ML073480241

From kanterella
Jump to navigation Jump to search
IR 05000348-08-006 & 05000364-08-006, on 02/26-28/2008 & 03/17-21/2008 and 03/31-04/04/2008, Southern Nuclear Operating Co. Inc Notification of Triennial Fire Protection Baseline Inspection
ML073480241
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/10/2007
From: Payne D
NRC/RGN-II/DRS/EB2
To: Jerrica Johnson
Southern Nuclear Operating Co
References
IR-08-006
Download: ML073480241 (8)


See also: IR 05000348/2008006

Text

December 10, 2007

Southern Nuclear Operating Company, Inc.

ATTN: Mr. J. Randy Johnson

Vice President - Farley

Joseph M. Farley Nuclear Plant

7388 North State Highway 95

Columbia, AL 36319

SUBJECT: NOTIFICATION OF TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT 05000348/2008006 AND 05000364/2008006)

Dear Mr. Johnson:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection at the Joseph M. Farley

Nuclear Plant, Units 1 and 2, in March and April 2008. The inspection team will be led by Mr.

Norman Merriweather, NRC Senior Reactor Inspector, of the Region II Office. The team will be

composed of personnel from the NRC Region II Office. The inspection will be conducted in

accordance with the NRCs baseline fire protection inspection procedure 71111.05T.

The inspection objective will be to evaluate your fire protection program implementation with

emphasis on post-fire safe shutdown capability and the fire protection features provided to

ensure at least one post-fire safe shutdown success path is maintained free of fire damage.

The inspection team will focus their review on the separation of the systems and equipment

necessary to achieve and maintain safe shutdown and the fire protection features of selected

fire areas.

On December 3, 2007, during a telephone conversation between Mr. Doug McKinney,

Licensing Supervisor, and Mr. Merriweather, our respective staffs confirmed arrangements for a

three-day information gathering onsite visit and a two-week onsite inspection. The schedule for

the inspection is as follows:

  • Information gathering visit: February 26 - 28, 2008
  • Week 1 of onsite inspection: March 17 - 21, 2008
  • Week 2 of onsite inspection: March 31 - April 4, 2008

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, and to become familiar with the Farley Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities and plant

layout. The types of documents the team will be interested in reviewing, and possibly obtaining,

are listed in the Enclosure.

Please contact Mr. Merriweather prior to preparing copies of the materials listed in the

Enclosure. The inspection team will try to minimize your administrative burden by specifically

identifying those documents required for inspection preparation.

SNC 2

During the information gathering visit, the team will also discuss the following inspection support

administrative details - office space; specific documents to be made available to the team in its

office space; arrangements for reactor site access (including radiation protection training,

security, safety and fitness for duty requirements); and the availability of knowledgeable plant

engineering and licensing organization personnel to serve as points of contact during the

inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the Farley Nuclear Plant fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for its review. Of specific interest are those documents which establish that your fire

protection program satisfies NRC regulatory requirements and conforms to applicable NRC and

industry fire protection guidance. Also, personnel should be available at the site during the

inspection who are knowledgeable regarding those plant systems required to achieve and

maintain safe shutdown conditions from inside and outside the control room (including the

electrical aspects of the relevant post-fire safe shutdown analyses), reactor plant fire protection

systems and features, and the Farley Nuclear Plant fire protection program and its

implementation.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Merriweather at (404) 562-4627, or me at (404) 562-4669.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

D. Charles Payne, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-348 and 50-364

License Nos.: NPF-2 and NPF-8

Enclosure: Triennial Fire Protection Inspection Support Documentation

cc w/encl:

Mr. B. D. McKinney, Licensing Manager

Southern Nuclear Operating

Company, Inc.

Electronic Mail Distribution

(cc w/encl contd - See next page)

SNC 3

(cc w/encl contd)

Mr. Jeffrey T. Gasser

Executive Vice President

Southern Nuclear Operating

Company, Inc.

Electronic Mail Distribution

Mr. M. Stanford Blanton

Balch and Bingham Law Firm

Electronic Mail Distribution

Dr. D. E. Williamson

State Health Officer

Alabama Department of Public Health

Electronic Mail Distribution

Mr. William D. Oldfield, SAER Supervisor

Joseph M. Farley Nuclear Plant

Electronic Mail Distribution

Mr. Mark Culver, Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

David H. Jones

Vice President - Engineering

Southern Nuclear Operating Company, Inc.

P.O. Box 1295

Birmingham, AL 35201-1295

Moanica Caston

Southern Nuclear Operating Company, Inc.

Bin B-022

P. O. Box 1295

Birmingham, AL 35201-1295

L. M. Stinson, Vice President,

Fleet Operations Support

Southern Nuclear Operating Company, Inc.

11028 Hatch Parkway North

Baxley, GA 31513

Distribution w/encl: (See next page)

SNC 4

Distribution w/encl:

K. Cotton, NRR

RIDSNRRDIRS

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

7388 N State Hwy 95

Columbia, AL 36319

_________________________

OFFICE RII:DRS RII:DRP

SIGNATURE RA RA

NAME MERRIWEATHER SHAFFER

DATE 12/05/2007 12/10/2007 12/ /2007 12/ /2007 12/ /2007 12/ /2007 12/ /2007

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 3

Note: This is a broad list of the documents the NRC inspection team may be interested

in reviewing, and possibly obtaining, during the information gathering site visit. The

current version of these documents is expected unless specified otherwise. Electronic

media is preferred, if readily available. (The preferred file format is searchable .pdf

files on CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of

use. Please provide 5 copies of each CDROM submitted.) Information in lists should

contain enough information to be easily understood by someone who has a knowledge

of the technology. The lead inspector will discuss specific information needs with the

licensee staff and may request additional documents.

1. The Fire Protection Program document and the Fire Hazards Analysis.

2. The fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

3. The fire brigade training program document and the pre-fire plans for the selected fire

areas/zones (to be determined during information gathering visit).

4. The post-fire safe shutdown analysis, including system and separation analyses.

5. The alternative shutdown analysis.

6. Piping and instrumentation (flow) diagrams for the fire suppression systems.

7. Piping and instrumentation (flow) diagrams for the systems and components used to

achieve and maintain hot standby, and cold shutdown, for fires involving shutdown from

the control room.

8. Piping and instrumentation (flow) diagrams for the systems and components used to

achieve and maintain hot standby, and cold shutdown, for fires in areas requiring

alternative or dedicated shutdown capability.

9. Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment.

10. Plant layout drawings which identify plant fire area and/or fire zone delineation, areas

protected by automatic fire suppression and detection, and the locations of fire

protection equipment for the selected fire areas/zones (to be determined during

information gathering visit).

11. Plant layout drawings which identify the general location of the post-fire emergency

lighting units.

12. Plant operating procedures used to, and describing, shutdown from inside the control

room with a postulated fire occurring in any plant area outside the control room.

Enclosure

3

13. Plant operating procedures used to implement the alternative shutdown capability from

outside the control room with a fire in either the control or cable spreading room (or any

other alternative shutdown area).

14. Maintenance and surveillance testing procedures for alternative shutdown capability

(including Appendix R emergency lights and communication systems) and fire barriers,

detectors, fire pumps and fire suppression systems.

15. Calculations and/or justifications that verify fuse/breaker coordination for the selected

fire areas/zones (to be determined during information gathering visit) that are fed off the

same electrical buses as components in the protected train. Also, a list of the

maintenance procedures used to routinely verify fuse/breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

16. A list of the significant fire protection and post-fire safe shutdown design change

descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter

(GL) 86-10 evaluations.

17. A list of the protection methodologies (as identified in 10 CFR Part 50, Appendix R,

Section III.G) used to achieve regulatory compliance for the selected fire areas/zones

(to be determined during information gathering visit). That is, please specify whether 3-

hour rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and

suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression

(Section III.G.2.c), or alternative shutdown capability (Section III.G.3) is used for the

selected fire areas/zones.

18. Procedures or instructions that govern the implementation of plant modifications,

temporary modifications, maintenance, and special operations, and their impact on fire

protection.

19. Organization chart(s) of site personnel down to the level of the fire protection staff.

20. Procedures or instructions that control the configuration of the fire protection program,

features, and post-fire safe shutdown methodology and system design.

21. A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations (i.e., a listing of the NFPA code editions

committed to (Code of Record)).

22. The three most recent fire protection QA audits and/or fire protection self-assessments.

23. A list of open and closed fire protection problem identification and resolution reports

[also known as action reports/condition reports/problem reports/problem investigation

reports/NCRs/EARs] associated with fire protection or Appendix R safe shutdown for the

past three years.

Enclosure

3

24. A list of plant fire protection licensing basis documents (i.e., a list of the SERs and

change evaluations which form the licensing basis for the facilitys post-fire safe

shutdown configuration).

25. A list of fire protection or Appendix R calculations.

26. A list of fire impairments identified during the previous year.

27. A list of abbreviations/designators for plant systems.

Enclosure