         CRS     EVALUATE Technical Specifications.
+ 10 min CRS EVALUATE Technical Specifications.
* LCO 3.3.5.A, ESFAS Instrumentation.
LCO 3.3.5.A, ESFAS Instrumentation.
* CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable; ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.
CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable; ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 2.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 2.  


Appendix D                                 Operator Action                         Form ES-D-2 Op Test No.:       NRC       Scenario #     1   Event #       2               Page 7   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
2 Page 7
of 72 Event


== Description:==
== Description:==
VCT Level Transmitter Failure Time         Position                           Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 2.
VCT Level Transmitter Failure Time Position Applicants Actions or Behavior Machine Operator:
                            - CV16A, VCT Level Transmitter LT-0226 fails low Indications available:
When directed, EXECUTE Event 2.  
58A04 - VCT LEVEL HI/LO VCT Level Indicator LI-0226A lowering VCT Auto Makeup initiation
- CV16A, VCT Level Transmitter LT-0226 fails low Indications available:
+ 1 min           RO         REFER to Annunciator Response Procedures.
58A04 - VCT LEVEL HI/LO VCT Level Indicator LI-0226A lowering VCT Auto Makeup initiation  
RO         DETERMINE that VCT Auto Makeup has started.
+ 1 min RO REFER to Annunciator Response Procedures.
CHECK VCT Level indicator LI-0227 on PCS and DETERMINE RO          that level is normal (~51% and trending up due to auto makeup initiation).
RO DETERMINE that VCT Auto Makeup has started.
RO         IDENTIFY that VCT level transmitter LI-0226 has failed low.
RO CHECK VCT Level indicator LI-0227 on PCS and DETERMINE that level is normal (~51% and trending up due to auto makeup initiation).
RO         PLACE Makeup Mode Selector, HS-0210, to MANUAL.
RO IDENTIFY that VCT level transmitter LI-0226 has failed low.
Examiner Note:           When Makeup Control is placed in MANUAL, the following alarms will illuminate (on short time delay):
RO PLACE Makeup Mode Selector, HS-0210, to MANUAL.
* 58A06 - BORIC ACID TO VCT FLOW HI/LO
Examiner Note:
* 58A07 - DEMIN WATER TO VCT FLOW HI/LO DIRECT performance of SO23-3-2.2, Makeup Operations to CRS ensure proper CVCS alignment is achieved.
When Makeup Control is placed in MANUAL, the following alarms will illuminate (on short time delay):
+10 min           CRS         REQUEST I&C assistance.
58A06 - BORIC ACID TO VCT FLOW HI/LO 58A07 - DEMIN WATER TO VCT FLOW HI/LO CRS DIRECT performance of SO23-3-2.2, Makeup Operations to ensure proper CVCS alignment is achieved.  
When VCT Makeup is in Manual or at Lead Evaluators discretion, PROCEED to Event 3.
+10 min CRS REQUEST I&C assistance.
When VCT Makeup is in Manual or at Lead Evaluators discretion, PROCEED to Event 3.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #       1     Event #     3               Page 8   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
3 Page 8
of 72 Event


== Description:==
== Description:==
Seismic Event / Loss of Auxiliary Feedwater Pump Time         Position                           Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 3.
Seismic Event / Loss of Auxiliary Feedwater Pump Time Position Applicants Actions or Behavior Machine Operator:
                            - Seismic OBE without Main Feedwater Pump trip
When directed, EXECUTE Event 3.  
                            - FW25, Steam Driven Auxiliary Feedwater Pump (P140) trip Indications Available:
- Seismic OBE without Main Feedwater Pump trip  
61C21 - SEISMIC RECORDING SYSTEM ACTIVATED 61C22 - OPERATING BASIS EARTHQUAKE DETECTED 61C03 - SPENT FUEL POOL LEVEL HI/LO 64A26(29) - CCW SURGE TANK TRAIN A(B) LEVEL HI/LO 99B49 - TURBINE VIBRATION HI 99A11 - TPCW SURGE TANK LEVEL HI/LO 53A15 - MFWP TURBINE K006 VIBRATION HI PRETRIP 53A30 - MFWP/TURBINE P062/K006 VIBRATION HI 53B58 - CONDENSATE TANK T120 LEVEL HI/LO 50A54 - CEDMCS MG OUTPUT CONTACTOR OPEN 50A55 - ATWS/DSS TROUBLE 58A25(35) - BAMU TANK T072 (T071) LEVEL HI/LO 57A(B)16 - RWST T006 (T005 ) LEVEL LO 63B(C)50 - DIESEL GEN 2G002 (2G003 ) STORAGE TANK LEVEL HI/LO 52A53 - TURBINE AUX FW PUMP GOVERNOR OVERSPEED/OOS
- FW25, Steam Driven Auxiliary Feedwater Pump (P140) trip Indications Available:
  +1 min         CREW         REFER to Annunciator Response Procedures.
61C21 - SEISMIC RECORDING SYSTEM ACTIVATED 61C22 - OPERATING BASIS EARTHQUAKE DETECTED 61C03 - SPENT FUEL POOL LEVEL HI/LO 64A26(29) - CCW SURGE TANK TRAIN A(B) LEVEL HI/LO 99B49 - TURBINE VIBRATION HI 99A11 - TPCW SURGE TANK LEVEL HI/LO 53A15 - MFWP TURBINE K006 VIBRATION HI PRETRIP 53A30 - MFWP/TURBINE P062/K006 VIBRATION HI 53B58 - CONDENSATE TANK T120 LEVEL HI/LO 50A54 - CEDMCS MG OUTPUT CONTACTOR OPEN 50A55 - ATWS/DSS TROUBLE 58A25(35) - BAMU TANK T072 (T071) LEVEL HI/LO 57A(B)16 - RWST T006 (T005 ) LEVEL LO 63B(C)50 - DIESEL GEN 2G002 (2G003 ) STORAGE TANK LEVEL HI/LO 52A53 - TURBINE AUX FW PUMP GOVERNOR OVERSPEED/OOS  
RECOGNIZE Operating Basis Earthquake and INFORM the BOP CRS AOI SO23-13-3 entry required.
+1 min CREW REFER to Annunciator Response Procedures.
DETERMINE Steam Driven Auxiliary Feedwater Pump (P-140)
BOP RECOGNIZE Operating Basis Earthquake and INFORM the CRS AOI SO23-13-3 entry required.
BOP tripped and REPORT to the CRS.
BOP DETERMINE Steam Driven Auxiliary Feedwater Pump (P-140) tripped and REPORT to the CRS.
CRS         DIRECT performance of SO23-13-3, Earthquake.
CRS DIRECT performance of SO23-13-3, Earthquake.
CRS         DISPATCH an operator to the AFW Pump Room.
CRS DISPATCH an operator to the AFW Pump Room.
M.O. Cue:       Once dispatched, WAIT three (3) minutes and REPORT P140 linkage is damaged and pump is tripped.
M.O. Cue: Once dispatched, WAIT three (3) minutes and REPORT P140 linkage is damaged and pump is tripped.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #       1     Event #     3               Page 9   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
3 Page 9
of 72 Event


== Description:==
== Description:==
Seismic Event / Loss of Auxiliary Feedwater Pump Time         Position                           Applicants Actions or Behavior Floor Cue:       If requested, the Shift Manager will SHOW Seismic Panel indications to the CRS after a two (2) minute time delay (copy located at the end of the scenario).
Seismic Event / Loss of Auxiliary Feedwater Pump Time Position Applicants Actions or Behavior Floor Cue:
CRS       VERIFY the following occurred:
If requested, the Shift Manager will SHOW Seismic Panel indications to the CRS after a two (2) minute time delay (copy located at the end of the scenario).
* Valid activation of any of the following alarms or Seismic Instrument Panel indications:
CRS VERIFY the following occurred:
* 2UA61C21, Seismic Recording System Activated alarm -
Valid activation of any of the following alarms or Seismic Instrument Panel indications:
2UA61C21, Seismic Recording System Activated alarm -
illuminated.
illuminated.
* Strong Motion Acceleration System Activation (light indication on 2UA-8020, actuates at 0.019g)
Strong Motion Acceleration System Activation (light indication on 2UA-8020, actuates at 0.019g)
* Event 2ZLH-8020G (light indication on 2XY-8020), AND
Event 2ZLH-8020G (light indication on 2XY-8020), AND Ground motion that is readily felt by a consensus of Control Room personnel.
* Ground motion that is readily felt by a consensus of Control Room personnel.
Floor Cue:
Floor Cue:       Shift Manager will REPORT there was ground motion.
Shift Manager will REPORT there was ground motion.
CRS       DETERMINE Operating Basis Earthquake occurred:
CRS DETERMINE Operating Basis Earthquake occurred:
* 2UA61C22, Operating Basis Earthquake Acceleration BOP alarm - ILLUMINATED (actuates at 0.33g), AND
BOP 2UA61C22, Operating Basis Earthquake Acceleration alarm - ILLUMINATED (actuates at 0.33g), AND BOP OBE alarms (both white lamps: Containment Base OBE AND Containment Operating Level OBE) on Seismic Instrumentation Panel ILLUMINATED.
* OBE alarms (both white lamps: Containment Base OBE BOP            AND Containment Operating Level OBE) on Seismic Instrumentation Panel ILLUMINATED.
CRS INITIATE Attachment 1, Post Operating Basis Earthquake Inspections.
INITIATE Attachment 1, Post Operating Basis Earthquake CRS Inspections.
CRS INITIATE Attachment 4, Seismic Annunciator Data Collection.
CRS       INITIATE Attachment 4, Seismic Annunciator Data Collection.
M.O. Cue: When the ARO is directed to perform Attachment 4, WAIT two (2) minutes then CLEAR the Seismic alarms on Control Board Panel 61C (61C21 & 61C22) in preparation for the aftershock preceding Event 5.  
M.O. Cue:     When the ARO is directed to perform Attachment 4, WAIT two (2) minutes then CLEAR the Seismic alarms on Control Board Panel 61C (61C21 & 61C22) in preparation for the aftershock preceding Event 5.


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #       1     Event #     3               Page 10 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
3 Page 10 of 72 Event


== Description:==
== Description:==
Seismic Event / Loss of Auxiliary Feedwater Pump Time         Position                           Applicants Actions or Behavior CRS       INITIATE Attachment 2, Post Seismic Event Inspections.
Seismic Event / Loss of Auxiliary Feedwater Pump Time Position Applicants Actions or Behavior CRS INITIATE Attachment 2, Post Seismic Event Inspections.
CRS       EVALUATE Technical Specifications.
CRS EVALUATE Technical Specifications.
* LCO 3.7.5.B, Auxiliary Feedwater System.
LCO 3.7.5.B, Auxiliary Feedwater System.
* CONDITION B - One AFW Train inoperable for reasons other than Condition A in MODE 1, 2, or 3; ACTION B.1 - Restore AFW train to OPERABLE status within 72 hours.
CONDITION B - One AFW Train inoperable for reasons other than Condition A in MODE 1, 2, or 3; ACTION B.1 - Restore AFW train to OPERABLE status within 72 hours.  
INITIATE a normal plant shut down per SO23-13-3, Attachment
+ 15 min CRS INITIATE a normal plant shut down per SO23-13-3, Attachment 1 following guidance of SO23-5-1.7, Power Operations.
+ 15 min          CRS 1 following guidance of SO23-5-1.7, Power Operations.
Floor Cue: Once the decision to shut down the plant is initiated by the CRS, REPORT as the Shift Manager to perform a Rapid Power Reduction at 15% per hour per SO23-5-1.7, Power Operations.
Floor Cue: Once the decision to shut down the plant is initiated by the CRS, REPORT as the Shift Manager to perform a Rapid Power Reduction at 15% per hour per SO23-5-1.7, Power Operations.
When SO23-13-3, Attachment 1 is initiated and Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 4.
When SO23-13-3, Attachment 1 is initiated and Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 4.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     1   Event #       4               Page 11 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
4 Page 11 of 72 Event


== Description:==
== Description:==
Rapid Power Reduction at 15%/hour Time         Position                           Applicants Actions or Behavior Machine Operator:           If contacted as Grid Control Center, ACKNOWLEDGE Rapid Power Reduction at 15%/hour due to seismic event.
Rapid Power Reduction at 15%/hour Time Position Applicants Actions or Behavior Machine Operator:
DIRECT performance of actions in SO23-5-1.7, Power CRS Operations, Step for Rapid Power Reduction.
If contacted as Grid Control Center, ACKNOWLEDGE Rapid Power Reduction at 15%/hour due to seismic event.
INITIATE a Moisture Separator Heater cooldown per BOP        SO23-10-2, Attachment for MSR Cooldown for Load Reduction/ Turbine Shutdown.
CRS DIRECT performance of actions in SO23-5-1.7, Power Operations, Step for Rapid Power Reduction.
IMPLEMENT Attachment 8 to determine the amount of
BOP INITIATE a Moisture Separator Heater cooldown per SO23-10-2, Attachment for MSR Cooldown for Load Reduction/ Turbine Shutdown.  
+1 min        RO/BOP Boration and CEAs to be used (located on Control Board).
+1 min RO/BOP IMPLEMENT Attachment 8 to determine the amount of Boration and CEAs to be used (located on Control Board).
* A combination of CEA insertion and/or Boron will be used.
A combination of CEA insertion and/or Boron will be used.
RO         BORATE to the Charging Pump suction (Borate Mode).
RO BORATE to the Charging Pump suction (Borate Mode).
LOWER Turbine load (to raise Tc) until SBCS permissives are BOP        in by lowering Main Generator load using HS-2210, Main Turbine Speed Load Control to LOWER.
BOP LOWER Turbine load (to raise Tc) until SBCS permissives are in by lowering Main Generator load using HS-2210, Main Turbine Speed Load Control to LOWER.
RO         INSERT CEAs for power reduction and ASI control.
RO INSERT CEAs for power reduction and ASI control.
Examiner Cue:           Once the power change is under way it may be desirable to initiate conditions for Event 5 as there is an approximate seven
Examiner Cue:
Once the power change is under way it may be desirable to initiate conditions for Event 5 as there is an approximate seven
(~7) minute time delay before the CCW Surge Tank low-level alarm is received. The next event is preceded by an aftershock.
(~7) minute time delay before the CCW Surge Tank low-level alarm is received. The next event is preceded by an aftershock.
STOP CEA insertion any time the PPDIL alarm is received.
RO STOP CEA insertion any time the PPDIL alarm is received.
RO PROCEED after PPDIL alarm has reset.
PROCEED after PPDIL alarm has reset.  


Appendix D                             Operator Action                             Form ES-D-2 Op Test No.:     NRC     Scenario #   1     Event #       4               Page 12 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
4 Page 12 of 72 Event


== Description:==
== Description:==
Rapid Power Reduction at 15%/hour Time         Position                         Applicants Actions or Behavior FORCE Pressurizer Normal Spray flow using both Spray
Rapid Power Reduction at 15%/hour Time Position Applicants Actions or Behavior  
+20 min          RO Valves.
+20 min RO FORCE Pressurizer Normal Spray flow using both Spray Valves.
When power level is lowered 3-5%, or at Lead Evaluators discretion, PROCEED to Event 5.
When power level is lowered 3-5%, or at Lead Evaluators discretion, PROCEED to Event 5.  


Appendix D                               Operator Action                         Form ES-D-2 Op Test No.:     NRC     Scenario #     1   Event #       5               Page 13 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 13 of 72 Event


== Description:==
== Description:==
CCW Train A Header Rupture Time         Position                       Applicants Actions or Behavior M.O. Cue:       When directed, INITIATE the Seismic alarms on Control Board Panel 61C (61C21 & 81C22) to simulate an aftershock.
CCW Train A Header Rupture Time Position Applicants Actions or Behavior M.O. Cue: When directed, INITIATE the Seismic alarms on Control Board Panel 61C (61C21 & 81C22) to simulate an aftershock.
Floor Cue:       Shift Manager will REPORT there was ground motion.
Floor Cue:
Floor Cue:       If requested, the Shift Manager will SHOW Seismic Panel indications to the CRS after a two (2) minute time delay (aftershock copy located at the end of the scenario).
Shift Manager will REPORT there was ground motion.
Machine Operator:           When directed, EXECUTE Event 5.
Floor Cue:
                            - CC03A, CCW Train A rupture at SDC HX E004 @ 500 gpm Indications available:
If requested, the Shift Manager will SHOW Seismic Panel indications to the CRS after a two (2) minute time delay (aftershock copy located at the end of the scenario).
64A26 - CCW SURGE TANK TRAIN A LEVEL HI/LO (time delay of ~7 min) 64A07 - CCW PUMP TRAIN A DISCH PRESS LO 64A45 - CCW HX TRAIN A OUTLET PRESS LO 64A17 - CCW TRAIN A RETURN FLOW LO 56C58 - SAFETY EQPT BLDG SUMP LEVEL HI-HI (time delay of ~10 min)
Machine Operator:
+30 sec           BOP       REFER to Annunciator Response Procedures.
When directed, EXECUTE Event 5.  
RECOGNIZE lowering surge tank level and CCW Pump BOP        discharge pressure and INFORM the CRS AOI SO23-13-7 entry required.
- CC03A, CCW Train A rupture at SDC HX E004 @ 500 gpm Indications available:
+1 min             CRS       DIRECT performance of AOI SO23-13-7, Loss of CCW/ SWC.
64A26 - CCW SURGE TANK TRAIN A LEVEL HI/LO (time delay of ~7 min) 64A07 - CCW PUMP TRAIN A DISCH PRESS LO 64A45 - CCW HX TRAIN A OUTLET PRESS LO 64A17 - CCW TRAIN A RETURN FLOW LO 56C58 - SAFETY EQPT BLDG SUMP LEVEL HI-HI (time delay of ~10 min)  
ISOLATE Radwaste by closing 2HV-6465, 3HV-6465, BOP 2HV-6217, and 3HV-6217.
+30 sec BOP REFER to Annunciator Response Procedures.
CRS/BOP       DETERMINE that the leak is not isolated.
BOP RECOGNIZE lowering surge tank level and CCW Pump discharge pressure and INFORM the CRS AOI SO23-13-7 entry required.  
CRS       DIRECT placing Train B CCW in service.
+1 min CRS DIRECT performance of AOI SO23-13-7, Loss of CCW/ SWC.
BOP ISOLATE Radwaste by closing 2HV-6465, 3HV-6465, 2HV-6217, and 3HV-6217.
CRS/BOP DETERMINE that the leak is not isolated.
CRS DIRECT placing Train B CCW in service.  


Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #   1     Event #     5               Page 14 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 14 of 72 Event


== Description:==
== Description:==
CCW Train A Header Rupture Time         Position                       Applicants Actions or Behavior START CCW Pump P-026 and VERIFY that SWC P-114 BOP automatically starts.
CCW Train A Header Rupture Time Position Applicants Actions or Behavior BOP START CCW Pump P-026 and VERIFY that SWC P-114 automatically starts.  
+3 min             CRS       DIRECT transfer of the CCW Non-Critical Loop to Train B.
+3 min CRS DIRECT transfer of the CCW Non-Critical Loop to Train B.
With loss of flow to the CCW Non-Critical Loop and prior to Critical Task exceeding RCP operating limits, restore flow to the NCL from Statement any available CCW train.
Critical Task Statement With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP operating limits, restore flow to the NCL from any available CCW train.
CRITICAL TASK BOP       TRANSFER the CCW Non-Critical Loop to Train B.
CRITICAL TASK BOP TRANSFER the CCW Non-Critical Loop to Train B.
CRS       DIRECT transfer of Letdown HX to Train B.
CRS DIRECT transfer of Letdown HX to Train B.
BOP       TRANSFER Letdown HX to Train B.
BOP TRANSFER Letdown HX to Train B.
CRS/RO       DISPATCH PEO to investigate flooding alarms.
CRS/RO DISPATCH PEO to investigate flooding alarms.
CRS       DIRECT securing CCW Pump P-025.
CRS DIRECT securing CCW Pump P-025.
BOP       STOP CCW Pump P-025 and SWC Pump P-112.
BOP STOP CCW Pump P-025 and SWC Pump P-112.
M.O. Cue:         If directed to rack out breaker for CCW Pump P-024, WAIT 3 minutes and EXECUTE remote functions CC57A (DC to P-024) and CC58A (P-024 Breaker).
M.O. Cue:
If directed to rack out breaker for CCW Pump P-024, WAIT 3 minutes and EXECUTE remote functions CC57A (DC to P-024) and CC58A (P-024 Breaker).
If directed to rack out breaker for CCW Pump P-025, WAIT 3 minutes and EXECUTE remote functions CC57B (DC to P-025) and CC58B (P-025 Breaker).
If directed to rack out breaker for CCW Pump P-025, WAIT 3 minutes and EXECUTE remote functions CC57B (DC to P-025) and CC58B (P-025 Breaker).
DISPATCH PEO to close Loop A CCW Surge Tank Outlet, CRS/ BOP HV-6225.
CRS/ BOP DISPATCH PEO to close Loop A CCW Surge Tank Outlet, HV-6225.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #   1     Event #       5               Page 15 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 15 of 72 Event


== Description:==
== Description:==
CCW Train A Header Rupture Time         Position                         Applicants Actions or Behavior M.O. Cue:         If directed to close HV-6225, Loop A CCW Surge Tank Outlet, WAIT 3 minutes and EXECUTE remote function CC60.
CCW Train A Header Rupture Time Position Applicants Actions or Behavior M.O. Cue:
M.O. Cue:         If contacted to report status of Unit 3 CCW Surge Tank Level, REPORT that Train A CCW Surge Tank level is stable and unchanged.
If directed to close HV-6225, Loop A CCW Surge Tank Outlet, WAIT 3 minutes and EXECUTE remote function CC60.
+10 min           CRS       EVALUATE Technical Specifications.
M.O. Cue:
* LCO 3.7.7.A, Component Cooling Water System.
If contacted to report status of Unit 3 CCW Surge Tank Level, REPORT that Train A CCW Surge Tank level is stable and unchanged.  
* CONDITION A - One CCW Train inoperable; ACTION A.1 - Restore CCW Train to OPERABLE status within 72 hours.
+10 min CRS EVALUATE Technical Specifications.
Examiner Note:           The crew may decide to place CCW pumps P-024 and P-025 OOS, swap CCW Pump P-025 to Train B, and/or place Train A HPSI and CS Pumps OOS. Crew may remove DC Control Power for Train A HPSI and CS pumps to avoid damage due to lack of cooling water.
LCO 3.7.7.A, Component Cooling Water System.
M.O. Cues:       If directed to open the DC power supply breaker for the Train A ESF Pumps, ACKNOWLEDGE the order but do not perform (Time restriction).
CONDITION A - One CCW Train inoperable; ACTION A.1 - Restore CCW Train to OPERABLE status within 72 hours.
Examiner Note:
The crew may decide to place CCW pumps P-024 and P-025 OOS, swap CCW Pump P-025 to Train B, and/or place Train A HPSI and CS Pumps OOS. Crew may remove DC Control Power for Train A HPSI and CS pumps to avoid damage due to lack of cooling water.
M.O. Cues:
If directed to open the DC power supply breaker for the Train A ESF Pumps, ACKNOWLEDGE the order but do not perform (Time restriction).
If directed to transfer Emergency Chiller E-336 to Unit 3, ACKNOWLEDGE the order but do not perform (Time restriction).
If directed to transfer Emergency Chiller E-336 to Unit 3, ACKNOWLEDGE the order but do not perform (Time restriction).
If directed to transfer CCW Pump P-025 from Train A to Train B, ACKNOWLEDGE the order but do not perform (Time restriction).
If directed to transfer CCW Pump P-025 from Train A to Train B, ACKNOWLEDGE the order but do not perform (Time restriction).
CRS       ENSURE ECCS is not required.
CRS ENSURE ECCS is not required.
* HPSI, LPSI, CS pumps are stopped.
HPSI, LPSI, CS pumps are stopped.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6, 7, & 8.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6, 7, & 8.  


Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #   1     Event #       6, 7 & 8         Page   16     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 16 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                       Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Events 6, 7, and 8.
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior Machine Operator:
                            - MS03B, ESDE on E089 inside Containment @ 1.2%
When directed, EXECUTE Events 6, 7, and 8.  
                            - RPS LP, MSIS fails to actuate
- MS03B, ESDE on E089 inside Containment @ 1.2%  
                            - RP01C, HPSI Pump P019 start failure Indications available:
- RPS LP, MSIS fails to actuate  
60A02 - CONTAINMENT HUMIDITY HIGH 60A12 - REACTOR CAVITY TEMP HI 60A03 - CONTAINMENT / FHB TEMP HI 56A35 - CONTAINMENT PRESSURE HI PRETRIP 56A17 - CONTAINMENT PRESS HI ESFAS PRETRIP RECOGNIZE that an uncontrolled cooldown is in progress and
- RP01C, HPSI Pump P019 start failure Indications available:
+30 secs      RO/BOP INFORM the CRS that a Reactor trip is required.
60A02 - CONTAINMENT HUMIDITY HIGH 60A12 - REACTOR CAVITY TEMP HI 60A03 - CONTAINMENT / FHB TEMP HI 56A35 - CONTAINMENT PRESSURE HI PRETRIP 56A17 - CONTAINMENT PRESS HI ESFAS PRETRIP  
CRS       DIRECT entry into SO23-12-1, Standard Post Trip Actions.
+30 secs RO/BOP RECOGNIZE that an uncontrolled cooldown is in progress and INFORM the CRS that a Reactor trip is required.
RO         VERIFY Reactor Trip:
CRS DIRECT entry into SO23-12-1, Standard Post Trip Actions.
* VERIFY Reactor Trip Circuit Breakers (8) - open.
RO VERIFY Reactor Trip:
* VERIFY Reactor Power lowering and Startup Rate -
VERIFY Reactor Trip Circuit Breakers (8) - open.
VERIFY Reactor Power lowering and Startup Rate -
negative.
negative.
* VERIFY maximum of one full length CEA - NOT fully inserted.
VERIFY maximum of one full length CEA - NOT fully inserted.
BOP       VERIFY Turbine Trip:
BOP VERIFY Turbine Trip:
* VERIFY Main Turbine tripped.
VERIFY Main Turbine tripped.
* HP and LP Stop and Governor valves - closed.
HP and LP Stop and Governor valves - closed.
* VERIFY both Unit Output Breakers - open.
VERIFY both Unit Output Breakers - open.
* VERIFY Main Turbine speed <2000 RPM or lowering.
VERIFY Main Turbine speed <2000 RPM or lowering.
CRS       DETERMINE Reactivity Control criteria satisfied.
CRS DETERMINE Reactivity Control criteria satisfied.  


Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #   1     Event #     6, 7 & 8         Page   17     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 17 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                       Applicants Actions or Behavior CRS       INITIATE Administrative Actions:
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior CRS INITIATE Administrative Actions:
* ANNOUNCE Reactor trip via PA system.
ANNOUNCE Reactor trip via PA system.
* INITIATE Attachment 4, Worksheet.
INITIATE Attachment 4, Worksheet.
* INITIATE Attachment 5, Administrative Actions.
INITIATE Attachment 5, Administrative Actions.
BOP       VERIFY Vital Auxiliaries functioning properly:
BOP VERIFY Vital Auxiliaries functioning properly:
* VERIFY both 1E 4 kV Buses A04 and A06 - energized.
VERIFY both 1E 4 kV Buses A04 and A06 - energized.
* VERIFY both 1E 480 V Buses B04 and B06 - energized.
VERIFY both 1E 480 V Buses B04 and B06 - energized.
* VERIFY all Class 1E DC Buses - energized.
VERIFY all Class 1E DC Buses - energized.
* VERIFY all Non-1E 4 kV Buses - energized.
VERIFY all Non-1E 4 kV Buses - energized.
* VERIFY one CCW Train - operating AND aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.
VERIFY one CCW Train - operating AND aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.
M.O. Cue:         If directed to check Main Steam Safety Valve status, REPORT that all safety valves appear to be seated, with no steam coming from the MSIV roof.
M.O. Cue:
RO       DETERMINE RCS Inventory Control criteria NOT satisfied:
If directed to check Main Steam Safety Valve status, REPORT that all safety valves appear to be seated, with no steam coming from the MSIV roof.
* DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
RO DETERMINE RCS Inventory Control criteria NOT satisfied:
                                  *  [RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
* VERIFY Core Exit Saturation Margin 20&deg;F:
[RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.
VERIFY Core Exit Saturation Margin 20&deg;F:
* QSPDS page 611.
* QSPDS page 611.
* CFMS page 311.
* CFMS page 311.  


Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #   1     Event #       6, 7 & 8         Page   18     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 18 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                       Applicants Actions or Behavior RO       DETERMINE RCS Pressure Control criteria NOT satisfied:
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior RO DETERMINE RCS Pressure Control criteria NOT satisfied:
* DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
                                  *  [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
                                  *  [RNO] ENSURE Normal and Aux Spray valves -
[RNO] ENSURE Normal and Aux Spray valves -
closed.
closed.
                                  *  [RNO] ENSURE SIAS, CCAS, and CRIS - actuated.
[RNO] ENSURE SIAS, CCAS, and CRIS - actuated.
                                  *  [RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop - stopped.
[RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop - stopped.
                                  *  [RNO] If RCP NPSH requirements NOT satisfied, then ENSURE all RCPs - stopped.
[RNO] If RCP NPSH requirements NOT satisfied, then ENSURE all RCPs - stopped.
REPORT that HPSI Pump P-019 failed to start and START RO HPSI Pump P-019.
RO REPORT that HPSI Pump P-019 failed to start and START HPSI Pump P-019.
RO       DETERMINE Core Heat Removal criteria is NOT satisfied:
RO DETERMINE Core Heat Removal criteria is NOT satisfied:
* DETERMINE no RCPs should be operating due to CIAS.
DETERMINE no RCPs should be operating due to CIAS.
* VERIFY Core Exit Saturation Margin 20&deg;F.
VERIFY Core Exit Saturation Margin 20&deg;F.
* QSPDS page 611.
QSPDS page 611.
* CFMS page 311.
CFMS page 311.
BOP       DETERMINE RCS Heat Removal criteria NOT satisfied:
BOP DETERMINE RCS Heat Removal criteria NOT satisfied:
* VERIFY at least one SG level between 21% and 80% NR and Feedwater available.
VERIFY at least one SG level between 21% and 80% NR and Feedwater available.
* DETERMINE TC less than 545&deg;F and NOT controlled.
DETERMINE TC less than 545&deg;F and NOT controlled.
* DETERMINE heat removal is excessive:
DETERMINE heat removal is excessive:
                                  *    [RNO] TC - less than 545&deg;F.
[RNO] TC - less than 545&deg;F.
                                  *    [RNO] ENSURE SBCS valves closed.
[RNO] ENSURE SBCS valves closed.
                                  *    [RNO] ENSURE ADVs closed.
[RNO] ENSURE ADVs closed.  


Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       6, 7 & 8         Page 19     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 19 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                         Applicants Actions or Behavior
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior
                                  *    [RNO] ENSURE SG Blowdown valves closed.
[RNO] ENSURE SG Blowdown valves closed.
* E-088 - HV-4054
E-088 - HV-4054 E-089 - HV-4053
* E-089 - HV-4053
[RNO] ENSURE Main Steam to Reheaters valves closed.
                                  *    [RNO] ENSURE Main Steam to Reheaters valves closed.
HV-2703 or HV-2704; HV-2721; HV-2751 DETERMINE SG pressures - less than 740 PSIA.
* HV-2703 or HV-2704; HV-2721; HV-2751
ENSURE MSIS actuated.
* DETERMINE SG pressures - less than 740 PSIA.
Critical Task Statement Actions are taken to isolate the SGs prior to either SG blowing dry. These actions may include either manual actuation of the MSIS signal, or manual closure of MSIS actuated components.
* ENSURE MSIS actuated.
Actions are taken to isolate the SGs prior to either SG blowing Critical Task dry. These actions may include either manual actuation of the Statement MSIS signal, or manual closure of MSIS actuated components.
CRITICAL TASK Manually INITIATE MSIS.
CRITICAL TASK Manually INITIATE MSIS.
RO       DETERMINE Containment Isolation criteria NOT satisfied:
RO DETERMINE Containment Isolation criteria NOT satisfied:
* DETERMINE Containment pressure - greater than 1.5 PSIG.
DETERMINE Containment pressure - greater than 1.5 PSIG.
                                  *  [RNO] DETERMINE Containment pressure > 3.4 PSIG.
[RNO] DETERMINE Containment pressure > 3.4 PSIG.
                                  *  [RNO] ENSURE SIAS, CIAS, CCAS, and CRIS actuated.
[RNO] ENSURE SIAS, CIAS, CCAS, and CRIS actuated.
                                  *  [RNO] ENSURE all RCPs stopped.
[RNO] ENSURE all RCPs stopped.
Critical Task         Upon loss of CCW and prior to exceeding RCP operating limits, Statement            the affected RCP(s) will be stopped.
Critical Task Statement Upon loss of CCW and prior to exceeding RCP operating limits, the affected RCP(s) will be stopped.
CRITICAL TASK RO
CRITICAL TASK RO STOP all RCPs due to CIAS.
* STOP all RCPs due to CIAS.
VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.
* VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.
VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.  
* VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.


Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       6, 7 & 8         Page 20     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 20 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                         Applicants Actions or Behavior DETERMINE Containment Temperature and Pressure criteria RO NOT satisfied:
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior RO DETERMINE Containment Temperature and Pressure criteria NOT satisfied:
* DETERMINE Containment average temperature > 120&deg;F.
DETERMINE Containment average temperature > 120&deg;F.
* DETERMINE Containment pressure > 1.5 PSIG.
DETERMINE Containment pressure > 1.5 PSIG.
                                  *  [RNO] ENSURE proper functioning of the Normal Containment Cooling.
[RNO] ENSURE proper functioning of the Normal Containment Cooling.
                                  *  [RNO] ENSURE at least one Containment Dome Air Circulator operating.
[RNO] ENSURE at least one Containment Dome Air Circulator operating.
                                  *  [RNO] DETERMINE Containment pressure > 3.4 PSIG.
[RNO] DETERMINE Containment pressure > 3.4 PSIG.
                                  *  [RNO] ENSURE all RCPs stopped.
[RNO] ENSURE all RCPs stopped.
                                  *  [RNO] ENSURE all available Containment Emergency Cooling Units operating.
[RNO] ENSURE all available Containment Emergency Cooling Units operating.
* DETERMINE Containment pressure > 14 PSIG.
DETERMINE Containment pressure > 14 PSIG.
                                  *  [RNO] ENSURE CSAS actuated.
[RNO] ENSURE CSAS actuated.
                                  *  [RNO] ENSURE all available Containment Spray Header flows > 1600 GPM.
[RNO] ENSURE all available Containment Spray Header flows > 1600 GPM.  
+15 min           CRS       DIAGNOSE event in progress:
+15 min CRS DIAGNOSE event in progress:
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
                                  *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                  *  [RNO] DIAGNOSE event as ESDE on SG E089.
[RNO] DIAGNOSE event as ESDE on SG E089.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
                                  *  [RNO] DETERMINE all RCPs stopped.
[RNO] DETERMINE all RCPs stopped.
* DIRECT initiating Steps 12 through 15.
DIRECT initiating Steps 12 through 15.
BOP       INITIATE Steps 12 through 15.
BOP INITIATE Steps 12 through 15.  


Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       6, 7 & 8         Page 21     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 21 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                         Applicants Actions or Behavior Examiner Note:           When SG E089 reaches dryout conditions the crew should initiate FS-30, Establish Stable RCS Temperature during ESDE.
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior Examiner Note:
DIRECT performance of SO23-12-5, Excess Steam Demand CRS Event.
When SG E089 reaches dryout conditions the crew should initiate FS-30, Establish Stable RCS Temperature during ESDE.
* RECORD time of EOI entry.
CRS DIRECT performance of SO23-12-5, Excess Steam Demand Event.
CRS       VERIFY ESDE diagnosis.
RECORD time of EOI entry.
* INITIATE SO23-12-10, Safety Function Status Checks.
CRS VERIFY ESDE diagnosis.
* INITIATE Foldout Page.
INITIATE SO23-12-10, Safety Function Status Checks.
* DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
INITIATE Foldout Page.
* DIRECT performance of FS-3, Monitor Natural Circulation.
DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
* DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
DIRECT performance of FS-3, Monitor Natural Circulation.
* DIRECT performance of FS-30, Stabilize RCS Temperature.
DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
* VERIFY ESDE diagnosis using Figure 1, Break Identification Chart.
DIRECT performance of FS-30, Stabilize RCS Temperature.
* INITIATE sampling of both Steam Generators for radioactivity and boron.
VERIFY ESDE diagnosis using Figure 1, Break Identification Chart.
M.O. Cue:         If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
INITIATE sampling of both Steam Generators for radioactivity and boron.
CRS       INITIATE Administrative Actions.
M.O. Cue:
* NOTIFY Shift Manger/Operations Leader of entry into SO23-12-5, Excess Steam Demand Event.
If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
* ENSURE Emergency Plan is initiated.
CRS INITIATE Administrative Actions.
* IMPLEMENT Placekeeper.
NOTIFY Shift Manger/Operations Leader of entry into SO23-12-5, Excess Steam Demand Event.
ENSURE Emergency Plan is initiated.
IMPLEMENT Placekeeper.  


Appendix D                               Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #   1     Event #       6, 7 & 8         Page   22     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 22 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                       Applicants Actions or Behavior RO       VERIFY ESF actuation.
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior RO VERIFY ESF actuation.
* VERIFY SIAS actuation required.
VERIFY SIAS actuation required.
* PZR pressure less than SIAS setpoint.
PZR pressure less than SIAS setpoint.
OR
OR Containment pressure > 3.4 PSIG.
* Containment pressure > 3.4 PSIG.
ENSURE the following actuated:
* ENSURE the following actuated:
SIAS / CCAS / CRIS RO/BOP VERIFY SIAS, CCAS, CRIS actuated.
* SIAS / CCAS / CRIS RO/BOP       VERIFY SIAS, CCAS, CRIS actuated.
CRS RECORD time of SIAS.
CRS       RECORD time of SIAS.
BOP STOP unloaded Diesel Generators.
BOP       STOP unloaded Diesel Generators.
BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.
INITIATE SO23-12-11, Attachment 22, Non-Qualified Load BOP Restoration.
M.O. Cue:
M.O. Cue:         When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
BOP       VERIFY MSIS actuation required and ENSURE MSIS actuated.
BOP VERIFY MSIS actuation required and ENSURE MSIS actuated.
* SG pressure < 740 PSIA.
SG pressure < 740 PSIA.
RO       VERIFY CIAS actuation required and ENSURE CIAS actuated.
RO VERIFY CIAS actuation required and ENSURE CIAS actuated.
* Containment pressure > 3.4 psig.
Containment pressure > 3.4 psig.
* CFMS pages 342 and 343.
CFMS pages 342 and 343.
RO       VERIFY SIAS actuated.
RO VERIFY SIAS actuated.  


Appendix D                                   Operator Action                             Form ES-D-2 Op Test No.:       NRC     Scenario #       1     Event #       6, 7 & 8         Page 23     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 23 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                           Applicants Actions or Behavior Examiner Note:           At this point, the CRS may elect to secure Train A ECCS components due to loss of CCW.
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior Examiner Note:
RO         ESTABLISH Optimum SI Alignment.
At this point, the CRS may elect to secure Train A ECCS components due to loss of CCW.
* ESTABLISH one or two train operation:
RO ESTABLISH Optimum SI Alignment.
* All Charging Pumps operating.
ESTABLISH one or two train operation:
* One HPSI and one LPSI per train operating.
All Charging Pumps operating.
* All Cold leg flow paths aligned.
One HPSI and one LPSI per train operating.
* VERIFY SI flow required:
All Cold leg flow paths aligned.
* SI flow indicated OR RCS pressure >1250 psia.
VERIFY SI flow required:
OR
SI flow indicated OR RCS pressure >1250 psia.
* DETERMINE FS-7, Verify SI Throttle/Stop criteria NOT satisfied.
OR DETERMINE FS-7, Verify SI Throttle/Stop criteria NOT satisfied.
BOP       CLOSE MSIVs and MSIV Bypasses:
BOP CLOSE MSIVs and MSIV Bypasses:
* ENSURE MSIVs - closed:
ENSURE MSIVs - closed:
* HV-8205 for E088.
HV-8205 for E088.
* HV-8204 for E089.
HV-8204 for E089.
* ENSURE MSIV Bypasses - closed:
ENSURE MSIV Bypasses - closed:
* HV-8203 for E088.
HV-8203 for E088.
* HV-8202 for E089.
HV-8202 for E089.
CREW         PREVENT Pressurized Thermal Shock.
CREW PREVENT Pressurized Thermal Shock.
* INITIATE FS-30, Establish Stable RCS temperature during ESDE.
INITIATE FS-30, Establish Stable RCS temperature during ESDE.
* INITIATE FS-7, Verify SI Throttle/Stop Criteria.
INITIATE FS-7, Verify SI Throttle/Stop Criteria.
Examiner Note:           The following steps from FS-30 will be performed when conditions are met. Both the ESDE procedure and the ESDE Foldout Page direct performance of these steps.
Examiner Note:
The following steps from FS-30 will be performed when conditions are met. Both the ESDE procedure and the ESDE Foldout Page direct performance of these steps.  


Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       6, 7 & 8         Page 24     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 24 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                         Applicants Actions or Behavior
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior  
+20 min                     VERIFY SG least affected by ESDE, SG E088, NOT isolated BOP for SGTR.
+20 min BOP VERIFY SG least affected by ESDE, SG E088, NOT isolated for SGTR.
BOP       VERIFY most affected SG level E089 - less than 50% WR.
BOP VERIFY most affected SG level E089 - less than 50% WR.
BOP       PERFORM the following on least affected SG E088:
BOP PERFORM the following on least affected SG E088:
* TRANSFER ADV to Auto/Modulate.
TRANSFER ADV to Auto/Modulate.
* MAINTAIN least affected SG pressure 200 PSIA above most affected SG pressure.
MAINTAIN least affected SG pressure 200 PSIA above most affected SG pressure.
BOP       VERIFY SG dryout on most affected SG E089:
BOP VERIFY SG dryout on most affected SG E089:
* RCS Tcold - stable or rising, OR
RCS Tcold - stable or rising, OR SG pressure - 200 PSIA Critical Task Statement With loss of heat removal from the affected SG, transfer the primary to secondary heat sink to the least affected SG. Actions shall include the following:
* SG pressure - 200 PSIA With loss of heat removal from the affected SG, transfer the primary to secondary heat sink to the least affected SG. Actions shall include the following:
Steaming of the least affected (non-ESDE) SG to maintain Psat for lowest RCS Tc ;
Critical Task
Manipulation of feedwater controls to maintain SG level of 40% to 80% NR.
* Steaming of the least affected (non-ESDE) SG to Statement maintain Psat for lowest RCS Tc ;
CRITICAL TASK BOP STABILIZE least affected SG E088 pressure:
* Manipulation of feedwater controls to maintain SG level of 40% to 80% NR.
VERIFY ADV on SG E088 in Auto/Modulate.
CRITICAL TASK BOP       STABILIZE least affected SG E088 pressure:
MAINTAIN Psat for lowest RCS Tc on SG E088.
* VERIFY ADV on SG E088 in Auto/Modulate.
STABILIZE AFW flow on SG E088.
* MAINTAIN Psat for lowest RCS Tc on SG E088.
RO VERIFY RCS pressure is to the right of the Appendix E curve on Attachment 29, Post-Accident Pressure/Temperature Limits.  
* STABILIZE AFW flow on SG E088.
VERIFY RCS pressure is to the right of the Appendix E curve RO on Attachment 29, Post-Accident Pressure/Temperature Limits.


Appendix D                                 Operator Action                               Form ES-D-2 Op Test No.:       NRC     Scenario #     1     Event #       6, 7 & 8         Page 25     of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
6, 7 & 8 Page 25 of 72 Event


== Description:==
== Description:==
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time         Position                         Applicants Actions or Behavior OPERATE feedwater on SG E088 to maintain level between BOP 40% and 80% NR.
ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior BOP OPERATE feedwater on SG E088 to maintain level between 40% and 80% NR.
Examiner Note:           The following steps are from EOI SO23-12-11, Attachment 28, Isolation of SG with ESDE.
Examiner Note:
BOP       DETERMINE E089 is the most affected SG.
The following steps are from EOI SO23-12-11, Attachment 28, Isolation of SG with ESDE.
NOTIFY Shift Manager / Operations Leader of the SG most CRS affected by the ESDE.
BOP DETERMINE E089 is the most affected SG.
VERIFY SG least affected by ESDE available for heat removal BOP and not affected by SGTR.
CRS NOTIFY Shift Manager / Operations Leader of the SG most affected by the ESDE.
Critical Task Identify and isolate the most affected Steam Generator (ESDE).
BOP VERIFY SG least affected by ESDE available for heat removal and not affected by SGTR.
Statement CRITICAL TASK BOP       ISOLATE SG E089. CLOSE/STOP the following components:
Critical Task Statement Identify and isolate the most affected Steam Generator (ESDE).
* MSIV HV-8204
CRITICAL TASK BOP ISOLATE SG E089. CLOSE/STOP the following components:
* MSIV Bypass HV-8202
MSIV HV-8204 MSIV Bypass HV-8202 ADV HV-8421 MFIV HV-4052 AFW valves HV-4715, HV-4731 Steam to AFW P-140 HV-8200 SG Blowdown Isolation HV-4053 SG Water Sample Isolation HV-4057 Electric AFW Pump P-141  
* ADV HV-8421
+30 min BOP ENSURE SG E089 ADV HV-8421 selected to MANUAL.
* MFIV HV-4052
When Steam Generator E089 is isolated, TERMINATE the scenario.  
* AFW valves HV-4715, HV-4731
* Steam to AFW P-140 HV-8200
* SG Blowdown Isolation HV-4053
* SG Water Sample Isolation HV-4057
* Electric AFW Pump P-141
+30 min           BOP       ENSURE SG E089 ADV HV-8421 selected to MANUAL.
When Steam Generator E089 is isolated, TERMINATE the scenario.


Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       NRC   Scenario #     1       Event #     3               Page 26   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
3 Page 26 of 72 Event


== Description:==
== Description:==
Cue Card For Initial Seismic Event Time         Position                           Applicants Actions or Behavior OPERATOR INDICATIONS AT 2UA-8020, SEISMIC PANEL INITIAL SEISMIC EVENT
Cue Card For Initial Seismic Event Time Position Applicants Actions or Behavior OPERATOR INDICATIONS AT 2UA-8020, SEISMIC PANEL INITIAL SEISMIC EVENT
* Strong Motion Acceleration System Activation light (0.019g) - ON
* Strong Motion Acceleration System Activation light (0.019g) - ON
* 2ZLH-8020G, Event Light Indication, (0.019g) Power Panel - ON
* 2ZLH-8020G, Event Light Indication, (0.019g) Power Panel - ON
* Containment Base OBE (0.33g) - ON
* Containment Base OBE (0.33g) - ON
* Containment Operating Level OBE (0.33g) - ON
* Containment Operating Level OBE (0.33g) - ON  


Appendix D                       Scenario Outline                     Form ES-D-1 OPERATOR INDICATIONS AT 2UA-8020, SEISMIC PANEL AFTERSHOCK EVENT
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc OPERATOR INDICATIONS AT 2UA-8020, SEISMIC PANEL AFTERSHOCK EVENT
* Strong Motion Acceleration System Activation light (0.019g) - ON
* Strong Motion Acceleration System Activation light (0.019g) - ON
* 2ZLH-8020G, Event Light Indication, (0.019g) Power Panel - ON
* 2ZLH-8020G, Event Light Indication, (0.019g) Power Panel - ON
* Containment Base OBE (0.33g) - ON
* Containment Base OBE (0.33g) - ON
* Containment Operating Level OBE (0.33g) - ON SONGS-12-2007-FINAL-SCENARIOS.doc
* Containment Operating Level OBE (0.33g) - ON  


Appendix D                                     Scenario Outline                             Form ES-D-1 Facility:         San Onofre                     Scenario No.:         2   Op Test No.:     NRC Examiners:                                                 Operators:
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Facility:
San Onofre Scenario No.:
2 Op Test No.:
NRC Examiners:
Operators:
Initial Conditions:
Initial Conditions:
* 69% power MOC - RCS Boron is 956 ppm (by sample)
69% power MOC - RCS Boron is 956 ppm (by sample)
* Train A Component Cooling Water Pump (P-025) in service
Train A Component Cooling Water Pump (P-025) in service Train A Containment Spray Pump (P-012) OOS Train A High Pressure Safety Injection Pump (P-017) OOS Fire Computer OOS Turnover:
* Train A Containment Spray Pump (P-012) OOS
Dilution and power ascension in progress at 10% per hour.
* Train A High Pressure Safety Injection Pump (P-017) OOS
* Fire Computer OOS Turnover:             Dilution and power ascension in progress at 10% per hour.
Critical Tasks:
Critical Tasks:
* Restore flow to the CCW Non-Critical Loop (RCPs operating).
Restore flow to the CCW Non-Critical Loop (RCPs operating).
* Energize at least one vital 4 kV 1E Bus and associated 480 V 1E Bus.
Energize at least one vital 4 kV 1E Bus and associated 480 V 1E Bus.
* Establish Reactivity Control (> 2 FLCEAs Not Fully Inserted & No SIAS).
Establish Reactivity Control (> 2 FLCEAs Not Fully Inserted & No SIAS).
Event No.     Malf. No. Event Type*                           Event Description 1                     R (RO)             Dilution and power ascension at 10% per hour.
Event No.
+ 15 min                   N (BOP, CRS) 2      RC24A        I (RO, CRS)         Pressurizer Spray Valve (PV-0100A) fails open.
Malf. No.
+ 25 min                   TS (CRS) 3      SG05G         I (BOP, CRS)       Steam Generator E-089 Narrow Range Level Transmitter
Event Type*
+ 35 min                  TS (CRS)            (LT-1113-3) fails low.
Event Description 1  
4       ED03A         C (ALL)             Bus 2A04 Overcurrent lockout.
+ 15 min R (RO)
+ 50 min                   TS (CRS) 5      TU08         M (ALL)             Turbine trip.
N (BOP, CRS)
+ 85 min    PG24                              Loss of Offsite Power.
Dilution and power ascension at 10% per hour.
PG57                              Loss of SDG&E Switchyard.
2
6       RD8802       C (RO)             Four fully stuck CEAs; Loss of Reactivity Control.
+ 25 min RC24A I (RO, CRS)
+ 85 min     RD8902 RD9002 RD9102 7      EG08B         C (BOP)             Emergency Diesel Generator (2G003) mechanical failure.
TS (CRS)
+ 85 min                                      Station Blackout.
Pressurizer Spray Valve (PV-0100A) fails open.
    *    (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor, (TS)Technical Specifications SONGS-12-2007-FINAL-SCENARIOS.doc
3
+ 35 min SG05G I (BOP, CRS)
TS (CRS)
Steam Generator E-089 Narrow Range Level Transmitter (LT-1113-3) fails low.
4  
+ 50 min ED03A C (ALL)
TS (CRS)
Bus 2A04 Overcurrent lockout.
5
+ 85 min TU08 PG24 PG57 M (ALL)
Turbine trip.
Loss of Offsite Power.
Loss of SDG&E Switchyard.
6  
+ 85 min RD8802 RD8902 RD9002 RD9102 C (RO)
Four fully stuck CEAs; Loss of Reactivity Control.
7
+ 85 min EG08B C (BOP)
Emergency Diesel Generator (2G003) mechanical failure.
Station Blackout.
(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications  


Appendix D                               Scenario Outline                           Form ES-D-1 SCENARIO  
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc SCENARIO  


==SUMMARY==
==SUMMARY==
Line 511: Line 627:
This is followed by a bus fault and lockout on 1E Bus 2A04. The crew will refer to AOI SO23-13-26, Loss of Power to an AC Bus. Actions include transferring the Non-Critical Loop to Train B, starting a standby Charging Pump, and stopping and placing the Train A Emergency Diesel Generator in Maintenance Lockout. The CRS will evaluate Technical Specifications and determine that a plant shutdown is required.
This is followed by a bus fault and lockout on 1E Bus 2A04. The crew will refer to AOI SO23-13-26, Loss of Power to an AC Bus. Actions include transferring the Non-Critical Loop to Train B, starting a standby Charging Pump, and stopping and placing the Train A Emergency Diesel Generator in Maintenance Lockout. The CRS will evaluate Technical Specifications and determine that a plant shutdown is required.
Once the decision to shutdown is made, a Loss of Offsite Power will occur. The Reactor will trip and the crew will perform Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions (SPTAs). Emergency Diesel Generator 2G003 will trip while SPTAs are being performed (one minute post-trip). Four rods remain stuck out of the core requiring manual boration alignment on the part of the RO in preparation for Bus 2A06 power restoration.
Once the decision to shutdown is made, a Loss of Offsite Power will occur. The Reactor will trip and the crew will perform Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions (SPTAs). Emergency Diesel Generator 2G003 will trip while SPTAs are being performed (one minute post-trip). Four rods remain stuck out of the core requiring manual boration alignment on the part of the RO in preparation for Bus 2A06 power restoration.
* The crew diagnoses a Loss of Reactivity Control due to four (4) full length CEAs stuck out with a Station Blackout and enters EOI SO23-12-9, Functional Recovery. The success path will require cross-tying power with Unit 3 and establishing a boration flowpath.
The crew diagnoses a Loss of Reactivity Control due to four (4) full length CEAs stuck out with a Station Blackout and enters EOI SO23-12-9, Functional Recovery. The success path will require cross-tying power with Unit 3 and establishing a boration flowpath.
* The scenario is terminated when Bus 2A06 is energized and boration at greater than 40 gpm is established.
The scenario is terminated when Bus 2A06 is energized and boration at greater than 40 gpm is established.
Risk Significance:
Risk Significance:
* Risk important components out of service:           CS P-012, HPSI P-017
Risk important components out of service:
* Failure of risk important system prior to trip:     Loss of Vital Inverters
CS P-012, HPSI P-017 Failure of risk important system prior to trip:
* Risk significant core damage sequence:               SBO with Loss of Reactivity Control
Loss of Vital Inverters Risk significant core damage sequence:
* Risk significant operator actions:                   Establish Non-Critical Loop CCW flow Vital AC power restoration Establish boration flowpath SONGS-12-2007-FINAL-SCENARIOS.doc
SBO with Loss of Reactivity Control Risk significant operator actions:
Establish Non-Critical Loop CCW flow Vital AC power restoration Establish boration flowpath  


Scenario Event Description NRC Scenario 2 SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 2 Machine Operator: EXECUTE IC #182 and NRC Scenario #2 SETUP file to align components.
Scenario Event Description NRC Scenario 2 SONGS-12-2007-FINAL-SCENARIOS.doc SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 2 Machine Operator:
EXECUTE IC #182 and NRC Scenario #2 SETUP file to align components.
HANG Control Board Tags on P-012 and P-017.
HANG Control Board Tags on P-012 and P-017.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.
Line 525: Line 643:
VERIFY both Pressurizer Spray Valves in AUTO.
VERIFY both Pressurizer Spray Valves in AUTO.
VERIFY Master Alarm Silence Switch in NORMAL.
VERIFY Master Alarm Silence Switch in NORMAL.
PLACE procedures in progress on the RO desk:
PLACE procedures in progress on the RO desk:  
                      - Copy of SO23-5-1.7 open to Step 6.3.15, 50-80%
- Copy of SO23-5-1.7 open to Step 6.3.15, 50-80%
Reactor Power.
Reactor Power.  
                      - MARKED UP copy of SO23-5-1.7, Attachment 9.
- MARKED UP copy of SO23-5-1.7, Attachment 9.  
                      - Copy of SO23-3-2.2 with Steps 6.5.1 through 6.5.5 checked off.
- Copy of SO23-3-2.2 with Steps 6.5.1 through 6.5.5 checked off.  
                      - Copy of SO23-3-1.10 open to Section 6.2, Forcing Pressurizer Sprays.
- Copy of SO23-3-1.10 open to Section 6.2, Forcing Pressurizer Sprays.
VERIFY that dilution is in progress then PLACE in FREEZE.
VERIFY that dilution is in progress then PLACE in FREEZE.
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).
PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position(s).
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position(s).
Control Room Annunciators in Alarm at 70%:
Control Room Annunciators in Alarm at 70%:
57A52 - CONTAINMENT SPRAY SYS TRAIN A INOPERABLE SONGS-12-2007-FINAL-SCENARIOS.doc
57A52 - CONTAINMENT SPRAY SYS TRAIN A INOPERABLE  


Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #   2     Event #       1               Page 31 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
1 Page 31 of 72 Event


== Description:==
== Description:==
Dilution and Power Ascension in Progress at 10%/hr Time         Position                       Applicants Actions or Behavior Machine Operator:         When turnover is complete, PLACE Simulator in RUN.
Dilution and Power Ascension in Progress at 10%/hr Time Position Applicants Actions or Behavior Machine Operator:
DIRECT performance of SO23-5-1.7, Power Operations,
When turnover is complete, PLACE Simulator in RUN.  
  +1 min          CRS    SO23-3-2.2, Makeup Operations, and SO23-10-1, Turbine Startup and Normal Operation.
+1 min CRS DIRECT performance of SO23-5-1.7, Power Operations, SO23-3-2.2, Makeup Operations, and SO23-10-1, Turbine Startup and Normal Operation.
RO     VERIFY Batch Counter and Makeup Integrator settings.
RO VERIFY Batch Counter and Makeup Integrator settings.
RO     PERFORM dilution valve alignment.
RO PERFORM dilution valve alignment.
* PLACE FV-9253 in OPEN.
PLACE FV-9253 in OPEN.
* VERIFY FIC-0210X in AUTO at ~ 19 gpm.
VERIFY FIC-0210X in AUTO at ~ 19 gpm.
* PLACE HS-0210 in DILUTE.
PLACE HS-0210 in DILUTE.
RO     VERIFY Tcold changing as dilution progresses.
RO VERIFY Tcold changing as dilution progresses.
RO     ADJUST CEAs as required for ASI control.
RO ADJUST CEAs as required for ASI control.  
MAINTAIN Tcold within required band by raising Main
+15 min BOP MAINTAIN Tcold within required band by raising Main Generator load using HS-2210, Main Turbine Speed Load Control to RAISE.
+15 min          BOP    Generator load using HS-2210, Main Turbine Speed Load Control to RAISE.
When power has been raised 3 to 5%, or at Lead Evaluators discretion, PROCEED to Event 2.  
When power has been raised 3 to 5%, or at Lead Evaluators discretion, PROCEED to Event 2.


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     2     Event #     2               Page 32 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
2 Page 32 of 72 Event


== Description:==
== Description:==
Pressurizer Spray Valve Fails Open Time         Position                           Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 2.
Pressurizer Spray Valve Fails Open Time Position Applicants Actions or Behavior Machine Operator:
                            - RC24A @ 80%, Pressurizer Spray Valve fails open Indications available:
When directed, EXECUTE Event 2.  
- RC24A @ 80%, Pressurizer Spray Valve fails open Indications available:
50A14 - PZR PRESS HI/LO (+90 seconds from event initiation)
50A14 - PZR PRESS HI/LO (+90 seconds from event initiation)
Examiner Note:           Because both Spray Valves will be open during the power ascension, PV-100A is failed 80% open. This is equivalent to a 40% open failure when not forcing sprays with all heaters energized.
Examiner Note:
+2 min             RO         REFER to Annunciator Response Procedures.
Because both Spray Valves will be open during the power ascension, PV-100A is failed 80% open. This is equivalent to a 40% open failure when not forcing sprays with all heaters energized.  
RECOGNIZE PZR Pressure Control failure and INFORM the RO CRS AOI SO23-13-27 entry required.
+2 min RO REFER to Annunciator Response Procedures.
DIRECT performance of SO23-13-27, Pressurizer Pressure CRS and Level Malfunction.
RO RECOGNIZE PZR Pressure Control failure and INFORM the CRS AOI SO23-13-27 entry required.
START and/or VERIFY PZR Backup and Proportional Heaters RO energized.
CRS DIRECT performance of SO23-13-27, Pressurizer Pressure and Level Malfunction.
DETERMINE Pressurizer Pressure channel is NOT between CRS/RO 2225 and 2275 psig.
RO START and/or VERIFY PZR Backup and Proportional Heaters energized.
CRS/RO         DETERMINE Pressurizer Pressure is NOT stable.
CRS/RO DETERMINE Pressurizer Pressure channel is NOT between 2225 and 2275 psig.
OBSERVE PV-0100B, Pressurizer Spray Valve from Loop 1B, RO is failed ~80% open.
CRS/RO DETERMINE Pressurizer Pressure is NOT stable.
M.O. Cue:         Closely MONITOR pressure and REDUCE malfunction RC24A to 60%
RO OBSERVE PV-0100B, Pressurizer Spray Valve from Loop 1B, is failed ~80% open.
once identified (this will allow pressure to stabilize and avoid a plant trip).
M.O. Cue:
Closely MONITOR pressure and REDUCE malfunction RC24A to 60%
once identified (this will allow pressure to stabilize and avoid a plant trip).  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     2     Event #       2               Page 33 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
2 Page 33 of 72 Event


== Description:==
== Description:==
Pressurizer Spray Valve Fails Open Time         Position                           Applicants Actions or Behavior DIRECT an ARO to fail closed PV-0100A, PZR Spray Valve, by CRS        removing the connector block at Cabinet L-138, SPEC 200 Power Supply Cabinet, Nest 4, Slot 10. (HC-0100A)
Pressurizer Spray Valve Fails Open Time Position Applicants Actions or Behavior CRS DIRECT an ARO to fail closed PV-0100A, PZR Spray Valve, by removing the connector block at Cabinet L-138, SPEC 200 Power Supply Cabinet, Nest 4, Slot 10. (HC-0100A)
M.O. Cue:         REDUCE malfunction RC24A to 0% and REPORT to the Control Room that the connector block at Cabinet L-138, SPEC 200 Power Supply Cabinet, Nest 4, Slot 10 was removed.
M.O. Cue:
RO/CRS       DETERMINE Pressurizer pressure is recovering.
REDUCE malfunction RC24A to 0% and REPORT to the Control Room that the connector block at Cabinet L-138, SPEC 200 Power Supply Cabinet, Nest 4, Slot 10 was removed.
RO         VERIFY the Pressurizer Pressure signal has not failed high.
RO/CRS DETERMINE Pressurizer pressure is recovering.
VERIFY Pressurizer Pressure Control System is operating RO properly in automatic.
RO VERIFY the Pressurizer Pressure signal has not failed high.
VERIFY Pressurizer Spray was not initiated with delta RO temperature > 180&deg;F.
RO VERIFY Pressurizer Pressure Control System is operating properly in automatic.
Examiner Note:           The following Technical Specification is entered if RCS pressure drops below 2025 PSIA during this event.
RO VERIFY Pressurizer Spray was not initiated with delta temperature > 180&deg;F.
+10 min           CRS       EVALUATE Technical Specifications.
Examiner Note:
* LCO 3.4.1.A, RCS DNB Limits.
The following Technical Specification is entered if RCS pressure drops below 2025 PSIA during this event.  
* CONDITION A - Pressurizer pressure not within limits; ACTION A.1 - Restore Pressurizer pressure to within limit within two (2) hours.
+10 min CRS EVALUATE Technical Specifications.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 3.
LCO 3.4.1.A, RCS DNB Limits.
CONDITION A - Pressurizer pressure not within limits; ACTION A.1 - Restore Pressurizer pressure to within limit within two (2) hours.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 3.  


Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     2     Event #     3                 Page 34 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
3 Page 34 of 72 Event


== Description:==
== Description:==
Steam Generator E089 NR Level Transmitter Fails Low Time         Position                       Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.
Steam Generator E089 NR Level Transmitter Fails Low Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.  
                          - SG05G, LT-1113-3 S/G E089 Level Instrument fails low Indications Available:
- SG05G, LT-1113-3 S/G E089 Level Instrument fails low Indications Available:
52A06 - SG1 E089 LEVEL HI/LO 52A07 - FWCS SG1 E089 LEVEL DEVIATION
52A06 - SG1 E089 LEVEL HI/LO 52A07 - FWCS SG1 E089 LEVEL DEVIATION  
  +1 min           BOP       REFER to Annunciator Response Procedures.
+1 min BOP REFER to Annunciator Response Procedures.
IDENTIFY failed transmitter is Steam Generator E089 NR BOP Level Transmitter Channel C, 2LT-1113-3.
BOP IDENTIFY failed transmitter is Steam Generator E089 NR Level Transmitter Channel C, 2LT-1113-3.
DIRECT performance of AOI SO23-13-18, Reactor Protection CRS System Failure.
CRS DIRECT performance of AOI SO23-13-18, Reactor Protection System Failure.
CRS       IDENTIFY a Single PPS Channel failed.
CRS IDENTIFY a Single PPS Channel failed.
IDENTIFY Affected Functional Units for Channel C, using CRS Attachment 5 of AOI SO23-13-18.
CRS IDENTIFY Affected Functional Units for Channel C, using of AOI SO23-13-18.
* SG 1 Level - Low (RPS)
SG 1 Level - Low (RPS)
* SG 1 Level - High (RPS)
SG 1 Level - High (RPS)
* SG 1 Level - High (DEFAS-1)
SG 1 Level - High (DEFAS-1)
* SG 1 P (EFAS-1)
SG 1 P (EFAS-1)
DIRECT placing the affected Functional Unit in BYPASS per CRS SO23-3-2.12, Section for Bypass Operation of Trip Channels.
CRS DIRECT placing the affected Functional Unit in BYPASS per SO23-3-2.12, Section for Bypass Operation of Trip Channels.  


Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     2     Event #     3                 Page 35 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
3 Page 35 of 72 Event


== Description:==
== Description:==
Steam Generator E089 NR Level Transmitter Fails Low Time         Position                       Applicants Actions or Behavior CONTACT an outside operator to place the Affected Functional RO        Units in Bypass per SO23-3-2.12, Reactor Protective System Operation.
Steam Generator E089 NR Level Transmitter Fails Low Time Position Applicants Actions or Behavior RO CONTACT an outside operator to place the Affected Functional Units in Bypass per SO23-3-2.12, Reactor Protective System Operation.
M.O. Cue:         When outside operator is contacted to bypass the associated trips, WAIT 3 minutes and then CALL when ready to begin. When directed, EXECUTE individual events for Bypassing RPS Trips.
M.O. Cue:
M.O. Cue:         When directed, EXECUTE the following Remote Functions:
When outside operator is contacted to bypass the associated trips, WAIT 3 minutes and then CALL when ready to begin. When directed, EXECUTE individual events for Bypassing RPS Trips.
RP51 = OPEN             (PPS Door Open Annunciator 56B46)
M.O. Cue:
When directed, EXECUTE the following Remote Functions:
RP51 = OPEN (PPS Door Open Annunciator 56B46)
RP54G = BYPASS (Low SG-1 Level Channel C)
RP54G = BYPASS (Low SG-1 Level Channel C)
RP54I = BYPASS         (High SG-1 Level Channel C)
RP54I = BYPASS (High SG-1 Level Channel C)
RP54U = BYPASS (High SG-1 DP EFAS-1 Channel C)
RP54U = BYPASS (High SG-1 DP EFAS-1 Channel C)
RP68A = BYPASS (DEFAS-1 L-034)
RP68A = BYPASS (DEFAS-1 L-034)
RP68B = BYPASS (DEFAS-1 L-035)
RP68B = BYPASS (DEFAS-1 L-035)
Delete RP51             (PPS Door Open Annunciator 56B46)
Delete RP51 (PPS Door Open Annunciator 56B46)
CRS       CONFIRM failure does NOT affect RPS/ESFAS matrix or logic.
CRS CONFIRM failure does NOT affect RPS/ESFAS matrix or logic.
CONFIRM failure does affect Feedwater Digital Control CRS System.
CRS CONFIRM failure does affect Feedwater Digital Control System.
* BYPASS 2LT-1113-3 per SO23-3-2.38, Section for BOP Bypassing Selected Feedwater Control Signals.
BOP BYPASS 2LT-1113-3 per SO23-3-2.38, Section for Bypassing Selected Feedwater Control Signals.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     2     Event #     3                 Page 36 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
3 Page 36 of 72 Event


== Description:==
== Description:==
Steam Generator E089 NR Level Transmitter Fails Low Time         Position                       Applicants Actions or Behavior
Steam Generator E089 NR Level Transmitter Fails Low Time Position Applicants Actions or Behavior  
+10 min           CRS       EVALUATE Technical Specifications.
+10 min CRS EVALUATE Technical Specifications.
* LCO 3.3.1.A, RPS Instrumentation - Operating.
LCO 3.3.1.A, RPS Instrumentation - Operating.
* CONDITION A - One or more Functions with one automatic RPS trip channel inoperable; ACTION A.1 - Place channel in Bypass or Trip within one (1) hour.
CONDITION A - One or more Functions with one automatic RPS trip channel inoperable; ACTION A.1 - Place channel in Bypass or Trip within one (1) hour.
* LCO 3.3.5.A, ESFAS Instrumentation.
LCO 3.3.5.A, ESFAS Instrumentation.
* CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable; ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.
CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable; ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.
* LCO 3.3.12.A, Remote Shutdown System.
LCO 3.3.12.A, Remote Shutdown System.
* CONDITION A - One or more required Functions inoperable; ACTION A.1 - Restore required Functions to OPERABLE status within 30 days.
CONDITION A - One or more required Functions inoperable; ACTION A.1 - Restore required Functions to OPERABLE status within 30 days.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 4.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 4.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     2     Event #     4               Page 37   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
4 Page 37 of 72 Event


== Description:==
== Description:==
Bus 2A04 Overcurrent Lockout Time         Position                         Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 4.
Bus 2A04 Overcurrent Lockout Time Position Applicants Actions or Behavior Machine Operator:
                            - ED03A, Bus 2A04 overcurrent Indications Available:
When directed, EXECUTE Event 4.  
63B05 - 2A04 VOLTAGE LO 63B06 - 2B04 VOLTAGE LO 63B25 - 2A04 SUPPLY BREAKER 2A0418 OC
- ED03A, Bus 2A04 overcurrent Indications Available:
+30 sec         RO/BOP       REFER to Annunciator Response Procedures.
63B05 - 2A04 VOLTAGE LO 63B06 - 2B04 VOLTAGE LO 63B25 - 2A04 SUPPLY BREAKER 2A0418 OC  
RECOGNIZE low bus voltage and INFORM the CRS AOI RO/BOP SO23-13-26 entry required.
+30 sec RO/BOP REFER to Annunciator Response Procedures.
DIRECT performance of SO23-13-26, Loss of Power to an AC CRS Bus.
RO/BOP RECOGNIZE low bus voltage and INFORM the CRS AOI SO23-13-26 entry required.
CRS       DIRECT aligning of Train B CCW and SWC.
CRS DIRECT performance of SO23-13-26, Loss of Power to an AC Bus.
With loss of flow to the CCW Non-Critical Loop and prior to Critical Task exceeding RCP operating limits, restore flow to the NCL from Statement any available CCW train.
CRS DIRECT aligning of Train B CCW and SWC.
BOP       START the Train B CCW Pump.
Critical Task Statement With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP operating limits, restore flow to the NCL from any available CCW train.
CRITICAL TASK
BOP START the Train B CCW Pump.
* TRANSFER the Non-Critical Loop to Train B.
CRITICAL TASK TRANSFER the Non-Critical Loop to Train B.
* TRANSFER the Letdown Heat Exchanger to Train B.
TRANSFER the Letdown Heat Exchanger to Train B.
RO         START Charging Pump P-192.
RO START Charging Pump P-192.
DISPATCH an operator to VERIFY loss of the 1E 4 kV Bus is CRS NOT due to a fire in the 1E Switchgear Room.
CRS DISPATCH an operator to VERIFY loss of the 1E 4 kV Bus is NOT due to a fire in the 1E Switchgear Room.
DETERMINE overcurrent annunciators are alarming on Bus RO/BOP 2A04.
RO/BOP DETERMINE overcurrent annunciators are alarming on Bus 2A04.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     2     Event #       4               Page 38   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
4 Page 38 of 72 Event


== Description:==
== Description:==
Bus 2A04 Overcurrent Lockout Time         Position                         Applicants Actions or Behavior DIRECT initiation of SO23-6-9, 6.9 kV, 4 kV and 480V Bus and CRS Feeder Faults, to return Bus 2A04 to service.
Bus 2A04 Overcurrent Lockout Time Position Applicants Actions or Behavior CRS DIRECT initiation of SO23-6-9, 6.9 kV, 4 kV and 480V Bus and Feeder Faults, to return Bus 2A04 to service.
DIRECT initiation of Equipment Actions for Loss of the 1E 4 kV CRS Bus 2A04.
CRS DIRECT initiation of Equipment Actions for Loss of the 1E 4 kV Bus 2A04.  
STOP G002 Diesel Generator by placing in MAINTENANCE
+5 min BOP STOP G002 Diesel Generator by placing in MAINTENANCE LOCKOUT.
+5 min            BOP LOCKOUT.
CRS Within 1 hour, DIRECT performance of SO23-3-3.23, Attachment for AC Sources Verification, for both Units.
Within 1 hour, DIRECT performance of SO23-3-3.23, CRS Attachment for AC Sources Verification, for both Units.
RO SELECT HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a Caution Tag at the switch to prevent inadvertent dilution.
SELECT HS-0210, Makeup Mode Selector Switch to MANUAL RO        and PLACE a Caution Tag at the switch to prevent inadvertent dilution.
CRS EVALUATE Technical Specifications.
CRS       EVALUATE Technical Specifications.
LCO 3.0.3 - Due to loss of two 1E Battery Chargers.
* LCO 3.0.3 - Due to loss of two 1E Battery Chargers.
ACTION - Within 1 hour, place the Unit in MODE 3 within 6 hours.
* ACTION - Within 1 hour, place the Unit in MODE 3 within 6 hours.
M.O. Cue:
M.O. Cue:         When directed, EXECUTE the following Remote Functions:
When directed, EXECUTE the following Remote Functions:
RP51 = OPEN             (PPS Door Open Annunciator 56B46)
RP51 = OPEN (PPS Door Open Annunciator 56B46)
RP52C = BYPASS (Channel A Hi Local Power)
RP52C = BYPASS (Channel A Hi Local Power)
RP52D = BYPASS (Channel A Low DNBR)
RP52D = BYPASS (Channel A Low DNBR)
Delete RP51             (PPS Door Open Annunciator 56B46)
Delete RP51 (PPS Door Open Annunciator 56B46)
RO       VERIFY the Trip Channel Bypassed Annunciator alarms.
RO VERIFY the Trip Channel Bypassed Annunciator alarms.
* 56A29 - PPS CHANNEL 1 TRIP BYPASSED
56A29 - PPS CHANNEL 1 TRIP BYPASSED  


Appendix D                               Operator Action                             Form ES-D-2 Op Test No.:       NRC   Scenario #   2       Event #     4               Page 39   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
2 Event #
4 Page 39 of 72 Event


== Description:==
== Description:==
Bus 2A04 Overcurrent Lockout Time         Position                         Applicants Actions or Behavior CRS       DIRECT Bypassing Channel A DNBR and LPD trips.
Bus 2A04 Overcurrent Lockout Time Position Applicants Actions or Behavior CRS DIRECT Bypassing Channel A DNBR and LPD trips.  
+15 min                     DIRECT setting CEAC 2 INOP Flags in all CPCs by changing CRS each CPC Addressable Constant Point ID 062 to 2.
+15 min CRS DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC Addressable Constant Point ID 062 to 2.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Events 5, 6, and 7.
When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Events 5, 6, and 7.  


Appendix D                             Scenario Outline                       Form ES-D-1 Machine Operator:     When directed, EXECUTE Events 5, 6, and 7.
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Machine Operator:
                      - TU08, Turbine Trip
When directed, EXECUTE Events 5, 6, and 7.  
                      - PG24, Loss of Offsite Power
- TU08, Turbine Trip  
                      - RD8802/8902/9002/9102, Stuck CEAs
- PG24, Loss of Offsite Power  
                      - EG08B, 2G003 EDG Mechanical Failure (+1 minute)
- RD8802/8902/9002/9102, Stuck CEAs  
                      - PG57, Loss of SDGE Switchyard (+5 minutes)
- EG08B, 2G003 EDG Mechanical Failure (+1 minute)  
- PG57, Loss of SDGE Switchyard (+5 minutes)
Indications available:
Indications available:
Numerous Loss of Offsite Power related alarms RECOGNIZE Reactor trip and Loss of Offsite Power and
Numerous Loss of Offsite Power related alarms  
+ 10 secs  RO/BOP INFORM the CRS SO23-12-11 entry required.
+ 10 secs RO/BOP RECOGNIZE Reactor trip and Loss of Offsite Power and INFORM the CRS SO23-12-11 entry required.
DIRECT performance of SO23-12-1, Standard Post Trip CRS Actions.
CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.
RO       VERIFY Reactor Trip:
RO VERIFY Reactor Trip:
* VERIFY Reactor Trip Circuit Breakers (8) - open.
VERIFY Reactor Trip Circuit Breakers (8) - open.
* VERIFY Reactor Power lowering and Startup Rate -
VERIFY Reactor Power lowering and Startup Rate -
negative.
negative.
* DETERMINE four (4) full length CEAs - NOT fully inserted.
DETERMINE four (4) full length CEAs - NOT fully inserted.
Examiner Note:     The following Critical Task may be started; however, it cannot be completed until power is available later in the scenario.
Examiner Note:
CRITICAL                   * [RNO] COMMENCE emergency boration at greater than TASK        RO 40 gpm.
The following Critical Task may be started; however, it cannot be completed until power is available later in the scenario.
CRS       DETERMINE Reactivity Control criteria NOT satisfied.
CRITICAL TASK RO
SONGS-12-2007-FINAL-SCENARIOS.doc
* [RNO] COMMENCE emergency boration at greater than 40 gpm.
CRS DETERMINE Reactivity Control criteria NOT satisfied.  


Appendix D                           Scenario Outline                       Form ES-D-1 BOP       VERIFY Turbine Trip:
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP VERIFY Turbine Trip:
* VERIFY Main Turbine tripped.
VERIFY Main Turbine tripped.
* HP and LP Stop and Governor valves - closed.
HP and LP Stop and Governor valves - closed.
* VERIFY both Unit Output Breakers - open.
VERIFY both Unit Output Breakers - open.
* VERIFY Main Turbine speed <2000 RPM or lowering.
VERIFY Main Turbine speed <2000 RPM or lowering.
CRS       INITIATE Administrative Actions:
CRS INITIATE Administrative Actions:
* ANNOUNCE Reactor trip via PA System.
ANNOUNCE Reactor trip via PA System.
* INITIATE Attachment 4, Worksheet.
INITIATE Attachment 4, Worksheet.
* INITIATE Attachment 5, Administrative Actions.
INITIATE Attachment 5, Administrative Actions.
BOP       DETERMINE Vital Auxiliaries NOT functioning properly:
BOP DETERMINE Vital Auxiliaries NOT functioning properly:
* DETERMINE both 1E 4 kV Buses A04 and A06 de-energized.
DETERMINE both 1E 4 kV Buses A04 and A06 de-energized.
                          *    [RNO] PLACE DG G003 in Maintenance Lockout.
[RNO] PLACE DG G003 in Maintenance Lockout.
                          *    [RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2A06.
[RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2A06.
* DETERMINE both 1E 480 V Buses B04 and B06 de-energized.
DETERMINE both 1E 480 V Buses B04 and B06 de-energized.
* VERIFY all Class 1E DC Buses - energized.
VERIFY all Class 1E DC Buses - energized.
* DETERMINE all Non-1E 4 kV Buses de-energized.
DETERMINE all Non-1E 4 kV Buses de-energized.
                          *    [RNO] ENSURE MSIVs - closed.
[RNO] ENSURE MSIVs - closed.
                          *    [RNO] OPERATE ADVs to maintain 1000 PSIA.
[RNO] OPERATE ADVs to maintain 1000 PSIA.
* DETERMINE CCW Train NOT operating and NOT aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.
DETERMINE CCW Train NOT operating and NOT aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.
M.O. Cue: If directed to investigate 2G003, WAIT 3 minutes and REPORT it is shutdown and there is a large amount of oil on the DG Room floor.
M.O. Cue:
SONGS-12-2007-FINAL-SCENARIOS.doc
If directed to investigate 2G003, WAIT 3 minutes and REPORT it is shutdown and there is a large amount of oil on the DG Room floor.  


Appendix D                   Scenario Outline                       Form ES-D-1 RO DETERMINE RCS Inventory Control criteria NOT satisfied:
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc RO DETERMINE RCS Inventory Control criteria NOT satisfied:
* DETERMINE PZR level between 10% and 70% and NOT trending to between 30% and 60%.
DETERMINE PZR level between 10% and 70% and NOT trending to between 30% and 60%.
* VERIFY Core Exit Saturation Margin - greater than or equal to 20&deg;F:
VERIFY Core Exit Saturation Margin - greater than or equal to 20&deg;F:
* QSPDS page 611.
* QSPDS page 611.
* CFMS page 311.
* CFMS page 311.
RO DETERMINE RCS Pressure Control criteria NOT satisfied:
RO DETERMINE RCS Pressure Control criteria NOT satisfied:
* DETERMINE PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and NOT controlled AND trending between 2025 PSIA and 2275 PSIA.
DETERMINE PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and NOT controlled AND trending between 2025 PSIA and 2275 PSIA.
                  *  [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
                  *  [RNO] ENSURE Normal and Aux Spray valves -
[RNO] ENSURE Normal and Aux Spray valves -
closed.
closed.
RO DETERMINE Core Heat Removal criteria is NOT satisfied:
RO DETERMINE Core Heat Removal criteria is NOT satisfied:
* DETERMINE no RCPs are operating.
DETERMINE no RCPs are operating.
* VERIFY Core Exit Saturation Margin 20&deg;F.
VERIFY Core Exit Saturation Margin 20&deg;F.
* QSPDS page 611.
QSPDS page 611.
* CFMS page 311.
CFMS page 311.
BOP VERIFY RCS Heat Removal criteria satisfied:
BOP VERIFY RCS Heat Removal criteria satisfied:
* VERIFY both SGs level - greater than 21% NR.
VERIFY both SGs level - greater than 21% NR.
* VERIFY both SGs level - less than 80% NR.
VERIFY both SGs level - less than 80% NR.
* VERIFY Auxiliary feedwater available to restore both SGs level - between 40% NR and 80% NR.
VERIFY Auxiliary feedwater available to restore both SGs level - between 40% NR and 80% NR.
                  *    [RNO] If required, manually INITIATE EFAS.
[RNO] If required, manually INITIATE EFAS.
* VERIFY heat removal adequate:
VERIFY heat removal adequate:
* TC - trending to between 545&deg;F and 555&deg;F.
* TC - trending to between 545&deg;F and 555&deg;F.
* SG pressures - approximately 1000 PSIA.
* SG pressures - approximately 1000 PSIA.
RO VERIFY Containment Isolation criteria satisfied:
RO VERIFY Containment Isolation criteria satisfied:  
SONGS-12-2007-FINAL-SCENARIOS.doc


Appendix D                           Scenario Outline                       Form ES-D-1
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc VERIFY Containment pressure - less than 1.5 PSIG.
* VERIFY Containment pressure - less than 1.5 PSIG.
DETERMINE some Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
* DETERMINE some Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.
DETERMINE some Secondary Plant Radiation Monitors energized and NOT alarming or trending to alarm.
* DETERMINE some Secondary Plant Radiation Monitors energized and NOT alarming or trending to alarm.
RO VERIFY Containment Temperature and Pressure criteria satisfied:
VERIFY Containment Temperature and Pressure criteria RO satisfied:
VERIFY Containment average temperature - less than 120&deg;F.
* VERIFY Containment average temperature - less than 120&deg;F.
VERIFY Containment pressure - less than 1.5 PSIG.  
* VERIFY Containment pressure - less than 1.5 PSIG.
+15 min CRS DIAGNOSE Event in Progress:
+15 min   CRS       DIAGNOSE Event in Progress:
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                          *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
[RNO] DIAGNOSE loss of Reactivity Control and Station Blackout.
                          *  [RNO] DIAGNOSE loss of Reactivity Control and Station Blackout.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
[RNO] DETERMINE all RCPs stopped.
                          *  [RNO] DETERMINE all RCPs stopped.
DIRECT initiating Steps 12 through 15.
* DIRECT initiating Steps 12 through 15.
BOP INITIATE Steps 12 through 15.
BOP       INITIATE Steps 12 through 15.
M.O. Cue:
M.O. Cue: If SC&E GCC is contacted for grid status, REPORT that cause of grid loss is unknown and field crews are investigating. No estimate on time to restore a line.
If SC&E GCC is contacted for grid status, REPORT that cause of grid loss is unknown and field crews are investigating. No estimate on time to restore a line.
M.O. Cue: If Unit 3 status is requested, REPORT that Bus 3A06 is energized from EDG 3G003 and Bus 3A04 is energized from EDG 3G002.
M.O. Cue:
CRS       DIRECT performance of SO23-12-9, Functional Recovery.
If Unit 3 status is requested, REPORT that Bus 3A06 is energized from EDG 3G003 and Bus 3A04 is energized from EDG 3G002.
SONGS-12-2007-FINAL-SCENARIOS.doc
CRS DIRECT performance of SO23-12-9, Functional Recovery.  


Appendix D                           Scenario Outline                       Form ES-D-1 M.O. Cue: When SO23-12-9 is initiated, CALL as SDG&E GCC and REPORT that SONGS Switchyard appears to have several faults and will not be available until a crew can be dispatched to determine the problem.
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc M.O. Cue:
CRS       VERIFY Functional Recovery diagnosis:
When SO23-12-9 is initiated, CALL as SDG&E GCC and REPORT that SONGS Switchyard appears to have several faults and will not be available until a crew can be dispatched to determine the problem.
* INITIATE SO23-12-10, Safety Function Status Checks.
CRS VERIFY Functional Recovery diagnosis:
* INITIATE Foldout Page.
INITIATE SO23-12-10, Safety Function Status Checks.
* DIRECT performance of FS-3, Monitor Natural Circulation.
INITIATE Foldout Page.
* DIRECT performance of SO23-12-11, Attachment 19, Non-1E DC Load Reduction.
DIRECT performance of FS-3, Monitor Natural Circulation.
* DIRECT performance of SO23-12-11, Attachment 20, Class1E Battery Load Reduction.
DIRECT performance of SO23-12-11, Attachment 19, Non-1E DC Load Reduction.
* DIRECT performance of FS-18, Secondary Plant Protection.
DIRECT performance of SO23-12-11, Attachment 20, Class1E Battery Load Reduction.
* DIRECT performance of SO23-12-11, Attachment 24, Supply 1E 4 kV Bus with Opposite Unit Diesel.
DIRECT performance of FS-18, Secondary Plant Protection.
* DIRECT performance of SO23-12-11, Attachment 6, Diesel Generator Failure Follow-up Actions.
DIRECT performance of SO23-12-11, Attachment 24, Supply 1E 4 kV Bus with Opposite Unit Diesel.
* DIRECT performance of SO23-12-11, Attachment 8, Restoration of Offsite Power.
DIRECT performance of SO23-12-11, Attachment 6, Diesel Generator Failure Follow-up Actions.
* DIRECT Chemistry to sample both SGs for radioactivity and boron.
DIRECT performance of SO23-12-11, Attachment 8, Restoration of Offsite Power.
M.O. Cue: If directed to sample SGs, WAIT 10 minutes and REPORT that E088 and E089 sample lines were frisked, and both have activity near background. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
DIRECT Chemistry to sample both SGs for radioactivity and boron.
M.O. Cue: When directed to initiate Non-1E DC Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
M.O. Cue:
M.O. Cue: When directed to initiate Class 1E Battery Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
If directed to sample SGs, WAIT 10 minutes and REPORT that E088 and E089 sample lines were frisked, and both have activity near background. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.
DIRECT performance of SO23-12-11, Attachment 24, CRS Supplying 1E 4 kV Bus with Opposite Unit Diesel.
M.O. Cue:
SONGS-12-2007-FINAL-SCENARIOS.doc
When directed to initiate Non-1E DC Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
M.O. Cue:
When directed to initiate Class 1E Battery Load Reduction, ACKNOWLEDGE and STATE you will report when complete.
CRS DIRECT performance of SO23-12-11, Attachment 24, Supplying 1E 4 kV Bus with Opposite Unit Diesel.  


Appendix D                         Scenario Outline                       Form ES-D-1 CRS   DETERMINE Train B is available.
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc CRS DETERMINE Train B is available.
OBTAIN approval of Shift Manager to cross connect Train B CRS    using 10 CFR 50.54(x) on both units to supply 1E 4 kV Bus 2A06 with the opposite unit Diesel Generator.
CRS OBTAIN approval of Shift Manager to cross connect Train B using 10 CFR 50.54(x) on both units to supply 1E 4 kV Bus 2A06 with the opposite unit Diesel Generator.
REQUEST SM initiate NRC notification within one hour CRS/BOP regarding actions per this attachment.
CRS/BOP REQUEST SM initiate NRC notification within one hour regarding actions per this attachment.
NOTIFY opposite Unit SRO that automatic sequencing of ESF CRS/BOP loads onto opposite Unit 1E 4kV Bus 3A06 will be blocked.
CRS/BOP NOTIFY opposite Unit SRO that automatic sequencing of ESF loads onto opposite Unit 1E 4kV Bus 3A06 will be blocked.
ENSURE 1E 4kV Bus Tie breaker AUTO/MANUAL transfer BOP switches selected to MANUAL.
BOP ENSURE 1E 4kV Bus Tie breaker AUTO/MANUAL transfer switches selected to MANUAL.
* 2A0619 (2HS-1639B2) and 3A0603 (3HS-1639B2).
2A0619 (2HS-1639B2) and 3A0603 (3HS-1639B2).
BOP   ENSURE 1E 4kV Bus Tie breakers open.
BOP ENSURE 1E 4kV Bus Tie breakers open.
* 2A0619 and 3A0603.
2A0619 and 3A0603.
ENSURE 2G003 Diesel Generator selected to MAINTENANCE BOP LOCKOUT.
BOP ENSURE 2G003 Diesel Generator selected to MAINTENANCE LOCKOUT.
DIRECT performance of Train B Diesel Generator Cross-Tie CRS Permissive switch alignment on 50' Elevation.
CRS DIRECT performance of Train B Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.
CONTACT the PPEO and INITIATE Unit 2 Train A Diesel BOP    Generator Cross-Tie Permissive switch alignment on 50' Elevation.
BOP CONTACT the PPEO and INITIATE Unit 2 Train A Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.
* VERIFY feeder faults NOT indicated by relay flags on:
VERIFY feeder faults NOT indicated by relay flags on:
* 2A0616 - Unit Aux Transformer
2A0616 - Unit Aux Transformer 2A0618 - Reserve Aux Transformer 2A0619 - 2A06 Bus Tie 2A0613 - 2G003 EDG M.O. Cue:
* 2A0618 - Reserve Aux Transformer
When asked, REPORT no feeder faults on breakers.  
* 2A0619 - 2A06 Bus Tie
* 2A0613 - 2G003 EDG M.O. Cue:   When asked, REPORT no feeder faults on breakers.
SONGS-12-2007-FINAL-SCENARIOS.doc


Appendix D                         Scenario Outline                       Form ES-D-1 DIRECT the PPEO to SELECT both Unit 2 Train B Diesel BOP      Generator Cross-Tie Permissive switches on Fire Isolation Panel 2L-413 to 50.54X.
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP DIRECT the PPEO to SELECT both Unit 2 Train B Diesel Generator Cross-Tie Permissive switches on Fire Isolation Panel 2L-413 to 50.54X.
* 2HS-5054XA2 and 2HS-5054XB2 M.O. Cue: When directed, PERFORM remote functions EG62A and EG62B and REPORT that the Unit 2 50.54X switches have been aligned.
2HS-5054XA2 and 2HS-5054XB2 M.O. Cue:
CONTACT the PPEO and INITIATE Unit 3 Train B Diesel BOP      Generator Cross-Tie Permissive switch alignment on 50' Elevation.
When directed, PERFORM remote functions EG62A and EG62B and REPORT that the Unit 2 50.54X switches have been aligned.
* VERIFY feeder faults NOT indicated by relay flags on:
BOP CONTACT the PPEO and INITIATE Unit 3 Train B Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.
* 3A0603 - 3A06 Bus Tie M.O. Cue: When asked, REPORT no feeder faults on breakers.
VERIFY feeder faults NOT indicated by relay flags on:
DIRECT the PPEO to SELECT both Unit 3 Train B Diesel BOP      Generator Cross-Tie Permissive switches on Fire Isolation Panel 3L-413 to 50.54X.
3A0603 - 3A06 Bus Tie M.O. Cue:
* 3HS-5054XA2 and 3HS-5054XB2 M.O. Cue: When directed, PERFORM remote functions EG62C and EG62D and REPORT that the Unit 3 50.54X switches have been aligned.
When asked, REPORT no feeder faults on breakers.
BOP     VERIFY 3G003 Diesel Generator loading less than 3.4 MW.
BOP DIRECT the PPEO to SELECT both Unit 3 Train B Diesel Generator Cross-Tie Permissive switches on Fire Isolation Panel 3L-413 to 50.54X.
BOP     VERIFY Bus 2A06 NOT energized.
3HS-5054XA2 and 3HS-5054XB2 M.O. Cue:
BOP     VERIFY Unit 2 overcurrent/ground alarms reset.
When directed, PERFORM remote functions EG62C and EG62D and REPORT that the Unit 3 50.54X switches have been aligned.
* 63C15 - 2A06 SUPPLY BKR 2A0616 OC
BOP VERIFY 3G003 Diesel Generator loading less than 3.4 MW.
* 63C25 - 2A06 SUPPLY BKR 2A0618 OC VERIFY 1E DC bus voltages 2D2 and 3D2 greater than BOP 108 VDC.
BOP VERIFY Bus 2A06 NOT energized.
M.O. Cue: When asked, REPORT 3D2 voltage at 129 VDC.
BOP VERIFY Unit 2 overcurrent/ground alarms reset.
SONGS-12-2007-FINAL-SCENARIOS.doc
63C15 - 2A06 SUPPLY BKR 2A0616 OC 63C25 - 2A06 SUPPLY BKR 2A0618 OC BOP VERIFY 1E DC bus voltages 2D2 and 3D2 greater than 108 VDC.
M.O. Cue:
When asked, REPORT 3D2 voltage at 129 VDC.  


Appendix D                 Scenario Outline                 Form ES-D-1 BOP ESTABLISH final Train B configuration.
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP ESTABLISH final Train B configuration.
BOP ENSURE 1E 4kV Bus 2A06 supply breakers open.
BOP ENSURE 1E 4kV Bus 2A06 supply breakers open.
* 2A0616 - Unit Aux Transformer
2A0616 - Unit Aux Transformer 2A0618 - Reserve Aux Transformer 2A0613 - 2G003 EDG BOP ENSURE 1E 4kV Bus A06 tie breakers open.
* 2A0618 - Reserve Aux Transformer
2A0619 - 2A06 Bus Tie 3A0603 - 3A06 Bus Tie  
* 2A0613 - 2G003 EDG BOP ENSURE 1E 4kV Bus A06 tie breakers open.
* 2A0619 - 2A06 Bus Tie
* 3A0603 - 3A06 Bus Tie SONGS-12-2007-FINAL-SCENARIOS.doc


Appendix D                       Scenario Outline                       Form ES-D-1 BOP ENSURE 1E 4kV Bus 2A06 load breakers open.
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP ENSURE 1E 4kV Bus 2A06 load breakers open.
* Emergency Chillers
Emergency Chillers Containment Spray Pumps HPSI Pumps LPSI Pumps AFW Pumps CCW Pumps SWC Pumps BOP VERIFY Train B Diesel Generator Cross-Tie Permissive switches on both units are in the 50.54X position.
* Containment Spray Pumps
* HPSI Pumps
* LPSI Pumps
* AFW Pumps
* CCW Pumps
* SWC Pumps VERIFY Train B Diesel Generator Cross-Tie Permissive BOP switches on both units are in the 50.54X position.
BOP CLOSE Unit 3 Bus Tie breaker 3A0603.
BOP CLOSE Unit 3 Bus Tie breaker 3A0603.
VERIFY Unit 3 Diesel Generator 3G003 output breaker remains BOP closed.
BOP VERIFY Unit 3 Diesel Generator 3G003 output breaker remains closed.
With a loss of 1E power, energize at least one 4 kV and the Critical Task Statement associated 480 VAC 1E bus before DC Bus D2 voltage drops to 107.3 VDC and DC Bus D4 drops to 106.5 VDC.
Critical Task Statement With a loss of 1E power, energize at least one 4 kV and the associated 480 VAC 1E bus before DC Bus D2 voltage drops to 107.3 VDC and DC Bus D4 drops to 106.5 VDC.
CRITICAL TASK BOP CLOSE Unit 2 Bus Tie breaker 2A0619.
CRITICAL TASK BOP CLOSE Unit 2 Bus Tie breaker 2A0619.
BOP VERIFY Unit 2 1E buses 2A06 and 2B06 energized.
BOP VERIFY Unit 2 1E buses 2A06 and 2B06 energized.
BOP START CCW Pump P-026 on Train B.
BOP START CCW Pump P-026 on Train B.  
SONGS-12-2007-FINAL-SCENARIOS.doc


Appendix D                             Scenario Outline                           Form ES-D-1 With failure of 2 or more Full Length CEAs to fully insert, Critical Task    perform an emergency boration (or some other alignment which Statement        adds boric acid from either the BAMU Tanks or RWST at 40 gpm or more).
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Critical Task Statement With failure of 2 or more Full Length CEAs to fully insert, perform an emergency boration (or some other alignment which adds boric acid from either the BAMU Tanks or RWST at 40 gpm or more).
CRITICAL               START Charging Pump P-192 on Train B and COMMENCE TASK          RO boration at > 40 gpm.
CRITICAL TASK RO START Charging Pump P-192 on Train B and COMMENCE boration at > 40 gpm.
* OPEN HV-9235 and HV-9240 Gravity Feed Valves.
OPEN HV-9235 and HV-9240 Gravity Feed Valves.  
+35 min
+35 min CLOSE LV-0227B VCT Outlet Block Valve.
* CLOSE LV-0227B VCT Outlet Block Valve.
When power is restored to Bus 2A06 and emergency boration is started, or at Lead Evaluators discretion, TERMINATE the scenario.  
When power is restored to Bus 2A06 and emergency boration is started, or at Lead Evaluators discretion, TERMINATE the scenario.
SONGS-12-2007-FINAL-SCENARIOS.doc


Appendix D                                     Scenario Outline                             Form ES-D-1 Facility:         San Onofre                     Scenario No.:       3   Op Test No.:     NRC Examiners:                                                 Operators:
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Facility:
San Onofre Scenario No.:
3 Op Test No.:
NRC Examiners:
Operators:
Initial Conditions:
Initial Conditions:
* Reactor Critical at 2.5x10E-4% power BOC - RCS Boron is 2038 ppm (by sample)
Reactor Critical at 2.5x10E-4% power BOC - RCS Boron is 2038 ppm (by sample)
* Train A Component Cooling Water Pump (P-025) in service
Train A Component Cooling Water Pump (P-025) in service Condenser Air Ejector Low Range Radiation Monitor (RM-7818) OOS Fire Computer OOS Turnover:
* Condenser Air Ejector Low Range Radiation Monitor (RM-7818) OOS
Power increase in progress to ~ 2% power; Mini-purge & PMW sampling in progress.
* Fire Computer OOS Turnover:               Power increase in progress to ~ 2% power; Mini-purge & PMW sampling in progress.
Critical Tasks:
Critical Tasks:
* Restore CCW Critical Loop flow.
Restore CCW Critical Loop flow.
* Trip any RCP not satisfying RCP operating limits.
Trip any RCP not satisfying RCP operating limits.
* Manually initiate Containment Isolation Actuation Signal.
Manually initiate Containment Isolation Actuation Signal.
Event       Malf. No. Event Type*                           Event Description No.
Event No.
1                    R (RO)             Rod withdrawal and power increase in progress to ~2% power.
Malf. No.
+ 20 min                 N (BOP, CRS) 2      CV12         C (RO, CRS)       Inadvertent Reactor Coolant System dilution.
Event Type*
+ 30 min 3      SG03C       TS (CRS)           Steam Generator Pressure Transmitter (PT-1023-3) fails low.
Event Description 1
+ 40 min 4      RPK624A     C (BOP, CRS)       Emergency Feedwater Actuation Signal (EFAS-1) partial actuation.
+ 20 min R (RO)
+ 50 min                 TS (CRS) 5      RC18B       C (RO, CRS)       Pressurizer Safety Valve (PSV-0201) leak less than Charging
N (BOP, CRS)
+ 65 min                  TS (CRS)          Pump capacity.
Rod withdrawal and power increase in progress to ~2% power.
6       RC18A       M (ALL)           Pressurizer Safety Valves (PSV-0200 and PSV-0201) fail open.
2
+ 95 min     RC18B 7      CC06B       C (BOP)           Train A Component Cooling Water Pump (P-025) trip on SIAS.
+ 30 min CV12 C (RO, CRS)
+ 95 min    CC06D                          Train B Component Cooling Water Pump (P-026) trip on SIAS.
Inadvertent Reactor Coolant System dilution.
8       RPS LP       I (RO)             Containment Isolation Actuation System fails to actuate.
3
+ 95 min
+ 40 min SG03C TS (CRS)
    *    (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor, (TS) Technical Specifications SONGS-12-2007-FINAL-SCENARIOS.doc
Steam Generator Pressure Transmitter (PT-1023-3) fails low.
4
+ 50 min RPK624A C (BOP, CRS)
TS (CRS)
Emergency Feedwater Actuation Signal (EFAS-1) partial actuation.
5
+ 65 min RC18B C (RO, CRS)
TS (CRS)
Pressurizer Safety Valve (PSV-0201) leak less than Charging Pump capacity.
6  
+ 95 min RC18A RC18B M (ALL)
Pressurizer Safety Valves (PSV-0200 and PSV-0201) fail open.
7
+ 95 min CC06B CC06D C (BOP)
Train A Component Cooling Water Pump (P-025) trip on SIAS.
Train B Component Cooling Water Pump (P-026) trip on SIAS.
8  
+ 95 min RPS LP I (RO)
Containment Isolation Actuation System fails to actuate.
(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS) Technical Specifications  


Appendix D                                 Scenario Outline                       Form ES-D-1 SCENARIO  
Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc SCENARIO  


==SUMMARY==
==SUMMARY==
NRC #3 The crew will assume the watch with the Reactor critical at ~2.5x10-4% power. The crew will raise power using rod withdrawal per SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load. A Containment Mini-Purge is in service and sampling of the Primary Water Makeup Tank is being performed at the time of turnover.
NRC #3 The crew will assume the watch with the Reactor critical at ~2.5x10-4% power. The crew will raise power using rod withdrawal per SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load. A Containment Mini-Purge is in service and sampling of the Primary Water Makeup Tank is being performed at the time of turnover.
With the plant stable at 1% to 2% power, an inadvertent dilution event will occur. The crew will respond per Abnormal Operating Instruction (AOI) S023-13-11, Emergency Boration of the RCS
With the plant stable at 1% to 2% power, an inadvertent dilution event will occur. The crew will respond per Abnormal Operating Instruction (AOI) S023-13-11, Emergency Boration of the RCS  
/ Inadvertent Dilution or Boration. The event is terminated when the inadvertent dilution is recognized and isolated. The crew will be required to maintain power level as the diluted water enters the RCS from the VCT throughout the scenario.
/ Inadvertent Dilution or Boration. The event is terminated when the inadvertent dilution is recognized and isolated. The crew will be required to maintain power level as the diluted water enters the RCS from the VCT throughout the scenario.
When steps of AOI SO23-13-11 are complete, a Steam Generator Pressure Transmitter will fail low. The crew will determine pressure instrument failure per Annunciator Response Procedures (ARPs), enter SO23-13-18, Reactor Protection System Failure and be required to bypass the failed channel using SO23-3-2.38, Digital Control System Operation. The CRS will evaluate Technical Specifications. The next event is a Partial ESFAS Actuation. The crew will restore Auxiliary Feedwater flow per ARPs and/or SO23-3-2.22, ESFAS Operations. The CRS will evaluate Technical Specifications.
When steps of AOI SO23-13-11 are complete, a Steam Generator Pressure Transmitter will fail low. The crew will determine pressure instrument failure per Annunciator Response Procedures (ARPs), enter SO23-13-18, Reactor Protection System Failure and be required to bypass the failed channel using SO23-3-2.38, Digital Control System Operation. The CRS will evaluate Technical Specifications. The next event is a Partial ESFAS Actuation. The crew will restore Auxiliary Feedwater flow per ARPs and/or SO23-3-2.22, ESFAS Operations. The CRS will evaluate Technical Specifications.
Line 888: Line 1,052:
Scenario is terminated when a transition to EOI SO23-13-3, Loss of Coolant Accident is entered and a plant cooldown is in progress.
Scenario is terminated when a transition to EOI SO23-13-3, Loss of Coolant Accident is entered and a plant cooldown is in progress.
Risk Significance:
Risk Significance:
* Failure of risk important system prior to trip:     Inadvertent dilution Loss of AFW flow
Failure of risk important system prior to trip:
* Risk significant core damage sequence:               LOCA with CCW and CIAS failure
Inadvertent dilution Loss of AFW flow Risk significant core damage sequence:
* Risk significant operator actions:                   Restore Critical Loop CCW flow Manually actuate CIAS SONGS-12-2007-FINAL-SCENARIOS.doc
LOCA with CCW and CIAS failure Risk significant operator actions:
Restore Critical Loop CCW flow Manually actuate CIAS  


Scenario Event Description NRC Scenario 3 SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 3 Machine Operator:     EXECUTE IC #183 and NRC Scenario #3 SETUP file to align components.
Scenario Event Description NRC Scenario 3 SONGS-12-2007-FINAL-SCENARIOS.doc SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 3 Machine Operator:
EXECUTE IC #183 and NRC Scenario #3 SETUP file to align components.
VERIFY Control Board Tags removed on P-012 and P-017.
VERIFY Control Board Tags removed on P-012 and P-017.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.
Line 898: Line 1,064:
CHANGE Operator Aid Tag #005-9 (AFW T-120/121 alignment) to AUTO MAKEUP for both T-120 and T-121.
CHANGE Operator Aid Tag #005-9 (AFW T-120/121 alignment) to AUTO MAKEUP for both T-120 and T-121.
VERIFY Master Silence Keylock Switch in NORMAL.
VERIFY Master Silence Keylock Switch in NORMAL.
PLACE procedures in progress on the RO desk:
PLACE procedures in progress on the RO desk:  
                          - Copy of SO23-5-1.3.1 INITIALED through Step 6.4.5.
- Copy of SO23-5-1.3.1 INITIALED through Step 6.4.5.  
                          - MARKED UP copy of SO23-5-1.7, Attachment 9.
- MARKED UP copy of SO23-5-1.7, Attachment 9.  
                          - MARKED UP copy of SO23-1-4.2, Attachment 6.
- MARKED UP copy of SO23-1-4.2, Attachment 6.
PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).
PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).
With Simulator in RUN, OPERATE TV-0224B as follows:
With Simulator in RUN, OPERATE TV-0224B as follows:
Line 908: Line 1,074:
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position(s).
If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position(s).
Significant Control Room Annunciators in Alarm at 2.5x10-4%:
Significant Control Room Annunciators in Alarm at 2.5x10-4%:
50A02 - COLSS ALARM 50A07 - SBCS DEMAND PRESENT 53A(B)03 - MFWP TURBINE K006 (K005) TRIP 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 63E10 - SCE CB TRIP 99A02 - EMERGENCY PUSHBUTTON TURBINE TRIP 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP 99B19 - VACUUM PROTECTION PLC TROUBLE 99B41(42) - AVR CH A(B) FAULT SONGS-12-2007-FINAL-SCENARIOS.doc
50A02 - COLSS ALARM 50A07 - SBCS DEMAND PRESENT 53A(B)03 - MFWP TURBINE K006 (K005) TRIP 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 63E10 - SCE CB TRIP 99A02 - EMERGENCY PUSHBUTTON TURBINE TRIP 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP 99B19 - VACUUM PROTECTION PLC TROUBLE 99B41(42) - AVR CH A(B) FAULT  


Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:       NRC     Scenario # 3     Event #     1               Page 53 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
1 Page 53 of 72 Event


== Description:==
== Description:==
Rod Withdrawal and Power Increase to ~2% power Time         Position                       Applicants Actions or Behavior Machine Operator:         ENSURE all Simulator Scenario Setup actions are complete.
Rod Withdrawal and Power Increase to ~2% power Time Position Applicants Actions or Behavior Machine Operator:
DIRECT performance of SO23-5-1.3.1, Plant Startup from Hot
ENSURE all Simulator Scenario Setup actions are complete.  
+1 min            CRS Standup to Minimum Load.
+1 min CRS DIRECT performance of SO23-5-1.3.1, Plant Startup from Hot Standup to Minimum Load.
BYPASS the High Log Power Trip on all PPS Modules per RO SO23-3-2.12.
RO BYPASS the High Log Power Trip on all PPS Modules per SO23-3-2.12.
RO       POSITION Group Select switch to CEA Group 6.
RO POSITION Group Select switch to CEA Group 6.
POSITION Mode Select Switch to MG (Manual Group) or MS RO (Manual Sequential).
RO POSITION Mode Select Switch to MG (Manual Group) or MS (Manual Sequential).
RO/CRS       When directed by CRS, WITHDRAW Control Rods as required.
RO/CRS When directed by CRS, WITHDRAW Control Rods as required.
RO       ESTABLISH a Startup Rate of 0.5 DPM.
RO ESTABLISH a Startup Rate of 0.5 DPM.
Floor Cue:       The initial startup rate based on Attachment 9 data will be ~ 0.25 DPM. In order to facilitate time requirements, REPORT as the Shift Manager that a startup rate of 0.5 DPM is desired.
Floor Cue:
M.O. Cue:         If asked, REPORT long path recirculation is secured.
The initial startup rate based on Attachment 9 data will be ~ 0.25 DPM. In order to facilitate time requirements, REPORT as the Shift Manager that a startup rate of 0.5 DPM is desired.
When CEA positioning is complete, PLACE Mode Select RO Switch to OFF.
M.O. Cue:
VERIFY proper operation of Steam Bypass Control System BOP when the Point of Adding Heat is reached (~2E-1%).
If asked, REPORT long path recirculation is secured.
RO When CEA positioning is complete, PLACE Mode Select Switch to OFF.
BOP VERIFY proper operation of Steam Bypass Control System when the Point of Adding Heat is reached (~2E-1%).  


Appendix D                           Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario # 3     Event #     1               Page 54 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
1 Page 54 of 72 Event


== Description:==
== Description:==
Rod Withdrawal and Power Increase to ~2% power Time         Position                     Applicants Actions or Behavior
Rod Withdrawal and Power Increase to ~2% power Time Position Applicants Actions or Behavior  
+20 min           BOP     MAINTAIN Tcold within band by monitoring SBCS operation.
+20 min BOP MAINTAIN Tcold within band by monitoring SBCS operation.
When power has been raised to ~2%, or at Lead Evaluators discretion, PROCEED to Event 2.
When power has been raised to ~2%, or at Lead Evaluators discretion, PROCEED to Event 2.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       2               Page 55 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
2 Page 55 of 72 Event


== Description:==
== Description:==
Inadvertent Reactor Coolant System Dilution Time         Position                         Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.
Inadvertent Reactor Coolant System Dilution Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.  
                          - CV12, Inadvertent RCS dilution Indications Available:
- CV12, Inadvertent RCS dilution Indications Available:
FQIS-0210, Blended Makeup Total Flow Integrator clicking VCT level rising FIC-0210X, Flow Controller indicates ~35 gpm FI-7171, PMW Flow indication @ 35 gpm DETERMINE an inadvertent dilution by observing FQIS-0210,
FQIS-0210, Blended Makeup Total Flow Integrator clicking VCT level rising FIC-0210X, Flow Controller indicates ~35 gpm FI-7171, PMW Flow indication @ 35 gpm  
  +1 min          RO        Blended Makeup Total Flow clicking, FIC-0210X, Flow Controller indication, and FI-7171, PMW Flow indication.
+1 min RO DETERMINE an inadvertent dilution by observing FQIS-0210, Blended Makeup Total Flow clicking, FIC-0210X, Flow Controller indication, and FI-7171, PMW Flow indication.
INFORM CRS of inadvertent dilution and INFORM the CRS RO        SO23-13-11, Emergency Boration of the RCS / Inadvertent Dilution or Boration entry required.
RO INFORM CRS of inadvertent dilution and INFORM the CRS SO23-13-11, Emergency Boration of the RCS / Inadvertent Dilution or Boration entry required.
CRS       DIRECT placing Makeup Mode Selector to MANUAL.
CRS DIRECT placing Makeup Mode Selector to MANUAL.
RO       PLACE Makeup Mode Selector to MANUAL.
RO PLACE Makeup Mode Selector to MANUAL.
CRS       DIRECT stopping Primary Makeup Water Pump.
CRS DIRECT stopping Primary Makeup Water Pump.
RO       STOP Primary Makeup Water Pump.
RO STOP Primary Makeup Water Pump.
ENSURE Letdown Heat Exchanger Outlet Temperature is RO        maintaining at ~115&deg;F with TIC-0223, CCW Temperature Controller in AUTO.
RO ENSURE Letdown Heat Exchanger Outlet Temperature is maintaining at ~115&deg;F with TIC-0223, CCW Temperature Controller in AUTO.
RO       PLACE T-0224B, CVCS Ion Exchanger in BYPASS.
RO PLACE T-0224B, CVCS Ion Exchanger in BYPASS.
RO       VERIFY Deborating Ion Exchange not in service.
RO VERIFY Deborating Ion Exchange not in service.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       2               Page 56 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
2 Page 56 of 72 Event


== Description:==
== Description:==
Inadvertent Reactor Coolant System Dilution Time         Position                         Applicants Actions or Behavior RO       ENSURE dilution flow paths isolated.
Inadvertent Reactor Coolant System Dilution Time Position Applicants Actions or Behavior RO ENSURE dilution flow paths isolated.
ENSURE FIC-0210X, PMW Flow Controller, and FIC-0210Y, RO        BAMU Flow Controller, are set for correct blended makeup per SO23-3-2.2, Section to Establish Automatic Makeup Mode.
RO ENSURE FIC-0210X, PMW Flow Controller, and FIC-0210Y, BAMU Flow Controller, are set for correct blended makeup per SO23-3-2.2, Section to Establish Automatic Makeup Mode.
RO       VERIFY RCS and VCT boron samples within 7 ppm.
RO VERIFY RCS and VCT boron samples within 7 ppm.
M.O. Cue:         When directed to perform RCS and VCT boron samples, REPORT the VCT is 5 ppm less than the RCS.
M.O. Cue:
+10 min           CRS       EVALUATE inadvertent dilution event terminated.
When directed to perform RCS and VCT boron samples, REPORT the VCT is 5 ppm less than the RCS.  
When plant conditions have been restored to normal, or at Lead Evaluators discretion, PROCEED to Event 3.
+10 min CRS EVALUATE inadvertent dilution event terminated.
When plant conditions have been restored to normal, or at Lead Evaluators discretion, PROCEED to Event 3.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       3               Page 57 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
3 Page 57 of 72 Event


== Description:==
== Description:==
Steam Generator Pressure Transmitter Fails Low Time         Position                         Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.
Steam Generator Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.  
                          - SG03C, PT-1023-3, SG E088 Pressure Transmitter fails low Indications Available:
- SG03C, PT-1023-3, SG E088 Pressure Transmitter fails low Indications Available:
52A13 - FWCS TROUBLE 56A41 - SG2 E088 PRESS LO CHANNEL TRIP 56A44 - SG1 E089 PRESS > SG2 E088 ESFAS CH TRIP 56A51 - SG2 E088 PRESS LO PRETRIP 56A54 - SG1 E089 PRESS > SG2 E088 PRETRIP 56B26 - PPS CHANNEL 3 TROUBLE
52A13 - FWCS TROUBLE 56A41 - SG2 E088 PRESS LO CHANNEL TRIP 56A44 - SG1 E089 PRESS > SG2 E088 ESFAS CH TRIP 56A51 - SG2 E088 PRESS LO PRETRIP 56A54 - SG1 E089 PRESS > SG2 E088 PRETRIP 56B26 - PPS CHANNEL 3 TROUBLE  
+30 sec         RO/BOP       REFER to Annunciator Response Procedures.
+30 sec RO/BOP REFER to Annunciator Response Procedures.
RECOGNIZE Steam Generator E088 pressure instrument BOP        failed low and INFORM the CRS SO23-13-18, Reactor Protection System Failure entry required.
BOP RECOGNIZE Steam Generator E088 pressure instrument failed low and INFORM the CRS SO23-13-18, Reactor Protection System Failure entry required.
REFER to Attachment 5 and DETERMINE PT-1023-3 is CRS Functional Unit affected.
CRS REFER to Attachment 5 and DETERMINE PT-1023-3 is Functional Unit affected.
PLACE the affected Functional Unit in BYPASS per RO SO23-3-2.12, Section for Bypass Operation of Trip Channels.
RO PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Section for Bypass Operation of Trip Channels.
VERIFY that the same bistable is not in bypass on any other RO Channel.
RO VERIFY that the same bistable is not in bypass on any other Channel.
M.O. Cue:         When directed, EXECUTE the following Remote Functions:
M.O. Cue:
RP51 = OPEN             (PPS Door Open Annunciator 56B46)
When directed, EXECUTE the following Remote Functions:
RP51 = OPEN (PPS Door Open Annunciator 56B46)
RP54L = BYPASS (Low SG-2 Pressure Channel C)
RP54L = BYPASS (Low SG-2 Pressure Channel C)
RP54U = BYPASS (High SG-1 DP EFAS-1 Channel C)
RP54U = BYPASS (High SG-1 DP EFAS-1 Channel C)
RP54V = BYPASS (High SG-2 DP EFAS-2 Channel C)
RP54V = BYPASS (High SG-2 DP EFAS-2 Channel C)
Delete RP51             (PPS Door Open Annunciator 56B46)
Delete RP51 (PPS Door Open Annunciator 56B46)
OBSERVE annunciator 56A49 - PPS CHANNEL 3 TRIP RO BYPASS goes into alarm.
RO OBSERVE annunciator 56A49 - PPS CHANNEL 3 TRIP BYPASS goes into alarm.  


Appendix D                             Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       3               Page 58 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
3 Page 58 of 72 Event


== Description:==
== Description:==
Steam Generator Pressure Transmitter Fails Low Time         Position                         Applicants Actions or Behavior CONFIRM failure does NOT affect RPS/ESFAS Matrix Logic, CRS      RPS/ESFAS Initiation Logic, RTCBs, RPS/ESFAS Manual Trip, or ESFAS Actuation Logic.
Steam Generator Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior CRS CONFIRM failure does NOT affect RPS/ESFAS Matrix Logic, RPS/ESFAS Initiation Logic, RTCBs, RPS/ESFAS Manual Trip, or ESFAS Actuation Logic.
CRS       CONFIRM failure affects the Feedwater Digital Control System.
CRS CONFIRM failure affects the Feedwater Digital Control System.
RECOGNIZE Steam Generator E089 level instrument failed BOP      low and INFORM the CRS SO23-3-2.38, Digital Control System Operation entry required.
BOP RECOGNIZE Steam Generator E089 level instrument failed low and INFORM the CRS SO23-3-2.38, Digital Control System Operation entry required.
DIRECT performance of Section 6.6, Bypassing Selected CRS Feedwater Control Signals.
CRS DIRECT performance of Section 6.6, Bypassing Selected Feedwater Control Signals.
ACCESS the PCS Console for the Digital Feedwater Control BOP System.
BOP ACCESS the PCS Console for the Digital Feedwater Control System.
BOP       ACCESS the Selected Signals screen for SG E088.
BOP ACCESS the Selected Signals screen for SG E088.
BOP       VERIFY SG E088 Channel D signal is valid.
BOP VERIFY SG E088 Channel D signal is valid.
BOP       SELECT BYPASS for the Channel C level instrument.
BOP SELECT BYPASS for the Channel C level instrument.
BOP       VERIFY the Channel C level instrument indicates BYPASS.
BOP VERIFY the Channel C level instrument indicates BYPASS.
BOP       VERIFY the Channel D is not in BYPASS.
BOP VERIFY the Channel D is not in BYPASS.  
+5 min             BOP       VERIFY the Selected Signal output looks valid.
+5 min BOP VERIFY the Selected Signal output looks valid.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       3               Page 59 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
3 Page 59 of 72 Event


== Description:==
== Description:==
Steam Generator Pressure Transmitter Fails Low Time         Position                         Applicants Actions or Behavior
Steam Generator Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior  
+10 min           CRS       EVALUATE Technical Specifications.
+10 min CRS EVALUATE Technical Specifications.
* 3.3.1.A, Reactor Protection System Instrumentation.
3.3.1.A, Reactor Protection System Instrumentation.
* CONDITION A - One or more Functions with one automatic RPS trip channel inoperable; ACTION A.1 - Place Channel in bypass or trip within one (1) hour.
CONDITION A - One or more Functions with one automatic RPS trip channel inoperable; ACTION A.1 - Place Channel in bypass or trip within one (1) hour.
* 3.3.5.B, ESFAS Instrumentation.
3.3.5.B, ESFAS Instrumentation.
* CONDITION B - One automatic trip channel inoperable for SG Pressure-Low or SG Pressure Difference-High for the EFAS function; ACTION B.1 - Place Functional Unit in bypass within one (1) hour.
CONDITION B - One automatic trip channel inoperable for SG Pressure-Low or SG Pressure Difference-High for the EFAS function; ACTION B.1 - Place Functional Unit in bypass within one (1) hour.
When the SG pressure instrument is bypassed, or at Lead Evaluators discretion, PROCEED to Event 4.
When the SG pressure instrument is bypassed, or at Lead Evaluators discretion, PROCEED to Event 4.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #     4               Page 60 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
4 Page 60 of 72 Event


== Description:==
== Description:==
EFAS-1 Partial Actuation Time         Position                           Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 4.
EFAS-1 Partial Actuation Time Position Applicants Actions or Behavior Machine Operator:
                            - RPK624A, Partial EFAS-1 Actuation Indications available:
When directed, EXECUTE Event 4.  
57A11 - ESFAS TRAIN A PARTIAL ACTUATION Increase in AFW flow due to AFW Valve 2HV-4713 failing open AFW Flow indication is off-scale high on Steam Generator E089 SG E089 level increasing
- RPK624A, Partial EFAS-1 Actuation Indications available:
  +1 min       RO/BOP         REFER to Annunciator Response Procedure.
57A11 - ESFAS TRAIN A PARTIAL ACTUATION Increase in AFW flow due to AFW Valve 2HV-4713 failing open AFW Flow indication is off-scale high on Steam Generator E089 SG E089 level increasing  
RO/BOP         REFER to Plant Monitoring System Alarm Page.
+1 min RO/BOP REFER to Annunciator Response Procedure.
DETERMINE that a Partial ESFAS Actuation has occurred and RO/BOP INFORM the CRS.
RO/BOP REFER to Plant Monitoring System Alarm Page.
CRS         DIRECT BOP to CLOSE AFW Valves and/or STOP P-141.
RO/BOP DETERMINE that a Partial ESFAS Actuation has occurred and INFORM the CRS.
CLOSE AFW Valve HV-4731 and/or STOP P-141 by BOP DEPRESSING the STOP pushbutton.
CRS DIRECT BOP to CLOSE AFW Valves and/or STOP P-141.
DIRECT performance of SO23-3-2.22, Engineering Safety CRS        Features Actuation System Operation to determine valves that may have operated.
BOP CLOSE AFW Valve HV-4731 and/or STOP P-141 by DEPRESSING the STOP pushbutton.
Examiner Note:           The crew should analyze methods to restoring feedwater flow including starting the Turbine Driven AFW Pump (P-140).
CRS DIRECT performance of SO23-3-2.22, Engineering Safety Features Actuation System Operation to determine valves that may have operated.
CRS/RO         RESTORE feedwater flow as required.
Examiner Note:
The crew should analyze methods to restoring feedwater flow including starting the Turbine Driven AFW Pump (P-140).
CRS/RO RESTORE feedwater flow as required.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #     4               Page 61 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
4 Page 61 of 72 Event


== Description:==
== Description:==
EFAS-1 Partial Actuation Time         Position                           Applicants Actions or Behavior Examiner Note:           The crew may use any or all of the following procedures to aid in identifying the failed relay:
EFAS-1 Partial Actuation Time Position Applicants Actions or Behavior Examiner Note:
* SO23-3.2.22, ESFAS Operation, Attachment 14
The crew may use any or all of the following procedures to aid in identifying the failed relay:
* SO23-3-3.43, ESF Subgroup Relays Test, Attachment 3
SO23-3.2.22, ESFAS Operation, Attachment 14 SO23-3-3.43, ESF Subgroup Relays Test, Attachment 3 SO23-3.3.43.33, ESF Subgroup Relay K-624A Test, Section 6.5  
* SO23-3.3.43.33, ESF Subgroup Relay K-624A Test, Section 6.5
+10 min CRS EVALUATE Technical Specifications.
+10 min           CRS         EVALUATE Technical Specifications.
LCO 3.7.5.H, Auxiliary Feedwater System.
* LCO 3.7.5.H, Auxiliary Feedwater System.
CONDITION H - An automatic valve in any flow path incapable of closing upon receipt of a Main Steam Isolation Signal; ACTION H.1 - Close the affected valve or its block valve within four (4) hours.
* CONDITION H - An automatic valve in any flow path incapable of closing upon receipt of a Main Steam Isolation Signal; ACTION H.1 - Close the affected valve or its block valve within four (4) hours.
When feedwater flow is controlled, or at Lead Evaluators discretion, PROCEED to Event 5.  
When feedwater flow is controlled, or at Lead Evaluators discretion, PROCEED to Event 5.


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       5               Page 62 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
5 Page 62 of 72 Event


== Description:==
== Description:==
Pressurizer Safety Valve Leak Time         Position                           Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Event 5.
Pressurizer Safety Valve Leak Time Position Applicants Actions or Behavior Machine Operator:
                            - RC18B @ 12%, PZR Safety Valve leak Indications available:
When directed, EXECUTE Event 5.  
57B17 - PZR RELIEF VALVE OPEN Identified RCS leakrate 10 gpm Charging flow > Letdown flow with plant conditions stable
- RC18B @ 12%, PZR Safety Valve leak Indications available:
  +1 min           RO         REFER to Annunciator Response Procedures.
57B17 - PZR RELIEF VALVE OPEN Identified RCS leakrate 10 gpm Charging flow > Letdown flow with plant conditions stable  
RECOGNIZE RCS leak and INFORM the CRS AOI SO23                     RO 14 entry required.
+1 min RO REFER to Annunciator Response Procedures.
Floor Cue:       If asked, REPORT the 5th LED is flashing on both Position Transducers for PZR Safety Valve PSV-0201.
RO RECOGNIZE RCS leak and INFORM the CRS AOI SO23 14 entry required.
CRS         DIRECT performance of SO23-13-14, RCS Leak.
Floor Cue:
DETERMINE Containment Mini-Purge is in the service and CRS DIRECT manual initiation of CPIS and CRIS.
If asked, REPORT the 5th LED is flashing on both Position Transducers for PZR Safety Valve PSV-0201.
RO/BOP       Manually INITIATE CPIS.
CRS DIRECT performance of SO23-13-14, RCS Leak.
RO/BOP       Manually INITIATE one train of CRIS.
CRS DETERMINE Containment Mini-Purge is in the service and DIRECT manual initiation of CPIS and CRIS.
CRS       VERIFY RCS leak is greater than 25 gpm.
RO/BOP Manually INITIATE CPIS.
RO       DETERMINE RCS leakrate is greater than 25 GPM.
RO/BOP Manually INITIATE one train of CRIS.
DIRECT initiation of a rapid shutdown per SO23-5-1.7, Section CRS for Power Descension.
CRS VERIFY RCS leak is greater than 25 gpm.
RO       DETERMINE Pressurizer level is lowering.
RO DETERMINE RCS leakrate is greater than 25 GPM.
CRS DIRECT initiation of a rapid shutdown per SO23-5-1.7, Section for Power Descension.
RO DETERMINE Pressurizer level is lowering.  


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       5               Page 63 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
5 Page 63 of 72 Event


== Description:==
== Description:==
Pressurizer Safety Valve Leak Time         Position                           Applicants Actions or Behavior RO       ENSURE Charging Pumps start to maintain Pressurizer level.
Pressurizer Safety Valve Leak Time Position Applicants Actions or Behavior RO ENSURE Charging Pumps start to maintain Pressurizer level.  
VERIFY VCT level is being maintained within programmed
+5 min RO VERIFY VCT level is being maintained within programmed band.
+5 min            RO band.
RO OPERATE Blended Makeup System to maintain VCT level.
RO       OPERATE Blended Makeup System to maintain VCT level.
RO VERIFY Pressurizer Level - STABLE or RISING.
RO       VERIFY Pressurizer Level - STABLE or RISING.
CREW QUANTIFY RCS leakage by Charging and Letdown mismatch and REPORT leakage rate to the Shift Manager.
QUANTIFY RCS leakage by Charging and Letdown mismatch CREW and REPORT leakage rate to the Shift Manager.
CRS EVALUATE Technical Specifications.
CRS       EVALUATE Technical Specifications.
LCO 3.4.13.A, RCS Operational Leakage.
* LCO 3.4.13.A, RCS Operational Leakage.
CONDITION A - RCS LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE; ACTION A.1 - Reduce LEAKAGE to within limits in four (4) hours.
* CONDITION A - RCS LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE; ACTION A.1 - Reduce LEAKAGE to within limits in four (4) hours.
CREW DETERMINE source of leak:
CREW       DETERMINE source of leak:
INSPECT Charging and Letdown Systems.
* INSPECT Charging and Letdown Systems.
INSPECT Penetration Building.
* INSPECT Penetration Building.
MONITOR Radiation Monitors.
* MONITOR Radiation Monitors.
SAMPLE Containment Atmosphere.
* SAMPLE Containment Atmosphere.
CREW CONFIRM Radiation Monitors and Containment Atmosphere samples indicate RCS leak is in Containment.
CONFIRM Radiation Monitors and Containment Atmosphere CREW samples indicate RCS leak is in Containment.
CREW VERIFY that RCS Leakage exceeds 10 gpm and the source of the leakage is identified.  
VERIFY that RCS Leakage exceeds 10 gpm and the source of CREW the leakage is identified.


Appendix D                               Operator Action                           Form ES-D-2 Op Test No.:     NRC     Scenario #     3     Event #       5               Page 64 of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
3 Event #
5 Page 64 of 72 Event


== Description:==
== Description:==
Pressurizer Safety Valve Leak Time         Position                           Applicants Actions or Behavior REDUCE the leakage rate to within limits within four (4) hours
Pressurizer Safety Valve Leak Time Position Applicants Actions or Behavior  
+15 min          CRS      or COMMENCE a shutdown to be in Hot Standby within 6 hours per SO23-5-1.4, Plant Shutdown to Hot Standby.
+15 min CRS REDUCE the leakage rate to within limits within four (4) hours or COMMENCE a shutdown to be in Hot Standby within 6 hours per SO23-5-1.4, Plant Shutdown to Hot Standby.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.
When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       5               Page 65   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 65 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior Machine Operator:           When directed, EXECUTE Events 6, 7, and 8.
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior Machine Operator:
                            - RC18A @ 100%, PZR Safety Valve (PSV-0200) fails open
When directed, EXECUTE Events 6, 7, and 8.  
                            - RC18B @ 100%, PZR Safety Valve (PSV-0201) fails open
- RC18A @ 100%, PZR Safety Valve (PSV-0200) fails open  
                            - CC06B, Component Cooling Water Pump (P-025) trip
- RC18B @ 100%, PZR Safety Valve (PSV-0201) fails open  
                            - CC06D, Component Cooling Water Pump (P-026) trip
- CC06B, Component Cooling Water Pump (P-025) trip  
                            - RPS LP, CIAS fails to actuate Indications Available:
- CC06D, Component Cooling Water Pump (P-026) trip  
50A01 - QUENCH TANK PRESS HI 50A11 - QUENCH TANK LEVEL HI/LO 50A21 - QUENCH TANK TEMP HI 50A31 - PZR RELIEF VALVE OUTLET TEMP HI
- RPS LP, CIAS fails to actuate Indications Available:
+30 sec         CREW         RECOGNIZE RCS pressure decreasing rapidly.
50A01 - QUENCH TANK PRESS HI 50A11 - QUENCH TANK LEVEL HI/LO 50A21 - QUENCH TANK TEMP HI 50A31 - PZR RELIEF VALVE OUTLET TEMP HI  
VERIFY Reactor trip and DIRECT crew to perform actions of CRS SO23-12-1, Standard Post Trip Actions.
+30 sec CREW RECOGNIZE RCS pressure decreasing rapidly.
RO         VERIFY Reactor Trip:
CRS VERIFY Reactor trip and DIRECT crew to perform actions of SO23-12-1, Standard Post Trip Actions.
* VERIFY Reactor Trip Circuit Breakers (8) - open.
RO VERIFY Reactor Trip:
* VERIFY Reactor Power lowering and Startup Rate -
VERIFY Reactor Trip Circuit Breakers (8) - open.
VERIFY Reactor Power lowering and Startup Rate -
negative.
negative.
* VERIFY maximum of one full length CEA - NOT fully inserted.
VERIFY maximum of one full length CEA - NOT fully inserted.
CRS       DETERMINE Reactivity Control criteria satisfied.
CRS DETERMINE Reactivity Control criteria satisfied.
BOP       VERIFY Turbine Trip:
BOP VERIFY Turbine Trip:
* VERIFY Main Turbine tripped.
VERIFY Main Turbine tripped.
o   HP and LP Stop and Governor valves - closed.
o HP and LP Stop and Governor valves - closed.
* VERIFY both Unit Output Breakers - open.
VERIFY both Unit Output Breakers - open.
* VERIFY Main Turbine speed <2000 RPM or lowering.
VERIFY Main Turbine speed <2000 RPM or lowering.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       5               Page 66   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 66 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior CRS       INITIATE Administrative Actions:
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior CRS INITIATE Administrative Actions:
* ANNOUNCE Reactor trip via PA System.
ANNOUNCE Reactor trip via PA System.
* INITIATE Attachment 4, Worksheet.
INITIATE Attachment 4, Worksheet.
* INITIATE Attachment 5, Administrative Actions.
INITIATE Attachment 5, Administrative Actions.
BOP       VERIFY Vital Auxiliaries functioning properly:
BOP VERIFY Vital Auxiliaries functioning properly:
* VERIFY both 1E 4 kV Buses A04 and A06 - energized.
VERIFY both 1E 4 kV Buses A04 and A06 - energized.
* VERIFY both 1E 480 V Buses B04 and B06 - energized.
VERIFY both 1E 480 V Buses B04 and B06 - energized.
* VERIFY all Class 1E DC Buses - energized.
VERIFY all Class 1E DC Buses - energized.
* VERIFY all Non-1E 4 kV Buses - energized.
VERIFY all Non-1E 4 kV Buses - energized.
* DETERMINE no CCW Trains - operating AND aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.
DETERMINE no CCW Trains - operating AND aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.
With ESFAS equipment operation without CCW flow, take action Critical Task to restore CCW Critical Loop flow to at least one train of Statement operating ESF pumps and Emergency Cooling Units.
Critical Task Statement With ESFAS equipment operation without CCW flow, take action to restore CCW Critical Loop flow to at least one train of operating ESF pumps and Emergency Cooling Units.
CRITICAL                         *    [RNO] DETERMINE no CCW Trains are operating TASK            BOP and START CCW Pump P-024.
CRITICAL TASK BOP
RO       DETERMINE RCS Inventory Control criteria NOT satisfied:
[RNO] DETERMINE no CCW Trains are operating and START CCW Pump P-024.
* DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
RO DETERMINE RCS Inventory Control criteria NOT satisfied:
* VERIFY Core Exit Saturation Margin 20&deg;F:
DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.
VERIFY Core Exit Saturation Margin 20&deg;F:
* QSPDS page 611.
* QSPDS page 611.
* CFMS page 311.
* CFMS page 311.  


Appendix D                                 Operator Action                             Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #     5               Page 67   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 67 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior RO       DETERMINE RCS Pressure Control criteria NOT satisfied:
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior RO DETERMINE RCS Pressure Control criteria NOT satisfied:
* DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.
                                  *  [RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.
                                  *  [RNO] ENSURE Normal and Aux Spray valves -
[RNO] ENSURE Normal and Aux Spray valves -
closed.
closed.
                                  *  [RNO] If PZR pressure (WR) is less than 1740 psia, ENSURE SIAS/CCAS/CRIS actuated.
[RNO] If PZR pressure (WR) is less than 1740 psia, ENSURE SIAS/CCAS/CRIS actuated.
Critical Task         Upon loss of CCW and prior to exceeding RCP operating limits, Statement            the affected RCP(s) will be stopped.
Critical Task Statement Upon loss of CCW and prior to exceeding RCP operating limits, the affected RCP(s) will be stopped.
RO       DETERMINE Core Heat Removal criteria is NOT satisfied:
RO DETERMINE Core Heat Removal criteria is NOT satisfied:
CRITICAL TASK
CRITICAL TASK When CIAS is MANUALLY actuated, STOP all RCPs.
* When CIAS is MANUALLY actuated, STOP all RCPs.
VERIFY Core Exit Saturation Margin 20&deg;F.
* VERIFY Core Exit Saturation Margin 20&deg;F.
QSPDS page 611.
* QSPDS page 611.
CFMS page 311.
* CFMS page 311.
BOP DETERMINE RCS Heat Removal criteria NOT satisfied:
BOP       DETERMINE RCS Heat Removal criteria NOT satisfied:
VERIFY at least one SGs level between 21% and 80% NR.
* VERIFY at least one SGs level between 21% and 80% NR.
DETERMINE TC less than 545&deg;F and NOT controlled.
* DETERMINE TC less than 545&deg;F and NOT controlled.
DETERMINE heat removal is excessive:
* DETERMINE heat removal is excessive:
[RNO] TC - less than 545&deg;F.
                                  *    [RNO] TC - less than 545&deg;F.
[RNO] ENSURE SBCS valves closed.
                                  *    [RNO] ENSURE SBCS valves closed.
[RNO] ENSURE ADVs closed.
                                  *    [RNO] ENSURE ADVs closed.
[RNO] ENSURE SG Blowdown valves closed.
                                  *    [RNO] ENSURE SG Blowdown valves closed.
E-088 - HV-4054 E-089 - HV-4053
* E-088 - HV-4054           E-089 - HV-4053
[RNO] ENSURE Main Steam to Reheaters valves  
                                  *    [RNO] ENSURE Main Steam to Reheaters valves


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       5               Page 68   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 68 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior closed.
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior closed.
* HV-2703 or HV-2704; HV-2721; HV-2751
HV-2703 or HV-2704; HV-2721; HV-2751 VERIFY SG pressures - greater than 740 PSIA.
* VERIFY SG pressures - greater than 740 PSIA.
[RNO] If required, INITIATE EFAS.
                                  *    [RNO] If required, INITIATE EFAS.
RO DETERMINE Containment Isolation criteria NOT satisfied:
RO       DETERMINE Containment Isolation criteria NOT satisfied:
DETERMINE Containment pressure - greater than 1.5 PSIG.
* DETERMINE Containment pressure - greater than 1.5 PSIG.
[RNO] DETERMINE Containment pressure > 3.4 PSIG.
                                  *  [RNO] DETERMINE Containment pressure > 3.4 PSIG.
[RNO] ENSURE SIAS, CCAS, and CRIS actuated.
                                  *  [RNO] ENSURE SIAS, CCAS, and CRIS actuated.
[RNO] DETERMINE CIAS NOT actuated.
                                  *  [RNO] DETERMINE CIAS NOT actuated.
Critical Task Statement With automatic actuation failure, crew manually initiates Containment Isolation.
Critical Task         With automatic actuation failure, crew manually initiates Statement            Containment Isolation.
CRITICAL TASK RO Manually INITIATE Containment Isolation Actuation Signal.
CRITICAL TASK RO       Manually INITIATE Containment Isolation Actuation Signal.
RO DETERMINE Containment Area Radiation Monitors energized AND alarming or trending to alarm.
* DETERMINE Containment Area Radiation Monitors RO energized AND alarming or trending to alarm.
VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
* VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.
CRS RECORD time of SIAS, CIAS, CCAS, CRIS.
CRS       RECORD time of SIAS, CIAS, CCAS, CRIS.
RO DETERMINE Containment Temperature and Pressure criteria NOT satisfied:
DETERMINE Containment Temperature and Pressure criteria RO NOT satisfied:
DETERMINE Containment average temperature > 120&deg;F.
* DETERMINE Containment average temperature > 120&deg;F.
DETERMINE Containment pressure > 1.5 PSIG.
* DETERMINE Containment pressure > 1.5 PSIG.
[RNO] ENSURE proper functioning of the Normal Containment Cooling.  
                                  *  [RNO] ENSURE proper functioning of the Normal Containment Cooling.


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       5               Page 69   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 69 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior
                                  *  [RNO] ENSURE at least one Containment Dome Air Circulator operating.
[RNO] ENSURE at least one Containment Dome Air Circulator operating.
                                  *  [RNO] DETERMINE Containment pressure > 3.4 PSIG.
[RNO] DETERMINE Containment pressure > 3.4 PSIG.
                                  *  [RNO] ENSURE all RCPs stopped.
[RNO] ENSURE all RCPs stopped.
                                  *  [RNO] ENSURE all available Containment Emergency Cooling Units operating.
[RNO] ENSURE all available Containment Emergency Cooling Units operating.
* VERIFY Containment pressure < 14 PSIG.
VERIFY Containment pressure < 14 PSIG.
CRS       DIAGNOSE event in progress:
CRS DIAGNOSE event in progress:
* DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.
                                  *  [RNO] COMPLETE Attachment 1, Recovery Diagnostics.
[RNO] COMPLETE Attachment 1, Recovery Diagnostics.
                                  *  [RNO] DIAGNOSE event as LOCA inside Containment.
[RNO] DIAGNOSE event as LOCA inside Containment.
* DETERMINE that Reactor Trip Recovery is NOT diagnosed.
DETERMINE that Reactor Trip Recovery is NOT diagnosed.
                                  *  [RNO] DETERMINE all RCPs stopped.
[RNO] DETERMINE all RCPs stopped.
* DIRECT initiating Steps 12 through 15.
DIRECT initiating Steps 12 through 15.
BOP       INITIATE Steps 12 through 15.
BOP INITIATE Steps 12 through 15.
CRS       DIRECT performance of SO23-12-3, LOCA.
CRS DIRECT performance of SO23-12-3, LOCA.
* RECORD time of EOI entry.
RECORD time of EOI entry.  
+15 min           CRS       VERIFY LOCA diagnosis:
+15 min CRS VERIFY LOCA diagnosis:
* INITIATE SO23-12-10, LOCA Safety Function Status Checks.
INITIATE SO23-12-10, LOCA Safety Function Status Checks.
* INITIATE Foldout Page.
INITIATE Foldout Page.
* DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.
DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       5               Page 70   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 70 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior DIRECT performance of FS-3, Monitor Natural Circulation.
* DIRECT performance of FS-3, Monitor Natural Circulation.
DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
* DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.
VERIFY LOCA diagnosis, using Figure 1, Break Identification Chart.
* VERIFY LOCA diagnosis, using Figure 1, Break Identification Chart.
INITIATE sampling of both Steam Generators for radioactivity and boron.
* INITIATE sampling of both Steam Generators for radioactivity and boron.
M.O. Cue:
M.O. Cue:         If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.
If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.
CRS       INITIATE Administrative actions:
CRS INITIATE Administrative actions:
* NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.
* ENSURE Emergency Plan is initiated.
ENSURE Emergency Plan is initiated.
* IMPLEMENT Placekeeper.
IMPLEMENT Placekeeper.
RO       VERIFY ESF actuation.
RO VERIFY ESF actuation.
* ENSURE the following actuated:
ENSURE the following actuated:
* SIAS / CCAS / CRIS CRS       RECORD time of SIAS.
SIAS / CCAS / CRIS CRS RECORD time of SIAS.
BOP       STOP unloaded Diesel Generators.
BOP STOP unloaded Diesel Generators.
INITIATE SO23-12-11, Attachment 22, Non-Qualified Load BOP Restoration.
BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.  


Appendix D                                   Operator Action                           Form ES-D-2 Op Test No.:       NRC     Scenario #       1     Event #     5               Page 71   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 71 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                           Applicants Actions or Behavior M.O. Cue:         When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior M.O. Cue:
Examiner Note:           At this point, the CRS may elect to secure Train B ECCS components due to loss of CCW.
When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.
RO         ESTABLISH Optimum SI Alignment:
Examiner Note:
* ESTABLISH one or two train operation.
At this point, the CRS may elect to secure Train B ECCS components due to loss of CCW.
* All Charging Pumps operating.
RO ESTABLISH Optimum SI Alignment:
* One HPSI and one LPSI per train operating.
ESTABLISH one or two train operation.
* All Cold leg flow paths aligned.
All Charging Pumps operating.
* VERIFY SI flow required:
One HPSI and one LPSI per train operating.
* SI flow indicated.
All Cold leg flow paths aligned.
* DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria NOT RO satisfied.
VERIFY SI flow required:
RO         VERIFY PZR pressure:
SI flow indicated.
* DETERMINE RCP NPSH requirements of SO23-12-11, Attachment 29 NOT satisfied.
RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria NOT satisfied.
                                    *  [RNO] VERIFY all RCPs stopped.
RO VERIFY PZR pressure:
                                    *  [RNO] INITIATE FS-3, Monitor Natural Circulation.
DETERMINE RCP NPSH requirements of SO23-12-11, 9 NOT satisfied.
RO         VERIFY Letdown isolated.
[RNO] VERIFY all RCPs stopped.
VERIFY outside Containment radiation alarms - NOT alarming RO or trending to alarm.
[RNO] INITIATE FS-3, Monitor Natural Circulation.
VERIFY outside Containment sump levels - NOT abnormally RO rising.
RO VERIFY Letdown isolated.
RO VERIFY outside Containment radiation alarms - NOT alarming or trending to alarm.
RO VERIFY outside Containment sump levels - NOT abnormally rising.  


Appendix D                                 Operator Action                           Form ES-D-2 Op Test No.:       NRC   Scenario #     1     Event #       5               Page 72   of 72 Event
Appendix D Operator Action Form ES-D-2 Op Test No.:
NRC Scenario #
1 Event #
5 Page 72 of 72 Event


== Description:==
== Description:==
Cue Card For Aftershock Seismic Event Time         Position                         Applicants Actions or Behavior VERIFY RCS sample valves, RCS and PZR head vents are RO closed.
Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior RO VERIFY RCS sample valves, RCS and PZR head vents are closed.
RO       VERIFY CCW parameters are normal.
RO VERIFY CCW parameters are normal.
CRS/RO       DETERMINE PZR safety valves are NOT closed.
CRS/RO DETERMINE PZR safety valves are NOT closed.
* Request Shift Manager/Operations Leader evaluate lowering PZR pressure to aid in resetting the safety valves.
Request Shift Manager/Operations Leader evaluate lowering PZR pressure to aid in resetting the safety valves.
                                  *  [RNO] Maintain core exit saturation margin greater than or equal to 20&deg;F.
[RNO] Maintain core exit saturation margin greater than or equal to 20&deg;F.
DETERMINE rate of RCS inventory and pressure loss greater CRS/RO than available charging pump capacity.
CRS/RO DETERMINE rate of RCS inventory and pressure loss greater than available charging pump capacity.  
+30 min           CRS       DIRECT initiation of RCS cooldown.
+30 min CRS DIRECT initiation of RCS cooldown.
When the RCS cooldown is initiated, or at Lead Evaluators discretion, TERMINATE the scenario.}}
When the RCS cooldown is initiated, or at Lead Evaluators discretion, TERMINATE the scenario.}}

Latest revision as of 18:50, 14 January 2025

2007-12 Final Scenarios/Outlines
ML080170291
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/18/2008
From:
Operations Branch IV
To:
Southern California Edison Co
References
50-361/07-302, 50-362/07-302, ES-D-1 50-361/07-302, 50-362/07-302
Download: ML080170291 (72)


Text

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Facility:

San Onofre Scenario No.:

1 Op Test No.:

NRC Examiners:

Operators:

Initial Conditions:

99.5% power MOC - RCS Boron is 883 ppm (by sample)

Train A Component Cooling Water Pump (P-025) in service Train A Containment Spray Pump (P-012) OOS Train A High Pressure Safety Injection Pump (P-017) OOS Condenser Air Ejector Low Range Radiation Monitor (RM-7818) OOS Fire Computer OOS Turnover:

Maintain steady-state power conditions.

Critical Tasks:

Transfer the Non-Critical Loop (Train A Critical Loop rupture).

Trip any RCP not satisfying RCP operating limits.

Manually initiate MSIS (Auto actuation failure).

Stabilize RCS temperature/pressure following loss of heat removal from the faulted Steam Generator.

Isolate the most affected Steam Generator (ESDE).

Event No.

Malf. No.

Event Type*

Event Description 1

+ 10 min CH04A TS (CRS)

Containment Pressure Transmitter (PT-0352-1) fails high.

2

+ 20 min CV16A I (RO, CRS)

VCT Level Instrument fails low (LT-0226).

3

+ 35 min SEIS OBE FW25 C (BOP, CRS)

TS (CRS)

Seismic event without Main Feedwater Pump trip.

Auxiliary Feedwater Pump (P-140) trip.

4

+ 65 min R (RO)

N (BOP, CRS)

Initiate Rapid Power Reduction at 15% per hour.

5

+ 75 min CC03A C (BOP, CRS)

TS (CRS)

Rupture of Component Cooling Water line to the Shutdown Cooling Heat Exchanger.

6

+ 105 min MS03B M (ALL)

Excess Steam Demand Event on Steam Generator (E-089) inside Containment.

7

+ 105 min RP01C C (RO)

Train B High Pressure Safety Injection Pump (P-019) start failure.

8

+ 105 min RPS LP I (BOP)

Main Steam Isolation Signal fails to actuate, manual actuation required.

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS) Technical Specifications

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc SCENARIO

SUMMARY

NRC #1 The crew will assume the watch and maintain steady-state conditions per SO23-5-1.7, Power Operations. When turnover is complete, a Containment Pressure Transmitter fails high. The crew will perform actions per the Annunciator Response Procedures (ARP). Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure will require placing the channel in Bypass. The CRS will evaluate Technical Specifications. When actions of SO23-13-18 are complete, the VCT Level Transmitter (LT-0226) will fail low. The crew will secure VCT makeup per the ARP and SO23-3-2.2, Makeup Operations. The RCS Makeup Control System will then be aligned for Manual Blended Makeup mode.

When plant conditions are stable, a seismic event will occur. The crew will respond per AOI SO23-13-3, Earthquake. The initial earthquake will cause trip and damage to the linkage of the Steam Driven Auxiliary Feedwater Pump. The CRS will evaluate Technical Specifications. The CRS will determine that a normal plant shutdown is required per SO23-13-3 and initiated per SO23-5-1.7, Power Operations at 15% per hour. The Shift Manager will direct the CRS to perform a Rapid Power Reduction at 15% per hour to expedite the downpower.

Once the power descension is underway, a seismic aftershock will cause a Train A Component Cooling Water header rupture. The crew will respond per AOI SO23-13-7, Loss of Component Cooling Water (CCW) / Saltwater Cooling (SWC). The crew will align Train B SWC & CCW and the ruptured header will be removed from service. The CRS will evaluate Technical Specifications.

The EOI entry point is caused by an Excess Steam Demand Event (ESDE) on Steam Generator E-089 inside Containment. The crew performs Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions and diagnoses an ESDE. The crew will transition to EOI SO23-12-5, Excess Steam Demand Event and perform necessary actions to stabilize RCS temperature. The Main Steam Isolation Signal (MSIS) fails to actuate and the BOP will be required to manually actuate MSIS. Additionally, the RO will be required to manually start Train B HPSI Pump P-019.

The scenario is terminated when the crew stabilizes RCS temperature and pressure following loss of heat removal from the faulted Steam Generator. The final action is isolation of SG E-089.

Risk Significance:

Risk important components out of service:

CS P-012, HPSI P-017 Failure of risk important system prior to trip:

Loss of CCW Train due to rupture Risk significant core damage sequence:

ESDE without MSIS Risk significant operator actions:

Transfer the Non-Critical Loop Manually start HPSI Pump Manually initiate MSIS Stabilize RCS temp following ESDE

Scenario Event Description NRC Scenario 1 SONGS-12-2007-FINAL-SCENARIOS.doc SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 1 Machine Operator:

EXECUTE IC #181 and NRC Scenario #1 SETUP file to align components.

HANG Control Board Tags on P-012 and P-017.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.

RESET CVCS Batch Counters to zero (0).

VERIFY both Pressurizer Spray Valves in AUTO.

VERIFY Master Alarm Keylock Switch in NORMAL.

PLACE procedures in progress on the RO desk:

Copy of SO32-5-1.7, Power Operations open to Section 6.4, Guidelines for Steady State Operation.

PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).

Control Room Annunciators in Alarm at 100%:

57A52 - CONTAINMENT SPRAY SYS TRAIN A INOPERABLE

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

1 Page 5

of 72 Event

Description:

Containment Pressure Transmitter Failure Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 1.

- CH04A, Cont. Pressure Transmitter (PT-0352-1) fails high Indications available:

56A08 - CTMT PRESS HI HI ESFAS CHANNEL TRIP 56A18 - CTMT PRESS HI HI ESFAS PRETRIP 56B06 - PPS CHANNEL 1 TROUBLE 63B02 - UNIT 2 CRITICAL PARAMETER PROBLEM

+ 1 min RO REFER to Annunciator Response Procedures.

RO RECOGNIZE Containment Pressure Channel failure and INFORM the CRS AOI SO23-13-18 entry required.

CRS DIRECT performance of AOI SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus.

RO DETERMINE failure by observing instrumentation for the affected channel and alternate redundant indications monitoring the same parameter.

RO IDENTIFY Containment Pressure Channel PT-0352-1 failure.

CRS REFER to Attachment 5 and DETERMINE Functional Unit(s) affected.

RO PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Reactor Protection System.

M.O. Cue:

When directed, EXECUTE the following Remote Functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP52S = BYPASS (Containment Pressure Channel A)

Delete RP51 (PPS Door Open Annunciator 56B46)

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

1 Page 6

of 72 Event

Description:

Containment Pressure Transmitter Failure Time Position Applicants Actions or Behavior RO VERIFY the Trip Channel Bypassed Annunciator alarm.

56A29 - PPS CHANNEL 1 TRIP BYPASSED RO LOG the bypass and the reason for the bypass in the Control Operators Log.

CRS INITIATE a LCOAR or follow guidelines of SO123-0-A5.

+ 10 min CRS EVALUATE Technical Specifications.

LCO 3.3.5.A, ESFAS Instrumentation.

CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable; ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.

When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 2.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

2 Page 7

of 72 Event

Description:

VCT Level Transmitter Failure Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Event 2.

- CV16A, VCT Level Transmitter LT-0226 fails low Indications available:

58A04 - VCT LEVEL HI/LO VCT Level Indicator LI-0226A lowering VCT Auto Makeup initiation

+ 1 min RO REFER to Annunciator Response Procedures.

RO DETERMINE that VCT Auto Makeup has started.

RO CHECK VCT Level indicator LI-0227 on PCS and DETERMINE that level is normal (~51% and trending up due to auto makeup initiation).

RO IDENTIFY that VCT level transmitter LI-0226 has failed low.

RO PLACE Makeup Mode Selector, HS-0210, to MANUAL.

Examiner Note:

When Makeup Control is placed in MANUAL, the following alarms will illuminate (on short time delay):

58A06 - BORIC ACID TO VCT FLOW HI/LO 58A07 - DEMIN WATER TO VCT FLOW HI/LO CRS DIRECT performance of SO23-3-2.2, Makeup Operations to ensure proper CVCS alignment is achieved.

+10 min CRS REQUEST I&C assistance.

When VCT Makeup is in Manual or at Lead Evaluators discretion, PROCEED to Event 3.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

3 Page 8

of 72 Event

Description:

Seismic Event / Loss of Auxiliary Feedwater Pump Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Event 3.

- Seismic OBE without Main Feedwater Pump trip

- FW25, Steam Driven Auxiliary Feedwater Pump (P140) trip Indications Available:

61C21 - SEISMIC RECORDING SYSTEM ACTIVATED 61C22 - OPERATING BASIS EARTHQUAKE DETECTED 61C03 - SPENT FUEL POOL LEVEL HI/LO 64A26(29) - CCW SURGE TANK TRAIN A(B) LEVEL HI/LO 99B49 - TURBINE VIBRATION HI 99A11 - TPCW SURGE TANK LEVEL HI/LO 53A15 - MFWP TURBINE K006 VIBRATION HI PRETRIP 53A30 - MFWP/TURBINE P062/K006 VIBRATION HI 53B58 - CONDENSATE TANK T120 LEVEL HI/LO 50A54 - CEDMCS MG OUTPUT CONTACTOR OPEN 50A55 - ATWS/DSS TROUBLE 58A25(35) - BAMU TANK T072 (T071) LEVEL HI/LO 57A(B)16 - RWST T006 (T005 ) LEVEL LO 63B(C)50 - DIESEL GEN 2G002 (2G003 ) STORAGE TANK LEVEL HI/LO 52A53 - TURBINE AUX FW PUMP GOVERNOR OVERSPEED/OOS

+1 min CREW REFER to Annunciator Response Procedures.

BOP RECOGNIZE Operating Basis Earthquake and INFORM the CRS AOI SO23-13-3 entry required.

BOP DETERMINE Steam Driven Auxiliary Feedwater Pump (P-140) tripped and REPORT to the CRS.

CRS DIRECT performance of SO23-13-3, Earthquake.

CRS DISPATCH an operator to the AFW Pump Room.

M.O. Cue: Once dispatched, WAIT three (3) minutes and REPORT P140 linkage is damaged and pump is tripped.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

3 Page 9

of 72 Event

Description:

Seismic Event / Loss of Auxiliary Feedwater Pump Time Position Applicants Actions or Behavior Floor Cue:

If requested, the Shift Manager will SHOW Seismic Panel indications to the CRS after a two (2) minute time delay (copy located at the end of the scenario).

CRS VERIFY the following occurred:

Valid activation of any of the following alarms or Seismic Instrument Panel indications:

2UA61C21, Seismic Recording System Activated alarm -

illuminated.

Strong Motion Acceleration System Activation (light indication on 2UA-8020, actuates at 0.019g)

Event 2ZLH-8020G (light indication on 2XY-8020), AND Ground motion that is readily felt by a consensus of Control Room personnel.

Floor Cue:

Shift Manager will REPORT there was ground motion.

CRS DETERMINE Operating Basis Earthquake occurred:

BOP 2UA61C22, Operating Basis Earthquake Acceleration alarm - ILLUMINATED (actuates at 0.33g), AND BOP OBE alarms (both white lamps: Containment Base OBE AND Containment Operating Level OBE) on Seismic Instrumentation Panel ILLUMINATED.

CRS INITIATE Attachment 1, Post Operating Basis Earthquake Inspections.

CRS INITIATE Attachment 4, Seismic Annunciator Data Collection.

M.O. Cue: When the ARO is directed to perform Attachment 4, WAIT two (2) minutes then CLEAR the Seismic alarms on Control Board Panel 61C (61C21 & 61C22) in preparation for the aftershock preceding Event 5.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

3 Page 10 of 72 Event

Description:

Seismic Event / Loss of Auxiliary Feedwater Pump Time Position Applicants Actions or Behavior CRS INITIATE Attachment 2, Post Seismic Event Inspections.

CRS EVALUATE Technical Specifications.

LCO 3.7.5.B, Auxiliary Feedwater System.

CONDITION B - One AFW Train inoperable for reasons other than Condition A in MODE 1, 2, or 3; ACTION B.1 - Restore AFW train to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

+ 15 min CRS INITIATE a normal plant shut down per SO23-13-3, Attachment 1 following guidance of SO23-5-1.7, Power Operations.

Floor Cue: Once the decision to shut down the plant is initiated by the CRS, REPORT as the Shift Manager to perform a Rapid Power Reduction at 15% per hour per SO23-5-1.7, Power Operations.

When SO23-13-3, Attachment 1 is initiated and Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 4.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

4 Page 11 of 72 Event

Description:

Rapid Power Reduction at 15%/hour Time Position Applicants Actions or Behavior Machine Operator:

If contacted as Grid Control Center, ACKNOWLEDGE Rapid Power Reduction at 15%/hour due to seismic event.

CRS DIRECT performance of actions in SO23-5-1.7, Power Operations, Step for Rapid Power Reduction.

BOP INITIATE a Moisture Separator Heater cooldown per SO23-10-2, Attachment for MSR Cooldown for Load Reduction/ Turbine Shutdown.

+1 min RO/BOP IMPLEMENT Attachment 8 to determine the amount of Boration and CEAs to be used (located on Control Board).

A combination of CEA insertion and/or Boron will be used.

RO BORATE to the Charging Pump suction (Borate Mode).

BOP LOWER Turbine load (to raise Tc) until SBCS permissives are in by lowering Main Generator load using HS-2210, Main Turbine Speed Load Control to LOWER.

RO INSERT CEAs for power reduction and ASI control.

Examiner Cue:

Once the power change is under way it may be desirable to initiate conditions for Event 5 as there is an approximate seven

(~7) minute time delay before the CCW Surge Tank low-level alarm is received. The next event is preceded by an aftershock.

RO STOP CEA insertion any time the PPDIL alarm is received.

PROCEED after PPDIL alarm has reset.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

4 Page 12 of 72 Event

Description:

Rapid Power Reduction at 15%/hour Time Position Applicants Actions or Behavior

+20 min RO FORCE Pressurizer Normal Spray flow using both Spray Valves.

When power level is lowered 3-5%, or at Lead Evaluators discretion, PROCEED to Event 5.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 13 of 72 Event

Description:

CCW Train A Header Rupture Time Position Applicants Actions or Behavior M.O. Cue: When directed, INITIATE the Seismic alarms on Control Board Panel 61C (61C21 & 81C22) to simulate an aftershock.

Floor Cue:

Shift Manager will REPORT there was ground motion.

Floor Cue:

If requested, the Shift Manager will SHOW Seismic Panel indications to the CRS after a two (2) minute time delay (aftershock copy located at the end of the scenario).

Machine Operator:

When directed, EXECUTE Event 5.

- CC03A, CCW Train A rupture at SDC HX E004 @ 500 gpm Indications available:

64A26 - CCW SURGE TANK TRAIN A LEVEL HI/LO (time delay of ~7 min) 64A07 - CCW PUMP TRAIN A DISCH PRESS LO 64A45 - CCW HX TRAIN A OUTLET PRESS LO 64A17 - CCW TRAIN A RETURN FLOW LO 56C58 - SAFETY EQPT BLDG SUMP LEVEL HI-HI (time delay of ~10 min)

+30 sec BOP REFER to Annunciator Response Procedures.

BOP RECOGNIZE lowering surge tank level and CCW Pump discharge pressure and INFORM the CRS AOI SO23-13-7 entry required.

+1 min CRS DIRECT performance of AOI SO23-13-7, Loss of CCW/ SWC.

BOP ISOLATE Radwaste by closing 2HV-6465, 3HV-6465, 2HV-6217, and 3HV-6217.

CRS/BOP DETERMINE that the leak is not isolated.

CRS DIRECT placing Train B CCW in service.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 14 of 72 Event

Description:

CCW Train A Header Rupture Time Position Applicants Actions or Behavior BOP START CCW Pump P-026 and VERIFY that SWC P-114 automatically starts.

+3 min CRS DIRECT transfer of the CCW Non-Critical Loop to Train B.

Critical Task Statement With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP operating limits, restore flow to the NCL from any available CCW train.

CRITICAL TASK BOP TRANSFER the CCW Non-Critical Loop to Train B.

CRS DIRECT transfer of Letdown HX to Train B.

BOP TRANSFER Letdown HX to Train B.

CRS/RO DISPATCH PEO to investigate flooding alarms.

CRS DIRECT securing CCW Pump P-025.

BOP STOP CCW Pump P-025 and SWC Pump P-112.

M.O. Cue:

If directed to rack out breaker for CCW Pump P-024, WAIT 3 minutes and EXECUTE remote functions CC57A (DC to P-024) and CC58A (P-024 Breaker).

If directed to rack out breaker for CCW Pump P-025, WAIT 3 minutes and EXECUTE remote functions CC57B (DC to P-025) and CC58B (P-025 Breaker).

CRS/ BOP DISPATCH PEO to close Loop A CCW Surge Tank Outlet, HV-6225.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 15 of 72 Event

Description:

CCW Train A Header Rupture Time Position Applicants Actions or Behavior M.O. Cue:

If directed to close HV-6225, Loop A CCW Surge Tank Outlet, WAIT 3 minutes and EXECUTE remote function CC60.

M.O. Cue:

If contacted to report status of Unit 3 CCW Surge Tank Level, REPORT that Train A CCW Surge Tank level is stable and unchanged.

+10 min CRS EVALUATE Technical Specifications.

LCO 3.7.7.A, Component Cooling Water System.

CONDITION A - One CCW Train inoperable; ACTION A.1 - Restore CCW Train to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Examiner Note:

The crew may decide to place CCW pumps P-024 and P-025 OOS, swap CCW Pump P-025 to Train B, and/or place Train A HPSI and CS Pumps OOS. Crew may remove DC Control Power for Train A HPSI and CS pumps to avoid damage due to lack of cooling water.

M.O. Cues:

If directed to open the DC power supply breaker for the Train A ESF Pumps, ACKNOWLEDGE the order but do not perform (Time restriction).

If directed to transfer Emergency Chiller E-336 to Unit 3, ACKNOWLEDGE the order but do not perform (Time restriction).

If directed to transfer CCW Pump P-025 from Train A to Train B, ACKNOWLEDGE the order but do not perform (Time restriction).

CRS ENSURE ECCS is not required.

HPSI, LPSI, CS pumps are stopped.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6, 7, & 8.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 16 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Events 6, 7, and 8.

- MS03B, ESDE on E089 inside Containment @ 1.2%

- RPS LP, MSIS fails to actuate

- RP01C, HPSI Pump P019 start failure Indications available:

60A02 - CONTAINMENT HUMIDITY HIGH 60A12 - REACTOR CAVITY TEMP HI 60A03 - CONTAINMENT / FHB TEMP HI 56A35 - CONTAINMENT PRESSURE HI PRETRIP 56A17 - CONTAINMENT PRESS HI ESFAS PRETRIP

+30 secs RO/BOP RECOGNIZE that an uncontrolled cooldown is in progress and INFORM the CRS that a Reactor trip is required.

CRS DIRECT entry into SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

VERIFY Reactor Trip Circuit Breakers (8) - open.

VERIFY Reactor Power lowering and Startup Rate -

negative.

VERIFY maximum of one full length CEA - NOT fully inserted.

BOP VERIFY Turbine Trip:

VERIFY Main Turbine tripped.

HP and LP Stop and Governor valves - closed.

VERIFY both Unit Output Breakers - open.

VERIFY Main Turbine speed <2000 RPM or lowering.

CRS DETERMINE Reactivity Control criteria satisfied.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 17 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior CRS INITIATE Administrative Actions:

ANNOUNCE Reactor trip via PA system.

INITIATE Attachment 4, Worksheet.

INITIATE Attachment 5, Administrative Actions.

BOP VERIFY Vital Auxiliaries functioning properly:

VERIFY both 1E 4 kV Buses A04 and A06 - energized.

VERIFY both 1E 480 V Buses B04 and B06 - energized.

VERIFY all Class 1E DC Buses - energized.

VERIFY all Non-1E 4 kV Buses - energized.

VERIFY one CCW Train - operating AND aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.

M.O. Cue:

If directed to check Main Steam Safety Valve status, REPORT that all safety valves appear to be seated, with no steam coming from the MSIV roof.

RO DETERMINE RCS Inventory Control criteria NOT satisfied:

DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.

[RNO] DETERMINE PZR Level Control System is NOT restoring PZR level.

VERIFY Core Exit Saturation Margin 20°F:

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 18 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior RO DETERMINE RCS Pressure Control criteria NOT satisfied:

DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.

[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.

[RNO] ENSURE Normal and Aux Spray valves -

closed.

[RNO] ENSURE SIAS, CCAS, and CRIS - actuated.

[RNO] If PZR pressure is < 1430 PSIA, then ENSURE at least one RCP in each loop - stopped.

[RNO] If RCP NPSH requirements NOT satisfied, then ENSURE all RCPs - stopped.

RO REPORT that HPSI Pump P-019 failed to start and START HPSI Pump P-019.

RO DETERMINE Core Heat Removal criteria is NOT satisfied:

DETERMINE no RCPs should be operating due to CIAS.

VERIFY Core Exit Saturation Margin 20°F.

QSPDS page 611.

CFMS page 311.

BOP DETERMINE RCS Heat Removal criteria NOT satisfied:

VERIFY at least one SG level between 21% and 80% NR and Feedwater available.

DETERMINE TC less than 545°F and NOT controlled.

DETERMINE heat removal is excessive:

[RNO] TC - less than 545°F.

[RNO] ENSURE SBCS valves closed.

[RNO] ENSURE ADVs closed.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 19 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior

[RNO] ENSURE SG Blowdown valves closed.

E-088 - HV-4054 E-089 - HV-4053

[RNO] ENSURE Main Steam to Reheaters valves closed.

HV-2703 or HV-2704; HV-2721; HV-2751 DETERMINE SG pressures - less than 740 PSIA.

ENSURE MSIS actuated.

Critical Task Statement Actions are taken to isolate the SGs prior to either SG blowing dry. These actions may include either manual actuation of the MSIS signal, or manual closure of MSIS actuated components.

CRITICAL TASK Manually INITIATE MSIS.

RO DETERMINE Containment Isolation criteria NOT satisfied:

DETERMINE Containment pressure - greater than 1.5 PSIG.

[RNO] DETERMINE Containment pressure > 3.4 PSIG.

[RNO] ENSURE SIAS, CIAS, CCAS, and CRIS actuated.

[RNO] ENSURE all RCPs stopped.

Critical Task Statement Upon loss of CCW and prior to exceeding RCP operating limits, the affected RCP(s) will be stopped.

CRITICAL TASK RO STOP all RCPs due to CIAS.

VERIFY Containment Area Radiation Monitors energized AND NOT alarming or trending to alarm.

VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 20 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior RO DETERMINE Containment Temperature and Pressure criteria NOT satisfied:

DETERMINE Containment average temperature > 120°F.

DETERMINE Containment pressure > 1.5 PSIG.

[RNO] ENSURE proper functioning of the Normal Containment Cooling.

[RNO] ENSURE at least one Containment Dome Air Circulator operating.

[RNO] DETERMINE Containment pressure > 3.4 PSIG.

[RNO] ENSURE all RCPs stopped.

[RNO] ENSURE all available Containment Emergency Cooling Units operating.

DETERMINE Containment pressure > 14 PSIG.

[RNO] ENSURE CSAS actuated.

[RNO] ENSURE all available Containment Spray Header flows > 1600 GPM.

+15 min CRS DIAGNOSE event in progress:

DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.

[RNO] COMPLETE Attachment 1, Recovery Diagnostics.

[RNO] DIAGNOSE event as ESDE on SG E089.

DETERMINE that Reactor Trip Recovery is NOT diagnosed.

[RNO] DETERMINE all RCPs stopped.

DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 21 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior Examiner Note:

When SG E089 reaches dryout conditions the crew should initiate FS-30, Establish Stable RCS Temperature during ESDE.

CRS DIRECT performance of SO23-12-5, Excess Steam Demand Event.

RECORD time of EOI entry.

CRS VERIFY ESDE diagnosis.

INITIATE SO23-12-10, Safety Function Status Checks.

INITIATE Foldout Page.

DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.

DIRECT performance of FS-3, Monitor Natural Circulation.

DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.

DIRECT performance of FS-30, Stabilize RCS Temperature.

VERIFY ESDE diagnosis using Figure 1, Break Identification Chart.

INITIATE sampling of both Steam Generators for radioactivity and boron.

M.O. Cue:

If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.

CRS INITIATE Administrative Actions.

NOTIFY Shift Manger/Operations Leader of entry into SO23-12-5, Excess Steam Demand Event.

ENSURE Emergency Plan is initiated.

IMPLEMENT Placekeeper.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 22 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior RO VERIFY ESF actuation.

VERIFY SIAS actuation required.

PZR pressure less than SIAS setpoint.

OR Containment pressure > 3.4 PSIG.

ENSURE the following actuated:

SIAS / CCAS / CRIS RO/BOP VERIFY SIAS, CCAS, CRIS actuated.

CRS RECORD time of SIAS.

BOP STOP unloaded Diesel Generators.

BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.

M.O. Cue:

When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.

BOP VERIFY MSIS actuation required and ENSURE MSIS actuated.

SG pressure < 740 PSIA.

RO VERIFY CIAS actuation required and ENSURE CIAS actuated.

Containment pressure > 3.4 psig.

CFMS pages 342 and 343.

RO VERIFY SIAS actuated.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 23 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior Examiner Note:

At this point, the CRS may elect to secure Train A ECCS components due to loss of CCW.

RO ESTABLISH Optimum SI Alignment.

ESTABLISH one or two train operation:

All Charging Pumps operating.

One HPSI and one LPSI per train operating.

All Cold leg flow paths aligned.

VERIFY SI flow required:

SI flow indicated OR RCS pressure >1250 psia.

OR DETERMINE FS-7, Verify SI Throttle/Stop criteria NOT satisfied.

BOP CLOSE MSIVs and MSIV Bypasses:

ENSURE MSIVs - closed:

HV-8205 for E088.

HV-8204 for E089.

ENSURE MSIV Bypasses - closed:

HV-8203 for E088.

HV-8202 for E089.

CREW PREVENT Pressurized Thermal Shock.

INITIATE FS-30, Establish Stable RCS temperature during ESDE.

INITIATE FS-7, Verify SI Throttle/Stop Criteria.

Examiner Note:

The following steps from FS-30 will be performed when conditions are met. Both the ESDE procedure and the ESDE Foldout Page direct performance of these steps.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 24 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior

+20 min BOP VERIFY SG least affected by ESDE, SG E088, NOT isolated for SGTR.

BOP VERIFY most affected SG level E089 - less than 50% WR.

BOP PERFORM the following on least affected SG E088:

TRANSFER ADV to Auto/Modulate.

MAINTAIN least affected SG pressure 200 PSIA above most affected SG pressure.

BOP VERIFY SG dryout on most affected SG E089:

RCS Tcold - stable or rising, OR SG pressure - 200 PSIA Critical Task Statement With loss of heat removal from the affected SG, transfer the primary to secondary heat sink to the least affected SG. Actions shall include the following:

Steaming of the least affected (non-ESDE) SG to maintain Psat for lowest RCS Tc ;

Manipulation of feedwater controls to maintain SG level of 40% to 80% NR.

CRITICAL TASK BOP STABILIZE least affected SG E088 pressure:

VERIFY ADV on SG E088 in Auto/Modulate.

MAINTAIN Psat for lowest RCS Tc on SG E088.

STABILIZE AFW flow on SG E088.

RO VERIFY RCS pressure is to the right of the Appendix E curve on Attachment 29, Post-Accident Pressure/Temperature Limits.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

6, 7 & 8 Page 25 of 72 Event

Description:

ESDE on SG E089 / MSIS Fails to Actuate / HPSI Pump Start Failure Time Position Applicants Actions or Behavior BOP OPERATE feedwater on SG E088 to maintain level between 40% and 80% NR.

Examiner Note:

The following steps are from EOI SO23-12-11, Attachment 28, Isolation of SG with ESDE.

BOP DETERMINE E089 is the most affected SG.

CRS NOTIFY Shift Manager / Operations Leader of the SG most affected by the ESDE.

BOP VERIFY SG least affected by ESDE available for heat removal and not affected by SGTR.

Critical Task Statement Identify and isolate the most affected Steam Generator (ESDE).

CRITICAL TASK BOP ISOLATE SG E089. CLOSE/STOP the following components:

MSIV HV-8204 MSIV Bypass HV-8202 ADV HV-8421 MFIV HV-4052 AFW valves HV-4715, HV-4731 Steam to AFW P-140 HV-8200 SG Blowdown Isolation HV-4053 SG Water Sample Isolation HV-4057 Electric AFW Pump P-141

+30 min BOP ENSURE SG E089 ADV HV-8421 selected to MANUAL.

When Steam Generator E089 is isolated, TERMINATE the scenario.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

3 Page 26 of 72 Event

Description:

Cue Card For Initial Seismic Event Time Position Applicants Actions or Behavior OPERATOR INDICATIONS AT 2UA-8020, SEISMIC PANEL INITIAL SEISMIC EVENT

  • Strong Motion Acceleration System Activation light (0.019g) - ON
  • 2ZLH-8020G, Event Light Indication, (0.019g) Power Panel - ON
  • Containment Base OBE (0.33g) - ON
  • Containment Operating Level OBE (0.33g) - ON

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc OPERATOR INDICATIONS AT 2UA-8020, SEISMIC PANEL AFTERSHOCK EVENT

  • Strong Motion Acceleration System Activation light (0.019g) - ON
  • 2ZLH-8020G, Event Light Indication, (0.019g) Power Panel - ON
  • Containment Base OBE (0.33g) - ON
  • Containment Operating Level OBE (0.33g) - ON

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Facility:

San Onofre Scenario No.:

2 Op Test No.:

NRC Examiners:

Operators:

Initial Conditions:

69% power MOC - RCS Boron is 956 ppm (by sample)

Train A Component Cooling Water Pump (P-025) in service Train A Containment Spray Pump (P-012) OOS Train A High Pressure Safety Injection Pump (P-017) OOS Fire Computer OOS Turnover:

Dilution and power ascension in progress at 10% per hour.

Critical Tasks:

Restore flow to the CCW Non-Critical Loop (RCPs operating).

Energize at least one vital 4 kV 1E Bus and associated 480 V 1E Bus.

Establish Reactivity Control (> 2 FLCEAs Not Fully Inserted & No SIAS).

Event No.

Malf. No.

Event Type*

Event Description 1

+ 15 min R (RO)

N (BOP, CRS)

Dilution and power ascension at 10% per hour.

2

+ 25 min RC24A I (RO, CRS)

TS (CRS)

Pressurizer Spray Valve (PV-0100A) fails open.

3

+ 35 min SG05G I (BOP, CRS)

TS (CRS)

Steam Generator E-089 Narrow Range Level Transmitter (LT-1113-3) fails low.

4

+ 50 min ED03A C (ALL)

TS (CRS)

Bus 2A04 Overcurrent lockout.

5

+ 85 min TU08 PG24 PG57 M (ALL)

Turbine trip.

Loss of Offsite Power.

Loss of SDG&E Switchyard.

6

+ 85 min RD8802 RD8902 RD9002 RD9102 C (RO)

Four fully stuck CEAs; Loss of Reactivity Control.

7

+ 85 min EG08B C (BOP)

Emergency Diesel Generator (2G003) mechanical failure.

Station Blackout.

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc SCENARIO

SUMMARY

NRC #2 The crew will assume the watch and resume a dilution and power ascension per SO23-5-1.7, Power Operations.

When the power change is underway, the Pressurizer Spray Valve will fail to 80% open. The crew will diagnose and stabilize the primary plant using Annunciator Response Procedures (ARP) and Abnormal Operating Instruction (AOI) SO23-13-27, Pressurizer Pressure and Level Malfunction. The CRS will evaluate Technical Specifications.

After the crew has removed power from the Pressurizer Spray Valve, a narrow range level transmitter will fail low on Steam Generator E-089. The crew will diagnose a level transmitter failure per the ARPs and Abnormal Operating Instruction (AOI) SO23-13-18, Reactor Protection System Failure/Loss of Vital Bus, and are required to bypass the affected Functional Units using SO23-3-2.12, Reactor Protective System Operation. The CRS will evaluate Technical Specifications.

This is followed by a bus fault and lockout on 1E Bus 2A04. The crew will refer to AOI SO23-13-26, Loss of Power to an AC Bus. Actions include transferring the Non-Critical Loop to Train B, starting a standby Charging Pump, and stopping and placing the Train A Emergency Diesel Generator in Maintenance Lockout. The CRS will evaluate Technical Specifications and determine that a plant shutdown is required.

Once the decision to shutdown is made, a Loss of Offsite Power will occur. The Reactor will trip and the crew will perform Emergency Operating Instruction (EOI) SO23-12-1, Standard Post Trip Actions (SPTAs). Emergency Diesel Generator 2G003 will trip while SPTAs are being performed (one minute post-trip). Four rods remain stuck out of the core requiring manual boration alignment on the part of the RO in preparation for Bus 2A06 power restoration.

The crew diagnoses a Loss of Reactivity Control due to four (4) full length CEAs stuck out with a Station Blackout and enters EOI SO23-12-9, Functional Recovery. The success path will require cross-tying power with Unit 3 and establishing a boration flowpath.

The scenario is terminated when Bus 2A06 is energized and boration at greater than 40 gpm is established.

Risk Significance:

Risk important components out of service:

CS P-012, HPSI P-017 Failure of risk important system prior to trip:

Loss of Vital Inverters Risk significant core damage sequence:

SBO with Loss of Reactivity Control Risk significant operator actions:

Establish Non-Critical Loop CCW flow Vital AC power restoration Establish boration flowpath

Scenario Event Description NRC Scenario 2 SONGS-12-2007-FINAL-SCENARIOS.doc SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 2 Machine Operator:

EXECUTE IC #182 and NRC Scenario #2 SETUP file to align components.

HANG Control Board Tags on P-012 and P-017.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario boron concentration.

RESET CVCS PMW Batch Counter to 1140.

VERIFY both Pressurizer Spray Valves in AUTO.

VERIFY Master Alarm Silence Switch in NORMAL.

PLACE procedures in progress on the RO desk:

- Copy of SO23-5-1.7 open to Step 6.3.15, 50-80%

Reactor Power.

- MARKED UP copy of SO23-5-1.7, Attachment 9.

- Copy of SO23-3-2.2 with Steps 6.5.1 through 6.5.5 checked off.

- Copy of SO23-3-1.10 open to Section 6.2, Forcing Pressurizer Sprays.

VERIFY that dilution is in progress then PLACE in FREEZE.

PLACE the MOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).

If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position(s).

Control Room Annunciators in Alarm at 70%:

57A52 - CONTAINMENT SPRAY SYS TRAIN A INOPERABLE

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

1 Page 31 of 72 Event

Description:

Dilution and Power Ascension in Progress at 10%/hr Time Position Applicants Actions or Behavior Machine Operator:

When turnover is complete, PLACE Simulator in RUN.

+1 min CRS DIRECT performance of SO23-5-1.7, Power Operations, SO23-3-2.2, Makeup Operations, and SO23-10-1, Turbine Startup and Normal Operation.

RO VERIFY Batch Counter and Makeup Integrator settings.

RO PERFORM dilution valve alignment.

PLACE FV-9253 in OPEN.

VERIFY FIC-0210X in AUTO at ~ 19 gpm.

PLACE HS-0210 in DILUTE.

RO VERIFY Tcold changing as dilution progresses.

RO ADJUST CEAs as required for ASI control.

+15 min BOP MAINTAIN Tcold within required band by raising Main Generator load using HS-2210, Main Turbine Speed Load Control to RAISE.

When power has been raised 3 to 5%, or at Lead Evaluators discretion, PROCEED to Event 2.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

2 Page 32 of 72 Event

Description:

Pressurizer Spray Valve Fails Open Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Event 2.

- RC24A @ 80%, Pressurizer Spray Valve fails open Indications available:

50A14 - PZR PRESS HI/LO (+90 seconds from event initiation)

Examiner Note:

Because both Spray Valves will be open during the power ascension, PV-100A is failed 80% open. This is equivalent to a 40% open failure when not forcing sprays with all heaters energized.

+2 min RO REFER to Annunciator Response Procedures.

RO RECOGNIZE PZR Pressure Control failure and INFORM the CRS AOI SO23-13-27 entry required.

CRS DIRECT performance of SO23-13-27, Pressurizer Pressure and Level Malfunction.

RO START and/or VERIFY PZR Backup and Proportional Heaters energized.

CRS/RO DETERMINE Pressurizer Pressure channel is NOT between 2225 and 2275 psig.

CRS/RO DETERMINE Pressurizer Pressure is NOT stable.

RO OBSERVE PV-0100B, Pressurizer Spray Valve from Loop 1B, is failed ~80% open.

M.O. Cue:

Closely MONITOR pressure and REDUCE malfunction RC24A to 60%

once identified (this will allow pressure to stabilize and avoid a plant trip).

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

2 Page 33 of 72 Event

Description:

Pressurizer Spray Valve Fails Open Time Position Applicants Actions or Behavior CRS DIRECT an ARO to fail closed PV-0100A, PZR Spray Valve, by removing the connector block at Cabinet L-138, SPEC 200 Power Supply Cabinet, Nest 4, Slot 10. (HC-0100A)

M.O. Cue:

REDUCE malfunction RC24A to 0% and REPORT to the Control Room that the connector block at Cabinet L-138, SPEC 200 Power Supply Cabinet, Nest 4, Slot 10 was removed.

RO/CRS DETERMINE Pressurizer pressure is recovering.

RO VERIFY the Pressurizer Pressure signal has not failed high.

RO VERIFY Pressurizer Pressure Control System is operating properly in automatic.

RO VERIFY Pressurizer Spray was not initiated with delta temperature > 180°F.

Examiner Note:

The following Technical Specification is entered if RCS pressure drops below 2025 PSIA during this event.

+10 min CRS EVALUATE Technical Specifications.

LCO 3.4.1.A, RCS DNB Limits.

CONDITION A - Pressurizer pressure not within limits; ACTION A.1 - Restore Pressurizer pressure to within limit within two (2) hours.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Event 3.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

3 Page 34 of 72 Event

Description:

Steam Generator E089 NR Level Transmitter Fails Low Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.

- SG05G, LT-1113-3 S/G E089 Level Instrument fails low Indications Available:

52A06 - SG1 E089 LEVEL HI/LO 52A07 - FWCS SG1 E089 LEVEL DEVIATION

+1 min BOP REFER to Annunciator Response Procedures.

BOP IDENTIFY failed transmitter is Steam Generator E089 NR Level Transmitter Channel C, 2LT-1113-3.

CRS DIRECT performance of AOI SO23-13-18, Reactor Protection System Failure.

CRS IDENTIFY a Single PPS Channel failed.

CRS IDENTIFY Affected Functional Units for Channel C, using of AOI SO23-13-18.

SG 1 Level - Low (RPS)

SG 1 Level - High (RPS)

SG 1 Level - High (DEFAS-1)

SG 1 P (EFAS-1)

CRS DIRECT placing the affected Functional Unit in BYPASS per SO23-3-2.12, Section for Bypass Operation of Trip Channels.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

3 Page 35 of 72 Event

Description:

Steam Generator E089 NR Level Transmitter Fails Low Time Position Applicants Actions or Behavior RO CONTACT an outside operator to place the Affected Functional Units in Bypass per SO23-3-2.12, Reactor Protective System Operation.

M.O. Cue:

When outside operator is contacted to bypass the associated trips, WAIT 3 minutes and then CALL when ready to begin. When directed, EXECUTE individual events for Bypassing RPS Trips.

M.O. Cue:

When directed, EXECUTE the following Remote Functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP54G = BYPASS (Low SG-1 Level Channel C)

RP54I = BYPASS (High SG-1 Level Channel C)

RP54U = BYPASS (High SG-1 DP EFAS-1 Channel C)

RP68A = BYPASS (DEFAS-1 L-034)

RP68B = BYPASS (DEFAS-1 L-035)

Delete RP51 (PPS Door Open Annunciator 56B46)

CRS CONFIRM failure does NOT affect RPS/ESFAS matrix or logic.

CRS CONFIRM failure does affect Feedwater Digital Control System.

BOP BYPASS 2LT-1113-3 per SO23-3-2.38, Section for Bypassing Selected Feedwater Control Signals.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

3 Page 36 of 72 Event

Description:

Steam Generator E089 NR Level Transmitter Fails Low Time Position Applicants Actions or Behavior

+10 min CRS EVALUATE Technical Specifications.

LCO 3.3.1.A, RPS Instrumentation - Operating.

CONDITION A - One or more Functions with one automatic RPS trip channel inoperable; ACTION A.1 - Place channel in Bypass or Trip within one (1) hour.

LCO 3.3.5.A, ESFAS Instrumentation.

CONDITION A - One or more Functions with one automatic ESFAS trip channel inoperable; ACTION A.1 - Place Functional Unit in bypass or trip within one (1) hour.

LCO 3.3.12.A, Remote Shutdown System.

CONDITION A - One or more required Functions inoperable; ACTION A.1 - Restore required Functions to OPERABLE status within 30 days.

When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Event 4.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

4 Page 37 of 72 Event

Description:

Bus 2A04 Overcurrent Lockout Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Event 4.

- ED03A, Bus 2A04 overcurrent Indications Available:

63B05 - 2A04 VOLTAGE LO 63B06 - 2B04 VOLTAGE LO 63B25 - 2A04 SUPPLY BREAKER 2A0418 OC

+30 sec RO/BOP REFER to Annunciator Response Procedures.

RO/BOP RECOGNIZE low bus voltage and INFORM the CRS AOI SO23-13-26 entry required.

CRS DIRECT performance of SO23-13-26, Loss of Power to an AC Bus.

CRS DIRECT aligning of Train B CCW and SWC.

Critical Task Statement With loss of flow to the CCW Non-Critical Loop and prior to exceeding RCP operating limits, restore flow to the NCL from any available CCW train.

BOP START the Train B CCW Pump.

CRITICAL TASK TRANSFER the Non-Critical Loop to Train B.

TRANSFER the Letdown Heat Exchanger to Train B.

RO START Charging Pump P-192.

CRS DISPATCH an operator to VERIFY loss of the 1E 4 kV Bus is NOT due to a fire in the 1E Switchgear Room.

RO/BOP DETERMINE overcurrent annunciators are alarming on Bus 2A04.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

4 Page 38 of 72 Event

Description:

Bus 2A04 Overcurrent Lockout Time Position Applicants Actions or Behavior CRS DIRECT initiation of SO23-6-9, 6.9 kV, 4 kV and 480V Bus and Feeder Faults, to return Bus 2A04 to service.

CRS DIRECT initiation of Equipment Actions for Loss of the 1E 4 kV Bus 2A04.

+5 min BOP STOP G002 Diesel Generator by placing in MAINTENANCE LOCKOUT.

CRS Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, DIRECT performance of SO23-3-3.23, Attachment for AC Sources Verification, for both Units.

RO SELECT HS-0210, Makeup Mode Selector Switch to MANUAL and PLACE a Caution Tag at the switch to prevent inadvertent dilution.

CRS EVALUATE Technical Specifications.

LCO 3.0.3 - Due to loss of two 1E Battery Chargers.

ACTION - Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, place the Unit in MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

M.O. Cue:

When directed, EXECUTE the following Remote Functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP52C = BYPASS (Channel A Hi Local Power)

RP52D = BYPASS (Channel A Low DNBR)

Delete RP51 (PPS Door Open Annunciator 56B46)

RO VERIFY the Trip Channel Bypassed Annunciator alarms.

56A29 - PPS CHANNEL 1 TRIP BYPASSED

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

2 Event #

4 Page 39 of 72 Event

Description:

Bus 2A04 Overcurrent Lockout Time Position Applicants Actions or Behavior CRS DIRECT Bypassing Channel A DNBR and LPD trips.

+15 min CRS DIRECT setting CEAC 2 INOP Flags in all CPCs by changing each CPC Addressable Constant Point ID 062 to 2.

When Technical Specifications have been addressed, or at Lead Evaluators discretion, PROCEED to Events 5, 6, and 7.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Machine Operator:

When directed, EXECUTE Events 5, 6, and 7.

- TU08, Turbine Trip

- PG24, Loss of Offsite Power

- RD8802/8902/9002/9102, Stuck CEAs

- EG08B, 2G003 EDG Mechanical Failure (+1 minute)

- PG57, Loss of SDGE Switchyard (+5 minutes)

Indications available:

Numerous Loss of Offsite Power related alarms

+ 10 secs RO/BOP RECOGNIZE Reactor trip and Loss of Offsite Power and INFORM the CRS SO23-12-11 entry required.

CRS DIRECT performance of SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

VERIFY Reactor Trip Circuit Breakers (8) - open.

VERIFY Reactor Power lowering and Startup Rate -

negative.

DETERMINE four (4) full length CEAs - NOT fully inserted.

Examiner Note:

The following Critical Task may be started; however, it cannot be completed until power is available later in the scenario.

CRITICAL TASK RO

  • [RNO] COMMENCE emergency boration at greater than 40 gpm.

CRS DETERMINE Reactivity Control criteria NOT satisfied.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP VERIFY Turbine Trip:

VERIFY Main Turbine tripped.

HP and LP Stop and Governor valves - closed.

VERIFY both Unit Output Breakers - open.

VERIFY Main Turbine speed <2000 RPM or lowering.

CRS INITIATE Administrative Actions:

ANNOUNCE Reactor trip via PA System.

INITIATE Attachment 4, Worksheet.

INITIATE Attachment 5, Administrative Actions.

BOP DETERMINE Vital Auxiliaries NOT functioning properly:

DETERMINE both 1E 4 kV Buses A04 and A06 de-energized.

[RNO] PLACE DG G003 in Maintenance Lockout.

[RNO] INITIATE Attachment 2, Diesel Generator Failure Follow-Up Actions for Bus 2A06.

DETERMINE both 1E 480 V Buses B04 and B06 de-energized.

VERIFY all Class 1E DC Buses - energized.

DETERMINE all Non-1E 4 kV Buses de-energized.

[RNO] ENSURE MSIVs - closed.

[RNO] OPERATE ADVs to maintain 1000 PSIA.

DETERMINE CCW Train NOT operating and NOT aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.

M.O. Cue:

If directed to investigate 2G003, WAIT 3 minutes and REPORT it is shutdown and there is a large amount of oil on the DG Room floor.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc RO DETERMINE RCS Inventory Control criteria NOT satisfied:

DETERMINE PZR level between 10% and 70% and NOT trending to between 30% and 60%.

VERIFY Core Exit Saturation Margin - greater than or equal to 20°F:

RO DETERMINE RCS Pressure Control criteria NOT satisfied:

DETERMINE PZR pressure (WR and NR) between 1740 PSIA and 2380 PSIA and NOT controlled AND trending between 2025 PSIA and 2275 PSIA.

[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.

[RNO] ENSURE Normal and Aux Spray valves -

closed.

RO DETERMINE Core Heat Removal criteria is NOT satisfied:

DETERMINE no RCPs are operating.

VERIFY Core Exit Saturation Margin 20°F.

QSPDS page 611.

CFMS page 311.

BOP VERIFY RCS Heat Removal criteria satisfied:

VERIFY both SGs level - greater than 21% NR.

VERIFY both SGs level - less than 80% NR.

VERIFY Auxiliary feedwater available to restore both SGs level - between 40% NR and 80% NR.

[RNO] If required, manually INITIATE EFAS.

VERIFY heat removal adequate:

  • TC - trending to between 545°F and 555°F.
  • SG pressures - approximately 1000 PSIA.

RO VERIFY Containment Isolation criteria satisfied:

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc VERIFY Containment pressure - less than 1.5 PSIG.

DETERMINE some Containment Area Radiation Monitors energized and NOT alarming or trending to alarm.

DETERMINE some Secondary Plant Radiation Monitors energized and NOT alarming or trending to alarm.

RO VERIFY Containment Temperature and Pressure criteria satisfied:

VERIFY Containment average temperature - less than 120°F.

VERIFY Containment pressure - less than 1.5 PSIG.

+15 min CRS DIAGNOSE Event in Progress:

DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.

[RNO] COMPLETE Attachment 1, Recovery Diagnostics.

[RNO] DIAGNOSE loss of Reactivity Control and Station Blackout.

DETERMINE that Reactor Trip Recovery is NOT diagnosed.

[RNO] DETERMINE all RCPs stopped.

DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

M.O. Cue:

If SC&E GCC is contacted for grid status, REPORT that cause of grid loss is unknown and field crews are investigating. No estimate on time to restore a line.

M.O. Cue:

If Unit 3 status is requested, REPORT that Bus 3A06 is energized from EDG 3G003 and Bus 3A04 is energized from EDG 3G002.

CRS DIRECT performance of SO23-12-9, Functional Recovery.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc M.O. Cue:

When SO23-12-9 is initiated, CALL as SDG&E GCC and REPORT that SONGS Switchyard appears to have several faults and will not be available until a crew can be dispatched to determine the problem.

CRS VERIFY Functional Recovery diagnosis:

INITIATE SO23-12-10, Safety Function Status Checks.

INITIATE Foldout Page.

DIRECT performance of FS-3, Monitor Natural Circulation.

DIRECT performance of SO23-12-11, Attachment 19, Non-1E DC Load Reduction.

DIRECT performance of SO23-12-11, Attachment 20, Class1E Battery Load Reduction.

DIRECT performance of FS-18, Secondary Plant Protection.

DIRECT performance of SO23-12-11, Attachment 24, Supply 1E 4 kV Bus with Opposite Unit Diesel.

DIRECT performance of SO23-12-11, Attachment 6, Diesel Generator Failure Follow-up Actions.

DIRECT performance of SO23-12-11, Attachment 8, Restoration of Offsite Power.

DIRECT Chemistry to sample both SGs for radioactivity and boron.

M.O. Cue:

If directed to sample SGs, WAIT 10 minutes and REPORT that E088 and E089 sample lines were frisked, and both have activity near background. If the SG sample valves are closed, REPORT that you are unable to establish sample flow.

M.O. Cue:

When directed to initiate Non-1E DC Load Reduction, ACKNOWLEDGE and STATE you will report when complete.

M.O. Cue:

When directed to initiate Class 1E Battery Load Reduction, ACKNOWLEDGE and STATE you will report when complete.

CRS DIRECT performance of SO23-12-11, Attachment 24, Supplying 1E 4 kV Bus with Opposite Unit Diesel.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc CRS DETERMINE Train B is available.

CRS OBTAIN approval of Shift Manager to cross connect Train B using 10 CFR 50.54(x) on both units to supply 1E 4 kV Bus 2A06 with the opposite unit Diesel Generator.

CRS/BOP REQUEST SM initiate NRC notification within one hour regarding actions per this attachment.

CRS/BOP NOTIFY opposite Unit SRO that automatic sequencing of ESF loads onto opposite Unit 1E 4kV Bus 3A06 will be blocked.

BOP ENSURE 1E 4kV Bus Tie breaker AUTO/MANUAL transfer switches selected to MANUAL.

2A0619 (2HS-1639B2) and 3A0603 (3HS-1639B2).

BOP ENSURE 1E 4kV Bus Tie breakers open.

2A0619 and 3A0603.

BOP ENSURE 2G003 Diesel Generator selected to MAINTENANCE LOCKOUT.

CRS DIRECT performance of Train B Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.

BOP CONTACT the PPEO and INITIATE Unit 2 Train A Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.

VERIFY feeder faults NOT indicated by relay flags on:

2A0616 - Unit Aux Transformer 2A0618 - Reserve Aux Transformer 2A0619 - 2A06 Bus Tie 2A0613 - 2G003 EDG M.O. Cue:

When asked, REPORT no feeder faults on breakers.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP DIRECT the PPEO to SELECT both Unit 2 Train B Diesel Generator Cross-Tie Permissive switches on Fire Isolation Panel 2L-413 to 50.54X.

2HS-5054XA2 and 2HS-5054XB2 M.O. Cue:

When directed, PERFORM remote functions EG62A and EG62B and REPORT that the Unit 2 50.54X switches have been aligned.

BOP CONTACT the PPEO and INITIATE Unit 3 Train B Diesel Generator Cross-Tie Permissive switch alignment on 50' Elevation.

VERIFY feeder faults NOT indicated by relay flags on:

3A0603 - 3A06 Bus Tie M.O. Cue:

When asked, REPORT no feeder faults on breakers.

BOP DIRECT the PPEO to SELECT both Unit 3 Train B Diesel Generator Cross-Tie Permissive switches on Fire Isolation Panel 3L-413 to 50.54X.

3HS-5054XA2 and 3HS-5054XB2 M.O. Cue:

When directed, PERFORM remote functions EG62C and EG62D and REPORT that the Unit 3 50.54X switches have been aligned.

BOP VERIFY 3G003 Diesel Generator loading less than 3.4 MW.

BOP VERIFY Bus 2A06 NOT energized.

BOP VERIFY Unit 2 overcurrent/ground alarms reset.

63C15 - 2A06 SUPPLY BKR 2A0616 OC 63C25 - 2A06 SUPPLY BKR 2A0618 OC BOP VERIFY 1E DC bus voltages 2D2 and 3D2 greater than 108 VDC.

M.O. Cue:

When asked, REPORT 3D2 voltage at 129 VDC.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP ESTABLISH final Train B configuration.

BOP ENSURE 1E 4kV Bus 2A06 supply breakers open.

2A0616 - Unit Aux Transformer 2A0618 - Reserve Aux Transformer 2A0613 - 2G003 EDG BOP ENSURE 1E 4kV Bus A06 tie breakers open.

2A0619 - 2A06 Bus Tie 3A0603 - 3A06 Bus Tie

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc BOP ENSURE 1E 4kV Bus 2A06 load breakers open.

Emergency Chillers Containment Spray Pumps HPSI Pumps LPSI Pumps AFW Pumps CCW Pumps SWC Pumps BOP VERIFY Train B Diesel Generator Cross-Tie Permissive switches on both units are in the 50.54X position.

BOP CLOSE Unit 3 Bus Tie breaker 3A0603.

BOP VERIFY Unit 3 Diesel Generator 3G003 output breaker remains closed.

Critical Task Statement With a loss of 1E power, energize at least one 4 kV and the associated 480 VAC 1E bus before DC Bus D2 voltage drops to 107.3 VDC and DC Bus D4 drops to 106.5 VDC.

CRITICAL TASK BOP CLOSE Unit 2 Bus Tie breaker 2A0619.

BOP VERIFY Unit 2 1E buses 2A06 and 2B06 energized.

BOP START CCW Pump P-026 on Train B.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Critical Task Statement With failure of 2 or more Full Length CEAs to fully insert, perform an emergency boration (or some other alignment which adds boric acid from either the BAMU Tanks or RWST at 40 gpm or more).

CRITICAL TASK RO START Charging Pump P-192 on Train B and COMMENCE boration at > 40 gpm.

OPEN HV-9235 and HV-9240 Gravity Feed Valves.

+35 min CLOSE LV-0227B VCT Outlet Block Valve.

When power is restored to Bus 2A06 and emergency boration is started, or at Lead Evaluators discretion, TERMINATE the scenario.

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc Facility:

San Onofre Scenario No.:

3 Op Test No.:

NRC Examiners:

Operators:

Initial Conditions:

Reactor Critical at 2.5x10E-4% power BOC - RCS Boron is 2038 ppm (by sample)

Train A Component Cooling Water Pump (P-025) in service Condenser Air Ejector Low Range Radiation Monitor (RM-7818) OOS Fire Computer OOS Turnover:

Power increase in progress to ~ 2% power; Mini-purge & PMW sampling in progress.

Critical Tasks:

Restore CCW Critical Loop flow.

Trip any RCP not satisfying RCP operating limits.

Manually initiate Containment Isolation Actuation Signal.

Event No.

Malf. No.

Event Type*

Event Description 1

+ 20 min R (RO)

N (BOP, CRS)

Rod withdrawal and power increase in progress to ~2% power.

2

+ 30 min CV12 C (RO, CRS)

Inadvertent Reactor Coolant System dilution.

3

+ 40 min SG03C TS (CRS)

Steam Generator Pressure Transmitter (PT-1023-3) fails low.

4

+ 50 min RPK624A C (BOP, CRS)

TS (CRS)

Emergency Feedwater Actuation Signal (EFAS-1) partial actuation.

5

+ 65 min RC18B C (RO, CRS)

TS (CRS)

Pressurizer Safety Valve (PSV-0201) leak less than Charging Pump capacity.

6

+ 95 min RC18A RC18B M (ALL)

Pressurizer Safety Valves (PSV-0200 and PSV-0201) fail open.

7

+ 95 min CC06B CC06D C (BOP)

Train A Component Cooling Water Pump (P-025) trip on SIAS.

Train B Component Cooling Water Pump (P-026) trip on SIAS.

8

+ 95 min RPS LP I (RO)

Containment Isolation Actuation System fails to actuate.

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS) Technical Specifications

Appendix D Scenario Outline Form ES-D-1 SONGS-12-2007-FINAL-SCENARIOS.doc SCENARIO

SUMMARY

NRC #3 The crew will assume the watch with the Reactor critical at ~2.5x10-4% power. The crew will raise power using rod withdrawal per SO23-5-1.3.1, Plant Startup from Hot Standby to Minimum Load. A Containment Mini-Purge is in service and sampling of the Primary Water Makeup Tank is being performed at the time of turnover.

With the plant stable at 1% to 2% power, an inadvertent dilution event will occur. The crew will respond per Abnormal Operating Instruction (AOI) S023-13-11, Emergency Boration of the RCS

/ Inadvertent Dilution or Boration. The event is terminated when the inadvertent dilution is recognized and isolated. The crew will be required to maintain power level as the diluted water enters the RCS from the VCT throughout the scenario.

When steps of AOI SO23-13-11 are complete, a Steam Generator Pressure Transmitter will fail low. The crew will determine pressure instrument failure per Annunciator Response Procedures (ARPs), enter SO23-13-18, Reactor Protection System Failure and be required to bypass the failed channel using SO23-3-2.38, Digital Control System Operation. The CRS will evaluate Technical Specifications. The next event is a Partial ESFAS Actuation. The crew will restore Auxiliary Feedwater flow per ARPs and/or SO23-3-2.22, ESFAS Operations. The CRS will evaluate Technical Specifications.

The next event is a Pressurizer Safety Valve leak greater than 10 gpm but less than Charging Pump capacity. The crew will respond per the ARPs and AOI SO23-13-14, Reactor Coolant System Leak. The RO will be required to secure the Containment Mini-Purge and the CRS will evaluate Technical Specifications and determine that a rapid shutdown per the AOI is required.

Once the requirement to shutdown is determined, both Pressurizer Safety Valves will fail open.

The crew will initiate a plant trip and perform Emergency Operating Instruction (EOI)

SO23-12-1, Standard Post Trip Actions.

Train A and B Component Cooling Water Pumps will trip upon receipt of an SIAS signal. The BOP must manually start the standby CCW Pump (P-024). A Containment Isolation Actuation Signal fails to actuate and must be manually initiated by the RO.

Scenario is terminated when a transition to EOI SO23-13-3, Loss of Coolant Accident is entered and a plant cooldown is in progress.

Risk Significance:

Failure of risk important system prior to trip:

Inadvertent dilution Loss of AFW flow Risk significant core damage sequence:

LOCA with CCW and CIAS failure Risk significant operator actions:

Restore Critical Loop CCW flow Manually actuate CIAS

Scenario Event Description NRC Scenario 3 SONGS-12-2007-FINAL-SCENARIOS.doc SONGS 2007 Facility NRC Retake License Examination Simulator Scenario Setup Scenario 3 Machine Operator:

EXECUTE IC #183 and NRC Scenario #3 SETUP file to align components.

VERIFY Control Board Tags removed on P-012 and P-017.

CHANGE Operator Aid Tags #029 (CVCS) and #005-4 (CVCS Ion Exchanger) to reflect the scenario born concentration.

VERIFY both Pressurizer Spray Valves in AUTO.

CHANGE Operator Aid Tag #005-9 (AFW T-120/121 alignment) to AUTO MAKEUP for both T-120 and T-121.

VERIFY Master Silence Keylock Switch in NORMAL.

PLACE procedures in progress on the RO desk:

- Copy of SO23-5-1.3.1 INITIALED through Step 6.4.5.

- MARKED UP copy of SO23-5-1.7, Attachment 9.

- MARKED UP copy of SO23-1-4.2, Attachment 6.

PLACE the BOC copies of OPS Physics Summary Book on RO Desk and SO23-5-1.7, Attachment 8 on Control Board (located on the desk behind and adjacent to Grid Breaker Display Smart Board).

With Simulator in RUN, OPERATE TV-0224B as follows:

DEPRESS MANUAL; then ION EXCHANGE; then AUTO.

VERIFY Primary Water Pump P-201 is running for sample.

If Group Position(s) is (are) not correct, MOVE CEAs and then RETURN CEAs to Shift Turnover Sheet position(s).

Significant Control Room Annunciators in Alarm at 2.5x10-4%:

50A02 - COLSS ALARM 50A07 - SBCS DEMAND PRESENT 53A(B)03 - MFWP TURBINE K006 (K005) TRIP 56A30/40/50/60 - LOSS OF LOAD CHANNEL 1/2/3/4 TRIP DISABLED 63E10 - SCE CB TRIP 99A02 - EMERGENCY PUSHBUTTON TURBINE TRIP 99A24 - TURBINE TRIP RELAY TRIPPED 99B01 - GENERATOR TRIP 99B19 - VACUUM PROTECTION PLC TROUBLE 99B41(42) - AVR CH A(B) FAULT

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

1 Page 53 of 72 Event

Description:

Rod Withdrawal and Power Increase to ~2% power Time Position Applicants Actions or Behavior Machine Operator:

ENSURE all Simulator Scenario Setup actions are complete.

+1 min CRS DIRECT performance of SO23-5-1.3.1, Plant Startup from Hot Standup to Minimum Load.

RO BYPASS the High Log Power Trip on all PPS Modules per SO23-3-2.12.

RO POSITION Group Select switch to CEA Group 6.

RO POSITION Mode Select Switch to MG (Manual Group) or MS (Manual Sequential).

RO/CRS When directed by CRS, WITHDRAW Control Rods as required.

RO ESTABLISH a Startup Rate of 0.5 DPM.

Floor Cue:

The initial startup rate based on Attachment 9 data will be ~ 0.25 DPM. In order to facilitate time requirements, REPORT as the Shift Manager that a startup rate of 0.5 DPM is desired.

M.O. Cue:

If asked, REPORT long path recirculation is secured.

RO When CEA positioning is complete, PLACE Mode Select Switch to OFF.

BOP VERIFY proper operation of Steam Bypass Control System when the Point of Adding Heat is reached (~2E-1%).

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

1 Page 54 of 72 Event

Description:

Rod Withdrawal and Power Increase to ~2% power Time Position Applicants Actions or Behavior

+20 min BOP MAINTAIN Tcold within band by monitoring SBCS operation.

When power has been raised to ~2%, or at Lead Evaluators discretion, PROCEED to Event 2.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

2 Page 55 of 72 Event

Description:

Inadvertent Reactor Coolant System Dilution Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 2.

- CV12, Inadvertent RCS dilution Indications Available:

FQIS-0210, Blended Makeup Total Flow Integrator clicking VCT level rising FIC-0210X, Flow Controller indicates ~35 gpm FI-7171, PMW Flow indication @ 35 gpm

+1 min RO DETERMINE an inadvertent dilution by observing FQIS-0210, Blended Makeup Total Flow clicking, FIC-0210X, Flow Controller indication, and FI-7171, PMW Flow indication.

RO INFORM CRS of inadvertent dilution and INFORM the CRS SO23-13-11, Emergency Boration of the RCS / Inadvertent Dilution or Boration entry required.

CRS DIRECT placing Makeup Mode Selector to MANUAL.

RO PLACE Makeup Mode Selector to MANUAL.

CRS DIRECT stopping Primary Makeup Water Pump.

RO STOP Primary Makeup Water Pump.

RO ENSURE Letdown Heat Exchanger Outlet Temperature is maintaining at ~115°F with TIC-0223, CCW Temperature Controller in AUTO.

RO PLACE T-0224B, CVCS Ion Exchanger in BYPASS.

RO VERIFY Deborating Ion Exchange not in service.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

2 Page 56 of 72 Event

Description:

Inadvertent Reactor Coolant System Dilution Time Position Applicants Actions or Behavior RO ENSURE dilution flow paths isolated.

RO ENSURE FIC-0210X, PMW Flow Controller, and FIC-0210Y, BAMU Flow Controller, are set for correct blended makeup per SO23-3-2.2, Section to Establish Automatic Makeup Mode.

RO VERIFY RCS and VCT boron samples within 7 ppm.

M.O. Cue:

When directed to perform RCS and VCT boron samples, REPORT the VCT is 5 ppm less than the RCS.

+10 min CRS EVALUATE inadvertent dilution event terminated.

When plant conditions have been restored to normal, or at Lead Evaluators discretion, PROCEED to Event 3.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

3 Page 57 of 72 Event

Description:

Steam Generator Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior Machine Operator: When directed, EXECUTE Event 3.

- SG03C, PT-1023-3, SG E088 Pressure Transmitter fails low Indications Available:

52A13 - FWCS TROUBLE 56A41 - SG2 E088 PRESS LO CHANNEL TRIP 56A44 - SG1 E089 PRESS > SG2 E088 ESFAS CH TRIP 56A51 - SG2 E088 PRESS LO PRETRIP 56A54 - SG1 E089 PRESS > SG2 E088 PRETRIP 56B26 - PPS CHANNEL 3 TROUBLE

+30 sec RO/BOP REFER to Annunciator Response Procedures.

BOP RECOGNIZE Steam Generator E088 pressure instrument failed low and INFORM the CRS SO23-13-18, Reactor Protection System Failure entry required.

CRS REFER to Attachment 5 and DETERMINE PT-1023-3 is Functional Unit affected.

RO PLACE the affected Functional Unit in BYPASS per SO23-3-2.12, Section for Bypass Operation of Trip Channels.

RO VERIFY that the same bistable is not in bypass on any other Channel.

M.O. Cue:

When directed, EXECUTE the following Remote Functions:

RP51 = OPEN (PPS Door Open Annunciator 56B46)

RP54L = BYPASS (Low SG-2 Pressure Channel C)

RP54U = BYPASS (High SG-1 DP EFAS-1 Channel C)

RP54V = BYPASS (High SG-2 DP EFAS-2 Channel C)

Delete RP51 (PPS Door Open Annunciator 56B46)

RO OBSERVE annunciator 56A49 - PPS CHANNEL 3 TRIP BYPASS goes into alarm.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

3 Page 58 of 72 Event

Description:

Steam Generator Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior CRS CONFIRM failure does NOT affect RPS/ESFAS Matrix Logic, RPS/ESFAS Initiation Logic, RTCBs, RPS/ESFAS Manual Trip, or ESFAS Actuation Logic.

CRS CONFIRM failure affects the Feedwater Digital Control System.

BOP RECOGNIZE Steam Generator E089 level instrument failed low and INFORM the CRS SO23-3-2.38, Digital Control System Operation entry required.

CRS DIRECT performance of Section 6.6, Bypassing Selected Feedwater Control Signals.

BOP ACCESS the PCS Console for the Digital Feedwater Control System.

BOP ACCESS the Selected Signals screen for SG E088.

BOP VERIFY SG E088 Channel D signal is valid.

BOP SELECT BYPASS for the Channel C level instrument.

BOP VERIFY the Channel C level instrument indicates BYPASS.

BOP VERIFY the Channel D is not in BYPASS.

+5 min BOP VERIFY the Selected Signal output looks valid.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

3 Page 59 of 72 Event

Description:

Steam Generator Pressure Transmitter Fails Low Time Position Applicants Actions or Behavior

+10 min CRS EVALUATE Technical Specifications.

3.3.1.A, Reactor Protection System Instrumentation.

CONDITION A - One or more Functions with one automatic RPS trip channel inoperable; ACTION A.1 - Place Channel in bypass or trip within one (1) hour.

3.3.5.B, ESFAS Instrumentation.

CONDITION B - One automatic trip channel inoperable for SG Pressure-Low or SG Pressure Difference-High for the EFAS function; ACTION B.1 - Place Functional Unit in bypass within one (1) hour.

When the SG pressure instrument is bypassed, or at Lead Evaluators discretion, PROCEED to Event 4.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

4 Page 60 of 72 Event

Description:

EFAS-1 Partial Actuation Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Event 4.

- RPK624A, Partial EFAS-1 Actuation Indications available:

57A11 - ESFAS TRAIN A PARTIAL ACTUATION Increase in AFW flow due to AFW Valve 2HV-4713 failing open AFW Flow indication is off-scale high on Steam Generator E089 SG E089 level increasing

+1 min RO/BOP REFER to Annunciator Response Procedure.

RO/BOP REFER to Plant Monitoring System Alarm Page.

RO/BOP DETERMINE that a Partial ESFAS Actuation has occurred and INFORM the CRS.

CRS DIRECT BOP to CLOSE AFW Valves and/or STOP P-141.

BOP CLOSE AFW Valve HV-4731 and/or STOP P-141 by DEPRESSING the STOP pushbutton.

CRS DIRECT performance of SO23-3-2.22, Engineering Safety Features Actuation System Operation to determine valves that may have operated.

Examiner Note:

The crew should analyze methods to restoring feedwater flow including starting the Turbine Driven AFW Pump (P-140).

CRS/RO RESTORE feedwater flow as required.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

4 Page 61 of 72 Event

Description:

EFAS-1 Partial Actuation Time Position Applicants Actions or Behavior Examiner Note:

The crew may use any or all of the following procedures to aid in identifying the failed relay:

SO23-3.2.22, ESFAS Operation, Attachment 14 SO23-3-3.43, ESF Subgroup Relays Test, Attachment 3 SO23-3.3.43.33, ESF Subgroup Relay K-624A Test, Section 6.5

+10 min CRS EVALUATE Technical Specifications.

LCO 3.7.5.H, Auxiliary Feedwater System.

CONDITION H - An automatic valve in any flow path incapable of closing upon receipt of a Main Steam Isolation Signal; ACTION H.1 - Close the affected valve or its block valve within four (4) hours.

When feedwater flow is controlled, or at Lead Evaluators discretion, PROCEED to Event 5.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

5 Page 62 of 72 Event

Description:

Pressurizer Safety Valve Leak Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Event 5.

- RC18B @ 12%, PZR Safety Valve leak Indications available:

57B17 - PZR RELIEF VALVE OPEN Identified RCS leakrate 10 gpm Charging flow > Letdown flow with plant conditions stable

+1 min RO REFER to Annunciator Response Procedures.

RO RECOGNIZE RCS leak and INFORM the CRS AOI SO23 14 entry required.

Floor Cue:

If asked, REPORT the 5th LED is flashing on both Position Transducers for PZR Safety Valve PSV-0201.

CRS DIRECT performance of SO23-13-14, RCS Leak.

CRS DETERMINE Containment Mini-Purge is in the service and DIRECT manual initiation of CPIS and CRIS.

RO/BOP Manually INITIATE CPIS.

RO/BOP Manually INITIATE one train of CRIS.

CRS VERIFY RCS leak is greater than 25 gpm.

RO DETERMINE RCS leakrate is greater than 25 GPM.

CRS DIRECT initiation of a rapid shutdown per SO23-5-1.7, Section for Power Descension.

RO DETERMINE Pressurizer level is lowering.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

5 Page 63 of 72 Event

Description:

Pressurizer Safety Valve Leak Time Position Applicants Actions or Behavior RO ENSURE Charging Pumps start to maintain Pressurizer level.

+5 min RO VERIFY VCT level is being maintained within programmed band.

RO OPERATE Blended Makeup System to maintain VCT level.

RO VERIFY Pressurizer Level - STABLE or RISING.

CREW QUANTIFY RCS leakage by Charging and Letdown mismatch and REPORT leakage rate to the Shift Manager.

CRS EVALUATE Technical Specifications.

LCO 3.4.13.A, RCS Operational Leakage.

CONDITION A - RCS LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE; ACTION A.1 - Reduce LEAKAGE to within limits in four (4) hours.

CREW DETERMINE source of leak:

INSPECT Charging and Letdown Systems.

INSPECT Penetration Building.

MONITOR Radiation Monitors.

SAMPLE Containment Atmosphere.

CREW CONFIRM Radiation Monitors and Containment Atmosphere samples indicate RCS leak is in Containment.

CREW VERIFY that RCS Leakage exceeds 10 gpm and the source of the leakage is identified.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

3 Event #

5 Page 64 of 72 Event

Description:

Pressurizer Safety Valve Leak Time Position Applicants Actions or Behavior

+15 min CRS REDUCE the leakage rate to within limits within four (4) hours or COMMENCE a shutdown to be in Hot Standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> per SO23-5-1.4, Plant Shutdown to Hot Standby.

When Technical Specifications are addressed, or at Lead Evaluators discretion, PROCEED to Events 6, 7, and 8.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 65 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior Machine Operator:

When directed, EXECUTE Events 6, 7, and 8.

- RC18A @ 100%, PZR Safety Valve (PSV-0200) fails open

- RC18B @ 100%, PZR Safety Valve (PSV-0201) fails open

- CC06B, Component Cooling Water Pump (P-025) trip

- CC06D, Component Cooling Water Pump (P-026) trip

- RPS LP, CIAS fails to actuate Indications Available:

50A01 - QUENCH TANK PRESS HI 50A11 - QUENCH TANK LEVEL HI/LO 50A21 - QUENCH TANK TEMP HI 50A31 - PZR RELIEF VALVE OUTLET TEMP HI

+30 sec CREW RECOGNIZE RCS pressure decreasing rapidly.

CRS VERIFY Reactor trip and DIRECT crew to perform actions of SO23-12-1, Standard Post Trip Actions.

RO VERIFY Reactor Trip:

VERIFY Reactor Trip Circuit Breakers (8) - open.

VERIFY Reactor Power lowering and Startup Rate -

negative.

VERIFY maximum of one full length CEA - NOT fully inserted.

CRS DETERMINE Reactivity Control criteria satisfied.

BOP VERIFY Turbine Trip:

VERIFY Main Turbine tripped.

o HP and LP Stop and Governor valves - closed.

VERIFY both Unit Output Breakers - open.

VERIFY Main Turbine speed <2000 RPM or lowering.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 66 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior CRS INITIATE Administrative Actions:

ANNOUNCE Reactor trip via PA System.

INITIATE Attachment 4, Worksheet.

INITIATE Attachment 5, Administrative Actions.

BOP VERIFY Vital Auxiliaries functioning properly:

VERIFY both 1E 4 kV Buses A04 and A06 - energized.

VERIFY both 1E 480 V Buses B04 and B06 - energized.

VERIFY all Class 1E DC Buses - energized.

VERIFY all Non-1E 4 kV Buses - energized.

DETERMINE no CCW Trains - operating AND aligned to Non-Critical Loop (NCL) and Letdown Heat Exchanger.

Critical Task Statement With ESFAS equipment operation without CCW flow, take action to restore CCW Critical Loop flow to at least one train of operating ESF pumps and Emergency Cooling Units.

CRITICAL TASK BOP

[RNO] DETERMINE no CCW Trains are operating and START CCW Pump P-024.

RO DETERMINE RCS Inventory Control criteria NOT satisfied:

DETERMINE PZR level NOT between 10% and 70% AND NOT trending to between 30% and 60%.

VERIFY Core Exit Saturation Margin 20°F:

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 67 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior RO DETERMINE RCS Pressure Control criteria NOT satisfied:

DETERMINE PZR pressure (WR and NR) NOT between 1740 PSIA and 2380 PSIA AND NOT trending to between 2025 PSIA and 2275 PSIA.

[RNO] DETERMINE PZR Pressure Control System is NOT restoring PZR pressure.

[RNO] ENSURE Normal and Aux Spray valves -

closed.

[RNO] If PZR pressure (WR) is less than 1740 psia, ENSURE SIAS/CCAS/CRIS actuated.

Critical Task Statement Upon loss of CCW and prior to exceeding RCP operating limits, the affected RCP(s) will be stopped.

RO DETERMINE Core Heat Removal criteria is NOT satisfied:

CRITICAL TASK When CIAS is MANUALLY actuated, STOP all RCPs.

VERIFY Core Exit Saturation Margin 20°F.

QSPDS page 611.

CFMS page 311.

BOP DETERMINE RCS Heat Removal criteria NOT satisfied:

VERIFY at least one SGs level between 21% and 80% NR.

DETERMINE TC less than 545°F and NOT controlled.

DETERMINE heat removal is excessive:

[RNO] TC - less than 545°F.

[RNO] ENSURE SBCS valves closed.

[RNO] ENSURE ADVs closed.

[RNO] ENSURE SG Blowdown valves closed.

E-088 - HV-4054 E-089 - HV-4053

[RNO] ENSURE Main Steam to Reheaters valves

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 68 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior closed.

HV-2703 or HV-2704; HV-2721; HV-2751 VERIFY SG pressures - greater than 740 PSIA.

[RNO] If required, INITIATE EFAS.

RO DETERMINE Containment Isolation criteria NOT satisfied:

DETERMINE Containment pressure - greater than 1.5 PSIG.

[RNO] DETERMINE Containment pressure > 3.4 PSIG.

[RNO] ENSURE SIAS, CCAS, and CRIS actuated.

[RNO] DETERMINE CIAS NOT actuated.

Critical Task Statement With automatic actuation failure, crew manually initiates Containment Isolation.

CRITICAL TASK RO Manually INITIATE Containment Isolation Actuation Signal.

RO DETERMINE Containment Area Radiation Monitors energized AND alarming or trending to alarm.

VERIFY Secondary Plant Radiation Monitors energized AND NOT alarming or trending to alarm.

CRS RECORD time of SIAS, CIAS, CCAS, CRIS.

RO DETERMINE Containment Temperature and Pressure criteria NOT satisfied:

DETERMINE Containment average temperature > 120°F.

DETERMINE Containment pressure > 1.5 PSIG.

[RNO] ENSURE proper functioning of the Normal Containment Cooling.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 69 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior

[RNO] ENSURE at least one Containment Dome Air Circulator operating.

[RNO] DETERMINE Containment pressure > 3.4 PSIG.

[RNO] ENSURE all RCPs stopped.

[RNO] ENSURE all available Containment Emergency Cooling Units operating.

VERIFY Containment pressure < 14 PSIG.

CRS DIAGNOSE event in progress:

DETERMINE some Safety Function criteria are NOT met per Attachment 4, Worksheet.

[RNO] COMPLETE Attachment 1, Recovery Diagnostics.

[RNO] DIAGNOSE event as LOCA inside Containment.

DETERMINE that Reactor Trip Recovery is NOT diagnosed.

[RNO] DETERMINE all RCPs stopped.

DIRECT initiating Steps 12 through 15.

BOP INITIATE Steps 12 through 15.

CRS DIRECT performance of SO23-12-3, LOCA.

RECORD time of EOI entry.

+15 min CRS VERIFY LOCA diagnosis:

INITIATE SO23-12-10, LOCA Safety Function Status Checks.

INITIATE Foldout Page.

DIRECT performance of FS-7, Verify SI Throttle/Stop Criteria.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 70 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior DIRECT performance of FS-3, Monitor Natural Circulation.

DIRECT performance of Attachment 22, Non-Qualified Loads Restoration.

VERIFY LOCA diagnosis, using Figure 1, Break Identification Chart.

INITIATE sampling of both Steam Generators for radioactivity and boron.

M.O. Cue:

If directed to sample SGs, WAIT 10 minutes and then REPORT that E088 and E089 both have activity near background, and normal boron levels. If the SG sample valves are closed, REPORT unable to establish sample flow.

CRS INITIATE Administrative actions:

NOTIFY Shift Manager/Operations Leader of SO23-12-3, Loss of Coolant Accident initiation.

ENSURE Emergency Plan is initiated.

IMPLEMENT Placekeeper.

RO VERIFY ESF actuation.

ENSURE the following actuated:

SIAS / CCAS / CRIS CRS RECORD time of SIAS.

BOP STOP unloaded Diesel Generators.

BOP INITIATE SO23-12-11, Attachment 22, Non-Qualified Load Restoration.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 71 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior M.O. Cue:

When directed to restore non-qualified loads, WAIT 2 minutes, then EXECUTE ED85, Non-Qualified Loads Restoration. INFORM the Control Room that you have restored non-qualified loads.

Examiner Note:

At this point, the CRS may elect to secure Train B ECCS components due to loss of CCW.

RO ESTABLISH Optimum SI Alignment:

ESTABLISH one or two train operation.

All Charging Pumps operating.

One HPSI and one LPSI per train operating.

All Cold leg flow paths aligned.

VERIFY SI flow required:

SI flow indicated.

RO DETERMINE FS-7, VERIFY SI Throttle/Stop Criteria NOT satisfied.

RO VERIFY PZR pressure:

DETERMINE RCP NPSH requirements of SO23-12-11, 9 NOT satisfied.

[RNO] VERIFY all RCPs stopped.

[RNO] INITIATE FS-3, Monitor Natural Circulation.

RO VERIFY Letdown isolated.

RO VERIFY outside Containment radiation alarms - NOT alarming or trending to alarm.

RO VERIFY outside Containment sump levels - NOT abnormally rising.

Appendix D Operator Action Form ES-D-2 Op Test No.:

NRC Scenario #

1 Event #

5 Page 72 of 72 Event

Description:

Cue Card For Aftershock Seismic Event Time Position Applicants Actions or Behavior RO VERIFY RCS sample valves, RCS and PZR head vents are closed.

RO VERIFY CCW parameters are normal.

CRS/RO DETERMINE PZR safety valves are NOT closed.

Request Shift Manager/Operations Leader evaluate lowering PZR pressure to aid in resetting the safety valves.

[RNO] Maintain core exit saturation margin greater than or equal to 20°F.

CRS/RO DETERMINE rate of RCS inventory and pressure loss greater than available charging pump capacity.

+30 min CRS DIRECT initiation of RCS cooldown.

When the RCS cooldown is initiated, or at Lead Evaluators discretion, TERMINATE the scenario.