| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 21, 2016 Cheryl A. Gayheart, Vice President Southern Nuclear Operating Company, Inc. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION |
|
| |
|
| Joseph M. Farley Nuclear Plant
| | ==REGION II== |
| | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 21, 2016 Cheryl A. Gayheart, Vice President Southern Nuclear Operating Company, Inc. |
|
| |
|
| 7388 North State Highway 95 | | Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000348/2016405 AND 05000364/2016405 |
| | |
| Columbia, AL 36319 | |
| | |
| SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT | |
| | |
| 05000348/2016405 AND 05000364/2016405 | |
|
| |
|
| ==Dear Ms. Gayheart:== | | ==Dear Ms. Gayheart:== |
| On May 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Joseph M. Farley Plant, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. | | On May 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Joseph M. Farley Plant, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. |
|
| |
|
| The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. | | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. |
|
| |
|
| The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
Line 39: |
Line 34: |
| The NRC inspectors did not identify any findings or violations of more than minor significance. | | The NRC inspectors did not identify any findings or violations of more than minor significance. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390," in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390, in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA: McKenzie Thomas for/ | | /RA: McKenzie Thomas for/ |
| Scott M. Shaeffer, Chief Engineering Branch 2 | | Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-348, 50-364 License No.: NPF-2, NPF-8 Nonpublic Enclosure: |
| | |
| Division of Reactor Safety | |
| | |
| Docket No.: 50-348, 50-364 License No.: NPF-2, NPF-8 Nonpublic Enclosure: | |
| Inspection Report No. 05000348/2016405 and 05000364/2016405 w/ Attachment: Supplementary Information (Official Use Only - Security Related Information) | | Inspection Report No. 05000348/2016405 and 05000364/2016405 w/ Attachment: Supplementary Information (Official Use Only - Security Related Information) |
| cc: (See page 3) | | cc: (See page 3) ___ ________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII: RII: RII: RII: |
| | | SIGNATURE JMM9 via email MJS6 via email MXT2 FOR SMS NAME MONTGOMERY SINGLETARY SHAEFFER DATE 6/16/2016 6/16/2016 6/21/2016 / /2015 / /2015 E-MAIL COPY? YES NO YES NO YES NO YES YES NO YES NO YES NO cc: |
| ___ ________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII: RII: RII: RII: SIGNATURE JMM9 via email MJS6 via email MXT2 FOR SMS NAME MONTGOMERY SINGLETARY SHAEFFER DATE 6/16/2016 6/16/2016 6/21/2016 / /2015 / /2015 E-MAIL COPY? YES NO YES NO YES NO YES YES NO YES NO YES NO cc: Stephen P. McGavin Fleet Security Director | | Stephen P. McGavin Fleet Security Director Southern Nuclear Operating Co., Inc. |
| | |
| Southern Nuclear Operating Co., Inc. | |
| | |
| 40 Inverness Center Parkway, Bin B042
| |
| | |
| Birmingham, AL 35242
| |
| | |
| Michael P. Long, Fleet Nuclear Security Operations Manager
| |
| | |
| Southern Nuclear Operating Co., Inc.
| |
| | |
| 40 Inverness Center Parkway
| |
| | |
| Bin B042 Birmingham, AL 35242
| |
|
| |
|
| Steven M. Shipman
| | 40 Inverness Center Parkway, Bin B042 Birmingham, AL 35242 Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc. |
|
| |
|
| Southern Nuclear Operating Co., Inc. | | 40 Inverness Center Parkway Bin B042 Birmingham, AL 35242 Steven M. Shipman Southern Nuclear Operating Co., Inc. |
|
| |
|
| 40 Inverness Center Parkway Birmingham, AL 35201-1295 | | 40 Inverness Center Parkway Birmingham, AL 35201-1295 |
| }} | | }} |
|
---|
Category:Inspection Report Correspondence
MONTHYEARIR 05000348/20164052016-06-21021 June 2016 NRC Security Target Set Inspection Report 05000348/2016405 and 05000364/2016405: Cover Letter ML0811406982008-04-23023 April 2008 IR 05000348-08-301 and 05000364-08-301, on 04/17/2008, Reactor and Senior Reactor Operator Initial Examinations - Joseph M. Farley Nuclear Plant ML0734802412007-12-10010 December 2007 IR 05000348-08-006 & 05000364-08-006, on 02/26-28/2008 & 03/17-21/2008 and 03/31-04/04/2008, Southern Nuclear Operating Co. Inc Notification of Triennial Fire Protection Baseline Inspection IR 05000348/20075012007-10-12012 October 2007 IR 05000348-07-501, 05000364-07-501, on 09/10-14/2007, Joseph M. Farley Nuclear Plant, Baseline Inspection IR 05000348/20052042007-10-0303 October 2007 Letter to Mr. R. Johnson Joseph M. Farley Nuclear Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report Nos. 5000348/2005204 and 05000364/2005204 IR 05000348/20070032007-07-30030 July 2007 IR 05000348-07-003 and 05000364-07-003, on 04/01/2007 - 06/30/2007, Joseph M. Farley Nuclear Plant, Units 1 & 2, Routine Integrated Report IR 05000348/20074012007-03-30030 March 2007 NRC Security Inspection Report 05000348/2007401 and 05000364/2007401 ML0633300552006-11-28028 November 2006 Notification of Inspection and Request for Information IR 05000348/20060072006-09-27027 September 2006 IR 05000348/2006007 and 05000364/2006007 - Safeguards Information Removed IR 05000348/20060062006-09-22022 September 2006 IR 05000348-06-006, IR 05000364-06-006, on 06/26 - 08/18/2006, Joseph M. Farley Nuclear Plant IR 05000348/20010072001-06-21021 June 2001 IR 05000348/2001007 and 05000364/2001007, Southern Nuclear Operating Company, Inc., Farley Nuclear Plant 2016-06-21
[Table view] Category:Letter
MONTHYEARIR 05000348/20240032024-11-13013 November 2024 Integrated Inspection Report 05000348/2024003, 05000364/2024003 and 07200042/2024001 IR 05000348/20244032024-11-13013 November 2024 – Security Baseline Inspection Report 05000348/2024403 & 05000364/2024403 NL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 21, 2016 Cheryl A. Gayheart, Vice President Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000348/2016405 AND 05000364/2016405
Dear Ms. Gayheart:
On May 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Joseph M. Farley Plant, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390, in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA: McKenzie Thomas for/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-348, 50-364 License No.: NPF-2, NPF-8 Nonpublic Enclosure:
Inspection Report No. 05000348/2016405 and 05000364/2016405 w/ Attachment: Supplementary Information (Official Use Only - Security Related Information)
cc: (See page 3) ___ ________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII: RII: RII: RII:
SIGNATURE JMM9 via email MJS6 via email MXT2 FOR SMS NAME MONTGOMERY SINGLETARY SHAEFFER DATE 6/16/2016 6/16/2016 6/21/2016 / /2015 / /2015 E-MAIL COPY? YES NO YES NO YES NO YES YES NO YES NO YES NO cc:
Stephen P. McGavin Fleet Security Director Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway, Bin B042 Birmingham, AL 35242 Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway Bin B042 Birmingham, AL 35242 Steven M. Shipman Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway Birmingham, AL 35201-1295