{{#Wiki_filter:February 18, 2010  
{{#Wiki_filter:UNITED STATES
 
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Mr. Adam C. Heflin, Senior Vice   President and Chief Nuclear Officer AmerenUE P.O. Box 620 Fulton, MO 65251  
                                                    R E GI ON I V
                                        612 EAST LAMAR BLVD , SU I TE 400
                                          AR LI N GTON , TEXAS 76011-4125
                                            February 18, 2010
Mr. Adam C. Heflin, Senior Vice
  President and Chief Nuclear Officer
AmerenUE
P.O. Box 620
Fulton, MO 65251
SUBJECT:        CALLAWAY NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION
                (NRC INSPECTION REPORT 050000483/2010003) AND REQUEST FOR
                INFORMATION
Dear Mr. Heflin:
From April 19 to April 23, 2010, reactor inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at the
Callaway Nuclear Power Plant, using NRC Inspection Procedure 71111.08, "Inservice
Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into two groups. The first group (Section A of
the enclosure) identified information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Steve Petzel of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector James Adams at (817) 860-8294 (James.Adams@nrc.gov) or
Breck Henderson at (817) 276-6569 (Breck.Henderson@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


SUBJECT: CALLAWAY NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 050000483/2010003) AND REQUEST FOR INFORMATION
AmerenUE                                       -2-
This letter does not contain new or amended information collection requirements subject to the
Dear Mr. Heflin:
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
From April 19 to April 23, 2010, reactor inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at the
requirements were approved by the Office of Management and Budget, control number 3150-
Callaway Nuclear Power Plant, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  These documents have been divided into two groups.  The first group (Section A of the enclosure) identified information to be provided prior to the inspection to ensure that the
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Steve Petzel of your licensing organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector James Adams at (817) 860-8294 (James.Adams@nrc.gov) or Breck Henderson at (817) 276-6569 (Breck.Henderson@nrc.gov).  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document
                                                      Sincerely,
system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                      /RA/
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
                                                      Gregory E. Werner, Chief
AmerenUE - 2 -  
                                                      Plant Support Branch 2
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
                                                      Division of Reactor Safety
request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.  
Docket: 50-483
  Sincerely,
License: NPF-30
Enclosure:
/RA/
Inservice Inspection Document Request
  Gregory E. Werner, Chief Plant Support Branch 2 Division of Reactor Safety  
cc w/enclosure:
Mr. Luke H. Graessle
Director, Operations Support
AmerenUE
P.O. Box 620
Fulton, MO 65251
E. Hope Bradley
Manager, Protective Services
AmerenUE
P.O. Box 620
Fulton, MO 65251
Mr. Scott Sandbothe, Manager
  Plant Support
AmerenUE
P.O. Box 620
Fulton, MO 65251


Docket:  50-483 License:  NPF-30
AmerenUE                                     -3-
Enclosure:
R. E. Farnam
Inservice Inspection Document Request
Assistant Manager, Technical
cc w/enclosure: Mr. Luke H. Graessle Director, Operations Support
  Training
AmerenUE P.O. Box 620 Fulton, MO  65251
AmerenUE
E. Hope Bradley
P.O. Box 620
Manager, Protective Services AmerenUE P.O. Box 620 Fulton, MO  65251
Fulton, MO 65251
J. S. Geyer
Mr. Scott Sandbothe, Manager  Plant Support AmerenUE P.O. Box 620 Fulton, MO  65251
Radiation Protection Manager
 
AmerenUE
AmerenUE - 3 -  
P.O. Box 620
R. E. Farnam Assistant Manager, Technical   Training AmerenUE  
Fulton, MO 65251
P.O. Box 620 Fulton, MO 65251  
John ONeill, Esq.
J. S. Geyer Radiation Protection Manager  
Pillsbury Winthrop Shaw Pittman LLP
AmerenUE P.O. Box 620 Fulton, MO 65251  
2300 N. Street, N.W.
John O'Neill, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.  
Washington, DC 20037
Washington, DC 20037  
Missouri Public Service Commission
Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102-0360  
P.O. Box 360
Jefferson City, MO 65102-0360
Dru Buntin
Director of Government Affairs
Department of Natural Resources
P.O. Box 176
Jefferson City, MO 65102-0176
Mr. Rick A. Muench, President and
Chief Executive officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Kathleen Logan Smith, Executive Director and
Kay Drey, Representative, Board of Directors
Missouri Coalition for the Environment
6267 Delmar Boulevard, Suite 2E
St. Louis, MO 63130
Presiding Commissioner
Callaway County Court House
10 East Fifth Street
Fulton, MO 65251


  Dru Buntin Director of Government Affairs Department of Natural Resources P.O. Box 176
AmerenUE                                -4-
Jefferson City, MO 65102-0176
Director, Missouri State Emergency
Mr. Rick A. Muench, President and   Chief Executive officer Wolf Creek Nuclear Operating Corporation
  Management Agency
P.O. Box 411 Burlington, KS  66839
P.O. Box 116
Kathleen Logan Smith, Executive Director and Kay Drey, Representative, Board of Directors
Jefferson City, MO 65102-0116
Missouri Coalition for the Environment 6267 Delmar Boulevard, Suite 2E St. Louis, MO  63130
Mr. Scott Clardy, Administrator
Presiding Commissioner Callaway County Court House 10 East Fifth Street
Section for Disease Control
Fulton, MO 65251  
Missouri Department of Health and
AmerenUE - 4 -
Senior Services
Director, Missouri State Emergency  Management Agency P.O. Box 116 Jefferson City, MO 65102-0116
P.O. Box 570
Jefferson City, MO 65102-0570
Certrec Corporation
4200 South Hulen, Suite 422
Fort Worth, TX 76109
Mr. Keith G. Henke, Planner II
Division of Community and Public Health
Office of Emergency Coordination
Missouri Department of Health and
  Senior Services
930 Wildwood Drive
P.O. Box 570
Jefferson City, MO 65102
Chief, Technological Hazards Branch
FEMA Region VII
9221 Ward Parkway, Suite 300
Kansas City, MO 64114-3372


Mr. Scott Clardy, Administrator Section for Disease Control Missouri Department of Health and  Senior Services
AmerenUE                                       -5-
P.O. Box 570 Jefferson City, MO 65102-0570
Electronic distribution by RIV:
Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX  76109
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
Mr. Keith G. Henke, Planner II Division of Community and Public Health Office of Emergency Coordination Missouri Department of Health and  Senior Services
DRP Director (Dwight.Chamberlain@nrc.gov)
930 Wildwood Drive P.O. Box 570 Jefferson City, MO  65102
DRP Deputy Director (Anton.Vegel@nrc.gov)
Chief, Technological Hazards Branch
DRS Director (Roy.Caniano@nrc.gov)
FEMA Region VII 9221 Ward Parkway, Suite 300 Kansas City, MO 64114-3372
DRS Deputy Director (Troy.Pruett@nrc.gov)
 
Senior Resident Inspector (David.Dumbacher@nrc.gov)
AmerenUE - 5 -  
Resident Inspector (Jeremy.Groom@nrc.gov)
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov)  
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (David.Dumbacher@nrc.gov) Resident Inspector (Jeremy.Groom@nrc.gov)  
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Acting Senior Project Engineer, DRP/B (Peter.Jayroe@nrc.gov) CWY Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Mohan.Thadani@nrc.gov)  
Acting Senior Project Engineer, DRP/B (Peter.Jayroe@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource  
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Only inspection reports to the following: DRS/TSB STA (Dale.Powers@nrc.gov) OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
  SUNSI Review Completed: ___Y___ ADAMS:   Yes  No        Initials: ____     Publicly Available         Non-Publicly Available         Sensitive   Non-Sensitive  
Project Manager (Mohan.Thadani@nrc.gov)
ML RI:EB1 RE:TSB C:PSB2   JAdams BHenderson GEWerner  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
/RA/ /RA//RA/ 2/17/10 2/17/10 2/18/10   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
Regional Counsel (Karla.Fuller@nrc.gov)
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
  Inspection Dates: April 19 through April 23, 2010  
OEMail Resource
Only inspection reports to the following:
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds" Inspectors: James Adams, Reactor Inspector (Lead Inspector - ISI) Breck Henderson, Reactor Inspector  
DRS/TSB STA (Dale.Powers@nrc.gov)
A. Information Requested for the In-Office Preparation Week  
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com or other electronic format is preferred over hard copy), in care of James Adams, by April 7, 2010, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select  
SUNSI Review Completed: ___Y___               ADAMS: 7 Yes       No   Initials: ____
specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.  
7 Publicly Available       Non-Publicly Available   Sensitive     7 Non-Sensitive
A.1 ISI/Welding Programs and Schedule Information
                                                                                      ML
  a) A detailed schedule (including preliminary dates) of:  
RI:EB1               RE:TSB             C:PSB2
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk  
JAdams               BHenderson         GEWerner
Informed (if applicable), and augmented ISI programs during the upcoming outage.  
/RA/                 /RA/               /RA/
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per  
2/17/10               2/17/10           2/18/10
ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information)  
OFFICIAL RECORD COPY T=Telephone                 E=E-mail   F=Fax
ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.  
 
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope. (If applicable)  
                        INSERVICE INSPECTION DOCUMENT REQUEST
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
Inspection Dates:           April 19 through April 23, 2010
  - 2 - Enclosure  
Inspection Procedures:     IP 71111.08 "Inservice Inspection (ISI) Activities"
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)).  
                            TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
Inspectors:                 James Adams, Reactor Inspector (Lead Inspector - ISI)
  c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service. The list of NDE reports should include a brief description of the SSC where the relevant condition was identified.  
                            Breck Henderson, Reactor Inspector
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.  
A.     Information Requested for the In-Office Preparation Week
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.  
      The following information should be sent to the Region IV office in hard copy or
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.  
      electronic format (ims.certrec.com or other electronic format is preferred over hard
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
      copy), in care of James Adams, by April 7, 2010, to facilitate the selection of specific
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.
      items that will be reviewed during the onsite inspection week. The inspector will select
      specific items from the information requested below and then request from your staff
      additional documents needed during the onsite inspection week (Section B of this
      enclosure). We ask that the specific items selected from the lists be available and ready
      for review on the first day of inspection. *Please provide requested documentation
      electronically if possible. If requested documents are large and only hard copy formats
      are available, please inform the inspector(s), and provide subject documentation during
      the first day of the onsite inspection. If you have any questions regarding this
      information request, please call the inspector as soon as possible.
A.1   ISI/Welding Programs and Schedule Information
      a)       A detailed schedule (including preliminary dates) of:
                i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
                        upcoming outage.
                        Provide a status summary of the NDE inspection activities vs. the
                        required inspection period percentages for this Interval by category per
                        ASME Section XI, IWX-2400 (Do not provide separately if other
                        documentation requested contains this information)
                ii)     Reactor pressure vessel head (RPVH) examinations planned for the
                        upcoming outage.
                iii)   Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope. (If applicable)
                iv)     Examinations planned as part of your Boric Acid Corrosion Control
                        Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                            -1-                                       Enclosure
 
          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs)).
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
A.2 Reactor Pressure Vessel Head (RPVH)
  a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified. (If  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
applicable)  
          identifies the types of NDE methods to be used on each specific part of the
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
  - 3 - Enclosure industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
A.3 Boric Acid Corrosion Control Program (BACCP)
          and planned expansion sample sizes if relevant conditions are identified. (If
  a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.  
          applicable)
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP. c) Please provide a copy of the most recent self-assessment performed for the BACCP. A.4 Steam Generator Tube (SGT) Inspections
    b)   A list of the standards and/or requirements that will be used to evaluate
  a) A detailed schedule of:  
          indications identified during NDE of the reactor vessel head (e.g., the specific
i) SGT inspection, data analyses, and repair activities for the upcoming outage. (If occurring)  
                                        -2-                                       Enclosure
ii) SG secondary side inspection activities for the upcoming outage. (If occurring)  
 
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available:
          industry or procedural standards which will be used to evaluate potential leakage
i) Degradation Assessment ii) Condition Monitoring Assessment  
          and/or flaw indications).
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with  
A.3 Boric Acid Corrosion Control Program (BACCP)
the NRC regarding deviations from the STS.  
    a)     Copy of the procedures that govern the scope, equipment and implementation of
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.  
          the inspections required to identify boric acid leakage and the procedures for
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.  
          boric acid leakage/corrosion evaluation.
 
    b)     Please provide a list of leaks (including Code class of the components) that have
  - 4 - Enclosure f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).  
          been identified since the last refueling outage and associated corrective action
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)  
          documentation. If during the last cycle, the Unit was shutdown, please provide
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control  
          documentation of containment walkdown inspections performed as part of the
programs.  
          BACCP.
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.  
    c)     Please provide a copy of the most recent self-assessment performed for the
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the  
          BACCP.
percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.   A.5 Materials Reliability (MRP-139) Program Activities
A.4 Steam Generator Tube (SGT) Inspections
  a) A list of, with verification, that the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed or will be completed by December 31, 2010.  
    a)     A detailed schedule of:
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the baseline inspections are consistent with the baseline schedules in MRP-139.  
          i)     SGT inspection, data analyses, and repair activities for the upcoming
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage. If none are scheduled, then data from previous  
                  outage. (If occurring)
examinations should be available for review.  
          ii)     SG secondary side inspection activities for the upcoming outage. (If
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage. If no welding will be performed, then records of previous welding on DMBWs and postweld NDE documentation should be available for review.  
                  occurring)
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage. If none are scheduled then have qualification reports for any SIs previously performed.  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.  
          include a copy of the Operational Assessment from last outage and a copy of the
g) A list of weld locations controlled by MRP-139 which includes the MRP-139 weld category, pre-mitigation volumetric examination date, type of mitigation or stress
          following documents as they become available:
  - 5 - Enclosure improvement, post mitigation volumetric examination date, and plans for future MRP-139 required examinations.  
          i)     Degradation Assessment
A.6 Additional information related to all ISI activities
          ii)     Condition Monitoring Assessment
  a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage. For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,  
    c)     If you are planning on modifying your Technical Specifications such that they are
boric acid, or errors in piping/SGT examinations.  
          consistent with TSTF-449, please provide copies of your correspondence with
b) Please provide names and phone numbers for the following program leads:  
          the NRC regarding deviations from the STS.
ISI contacts (Examination, planning) Containment Exams RPVH Exams  
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program  
          testing of the SGs during the upcoming outage.
SG Inspection Activities (site lead and vendor contact)  
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 19, 2010):
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
          copy of EPRI Appendix H ETSS Qualification Records.
                                        -3-                                       Enclosure
 
    f)     Identify and quantify any SGT leakage experienced during the previous operating
          cycle. Also provide documentation identifying which SG was leaking and
          corrective actions completed or planned for this condition (If applicable).
    g)     Provide past history of the condition and issues pertaining to the secondary side
          of the steam generators (including items such as loose parts, fouling, top of tube
          sheet condition, crud removal amounts, etc.)
    h)     Please provide copies of your most recent self assessments of the SG
          monitoring, loose parts monitoring, and secondary side water chemistry control
          programs.
    i)     Please also indicate where the primary, secondary, and resolution analyses are
          scheduled to take place.
    j)     Please provide a summary of the scope of the SGT examinations, including
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
          percentage of tubes to be examined. *Do not provide these documents
          separately if already included in other information requested.
A.5 Materials Reliability (MRP-139) Program Activities
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
          Metal Butt Welds (DMBWs) have been completed or will be completed by
          December 31, 2010.
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
          have been included in the inspection program and that the schedules for the
          baseline inspections are consistent with the baseline schedules in MRP-139.
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
          the upcoming refueling outage. If none are scheduled, then data from previous
          examinations should be available for review.
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
          outage. If no welding will be performed, then records of previous welding on
          DMBWs and postweld NDE documentation should be available for review.
    e)     A list and schedule of any stress improvement (SI) activities planned for the
          upcoming refueling outage. If none are scheduled then have qualification reports
          for any SIs previously performed.
    f)     Documentation and description of how the baseline and inservice inspection
          specifications in MRP-139 are satisfied at your facility.
    g)     A list of weld locations controlled by MRP-139 which includes the MRP-139 weld
          category, pre-mitigation volumetric examination date, type of mitigation or stress
                                          -4-                                         Enclosure
 
          improvement, post mitigation volumetric examination date, and plans for future
          MRP-139 required examinations.
A.6 Additional information related to all ISI activities
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
          (e.g., condition reports) entered into your corrective action program since the
          beginning of the last refueling outage. For example, a list based upon data base
          searches using key words related to piping or SG tube degradation such as: ISI,
          ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,
          boric acid, or errors in piping/SGT examinations.
    b)     Please provide names and phone numbers for the following program leads:
          ISI contacts (Examination, planning)
          Containment Exams
          RPVH Exams
          Snubbers and Supports
          Repair and Replacement Program Manager
          Licensing Contact
          Site Welding Engineer
          Boric Acid Corrosion Control Program
          SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 19,
    2010):
B.1 ISI / Welding Programs and Schedule Information
B.1 ISI / Welding Programs and Schedule Information
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.  
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:  
          welding activities, and schedule showing contingency repair plans, if available.
i) Weld data sheet (traveler)  
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above  
          provided from section A of this enclosure, please provide copies of the following
viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed)
          documentation for each subject weld:
  - 6 - Enclosure x) Copies of the preservice examination records for the selected welds. xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
          i)       Weld data sheet (traveler)
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.  
          ii)     Weld configuration and system location
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.  
          iii)     Applicable Code Edition and Addenda for weldment
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
          iv)     Applicable Code Edition and Addenda for welding procedures
f) For the NDEs selected by the inspector from section A of this enclosure, provide a copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic  
          v)       Applicable weld procedures (WPS) used to fabricate the welds
examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE  
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
personnel qualification records.  
                    from B.1.b.v
B.2 Reactor Pressure Vessel Head (RPVH)
          vii)     Copies of mechanical test reports identified in the PQRs above
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.
          viii)   Copies of the nonconformance reports for the selected welds (If
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)  
                    applicable)
i) RPVH and CRDM nozzle configurations ii) RPVH insulation configuration
          ix)     Radiographs of the selected welds and access to equipment to allow
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
                    viewing radiographs (If RT was performed)
c) Copy of NDE reports from the last RPVH examination.  
                                          -5-                                     Enclosure
 
          x)       Copies of the preservice examination records for the selected welds.
          xi)     Copies of welder performance qualifications records applicable to the
                    selected welds, including documentation that welder maintained
                    proficiency in the applicable welding processes specified in the WPS (at
                    least six months prior to the date of subject work)
          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
    c)     For the ISI related corrective action issues selected by the inspector(s) from
          section A of this enclosure, provide a copy of the corrective actions and
          supporting documentation.
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
          selected by the inspector from section A above, provide a copy of the
          examination records, examiner qualification records, and associated corrective
          action documents.
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
          and Plan for the current Interval.
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
          a copy of the NDE procedures used to perform the examinations (including
          calibration and flaw characterization/sizing procedures). For ultrasonic
          examination procedures qualified in accordance with ASME Code, Section XI,
          Appendix VIII, provide documentation supporting the procedure qualification
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
          include qualification documentation of the specific equipment to be used (e.g.,
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
          personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
    a)     Provide the NDE personnel qualification records for the examiners who will
          perform examinations of the RPVH.
    b)     Provide drawings showing the following: (If a visual examination is planned for
          the upcoming refueling outage)
          i)       RPVH and CRDM nozzle configurations
          ii)     RPVH insulation configuration
    The drawings listed above should include fabrication drawings for the nozzle attachment
    welds as applicable.
    c)     Copy of NDE reports from the last RPVH examination.
    d)    Copy of evaluation or calculation demonstrating that the scope of the visual
          examination of the upper head will meet the 95 percent minimum coverage
                                        -6-                                      Enclosure
 
          required by NRC Order EA-03-009 (If a visual examination is planned for the
          upcoming refueling outage).
    e)    Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
    f)    Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
    g)    Provide a copy of the vendor qualification report(s) that demonstrates the
          detection capability of the NDE equipment used for the RPVH examinations.
          Also, identify any changes in equipment configurations used for the RPVH
          examinations which differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)    Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and the overall status of planned boric acid inspections.
    b)    Please provide any engineering evaluations completed for boric acid leaks
          identified since the end of the last refueling outage. Please include a status of
          corrective actions to repair and/or clean these boric acid leaks. Please identify
          specifically which known leaks, if any, have remained in service or will remain in
          service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
    a)    Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
    b)    Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
    c)    Please provide a copy of the ET procedures used to perform the SGT
          inspections (specifically calibration and flaw characterization/sizing procedures,
          etc.). Also include documentation for the specific equipment to be used.
    d)    Please provide copies of your responses to NRC and industry operating
          experience communications such as Generic Letters, Information Notices, etc.
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
          assessment.
    e)    List of corrective action documents generated by the vendor and/or site with
          respect to SG inspection activities.
                                        -7-                                        Enclosure


d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95 percent minimum coverage 
B.5     Codes and Standards
  - 7 - Enclosure required by NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH.  If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations. 
              inspection at the onsite inspection location, or room number and location where
f)  Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.
              available):
g)  Provide a copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations.  Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
B.3 Boric Acid Corrosion Control Program (BACCP)
                      inservice inspection program and the repair/replacement program.
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and the overall status of planned boric acid inspections. 
              ii)     EPRI and industry standards referenced in the procedures used to
                      perform the SGT eddy current examination.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage.  Please include a status of corrective actions to repair and/or clean these boric acid leaks.  Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks. 
Inspector Contact Information:
B.4 Steam Generator Tube (SGT) Inspections
James Adams                   Breck Henderson
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.
Reactor Inspector             Reactor Inspector
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.
817-860-8294                   817-276-6569
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.).  Also include documentation for the specific equipment to be used.
James.Adams@nrc.gov           Breck.Henderson@nrc.gov
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation
Mailing Address:
assessment.
US NRC Region IV
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities. 
Attn: James Adams
  - 8 - Enclosure
612 E. Lamar Blvd, Suite 400
  B.5 Codes and Standards
Arlington, TX 76011-4125
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where  
                                            -8-                                      Enclosure
available):  
i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
ii) EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.  
  Inspector Contact Information:  
James Adams   Breck Henderson    
Reactor Inspector Reactor Inspector   817-860-8294   817-276-6569     James.Adams@nrc.gov Breck.Henderson@nrc.gov     Mailing Address:  
US NRC Region IV Attn: James Adams 612 E. Lamar Blvd, Suite 400 Arlington, TX 76011-4125
}}
}}

Latest revision as of 22:41, 13 November 2019

Notification of Inspection (IR 05000483-10-003) and Request for Information
ML100501614
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/18/2010
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Heflin A
AmerenUE
References
IR-10-003
Download: ML100501614 (13)


See also: IR 05000483/2010003

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

February 18, 2010

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

AmerenUE

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 050000483/2010003) AND REQUEST FOR

INFORMATION

Dear Mr. Heflin:

From April 19 to April 23, 2010, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at the

Callaway Nuclear Power Plant, using NRC Inspection Procedure 71111.08, "Inservice

Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A of

the enclosure) identified information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Steve Petzel of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector James Adams at (817) 860-8294 (James.Adams@nrc.gov) or

Breck Henderson at (817) 276-6569 (Breck.Henderson@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

AmerenUE -2-

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Sincerely,

/RA/

Gregory E. Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Mr. Luke H. Graessle

Director, Operations Support

AmerenUE

P.O. Box 620

Fulton, MO 65251

E. Hope Bradley

Manager, Protective Services

AmerenUE

P.O. Box 620

Fulton, MO 65251

Mr. Scott Sandbothe, Manager

Plant Support

AmerenUE

P.O. Box 620

Fulton, MO 65251

AmerenUE -3-

R. E. Farnam

Assistant Manager, Technical

Training

AmerenUE

P.O. Box 620

Fulton, MO 65251

J. S. Geyer

Radiation Protection Manager

AmerenUE

P.O. Box 620

Fulton, MO 65251

John ONeill, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N. Street, N.W.

Washington, DC 20037

Missouri Public Service Commission

P.O. Box 360

Jefferson City, MO 65102-0360

Dru Buntin

Director of Government Affairs

Department of Natural Resources

P.O. Box 176

Jefferson City, MO 65102-0176

Mr. Rick A. Muench, President and

Chief Executive officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Kathleen Logan Smith, Executive Director and

Kay Drey, Representative, Board of Directors

Missouri Coalition for the Environment

6267 Delmar Boulevard, Suite 2E

St. Louis, MO 63130

Presiding Commissioner

Callaway County Court House

10 East Fifth Street

Fulton, MO 65251

AmerenUE -4-

Director, Missouri State Emergency

Management Agency

P.O. Box 116

Jefferson City, MO 65102-0116

Mr. Scott Clardy, Administrator

Section for Disease Control

Missouri Department of Health and

Senior Services

P.O. Box 570

Jefferson City, MO 65102-0570

Certrec Corporation

4200 South Hulen, Suite 422

Fort Worth, TX 76109

Mr. Keith G. Henke, Planner II

Division of Community and Public Health

Office of Emergency Coordination

Missouri Department of Health and

Senior Services

930 Wildwood Drive

P.O. Box 570

Jefferson City, MO 65102

Chief, Technological Hazards Branch

FEMA Region VII

9221 Ward Parkway, Suite 300

Kansas City, MO 64114-3372

AmerenUE -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (David.Dumbacher@nrc.gov)

Resident Inspector (Jeremy.Groom@nrc.gov)

Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Acting Senior Project Engineer, DRP/B (Peter.Jayroe@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Mohan.Thadani@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Only inspection reports to the following:

DRS/TSB STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

SUNSI Review Completed: ___Y___ ADAMS: 7 Yes No Initials: ____

7 Publicly Available Non-Publicly Available Sensitive 7 Non-Sensitive

ML

RI:EB1 RE:TSB C:PSB2

JAdams BHenderson GEWerner

/RA/ /RA/ /RA/

2/17/10 2/17/10 2/18/10

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: April 19 through April 23, 2010

Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors: James Adams, Reactor Inspector (Lead Inspector - ISI)

Breck Henderson, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com or other electronic format is preferred over hard

copy), in care of James Adams, by April 7, 2010, to facilitate the selection of specific

items that will be reviewed during the onsite inspection week. The inspector will select

specific items from the information requested below and then request from your staff

additional documents needed during the onsite inspection week (Section B of this

enclosure). We ask that the specific items selected from the lists be available and ready

for review on the first day of inspection. *Please provide requested documentation

electronically if possible. If requested documents are large and only hard copy formats

are available, please inform the inspector(s), and provide subject documentation during

the first day of the onsite inspection. If you have any questions regarding this

information request, please call the inspector as soon as possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

-1- Enclosure

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified. (If

applicable)

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

-2- Enclosure

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii) SG secondary side inspection activities for the upcoming outage. (If

occurring)

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

-3- Enclosure

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Materials Reliability (MRP-139) Program Activities

a) A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed or will be completed by

December 31, 2010.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed, then records of previous welding on

DMBWs and postweld NDE documentation should be available for review.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

g) A list of weld locations controlled by MRP-139 which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

-4- Enclosure

improvement, post mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage. For example, a list based upon data base

searches using key words related to piping or SG tube degradation such as: ISI,

ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,

boric acid, or errors in piping/SGT examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 19,

2010):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

-5- Enclosure

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

a copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

-6- Enclosure

required by NRC Order EA-03-009 (If a visual examination is planned for the

upcoming refueling outage).

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide a copy of the vendor qualification report(s) that demonstrates the

detection capability of the NDE equipment used for the RPVH examinations.

Also, identify any changes in equipment configurations used for the RPVH

examinations which differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and the overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

-7- Enclosure

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

James Adams Breck Henderson

Reactor Inspector Reactor Inspector

817-860-8294 817-276-6569

James.Adams@nrc.gov Breck.Henderson@nrc.gov

Mailing Address:

US NRC Region IV

Attn: James Adams

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011-4125

-8- Enclosure