MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, October 06, 2011 3:27 PM To: Davis-BesseHearingFile Resource
Subject:
FW: Open Item List from DB Attachments: SER Open Items_2011-09-29.doc From: dorts@firstenergycorp.com [1]
Sent: Friday, September 30, 2011 1:35 PM To: CuadradoDeJesus, Samuel
Subject:
Open Item List from DB Sam..... we added a column to your list identifying the letter number that addresses or will address the item... we would like to review this list with you.
_____
Steve Dort DBNPS License Renewal 419.321.7662 work 412.974.3369 cell
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
1
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 1816 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806D230B61)
Subject:
FW: Open Item List from DB Sent Date: 10/6/2011 3:26:33 PM Received Date: 10/6/2011 3:26:34 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1018 10/6/2011 3:26:34 PM SER Open Items_2011-09-29.doc 72258 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status RASB BRogers CI RAI 2.1-3 Abandoned equipment L-11-252 sent Lehman/Istar OI 3.0.3.1.10-1 RAI B.2.22-5 Issue related to standing water in the L-11-252 sent (B.2.22-1) containment annulus, Lehman/Istar OI 3.0.3.1.10-2 RAI B.2.22-6 issue related to borated water leakage from L-11-237 sent (B.2.22-2) the reactor cavity, and Lehman/Istar OI 3.0.3.1.10-4 RAI B.2.22-7 issue related to inspection of the L-11-292 DRAFT (B.2.22-4) containment stainless steel penetration sleeves.
Naus/Lehman 46 OI 3.0.3.2.15-1 RAI B.2.39-9 Refueling canal leaks inside containment, L-11-252 sent (B.2.39-1)
Naus/Lehman 46 OI 3.0.3.2.15-3 B.2.39-11 aggressive groundwater infiltration and L-11-292 DRAFT (B.2.39-3) possible degradation of inaccessible concrete (core bores), and Naus/Lehman 46 OI 3.0.3.2.16-1 RAI B.2.40-1 degradation of the north embankment of the L-11-238 sent (B.2.40-2) safety related portion of the intake canal.
ABuford/ASheikh 63 OI 4.6-1 RAI 4.6-1 The staff needs more information to confirm L-11-292 DRAFT that fatigue evaluations for the containment vessel will remain valid for the period of extended operation. Telecon requested 9/9/2011 to discuss 8/17/2011 response.
Telecon held 9/13/2011 waiting for supplemental response by 9/30/2011.
RARB MHomiack OI RAI B1.4-1 Regarding how FENOC plans to address Supplement sent in the review and incorporation of operating L-11-238 experience into the license renewal aging management programs.
Trillo/Min/Yee 73 OI 3.1.2.2-1 RAI 3.1.2.2-3 Applicants first response do not clearly L-11-252 sent (3.1.2.2-2) address information regarding: (1) the functional groups, (2) the link relationships, or (3) the inspection method, including the frequency, specified for the CSA vent valve body and plenum cylinder reinforcing plate.
SMin and the primary reviewer (Trillo) will determine if the applicant 9/16/2011 response is acceptable by 9/30/2011.
Page 1 of 4 10/21/2011
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status SMin 101 OI RAI 3.1.2.2.16-1 We're waiting for the applicant response on L-11-317 DRAFT SG tube to tubesheet welds by 10/22/2011.
Oyee/CNg/Medoff OI 4.3.2.3.2-1 RAI 4.3.2.3.2-1 Class 1 valves. This will very likely end as L-11-292 DRAFT an OI.
On Yee CI steel crane, fatigue Waiting for applicant supplement letter L-11-292 DRAFT analysis TLAA adding steel crane fatigue analysis as a new TLAA section. the applicant will provide new section by the end of September. On Yee already agreed to provide the SER input soon (within a week) after we receive the new TLAA section.
Ching/Medoff OI 4.1-1 RAI 4.1-2 ASME Code Case N-481 evaluation. L-11-317 DRAFT Telecom 6/16 and 7/15/2011. On 8/10/11 letter they need to supplement their LRA to address the time-dependent J-integral analysis and TLAA(i). Revised Response received 8/17/2011. Telecon held 9/16/2011 applicant will supplement response to RAI.
Page 2 of 4 10/21/2011
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status RAPB Jklos 33 CI 3.2.2.2.3.6-2 RAI 3.2.2.2.3.6-2 #1 In a teleconference dated August 22, Response sent in 9/21/2011 e-mail 2011 the applicant stated that the item was L-11-238 on Supplemental intended to be deleted but documentation RAI response for had not yet been provided. Pending the Supplemental response 3.2.2.2.3.6-2. applicants changes to LRA Table 3.2.2-2, sent in L-11-252 Teleconference to the staffs review of this item is not complete be scheduled and will be tracked as Confirmatory item Correction to 2 rows 9/29/2011. XXX. Supplemental response received regarding the environment 9/16/2011. Probably closed I need to check and with JWise. statement regarding air-indoor uncontrolled from
- 2 Please confirm that these line items are 9/29/11 Telecon to be subject to a moist air (external) environment provided in L-11-292 and submit a correction letter stating that, DRAFT as appropriate. Once the environment has been confirmed for these line items, please restate the AMP to be assigned to these line items related to the applicant's response for 3.2.2.2.3.6-2. The applicant will confirm the environment in an upcoming response letter. Should be closed easily. In 9/16/2011 response letter the LRA was revised to define the moist air (internal) environment to encompass both the air-water interface and the air environment above the interface, we'll discuss this in a Telecon @ 9/29/2011.
Page 3 of 4 10/21/2011
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status Klos/Kichline 33 OI 3.3.2.14-1 RAI 3.3.2.14-1 NRC reviewer was concerned that not all L-11-292 DRAFT applicable aging effects are identified for the fire water storage tank heat exchanger tubes. FENOC stated that the consequences of tube failure do not directly challenge the function of the tank FENOC will review the issue to determine whether the fire water storage tank heat exchanger should be removed from scope. Waiting for RAI supplement by 9/30/2011. Issue can be easily closed if they remove the fwst from scope as they plan to.
JGavula OI RAI 2.3.3.18-4 Letdown cooler replacement frequency. L-11-317 DRAFT (RAI 2.3.3.18-3) Follow-up RAI issued 9/22/2011.
CVIB and CSGB (DCI)
JPoehler/CSydnor/Ganesh OI (9/13/2011 Table 3.1.2-3 RPV flange leak detection L-11-292 DRAFT Teleconference) (Nickel Alloy) missing item. Will receive supplemental response by 9/30/2011.
Should be closed once we receive the letter.
CSydnor 66 OI 4.7.3-1 RAI 4.7.3-1 (Telecon held on 9/13/2011) RAIs will be Maybe L-11-317 DRAFT issued early next week (Oct 3).
CSydnor 67 OI 4.7.4-1 RAI 4.7.4-1 RAIs will be issued early next week (Oct 3). Maybe L-11-317 DRAFT Sydnor 68 OI 4.7.5.2-2 RAI 4.7.5.2-2 SG shell flaw evaluations. RAIs will be Maybe L-11-317 DRAFT issued early next week (Oct 3).
Mkichline/AObodoako OI RAI 3.3.2.2.10.4-1 Explain why copper alloy with less than 15 L-11-317 DRAFT percent zinc components exposed to lubricating oil have no aging effects requiring management or provide an appropriate AMP to manage loss of material. RAI sent 9/22/2011.
Page 4 of 4 10/21/2011