{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 31, 2019 Ms. Mandy Halter, Director Nuclear Licensing Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213


Federal Register Federal Register
==SUBJECT:==
EXEMPTION FROM 10 CFR 50.54(w)(1) FOR THE BIG ROCK POINT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EPID L-2018-LLE-0017)


Federal Register}}
==Dear Ms. Halter:==
 
This is in response to your letter dated August 10, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18222A394), requesting an exemption from Title 10 of the Code of Federal Regulations Part 50 Section 54 (10 CFR) 50.54, Conditions of licenses, (w)(1) for dry fuel storage at the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.12. 10 CFR 50.54(w)(1) requires the following to power reactor licensees:
: 1)      obtain insurance coverage from private sources;
: 2)      provide protection covering the licensee's obligation (in case of an accident), and
: 3)      stabilize and decontaminate the reactor and the reactor site.
Specifically, licensees must obtain insurance having a minimum coverage limit for each reactor station site. This insurance coverage is referred to as "onsite coverage" or "onsite insurance coverage."
The licensee (Entergy Nuclear Operations, Inc. or ENO) requested an exemption to 10 CFR 50.54(w)(1) to reduce the minimum coverage limit of its onsite insurance coverage from
$1.06 billion to $50 million for BRP. The BRP is a single reactor facility. The facility ceased operation, permanently defueled, and transferred all spent nuclear fuel, special nuclear material, and greater than Class C waste to dry fuel storage systems stored in an ISFSI. The licensee requested this exemption to reduce the amount of onsite insurance coverage for BRP to a level commensurate with an ISFSI.
As discussed in the enclosed Federal Register Notice, the staff determined that this action meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(25).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with this action.
 
M. Halter                                      2 This exemption was granted on July 26, 2019, as indicated in the Federal Register Notice (ADAMS Accession No. ML19177A076).
If you have any questions, please contact me at (301) 415-5722, or Norma García Santos of my staff at (301) 415-6999. Any future correspondence related to this action should reference CAC No. 001028, Docket Nos. 50-155 and 72-43, and EPID L-2018-LLE-0017.
Sincerely,
                                                /RA/
John McKirgan, Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards CAC No. 001028 Docket Nos. 50-155, 72-43 EPID L-2018-LLE-0017
 
==Enclosure:==
 
Exemptions Federal Register Notice
 
M. Halter                                    3
 
==SUBJECT:==
EXEMPTION FROM 10 CFR 50.54(w)(1) FOR THE BIG ROCK POINT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EPID L-2018-LLE-0017), DOCUMENT DATED: July 31, 2019 DISTRIBUTION:
DSFM r/f NGarca Santos, NMSS          DMarcano, NMSS Note: This letter closes out EPID L-2018-LLE-0017.
File location: G:\SFST\Garcia\Casework_NGS\Part 72 Cases_NGS\Big Rock Point.docx ADAMS No.: ML19210C543 OFFICE          DSFM                DSFM              NRR              DSFM NAME      NGarcía Santos    WWheatley by email    FMiller by email  JMcKirgan DATE          7/24/19              7/25/19          7/26/19        7/31/2019 OFFICIAL RECORD COPY}}

Latest revision as of 12:50, 19 October 2019

Letter to M. Halter Exemption from 10 CFR 50.54(w)(1) for the Big Rock Point Independent Spent Fuel Storage Installation
ML19210C543
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 07/31/2019
From: John Mckirgan
Spent Fuel Licensing Branch
To: Halter M
Entergy Nuclear Operations
Garcia-Santos N
References
CAC 001028, EPID: L-2018-LLE-0017
Download: ML19210C543 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 31, 2019 Ms. Mandy Halter, Director Nuclear Licensing Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213

SUBJECT:

EXEMPTION FROM 10 CFR 50.54(w)(1) FOR THE BIG ROCK POINT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EPID L-2018-LLE-0017)

Dear Ms. Halter:

This is in response to your letter dated August 10, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18222A394), requesting an exemption from Title 10 of the Code of Federal Regulations Part 50 Section 54 (10 CFR) 50.54, Conditions of licenses, (w)(1) for dry fuel storage at the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.12. 10 CFR 50.54(w)(1) requires the following to power reactor licensees:

1) obtain insurance coverage from private sources;
2) provide protection covering the licensee's obligation (in case of an accident), and
3) stabilize and decontaminate the reactor and the reactor site.

Specifically, licensees must obtain insurance having a minimum coverage limit for each reactor station site. This insurance coverage is referred to as "onsite coverage" or "onsite insurance coverage."

The licensee (Entergy Nuclear Operations, Inc. or ENO) requested an exemption to 10 CFR 50.54(w)(1) to reduce the minimum coverage limit of its onsite insurance coverage from

$1.06 billion to $50 million for BRP. The BRP is a single reactor facility. The facility ceased operation, permanently defueled, and transferred all spent nuclear fuel, special nuclear material, and greater than Class C waste to dry fuel storage systems stored in an ISFSI. The licensee requested this exemption to reduce the amount of onsite insurance coverage for BRP to a level commensurate with an ISFSI.

As discussed in the enclosed Federal Register Notice, the staff determined that this action meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(25).

Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with this action.

M. Halter 2 This exemption was granted on July 26, 2019, as indicated in the Federal Register Notice (ADAMS Accession No. ML19177A076).

If you have any questions, please contact me at (301) 415-5722, or Norma García Santos of my staff at (301) 415-6999. Any future correspondence related to this action should reference CAC No. 001028, Docket Nos. 50-155 and 72-43, and EPID L-2018-LLE-0017.

Sincerely,

/RA/

John McKirgan, Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards CAC No. 001028 Docket Nos. 50-155, 72-43 EPID L-2018-LLE-0017

Enclosure:

Exemptions Federal Register Notice

M. Halter 3

SUBJECT:

EXEMPTION FROM 10 CFR 50.54(w)(1) FOR THE BIG ROCK POINT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EPID L-2018-LLE-0017), DOCUMENT DATED: July 31, 2019 DISTRIBUTION:

DSFM r/f NGarca Santos, NMSS DMarcano, NMSS Note: This letter closes out EPID L-2018-LLE-0017.

File location: G:\SFST\Garcia\Casework_NGS\Part 72 Cases_NGS\Big Rock Point.docx ADAMS No.: ML19210C543 OFFICE DSFM DSFM NRR DSFM NAME NGarcía Santos WWheatley by email FMiller by email JMcKirgan DATE 7/24/19 7/25/19 7/26/19 7/31/2019 OFFICIAL RECORD COPY