IR 05000289/2011301

From kanterella
Jump to navigation Jump to search
Er 05000289-11-301, on August 31 - September 1 6, 2011, Three Mile Island Nuclear Station, Unit 1, Initial Operator Licensing Examination Report
ML112920028
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/19/2011
From: Diane Jackson
Operations Branch I
To: Pacilio J
Exelon Generation Co, Exelon Nuclear
Shared Package
ML110030671 List:
References
50-289/11-301
Download: ML112920028 (12)


Text

UNITED STATES NUCLEAR REGU LATORY COMMISSION

REGION I

475 ALLENDALE ROAD KING OF PRUSSlA, PA 19406-1415

SUBJECT:

THREE MILE ]SLAND NUCLEAR STATION, UNIT 1 - NRC lNlTlAL OPERATOR LICENSING EXAMINATION REPORT O5OOO289/201 1301

Dear Mr. Pacilio:

On September7,2O11, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Three Mile lsland Nuclear Station, Unit 1. The enclosed report documents the examination findings, which were discussed on September 16,2011, with Mr. Thomas Van Wyen, Training Director, and other members of your staff.

The examination included the evaluation of three applicants for reactor operator licenses, one applicant for instant senior operator license, and one applicant for upgrade senior operator license. The written and operating examinations were developed using NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

The license examiners determined that all five of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on September 16, 2011.

No findings were identified during this examination.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencyruide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams/web-based.html (the Public Electronic Reading Room).

Sincerely, Qnrz-*-

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-289 License No. DPR-50

Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Wanenville, lL 60555 SUBJECT: THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - NRC lNlTlAL OPERATOR LICENSING EXAMINATION REPORT O5OOO289/2011301

Dear Mr. Pacilio:

On September7,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Three Mile lsland Nuclear Station, Unit 1. The enclosed report documents the examination findings, which were discussed on September 16,2011, with Mr. Thomas Van Wyen, Training Director, and other members of your staff.

The examination included the evaluation of three applicants for reactor operator licenses, one applicant for instant senior operator license, and one applicant for upgrade senior operator license. The written and operating examinations were developed using NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

The license examiners determined that all five of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on September 16, 2011, No findings were identified during this examination.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http:i/www.nrc.qov/readinq-rm/adams/web-based.html (the Public Electronic Reading Room).

Sincerely, lRA by Peter R. Wilson forl Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-289 License No. DPR-50 SUNSI Review Complete: JGC (Reviewer's Initials)

ADAMS PKG: ML110030671 ADAMS ACC #ML112920028 DOCUMENT NAME: G:\DRS\Operations Branch\CARUSO\Exam 11-TMlAug 11 (U01829)\TMl EXAM REPORT.docx After declaring this document "An OfficialAgency Record" it will be released to the Public.

To receive a copv of this indicate in the box: "C" = Copy without attachmenVenclosure "E" = with aftachmenVenclosure "N" = No OFFICE RI/DRS DATE 10119111 10119111 OFFICIAL RECORD COPY

Enclosure:

NRC Initial Operator Licensing Examination Report 05000289/2011301 w/Attachment: Supplemental Information

REGION I==

Dockets: 50-289 Licenses: DPR-50 Report: 05000289/2011301 Licensee: Exelon Generation Company LLC Facility: Three Mile lsland Nuclear Station, Unit 1 Location: POBox480 Middletown, PA 1 7057 -0480 Dates: August 31 - September 2,2011 (Operating Test Administration)

September 7, 2011 (Written Examination Administration)

September 14,2011(Licensee Submitted Post Exam Package)

September 6 -14,2011 (NRC Examination Grading)

September 16, 2011 (Licenses lssued)

Examiners: John Caruso, Chief Examiner, Operations Branch Joseph D'Antonio, Senior Operations Engineer Thomas Hedigan, Operations Engineer Approved by: Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS

ER 0500028912011301; August 31 - September 1 6, 2011; Three Mile lsland Nuclear Station,

Unit 1; Initial Operator Licensing Examination Report.

NRC examiners evaluated the competency of three applicants for reactor operator licenses, one applicant for instant senior operator license, and one applicant for upgrade senior operator license at Three Mile lsland Nuclear Station, Unit 1. The facility licensee developed the examinations using NU REG-1 021, " Operator Licensing Exam ination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the facility on September 7,2011. NRC examiners administered the operating tests on August 31-September 2,2011. The license examiners determined that all five of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

A. NRC-ldentifiedandSelf-RevealinqFindinos No findings were identified.

B. Licensee-ldentified Violations None.

REPORT DETAILS

4. OTHER ACTlVTTTES (OA)

4OA5 Other Activities (lnitial Operator License Examination)

.1 License Applications

a. Scope

The examiners reviewed allfive license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, "Personal Qualification Statement," and NRC Form 396, "Certification of Medical Examination by Facility Licensee." The examiners also audited four of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b Findinos No findings were identified.

.2 Operator Knowledge and Performance

a. Examination Scope

On September 7 , 2011 , the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 14,2011.

The NRC examination team administered the various portions of the operating examination to all five applicants on August 31-September 2, 2011. The three applicants for reactor operator licenses participated in two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The one applicant seeking an instant senior operator license participated in three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The one applicant for upgrade senior operator license participated in two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.

b. Findinos All five of the applicants passed all parts of the operating test. For the written examinations, the reactor operator applicants' average score was 87.10 percent and ranged from 82.66 to 90.66 percent, the senior operator applicants' average score was 85.00 percent and ranged from 84.00 to 86.00 percent. The overall written examination average was 86.26 percent. The text of the examination questions, and the licensee's examination analysis, may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.

The NRC examiners completed the final grading of the written examination on September 14,2011, and conducted a review of each missed question to determine the accuracy and validity of the examination questions. In accordance with current NRC policy, the release of this written examination will be delayed for two years. The text of the examination questions, the licensee's examination analysis, and the licensee's post-examination comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.

Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis for fourteen questions that met these criteria and submitted the analysis to the chief examiner. This analysis concluded that all questions on the written examination were technically accurate as written and no post exam comments were submitted by the licensee for this examination.

.3 lnitial Licensinq Examination Development

Examination Scope The facility licensee developed the examinations in accordance with NUREG-1021, Revision 9, Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on May 4,2011.

The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft operating test examination package on July 1 ,2O11and the draft written examination package on July 8,2011. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided comments to the licensee on the examination between July 21 and July 26, 2011. The NRC conducted an onsite validation of the operating examinations and provided further comments during the week of August 1, 2011. The licensee satisfactorily completed comment resolution on the operating test on August 19,2011 and on the written examination on August 25, 2011.

b. Findinqs The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.

The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.

No findings were identified.

,4 Simulation Facilitv Performance

a. Examination Scope

The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.

b. Findinqs No findings were identified.

.5 Examination Securitv

a. Examination Scooe The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.

b. Findinqs No findings were identified.

4OAO Meetinqs. lncludinq Exit The chief examiner presented the examination results to Mr. Thomas Van Wyen, Training Director, and other members of the licensee's management staff on September 16, 2011.

The licensee did not identify any information or materials used during the examination as proprietary.

ATTACHMENTS:

1.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

T. Van Wyen, Training Director
L. Blair, Operations training Manager
J. Ward, Licensed Operator InitialTraining Supervisor
G. Hoek, Training Instructor, Exam Developer
R. Megill, Nuclear Training Instructor, Exam Developer

NRC Personnel

D. Jackson, Chief Operations Branch
J. Caruso, Chief Examiner

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened/Closed/Discussed NONE

ADAMS DOCUMENTS REFERENCED