Category:Inspection Report
MONTHYEARIR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation IR 05000348/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 IR 05000348/20234402023-05-0505 May 2023 Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover IR 05000348/20230012023-05-0404 May 2023 Integrated Inspection Report 05000348/2023001 and 05000364/2023001 IR 05000348/20230112023-04-13013 April 2023 Biennial Problem Identification and Resolution Inspection Report 05000348/2023011 and 05000364/2023011 IR 05000348/20234012023-03-31031 March 2023 Security Baseline Inspection Report 05000348/2023401 and 05000364/2023401 IR 05000348/20220062023-03-0101 March 2023 Annual Assessment Letter for Joseph M. Farley Nuclear Plant, Units 1 and 2 Report 05000348/2022006 and 05000364/2022006 IR 05000348/20220112023-02-16016 February 2023 NRC Inspection Report 05000348/2022011 IR 05000348/20220902023-02-16016 February 2023 NRC Inspection Report 05000348/2022090 IR 05000348/20220042023-01-23023 January 2023 Integrated Inspection Report 05000348/2022004 and 05000364/2022004 ML22343A0382022-12-13013 December 2022 Notification of Joseph M. Farley Nuclear Plant Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 IR 05000348/20224042022-11-29029 November 2022 Security Baseline Inspection Report 05000348/2022404 and 05000364/2022404 IR 05000348/20224402022-11-0707 November 2022 Special Inspection Report 05000348/2022440 and 05000364/ 2022440 and Preliminary Greater than Green Finding and and Apparent Violation (Cover Letter) IR 05000348/20220032022-10-28028 October 2022 Integrated Inspection Report 05000348/2022003 and 05000364/2022003 IR 05000348/20220502022-09-30030 September 2022 Special Inspection Reactive Report 05000348/2022050 and Apparent Violation IR 05000348/20220052022-08-24024 August 2022 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2022005 and 05000364/2022005 IR 05000348/20220022022-08-12012 August 2022 Integrated Inspection Report 05000348/2022002 and 05000364/2022002 ML22214B8262022-08-0404 August 2022 Security Baseline Inspection Report 05000348/2022403 and 05000364/2022403 IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 IR 05000348/20224022022-07-26026 July 2022 Security Baseline Inspection Report 05000348/2022402 and 05000364/2022402 IR 05000348/20224012022-05-0606 May 2022 Cyber Security Inspection Report 05000348/2022401 and 05000364/2022401 IR 05000348/20220012022-05-0404 May 2022 Integrated Inspection Report 05000348/2022001 and 05000364/2022001 IR 05000348/20220102022-03-22022 March 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000348/2022010 and 05000364/2022010 IR 05000348/20210062022-03-0202 March 2022 Annual Assessment Letter for Joseph M. Farley Nuclear Plant Units 1 and 2 (Report No. 05000348/2021006 and 05000364/2021006) IR 05000348/20210042022-02-0808 February 2022 Integrated Inspection Report 05000348/2021004 and 05000364/2021004 IR 05000348/20210112021-12-13013 December 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000348/2021011 and 05000364/2021011 ML21347A4422021-12-13013 December 2021 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000348/2022401; 05000364/2022401 IR 05000348/20214032021-12-0202 December 2021 Security Baseline Inspection Report 05000348/2021403 and 05000364/2021403 IR 05000348/20210032021-11-10010 November 2021 Integrated Inspection Report 05000348/2021003, 05000364/2021003, and 07200042/2021001 IR 05000348/20214022021-09-15015 September 2021 Security Baseline Inspection Report 05000348/2021402 and 05000364/2021402 IR 05000348/20210052021-08-24024 August 2021 Updated Inspection Plan for Joseph M. Farley Nuclear Plant Units 1 and 2 (Report 05000348/2021005 and 05000364/2021005) IR 05000348/20213012021-08-18018 August 2021 NRC Operator License Examination Report 05000348/2021301 and 05000364/2021301 IR 05000348/20210022021-07-30030 July 2021 Integrated Inspection Report 05000348/2021002 and 05000364/2021002 and Exercise of Enforcement Discretion IR 05000348/20210122021-07-19019 July 2021 Triennial Fire Protection Team Inspection (FPTI) Report 05000348/2021012 and 05000364/2021012 IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 IR 05000348/20210012021-05-0404 May 2021 Integrated Inspection Report 05000348/2021001 and 05000364/2021001 IR 05000348/20214012021-04-0606 April 2021 Security Baseline Inspection Report 05000348/2021401 and 05000364/2021401 IR 05000348/20210102021-04-0505 April 2021 Biennial Problem Identification and Resolution Inspection Report 05000348/2021010 and 05000364/2021010 IR 05000348/20200062021-03-0303 March 2021 Annual Assessment Letter for Joseph M. Farley Nuclear Plant - Report 05000348/2020006 and 05000364/2020006 IR 05000348/20200042021-02-11011 February 2021 Integrated Inspection Report 05000348/2020004 and 05000364/2020004 and Independent Spent Fuel Storage Installation Report 07200042/2020003 IR 05000348/20200102021-01-14014 January 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000348/2020010 and 05000364/2020010 IR 05000348/20204032020-12-23023 December 2020 Security Baseline Inspection Report 05000348/2020403 and 05000364/2020403 2024-01-24
[Table view] Category:Inspection Report Correspondence
MONTHYEARIR 05000348/20164052016-06-21021 June 2016 NRC Security Target Set Inspection Report 05000348/2016405 and 05000364/2016405: Cover Letter ML0811406982008-04-23023 April 2008 IR 05000348-08-301 and 05000364-08-301, on 04/17/2008, Reactor and Senior Reactor Operator Initial Examinations - Joseph M. Farley Nuclear Plant ML0734802412007-12-10010 December 2007 IR 05000348-08-006 & 05000364-08-006, on 02/26-28/2008 & 03/17-21/2008 and 03/31-04/04/2008, Southern Nuclear Operating Co. Inc Notification of Triennial Fire Protection Baseline Inspection IR 05000348/20075012007-10-12012 October 2007 IR 05000348-07-501, 05000364-07-501, on 09/10-14/2007, Joseph M. Farley Nuclear Plant, Baseline Inspection IR 05000348/20052042007-10-0303 October 2007 Letter to Mr. R. Johnson Joseph M. Farley Nuclear Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report Nos. 5000348/2005204 and 05000364/2005204 IR 05000348/20070032007-07-30030 July 2007 IR 05000348-07-003 and 05000364-07-003, on 04/01/2007 - 06/30/2007, Joseph M. Farley Nuclear Plant, Units 1 & 2, Routine Integrated Report IR 05000348/20074012007-03-30030 March 2007 NRC Security Inspection Report 05000348/2007401 and 05000364/2007401 ML0633300552006-11-28028 November 2006 Notification of Inspection and Request for Information IR 05000348/20060072006-09-27027 September 2006 IR 05000348/2006007 and 05000364/2006007 - Safeguards Information Removed IR 05000348/20060062006-09-22022 September 2006 IR 05000348-06-006, IR 05000364-06-006, on 06/26 - 08/18/2006, Joseph M. Farley Nuclear Plant IR 05000348/20010072001-06-21021 June 2001 IR 05000348/2001007 and 05000364/2001007, Southern Nuclear Operating Company, Inc., Farley Nuclear Plant 2016-06-21
[Table view] Category:Letter
MONTHYEARML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information ML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation ML23221A3062023-08-0909 August 2023 Notification of NRC Supplemental Inspection (95002) and Request for Information (Cover Letter) NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0620, ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use2023-08-0303 August 2023 ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23175A0042023-07-27027 July 2023 Closeout Letter to Southern Nuclear Operating Company Regarding 2017, 2010 and 2023 Updated DFPs for Hatch, Vogtle, and Farley ISFSIs NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis IR 05000348/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal ML23164A2182023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Letter NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23116A1332023-05-18018 May 2023 Cover Letter to State of AL on Draft EA Regarding Farley ISFSI Updated DFP NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 IR 05000348/20234402023-05-0505 May 2023 Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover 2024-01-30
[Table view] |
Text
November 28, 2006 Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner Vice President P. O. Box 1295 Birmingham, AL 35201
SUBJECT:
FARLEY NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Sumner:
During the period of January 22 - 26, 2007 the NRC will conduct baseline radiation safety inspection activities at the Farley Nuclear Plant. The inspection will focus on the Public Radiation Safety Inspection cornerstone using NRC Inspection Procedures (IPs) 71121.03, 71122.01, 71122.03; and will include the Radiation Safety sections of IPs 711551 and 60855.1.
The inspectors also will complete the annual review of radiation protection activities associated with access controls to radiologically significant areas as outlined in IP 71121.01.
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three day pre-inspection visit with your staff for the January 03 - 05, 2007 period. The requested material will be reviewed and collected at that time.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory on-site contact for this inspection will be Mr. Rodrick Bayne of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 562-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
SNC 2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/
reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-348, 50-364, and 72-42 License Nos. NPF-2 and NPF-8
Enclosure:
Public Radiation Protection Inspection Document Request cc w/encl:
B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. R. Johnson General Manager, Farley Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bentina C. Terry Southern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 (cc contd - See page 3)
SNC 3 (cc contd)
State Health Officer Alabama Department of Public Health RSA Tower - Administration 201 Monroe St., Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution Distribution w/encl:
R. Martin, NRR RIDSNRRDIRS PUBLIC
PUBLIC RADIATION PROTECTION INSPECTION DOCUMENT REQUEST SITE: Farley Nuclear Plant (FNP) Rpt. 05000348, 364/2007002 PRE-INSPECTION VISIT: January 03-05, 2007 INSPECTION DATES: January 22-26, 2007, NRC INSPECTORS: George B. Kuzo, GBK1@NRC.GOV (404) 562-4658 Ruben Hamilton, RKH@NRC.GOV (404) 562-4672 Adam Nielsen, ADN@NRC.GOV (404) 562-4660 N. Jeff Griffis, NJG1@NRC.GOV (404) 562-4737 PRELIMINARY LICENSEE CONTACTS: Paul Harlos, RPM (334) 814-4785) or M. Graves (ext 4601) for Access Controls Portable Instruments/SCBA; Tony Livingston Chem Manager (ext 4619) for Effluents/ Process Monitors and REMP; and R. Bayne for onsite Licensing/
Compliance Inspection Procedures: IP 71121.01 Access Control To Radiologically Significant Areas IP 71121.03 Radiation Monitoring Instrumentation and Protective Equipment, IP 71122.01 Radioactive Gases and Liquid Effluent Treatment
& Monitoring Systems IP 71122.03 Radiological Environmental Monitoring Program IP 71151 Performance Indicator Verification for Occupational and Public Radiation Safety Cornerstones IP 60855.1 Operation of an ISFSI at Operating Plants Note: This is a broad list of the documents the lead NRC inspector will be interested in reviewing and obtaining during the pre-inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word, WordPerfect, or searchable .pdf files on CD-ROM. Please provide 3 copies of each CDROM that is submitted.) Information in the document lists should contain enough information to be easily understood by someone who has a knowledge of the subject. The lead inspector will discuss specific information needs with the licensee staff and may request additional documents.
ISFSI Activities [60855.1] Note: this area may be reviewed during the pre-inspection visit
- Provide the following Procedure/Guidance documents for:
- access controls and surveillances associated with Independent Spent Fuel Storage Installation (ISFSI) area activities Enclosure
2
- Provide Records/Documentation for:
- results of Routine ISFSI Surveys and Monitoring for Calendar Year (CY) 2006
- CR issues associated with, or potentially affecting ISFSI radiological conditions and measurements since January 2006 ACCESS CONTROLS TO RADIOLOGICALLY SIGNIFICANT AREAS [71121.01]
- Provide List/Maps of:
N current Radiation Area (RA) High Radiation Area (HRA), Locked- HRA (LHRA), Very
-HRA (VHRA), and airborne radioactivity area locations. Note: only provide general area maps of elevations identifying rooms with HRA/LHRA/VHRA conditions. Detailed maps of specific rooms/areas are not needed
- Provide Procedure/Guidance documents for:
N administrative and physical access controls including posting, labeling, survey frequency, dosimetry, multi-badging, LHRA key control, control of divers, controls for non-fuel highly activated materials stored in Spent Fuel Pool (SPF), direct alarming dosimetry (DAD) use, Radiation Work Permit (RWP) development
- Provide Corrective Action Program (CAP) documents including:
N listing of Condition Reports (CRs) issued/documented since January 2006 for radiation protection program activities including access control/personnel contamination events, and intakes N Audit and self assessments conducted/issued since January 2006 for radiation protection program activities
- Provide list of scheduled work in HRAs, LHRAs, VHRAs, airborne radioactivity areas tentatively scheduled for the week of onsite inspection (January 22 - 26, 2007)
- Identify list of infrequently performed tasks or tasks potentially involving LHRA/VHRA condition completed since October 2006_
- Provide the Following Records/Evaluations N List 10 maximum personnel exposures for Calendar Years (CY) 2006 and Year-to-Date (YTD) 2007 N List of internal dose assessments (with assigned dose) for intakes since January 2006 N List of Personnel Contamination Assessments conducted since January 2006 - general list, not details RADIATION PROTECTION INSTRUMENTATION AND PROTECTIVE EQUIPMENT
[71121.03]
- IF PASS capabilities have been modified through license amendment, provide copy of amendment and applicable SER
- Provide Procedures/Guidance for:
N operation, calibration, maintenance of ARM, CAM, Portal Monitor (PM), Personnel Contamination Monitor (PCM), Small Article Monitor (SAM), and Whole Body Counter (WBC) equipment, N issuance/operation of portable survey instruments N calibration and maintenance of portable instruments (ion chamber, GM, rem-ball etc) performed on site N identify any portable radiation detection instruments sent to vendor facilities for calibration Enclosure
3 N actions taken when portable instrument found to be significantly out of tolerance/calibration N issuance and use of respiratory protective equipment (SCBA and Air Supplied equipment)
N training for use of SCBA and supplied-air systems N SCBA maintenance activities N determination/verification of Grade D air for SCBA
- Provide the two most recent calibration records for the following ARM/CAM equipment:
N Unit 1 (U1) Control Room Monitor (R-1A)
N U1 Control Room Makeup Air Inlet Monitor (R-35A)
N U1 Containment High Radiation Monitor (R-27B)
N U2 Charging Pump Room (R-4)
N U2 Incore Instrument Area (R-7)# Provide most current DAW 10 CFR Part 61 analytical results
- Provide Records/Documentation for:
N data for certification of air quality for equipment used to fill SCBA or supply air-line respiratory equipment: provide data from July 2005 to present N current WBC equipment calibration
- CAP documents including N listing of CR documents issued/documented since July 2005 for:
- portable instrumentation, SAM, PCM, PM, and WBC monitoring equipment
- respiratory protection equipment and program implementation N audit and self assessments conducted/issued since July 2005 for:
- portable instruments, SAM, PCE, PM, and WBC monitoring equipment
- respiratory protection equipment and program implementation During on-site inspection:
- Records - will need rapid access to the following:
N calibration records for portable instruments staged for/in use N calibration records for PCM, PM, SAM equipment N training records for individuals approved to use and/or to perform maintenance on SCBA equipment N qualification records for respirator use (training, fit test, medical)
RADIOLOGICAL EFFLUENT MONITORING [71122.01]
Prior to the Onsite Inspection
- Provide Copy of Current ODCM
- Annual Effluent Monitoring Reports for Calendar Year (CY) 2004, & CY 2005
- Provide Procedures/Guidance for:
N procedures and data (including flow meter cals) for the two most recent calibrations of the following effluent monitors:
- U1 Plant Vent Gas (R-14)
- U1 Plant Vent Particulate (R-21)
- U1 Plant Vent Gas (R-22)
- U2 Waste Processing Liquid Monitor (R-18)
Enclosure
4
- U2 Containment Purge Monitor (R-24A)
- Flow Calibration Instrumentation Calibration for U1& U2 Plant Vent N HP/Chem/OP procedures for liquid and gaseous effluent releases/permits
- Provide Procedures/Guidance/Documentation for :
N onsite/offsite surface/groundwater monitoring activities N action plan developed for groundwater protection initiative N documenting events associated with spills, leaks, or unexpected liquid discharge or other unusual occurrence
- Provide Records for:
N modifications/design changes made since July 2005 to any effluent monitoring/
sampling systems; or to plant ventilation systems N the two most recent calibrations of the effluent monitors listed above, including flow meter calibrations N list of time periods for which main liquid/gaseous effluent monitors were out-of-service (OOS) and the duration since July 2005. Note: exclude monitors OOS less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> N interlaboratory comparison program results since July 2005 N most recent continuous gas and/or liquid release permits and most recent batch liquid and gas permits (4 permits total)
N two most recent surveillances of the air cleanup system for the routine main plant airborne effluent release pathway including flow rate determination, HEPA and Charcoal efficiency data
- Provide summary of spill, leak, unexpected liquid discharge data documented in the sites 10 CFR 50.75(g) files. Note: Only provide summary, 50.75(g) file details can be reviewed during onsite inspection
- CAP documents including N listing of CRs issued since July 2005 for:
- effluent monitoring/processing and equipment
- air cleanup systems
- onsite System Structure and Component liquid leaks or H-3 in ground and/or surface runoff water samples N audits and self assessments conducted/issued since July 2005 for:
- effluent monitoring activities and equipment
- air cleanup systems
- groundwater monitoring/contamination During on-site inspection:
- Records - will need rapid access to the following:
N calibration of count room gamma spectroscopy and liquid scintillation counting instrumentation used for effluents: Note: data sample to be selected during onsite inspection N count room instrument/effluent monitoring QA activities: Note: data sample to be selected during onsite inspection Enclosure
5 RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM (REMP) [71122.03]
Prior to the Onsite Inspection
- Provide Procedures/Guidance for :
N collection and analysis of environmental samples N calibration and maintenance of REMP air & water samplers N calibration of meteorological monitoring instrument loops (wind speed & direction, air temperature sensors currently in use)
N meteorological instrumentation surveillance requirements (control room & tower locations)
N RCA control/release point radiation survey instrumentation surveillance requirements N unrestricted release of materials from the RCA control points
- Records for two most recent:
N calibrations of REMP air and water samplers (if applicable)
N meteorological monitoring instrument calibrations (wind speed & direction, air temperature)
N detailed inter-laboratory comparison program results since July 2005
- CAP documents including:
N list of CRs issued/documented since July 2005 for:
- environmental monitoring
- meteorological monitoring
- unrestricted release of material from RCA locations
- abnormal/missed REMP samples for CYs 2005 and 2006, and YDT 2007 N audit and self assessments conducted/issued since July 2005 for:
- environmental monitoring
- meteorological monitoring
- unrestricted release of material from RCA locations N Records of any investigations done for material found offsite since July 2005
- Annual Radiological Environmental Monitoring Reports for CYs 2004, and 2005 PI VERIFICATION [71151]
- Procedure/Guidance for collection and reporting of PI data.
- Records:
- CRs related to occupational and public radiation safety PI occurrences issued since April 2006
- Monthly/Quarterly PI reports since April 2006
- DAD Alarm Logs Since April 2006
- List of Out of Service (OOS) Effluent Monitors and Length of Inoperability since April 2006.
GENERAL INFORMATION NEEDED
- Organization Charts and Contact Phone Numbers for:
- Radiation Protection
- Chemistry
- Operations
- Maintenance and I&C Enclosure
6
- Procedure for issuing CRs and assessing issues for significance and action.
- Updated Final Safety Analysis Report Chapters 11 (Effluents/Radwaste) and 12 Radiation Protection Enclosure
OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME KUZO SHAEFFER BONSER DATE 11/27/2006 11/27/2006 11/28/2006 11/ /2006 11/ /2006 11/ /2006 11/ /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO