ML061420328: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML061420328
| number = ML061420328
| issue date = 05/16/2006
| issue date = 05/16/2006
| title = Ltr 05/16/2006 Kewaunee Requalification Program Inspection
| title = 06 Kewaunee Requalification Program Inspection
| author name = Peterson H
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:May 16, 2006Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
{{#Wiki_filter:May 16, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711


==SUBJECT:==
==SUBJECT:==
Line 22: Line 22:
==Dear Mr. Christian:==
==Dear Mr. Christian:==


In a telephone conversation on May 1, 2006, Mr. Dell McNeil, Senior Operations Engineer, andMr. S. P. Johnson, Senior Instructor, Nuclear, made arrangements for the NRC to inspect thelicensed operator requalification program at the Kewaunee Nuclear Power Station. Theinspection is planned for the week of July 24, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare andconduct the requalification examinations in accordance with your NRC-approved requalificationprogram.This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office ofManagement and Budget, approval number 3150-0018, which expires on June 30, 2006.The public reporting burden for this collection of information is estimated to average 4 hours perresponse, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to theDesk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.The NRC may not conduct or sponsor, and a person is not required to respond to, a collectionof information unless it displays a currently valid OMB control number.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMSis accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).
In a telephone conversation on May 1, 2006, Mr. Dell McNeil, Senior Operations Engineer, and Mr. S. P. Johnson, Senior Instructor, Nuclear, made arrangements for the NRC to inspect the licensed operator requalification program at the Kewaunee Nuclear Power Station. The inspection is planned for the week of July 24, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
D. Christian-2-Thank you for your cooperation in this matter. If you have any questions regarding thisinspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9707.Sincerely,/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket No. 50-305License No. DPR-43cc:M. Gaffney, Site Vice PresidentC. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks III, Training Department D. Christian-2-Thank you for your cooperation in this matter. If you have any questions regarding thisinspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9707.Sincerely,/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket No. 50-305License No. DPR-43cc:M. Gaffney, Site Vice PresidentC. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks III, Training DepartmentDOCUMENT NAME:  E:\Filenet\ML061420328.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copyOFFICERIIIRIIINAMEDMcNeil:coPPetersonDATE05/11/0605/16/06OFFICIAL RECORD COPY D. Christian-3-ADAMS Distribution
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
:JLD JFS2 RidsNrrDirsIrib
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


GEG KGO SXB3 CAA1 DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS}}
D. Christian                                  Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9707.
Sincerely,
                                            /RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:    M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks III, Training Department
 
D. Christian                                                                  Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9707.
Sincerely,
                                                                          /RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:          M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks III, Training Department DOCUMENT NAME: E:\Filenet\ML061420328.wpd G Publicly Available                        G Non-Publicly Available                  G Sensitive              G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII                                            RIII NAME DMcNeil:co                                        PPeterson DATE            05/11/06                              05/16/06 OFFICIAL RECORD COPY
 
D. Christian        ADAMS Distribution:
JLD JFS2 RidsNrrDirsIrib GEG KGO SXB3 CAA1 DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS}}

Latest revision as of 19:19, 23 November 2019

06 Kewaunee Requalification Program Inspection
ML061420328
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/16/2006
From: Hironori Peterson
NRC/RGN-III/DRS/OLB
To: Christian D
Dominion Energy Kewaunee, Nuclear Management Co
References
Download: ML061420328 (4)


Text

May 16, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Christian:

In a telephone conversation on May 1, 2006, Mr. Dell McNeil, Senior Operations Engineer, and Mr. S. P. Johnson, Senior Instructor, Nuclear, made arrangements for the NRC to inspect the licensed operator requalification program at the Kewaunee Nuclear Power Station. The inspection is planned for the week of July 24, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

D. Christian Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks III, Training Department

D. Christian Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Dell McNeil at 630-829-9737, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks III, Training Department DOCUMENT NAME: E:\Filenet\ML061420328.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DMcNeil:co PPeterson DATE 05/11/06 05/16/06 OFFICIAL RECORD COPY

D. Christian ADAMS Distribution:

JLD JFS2 RidsNrrDirsIrib GEG KGO SXB3 CAA1 DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS