{{#Wiki_filter: l{ay 24, 20IIMr. MichaelJ. PacilioSenior Vice President, Exelon Generation Company, LLCPresident and Chief Nuclear Officer, Exelon Nuclear4300 Winfield Rd.Warrenville, lL 60555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406-1415 l{ay 24, 20II Mr. MichaelJ.


SUBJECT: THREE MILE ISLAND STATION, UNIT 1 _ NRC EVALUATED EMERGENCYPREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000289/2011502
Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.Warrenville, lL 60555
 
SUBJECT: THREE MILE ISLAND STATION, UNIT 1 _ NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000289/2011502


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On April 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection ofthe April 12,2011, evaluated emergency preparedness exercise at your Three Mile lsland,Unit 1 (TMl) facility. The enclosed inspection report documents the inspection results, whichwere discussed on April 14, 2011, with Mr. Richard Libra, TMI Plant Manager, and othermembers of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewedpersonnel.Based on the results of this inspection, no findings were identified.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component of theNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site athttp://www.nrc.sov/readinq-rm/adams.html (the Public Electronic Reading Room).
On April 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 12,2011, evaluated emergency preparedness exercise at your Three Mile lsland, Unit 1 (TMl) facility.
 
The enclosed inspection report documents the inspection results, which were discussed on April 14, 2011, with Mr. Richard Libra, TMI Plant Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Based on the results of this inspection, no findings were identified.


Sincerely,?J*eF-James M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyDocket No.: 50-289License No.: DPR-50
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.sov/readinq-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,?J*eF-James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-289 License No.: DPR-50  


===Enclosure:===
===Enclosure:===
NRC Inspection Report 0500028912011502cc w/encl: Distribution via ListServ Mr. Michael J. PacilioSenior Vice President, Exelon Generation Company, LLCPresident and Chief Nuclear Officer, Exelon Nuclear4300 Winfield Rd.Warrenville, lL 60555
NRC Inspection Report 0500028912011502 cc w/encl: Distribution via ListServ Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.Warrenville, lL 60555


SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC EVALUATED EMERGENCYPREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000289/2011502
SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000289/2011502


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On April 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection ofthe April 12, 2011, evaluated emergency preparedness exercise at your Three Mile lsland,Unit 1 (TMl) facility. The enclosed inspection report documents the inspection results, whichwere discussed on April 1 4, 2011, with Mr. Richard Libra, TMI Plant Manager, and othermembers of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewedpersonnel.Based on the results of this inspection, no findings were identified.ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component of theNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site athttp://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).
On April 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 12, 2011, evaluated emergency preparedness exercise at your Three Mile lsland, Unit 1 (TMl) facility.
 
The enclosed inspection report documents the inspection results, which were discussed on April 1 4, 2011, with Mr. Richard Libra, TMI Plant Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Based on the results of this inspection, no findings were identified.
 
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RNJames M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyDocket No.: 50-289License No.: DPR-50
Sincerely,/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-289 License No.: DPR-50  


===Enclosure:===
===Enclosure:===
NRC Inspection Report 0500028912011502cc Mencl: Distribution via ListServSUNSI Review Complete: JMT (Reviewer's Initials) ADAMS ACC #MLl11450137DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Barr\EP Ex11 TMI\TMl EPEx11 Report.docAfter declaring this document "An Official Agency Record" it will be released to the Public'To receive a copy of this document, indicate in th box: "C" = CopyICIAL RECORD COPYwith attachmenVenclosure "N" = No M. PacilioDistribution w/encl:W. Dean, RAD. Lew, DRAD. Roberts, DRPJ. Clifford, DRPC. Miller, DRSP. Wilson, DRSR. Bellamy, DRPS. Barber, DRPC. Newport, DRPN. Lafferty, DRPD. Kern, DRP, SRIJ. Heinly, DRP, RlC. LaRegina, DRP, OAS. Bush-Goddard, Rl OEDOD. Bearde, DRSRidsNrrPMThreeMi lel sland ResourceRidsNrrDorlLpll -2 ResourceROPReports Resource Docket No:License No:Report No:Licensee:Facility:Location:Dates:lnspectors:Approved By:NUCLEAR REGULATORY COMM ISSIONREGION I05000289DPR.5O05000289/2011502Exelon Generation Company, LLC (Exelon)Three Mile lsland Station. Unit 1P.O. Box 480Middletown, PA 17057April 11-14,2011S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead)D. Silk, Sr. Operations Engineer, DRS, Region ID. Kern, Sr. Resident Inspector-TMl, DRP, Region ID. Lawyer, Health Physicist, DNMS, Region IC. Crisden, Emergency Preparedness Inspector, DRS, Region IK. Cronk, Project Engineer, DRP, Region I (Observer)C. Williams, Reactor Engineer, DRS, Region l (Observer)James M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyEnclosure
NRC Inspection Report 0500028912011502 cc Mencl: Distribution via ListServ SUNSI Review Complete:
JMT (Reviewer's Initials)
ADAMS ACC #MLl11450137 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Barr\EP Ex11 TMI\TMl EPEx11 Report.doc After declaring this document "An Official Agency Record" it will be released to the Public'To receive a copy of this document, indicate in th box: "C" = Copy ICIAL RECORD COPY with attachmenVenclosure "N" = No Distribution w/encl: W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS R. Bellamy, DRP S. Barber, DRP C. Newport, DRP N. Lafferty, DRP D. Kern, DRP, SRI J. Heinly, DRP, Rl C. LaRegina, DRP, OA S. Bush-Goddard, Rl OEDO D. Bearde, DRS RidsNrrPMThreeMi lel sland Resource RidsNrrDorlLpll
-2 Resource ROPReports Resource Docket No: License No: Report No: Licensee: Facility: Location: Dates: lnspectors:
Approved By: NUCLEAR REGULATORY COMM ISSION REGION I 05000289 DPR.5O 05000289/2011502 Exelon Generation Company, LLC (Exelon)Three Mile lsland Station. Unit 1 P.O. Box 480 Middletown, PA 17057 April 11-14,2011 S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead)D. Silk, Sr. Operations Engineer, DRS, Region I D. Kern, Sr. Resident Inspector-TMl, DRP, Region I D. Lawyer, Health Physicist, DNMS, Region I C. Crisden, Emergency Preparedness Inspector, DRS, Region I K. Cronk, Project Engineer, DRP, Region I (Observer)
C. Williams, Reactor Engineer, DRS, Region l (Observer)
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
lR 0500028912011502, 0411112011-0411412011; Three Mile lsland, Unit 1; EmergencyPreparedness Exercise Report.This was an announced inspection conducted by four region-based inspectors and one residentinspector. No findings were identified. The NRC's program for overseeing the safe operation ofcommercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process,"Revision 6, dated December 2006.
lR 0500028912011502, 0411112011-0411412011;  
 
Three Mile lsland, Unit 1; Emergency Preparedness Exercise Report.This was an announced inspection conducted by four region-based inspectors and one resident inspector.
 
No findings were identified.
 
The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6, dated December 2006.


===Cornerstone: Emergency PreparednessNo findings were identified.Enclosure===
===Cornerstone: Emergency===
 
Preparedness No findings were identified.


1.
1.


=REPORT DETAILS=
=REPORT DETAILS=
REACTOR SAFETYCornerstone: Emergency Preparedness (EP)Exercise Evaluation (711M.A1- 1 Sample)1 EP1a. Inspection ScopePrior to the April 12,2011, emergency preparedness exercise, the NRC inspectorsconducted an in-office review of the exercise objectives and scenario, which Exelon hadsubmitted to the NRC, to determine if the exercise would test major elements of theThree Mile lsland (TMl) Emergency Plan as required by 10 CFR 50.47(b)(1a). Thisoverall exercise inspection activity represented the completion of one sample on abiennial cycle.The exercise evaluation consisted of the following review and assessment:. The adequacy of Exelon's performance in the biennial full-participation exerciseregarding the implementation of the risk-significant planning standards (RSPS)described in 10 CFR 50.47(bX4), (5), (9), and (10), which are: emergencyclassification; offsite notification; radiological assessment, and protective actionrecommendations, respectively.. The overall adequacy of Exelon's emergency response facilities with regard toNUREG-0696, "Functional Criteria for Emergency Response Facilities," andEmergency Plan commitments. The facilities assessed were the Control RoomSimulator, Operations Support Center (OSC), Technical Support Center (TSC),Emergency Operations Facility (EOF), and Joint Information Center (JlC).o A review of other performance areas, such as: the TMI emergency responseorganization's (ERO's) recognition of abnormal plant conditions; command andcontrol; intra- and inter-facility communications; prioritization of mitigating activities;utilization of repair and field monitoring teams; interface with offsite agencies;staffing and procedure adequacy; and the overall implementation of the emergencyplan and its implementing procedures.o A review of past performance issues from the last NRC TMI exercise inspectionreport and Exelon's EP drill reports, to determine the effectiveness of licenseecorrective actions as demonstrated during the April 12,2011, exercise and toensure compliance with 10 CFR 50.47(bX14).o The licensee's post-exercise critiques, to evaluate Exelon's self-assessment of itsERO performance during the April 12,2011, exercise and to ensure compliancewith 10 CFR 50, Appendix E, Section lV.F.2.g.The inspectors reviewed the documents listed in the attachment to this report.Enclosure 2b. FindinqsNo findings were identified.1EP4 Emeroencv Action Level (EAL) and Emerqencv Plan Chanoes (71114.04 - 1 Sample)a. Inspection ScopeSince the last NRC inspection of this program area, Exelon implemented Revision 16 ofthe TMI Emergency Plan Annex. Exelon had determined that in accordance with 10CFR 50.54(q), any change made to the Plan had not resulted in any decrease ineffectiveness of the Plan, and that the revised Plan continued to meet the requirementsof 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors reviewed all EALchanges made since March 2010, and conducted a sampling review of other EmergencyPlan changes, including changes to lower-tier emergency plan implementingprocedures, to evaluate for any potential decreases in effectiveness of the EmergencyPlan. However, this review was not documented in an NRC Safety Evaluation Reportand does not constitute formal NRC approval of the changes. Therefore, these changesremain subject to future NRC inspection in their entirety.b. FindinqsNo findings were identified.4. OTHER ACTTVTTTES (OA)4OA1 Performance Indicator (Pl) Verification (71151- 3 Samples)a. lnspection ScopeThe inspectors reviewed data for the TMI EP Pls, which are: (1) Drill and ExercisePerformance (DEP); (2) Emergency Response Organization (ERO) Drill Participation;and, (3) Alert and Notification System (ANS) Reliability. The last EP inspection at TMIwas conducted in the first quarter of 2010, so the inspectors reviewed supportingdocumentation from EP drills, training records, and equipment tests from the firstcalendar quarter of 2010 through the fourth quarter of 2010, to verify the accuracy of thereported Pl data. The review of these Pls was conducted in accordance with NRCInspection Procedure 71151, using the acceptance criteria documented in NEI 99-02,"Regulatory Assessment Performance I nd icator Guidelines, " Revision 6.This inspection activity represented the completion of three samples on an annual cycle.b. FindinosNo findings were identified.Enclosure 34OAO Meetinqs. Includinq ExitOn April 14,2011, the inspectors presented the results of this inspection to Mr. R. Libra,the TMI Plant Manager, and other members of the Exelon staff. No proprietaryinformation was provided to the inspectors during this inspection.Enclosure A-1ATTACHMENT


=SUPPLEMENTAL INFORMATION=
==REACTOR SAFETY==
 
===Cornerstone:===
 
Emergency Preparedness (EP)Exercise Evaluation (711M.A1-1 Sample)1 EP1
 
====a. Inspection Scope====
Prior to the April 12,2011, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Three Mile lsland (TMl) Emergency Plan as required by 10 CFR 50.47(b)(1a).
 
This overall exercise inspection activity represented the completion of one sample on a biennial cycle.The exercise evaluation consisted of the following review and assessment:. The adequacy of Exelon's performance in the biennial full-participation exercise regarding the implementation of the risk-significant planning standards (RSPS)described in 10 CFR 50.47(bX4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment, and protective action recommendations, respectively.. The overall adequacy of Exelon's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments.
 
The facilities assessed were the Control Room Simulator, Operations Support Center (OSC), Technical Support Center (TSC), Emergency Operations Facility (EOF), and Joint Information Center (JlC).o A review of other performance areas, such as: the TMI emergency response organization's (ERO's) recognition of abnormal plant conditions; command and control; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies;staffing and procedure adequacy; and the overall implementation of the emergency plan and its implementing procedures.
 
o A review of past performance issues from the last NRC TMI exercise inspection report and Exelon's EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the April 12,2011, exercise and to ensure compliance with 10 CFR 50.47(bX14).
 
o The licensee's post-exercise critiques, to evaluate Exelon's self-assessment of its ERO performance during the April 12,2011, exercise and to ensure compliance with 10 CFR 50, Appendix E, Section lV.F.2.g.The inspectors reviewed the documents listed in the attachment to this report.Enclosure 2 b. Findinqs No findings were identified.
 
1EP4 Emeroencv Action Level (EAL) and Emerqencv Plan Chanoes (71114.04 - 1 Sample)a. Inspection Scope Since the last NRC inspection of this program area, Exelon implemented Revision 16 of the TMI Emergency Plan Annex. Exelon had determined that in accordance with 10 CFR 50.54(q), any change made to the Plan had not resulted in any decrease in effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors reviewed all EAL changes made since March 2010, and conducted a sampling review of other Emergency Plan changes, including changes to lower-tier emergency plan implementing procedures, to evaluate for any potential decreases in effectiveness of the Emergency Plan. However, this review was not documented in an NRC Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.b. Findinqs No findings were identified.
 
===4. OTHER ACTTVTTTES (OA)4OA1 Performance ===
 
Indicator (Pl) Verification (71151- 3 Samples)a. lnspection Scope The inspectors reviewed data for the TMI EP Pls, which are: (1) Drill and Exercise Performance (DEP); (2) Emergency Response Organization (ERO) Drill Participation; and, (3) Alert and Notification System (ANS) Reliability.
 
The last EP inspection at TMI was conducted in the first quarter of 2010, so the inspectors reviewed supporting documentation from EP drills, training records, and equipment tests from the first calendar quarter of 2010 through the fourth quarter of 2010, to verify the accuracy of the reported Pl data. The review of these Pls was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02,"Regulatory Assessment Performance I nd icator Guidelines, " Revision 6.This inspection activity represented the completion of three samples on an annual cycle.b. Findinos No findings were identified.
 
3 4OAO Meetinqs.
 
Includinq Exit On April 14,2011, the inspectors presented the results of this inspection to Mr. R. Libra, the TMI Plant Manager, and other members of the Exelon staff. No proprietary information was provided to the inspectors during this inspection.
 
A-1 ATTACHMENT
 
=SUPPLEMENTAL
INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==


===Licensee Personnel===
===Licensee Personnel===
: [[contact::W. Noll]], TMI Site Vice President
: [[contact::W. Noll]], TMI Site Vice President  
: [[contact::V. Cwietniewicz]], Exelon Mid-Atlantic Emergency Planning Manager
: [[contact::V. Cwietniewicz]], Exelon Mid-Atlantic
: [[contact::D. Neff]], TMI Emergency Planning Manager
Emergency
Planning Manager  
: [[contact::D. Neff]], TMI Emergency
Planning Manager  
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
None.
None.
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS==
==Section 1EP1: Exercise EvaluationEP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision 20)EP-AA-1009, Three Mile lsland Generating Station Emergency Plan Annex (Revision 17)Three Mile lsland Emergency Plan lmplementing ProceduresThree Mile lsland April 12,2011, Emergency Exercise Scenario PackageThree Mile lsland Emergency Preparedness Drill Reports, January 2010 - March 2011Condition Reports generated as a result of the April 12, 2011 , exercise (As documented inTMI 2011 Graded Exercise Evaluation Report, dated May 9, 2011)Section 1EP4: Emerqencv Action Level and Emergencv Plan ChanqesEP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision 20)EP-AA-1009, Three Mile lsland Generating Station Emergency Plan Annex (Revision 17)EP-AA-120, Emergency Plan Administration (Revision 13)EP-==
REVIEWED
 
==Section 1EP1: Exercise Evaluation==
: EP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision  
: 20)EP-AA-1009, Three Mile lsland Generating Station Emergency Plan Annex (Revision  
: 17)Three Mile lsland Emergency Plan lmplementing
===Procedures===
: Three Mile lsland April 12,2011, Emergency Exercise Scenario Package Three Mile lsland Emergency Preparedness Drill Reports, January 2010 - March 2011 Condition Reports generated as a result of the April 12, 2011 , exercise (As documented in
: TMI 2011 Graded Exercise Evaluation Report, dated May 9, 2011)
 
==Section 1EP4: Emerqencv==
: Action Level and Emergencv Plan Chanqes
: EP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision  
: 20)EP-AA-1009, Three Mile lsland Generating Station Emergency Plan Annex (Revision  
: 17)EP-AA-120, Emergency Plan Administration (Revision  
: 13)EP-
: AA-120-1001 , 10
: AA-120-1001 , 10
: CFR 50.sa(q) Change Evaluation (Revision 6)LS-AA-104, Exelon 50.59 Review Process (Revision 6)Emergency Plan Change Packages:10-08, 10-35, 10-46, 10-1 19, 10-129, 10-146, 11-17Section 4OAl : Performance Indicator VerificationEP-AA-125-1001, EP Performance Indicator Guidance (Revision 6)Alert Notification System Pl data, January 2010 - December 2010DEP Pl data, January 2010 - December 2010ERO Drill Participation Pl data, January 2010 - December 2010Attachment
: CFR 50.sa(q) Change Evaluation (Revision  
: ANSCRDEPEALEOFEPEROJtcNEINRCoscPIRSPSTMITSCA-2
: 6)LS-AA-104, Exelon 50.59 Review Process (Revision  
: 6)Emergency Plan Change Packages: 10-08, 10-35, 10-46, 10-1 19, 10-129, 10-146, 11-17 Section 4OAl : Performance Indicator Verification
: EP-AA-125-1001, EP Performance Indicator Guidance (Revision  
: 6)Alert Notification System Pl data, January 2010 - December 2010 DEP Pl data, January 2010 - December 2010 ERO Drill Participation Pl data, January 2010 - December 2010 Attachment
: ANS CR DEP EAL EOF EP ERO Jtc NEI NRC osc PI RSPS TMI TSC A-2
==LIST OF ACRONYMS==
==LIST OF ACRONYMS==
Alert Notification SystemCondition ReportDrill and Exercise PerformanceEmergency Action LevelEmergency Operations FacilityEmergency PreparednessEmergency Response OrganizationJoint Information CenterNuclear Energy InstituteNuclear Regulatory CommissionOperations Support CenterPerformance IndicatorRisk Significant Planning StandardThree Mile lslandTechnical Support CenterAttachment
Alert Notification
System Condition
Report Drill and Exercise Performance
Emergency
Action Level Emergency
Operations
Facility Emergency
Preparedness
Emergency
Response Organization
Joint Information
Center Nuclear Energy Institute Nuclear Regulatory
Commission
Operations
Support Center Performance
Indicator Risk Significant
Planning Standard Three Mile lsland Technical
Support Center Attachment
}}
}}

Revision as of 02:41, 8 August 2018

IR 05000289-11-502; on 04/11/2011-04/14/2011; Three Mile Island, Unit 1; Emergency Preparedness Exercise Report
ML111450137
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/24/2011
From: Trapp J M
Plant Support Branch 1
To: Pacilio M J
Exelon Nuclear, Exelon Generation Co
References
IR-11-502
Download: ML111450137 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406-1415 l{ay 24, 20II Mr. MichaelJ.

Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.Warrenville, lL 60555

SUBJECT: THREE MILE ISLAND STATION, UNIT 1 _ NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000289/2011502

Dear Mr. Pacilio:

On April 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 12,2011, evaluated emergency preparedness exercise at your Three Mile lsland, Unit 1 (TMl) facility.

The enclosed inspection report documents the inspection results, which were discussed on April 14, 2011, with Mr. Richard Libra, TMI Plant Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.sov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely,?J*eF-James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-289 License No.: DPR-50

Enclosure:

NRC Inspection Report 0500028912011502 cc w/encl: Distribution via ListServ Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.Warrenville, lL 60555

SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE _ INSPECTION REPORT NO.05000289/2011502

Dear Mr. Pacilio:

On April 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 12, 2011, evaluated emergency preparedness exercise at your Three Mile lsland, Unit 1 (TMl) facility.

The enclosed inspection report documents the inspection results, which were discussed on April 1 4, 2011, with Mr. Richard Libra, TMI Plant Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-289 License No.: DPR-50

Enclosure:

NRC Inspection Report 0500028912011502 cc Mencl: Distribution via ListServ SUNSI Review Complete:

JMT (Reviewer's Initials)

ADAMS ACC #MLl11450137 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Barr\EP Ex11 TMI\TMl EPEx11 Report.doc After declaring this document "An Official Agency Record" it will be released to the Public'To receive a copy of this document, indicate in th box: "C" = Copy ICIAL RECORD COPY with attachmenVenclosure "N" = No Distribution w/encl: W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS R. Bellamy, DRP S. Barber, DRP C. Newport, DRP N. Lafferty, DRP D. Kern, DRP, SRI J. Heinly, DRP, Rl C. LaRegina, DRP, OA S. Bush-Goddard, Rl OEDO D. Bearde, DRS RidsNrrPMThreeMi lel sland Resource RidsNrrDorlLpll

-2 Resource ROPReports Resource Docket No: License No: Report No: Licensee: Facility: Location: Dates: lnspectors:

Approved By: NUCLEAR REGULATORY COMM ISSION REGION I 05000289 DPR.5O 05000289/2011502 Exelon Generation Company, LLC (Exelon)Three Mile lsland Station. Unit 1 P.O. Box 480 Middletown, PA 17057 April 11-14,2011 S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead)D. Silk, Sr. Operations Engineer, DRS, Region I D. Kern, Sr. Resident Inspector-TMl, DRP, Region I D. Lawyer, Health Physicist, DNMS, Region I C. Crisden, Emergency Preparedness Inspector, DRS, Region I K. Cronk, Project Engineer, DRP, Region I (Observer)

C. Williams, Reactor Engineer, DRS, Region l (Observer)

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS

lR 0500028912011502, 0411112011-0411412011;

Three Mile lsland, Unit 1; Emergency Preparedness Exercise Report.This was an announced inspection conducted by four region-based inspectors and one resident inspector.

No findings were identified.

The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6, dated December 2006.

Cornerstone: Emergency

Preparedness No findings were identified.

1.

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness (EP)Exercise Evaluation (711M.A1-1 Sample)1 EP1

a. Inspection Scope

Prior to the April 12,2011, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Three Mile lsland (TMl) Emergency Plan as required by 10 CFR 50.47(b)(1a).

This overall exercise inspection activity represented the completion of one sample on a biennial cycle.The exercise evaluation consisted of the following review and assessment:. The adequacy of Exelon's performance in the biennial full-participation exercise regarding the implementation of the risk-significant planning standards (RSPS)described in 10 CFR 50.47(bX4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment, and protective action recommendations, respectively.. The overall adequacy of Exelon's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments.

The facilities assessed were the Control Room Simulator, Operations Support Center (OSC), Technical Support Center (TSC), Emergency Operations Facility (EOF), and Joint Information Center (JlC).o A review of other performance areas, such as: the TMI emergency response organization's (ERO's) recognition of abnormal plant conditions; command and control; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies;staffing and procedure adequacy; and the overall implementation of the emergency plan and its implementing procedures.

o A review of past performance issues from the last NRC TMI exercise inspection report and Exelon's EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the April 12,2011, exercise and to ensure compliance with 10 CFR 50.47(bX14).

o The licensee's post-exercise critiques, to evaluate Exelon's self-assessment of its ERO performance during the April 12,2011, exercise and to ensure compliance with 10 CFR 50, Appendix E, Section lV.F.2.g.The inspectors reviewed the documents listed in the attachment to this report.Enclosure 2 b. Findinqs No findings were identified.

1EP4 Emeroencv Action Level (EAL) and Emerqencv Plan Chanoes (71114.04 - 1 Sample)a. Inspection Scope Since the last NRC inspection of this program area, Exelon implemented Revision 16 of the TMI Emergency Plan Annex. Exelon had determined that in accordance with 10 CFR 50.54(q), any change made to the Plan had not resulted in any decrease in effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors reviewed all EAL changes made since March 2010, and conducted a sampling review of other Emergency Plan changes, including changes to lower-tier emergency plan implementing procedures, to evaluate for any potential decreases in effectiveness of the Emergency Plan. However, this review was not documented in an NRC Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.b. Findinqs No findings were identified.

4. OTHER ACTTVTTTES (OA)4OA1 Performance

Indicator (Pl) Verification (71151- 3 Samples)a. lnspection Scope The inspectors reviewed data for the TMI EP Pls, which are: (1) Drill and Exercise Performance (DEP); (2) Emergency Response Organization (ERO) Drill Participation; and, (3) Alert and Notification System (ANS) Reliability.

The last EP inspection at TMI was conducted in the first quarter of 2010, so the inspectors reviewed supporting documentation from EP drills, training records, and equipment tests from the first calendar quarter of 2010 through the fourth quarter of 2010, to verify the accuracy of the reported Pl data. The review of these Pls was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02,"Regulatory Assessment Performance I nd icator Guidelines, " Revision 6.This inspection activity represented the completion of three samples on an annual cycle.b. Findinos No findings were identified.

3 4OAO Meetinqs.

Includinq Exit On April 14,2011, the inspectors presented the results of this inspection to Mr. R. Libra, the TMI Plant Manager, and other members of the Exelon staff. No proprietary information was provided to the inspectors during this inspection.

A-1 ATTACHMENT

=SUPPLEMENTAL

INFORMATION=

KEY POINTS OF CONTACT

Licensee Personnel

W. Noll, TMI Site Vice President
V. Cwietniewicz, Exelon Mid-Atlantic

Emergency

Planning Manager

D. Neff, TMI Emergency

Planning Manager

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

None.

LIST OF DOCUMENTS

REVIEWED

Section 1EP1: Exercise Evaluation

EP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision
20)EP-AA-1009, Three Mile lsland Generating Station Emergency Plan Annex (Revision
17)Three Mile lsland Emergency Plan lmplementing

Procedures

Three Mile lsland April 12,2011, Emergency Exercise Scenario Package Three Mile lsland Emergency Preparedness Drill Reports, January 2010 - March 2011 Condition Reports generated as a result of the April 12, 2011 , exercise (As documented in
TMI 2011 Graded Exercise Evaluation Report, dated May 9, 2011)

Section 1EP4: Emerqencv

Action Level and Emergencv Plan Chanqes
EP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision
20)EP-AA-1009, Three Mile lsland Generating Station Emergency Plan Annex (Revision
17)EP-AA-120, Emergency Plan Administration (Revision
13)EP-
AA-120-1001 , 10
CFR 50.sa(q) Change Evaluation (Revision
6)LS-AA-104, Exelon 50.59 Review Process (Revision
6)Emergency Plan Change Packages: 10-08, 10-35, 10-46, 10-1 19,10-129, 10-146, 11-17 Section 4OAl : Performance Indicator Verification
EP-AA-125-1001, EP Performance Indicator Guidance (Revision
6)Alert Notification System Pl data, January 2010 - December 2010 DEP Pl data, January 2010 - December 2010 ERO Drill Participation Pl data, January 2010 - December 2010 Attachment
ANS CR DEP EAL EOF EP ERO Jtc NEI NRC osc PI RSPS TMI TSC A-2

LIST OF ACRONYMS

Alert Notification

System Condition

Report Drill and Exercise Performance

Emergency

Action Level Emergency

Operations

Facility Emergency

Preparedness

Emergency

Response Organization

Joint Information

Center Nuclear Energy Institute Nuclear Regulatory

Commission

Operations

Support Center Performance

Indicator Risk Significant

Planning Standard Three Mile lsland Technical

Support Center Attachment